Commercial Ground Loop Water Source Heat Pump Systems Presented by Alan Niles Commercial Regional Sales Manager WaterFurnace International Other Names for Ground Loop Systems Geothermal Ground Source Ground Coupled GeoExchange

Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Commercial Ground LoopWater Source Heat Pump Systems

Presented byAlan NilesCommercial Regional Sales ManagerWaterFurnace International 

Other Names for Ground Loop Systems

GeothermalGround SourceGround CoupledGeoExchange

Page 2: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Why a Ground Loop Heat Pump System

Tax Incentives

Lower Operating Costs

Lower Life Cycle Costs

Lower Maintenance Costs

Why a Ground Loop Heat Pump System

Tax Incentives

Lower Operating CostsNeed Building Loads and Ground Loop Design Software for Monthly Average Water Temperatures

Lower Life Cycle CostsNeed Ground Loop Installed Cost

Lower Maintenance Costs

Page 3: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Tax Credits:  with no limit – until 1/1/2017

Energy Property Tax Credit: 10% of total system cost with no limit10% grant available in lieu of tax creditCombine with solar and wind tax credits

2010 IRS Form 3468   Investment Credit 

Part III, LINE 12 r Energy credit:  Geothermal heat pump systems

Basis of property placed in service during the tax year that was acquired after October 3, 2008, and the basis attributable to construction, reconstruction, or erection by the taxpayer after October 3, 2008 ..............$____________ × 10% (.10)

Federal Tax Incentives for Commercial GLHP Systems

Tax Deductions:

Energy Efficient Commercial Building Property Tax Deduction:   ($1.80 per Sq Ft)Combine with other Qualified Section 179 Real Property Deductions

A software model of 3 installed components:1) the building envelop2) the indoor lighting3) the HVAC and hot water system

compared to the minimum ASHRAE 90.1‐2001 design.  Combined, the 3 components must reduce energy by 50%.  Or as individual parts, each component must reduce energy by 16.667%.

Tax Deduction:If all 3 components meetor exceed 50% Energy savings  $1.80 per square foot of entire structure

If only the HVAC and Hot Water Systemmeets or exceed 16.667% Energy savings $ 0.60 per square foot of entire structure

Federal Tax Incentives for Commercial GLHP Systems

Page 4: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Tax Deductions:

Energy Efficient Commercial Building Property Tax Deduction: 

Energy savings must be calculated using a qualified computer software approved by the IRS.

Some approved software:  DOE 2.2,  E‐Quest,  Energy Plus,  Energy Pro,  HAP,  TRACE 700

Filing:This answer is copied from website:  http://www.efficientbuildings.org/about_the_provision.html#01

There is no special form to claim the deduction. The IRS instructions to business forms (e.g., Form 1120 for corporations, Form 1120‐S for S corporations, and Form 1065 for partnerships) indicate that the taxpayer should include the amount of the deduction in the amount in the "Other deductions" line of the tax return.  … it is important that a taxpayer obtain and retain the necessary certifications and documentation to claim the deduction (see, IRS Notice 2006‐52 for these requirements).

Federal Tax Incentives for Commercial GLHP Systems

Tax Deductions:

Accelerated Depreciation:

1/1/2012 until 12/31/2012:50% first year bonus depreciation with the balance on a 5 year MACRS depreciation

2010 IRS Form 4562 Instructions

Part II  Special Depreciation Allowance and Other DepreciationLine 14For qualified property placed in service during the tax year, you may be able to take an additional 50% special depreciation allowance. 

Federal Tax Incentives for Commercial GLHP Systems

Page 5: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Example:

Federal Tax Incentives for Commercial GLHP Systems

New Construction:   $2,000,000 to install geothermal heat pump system.  Building occupied August 2012 (3rd quarter). 

40% tax bracket when state income tax is included.

2012 Tax Credit:  $2,000,000 x 10% Credit  = $   200,000Depreciable Basis:  $2,000,000 ‐ ($200,000/2)  = $1,900,0002012 Bonus Tax Benefit:  $1,900,000 x 50% bonus x 40% tax rate = $   380,0002012 MACRS Tax Benefit:  $190,000 x 40% tax rate  = $      76,000Total Tax Benefit for 2012: = $    656,000

2013 MACRS Tax Benefit:  $304,000 x 40% tax rate  = $     121,6002014 MACRS Tax Benefit:  $182,400 x 40% tax rate  = $       72,9602015 MACRS Tax Benefit:  $109,440 x 40% tax rate  = $       43,7762016 MACRS Tax Benefit:  $109,440 x 40% tax rate  = $       43,7762017 MACRS Tax Benefit:  $54,720 x 40% tax rate  = $       21,888

Total Tax Savings: $960,000Plus Tax Deductions from theEnergy Efficient Commercial Building Property Tax Deduction

Eligibility:Building located in U.S.Original use begins with taxpayerBuilding design must fall under the guidelines of ASHRAE 90.1 Energy Standard for Buildings Except Low‐Rise Residential Buildings

Federal Tax Incentives for Commercial GLHP Systems

Page 6: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Why a Ground Loop Heat Pump System

Lower Operating Costs

Use the ground’s constant temperature as the sourceof heat in winter and as a high efficiency heat sink in summer

85 FSupplyWater

95 FReturn Water

10F Across the Cooling Tower

GLHP Operating Costs Basics 

Page 7: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

95 F

90 FReturn Water

79 F

85 FSupplyWater

95 F

87 F

Only 5F Across the Cooling Tower

One unit in each zone with individual local temperature control

GLHP Operating Costs Basics 

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

95 F

84 F

Only 1.8F Across the Cooling Tower

Heat Recovery To OA AHUSnow MeltDomestic Hot Water Pre‐Heat130 F or 160 F Hot Water

Water‐to‐Water Unit

GLHP Operating Costs Basics 

Page 8: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

95 F

84 F

Water‐to‐Water Unit

Boiler/Cooling Tower 20% to 25% of Total HVAC Operating Cost

GLHP Operating Costs Basics 

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

95 F

84 F

Heat Recovery To OA AHU:125 F Hot Water

Water‐to‐Water Unit

Supply Water approaches Ground Temperature

Only 1.8F to the Ground Loop

Operating Cost Basics

Page 9: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

GLHP Operating Costs Basics 

Typical Water Source Heat Pump Cooling Performance 

Typical Water Source Heat Pump Cooling Performance 

33% Increase

GLHP Operating Costs Basics 

Page 10: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

GLHP Basics 

Typical Water Source Heat Pump Cooling Performance 

33% IncreaseIMPORTANTGround Loops approach ground temperature when the Building is not at Peak Loads 

80% ‐ 90% of the time, building loads are at 50% or less of the Peak Load

Installation Costs 

GLHP Design Basics 

Page 11: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

NEED TO KNOW:

From the Ground: Thermal Conductivity and Average Ground Temperature

From the Building: Monthly/Daily Loads

From the Equipment: GLHP Efficiency of Each Specific Heat Pump

GLHP Design Basics 

The Ground

GLHP Design Basics 

Page 12: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

20 10 Tm 10 20

4

8

12

16

20

24

28

Dep

th in

Fee

t

WET SOIL(0.96 sq. ft./day) or

(0.40 sq. ft./hr)

AVERAGE SOIL(0.6 sq. ft./day) or(0.025 sq. ft./hr)

LIGHT DRY SOIL(0.26 sq. ft./day) or

(0.011 sq. ft./hr)

GLHP Design Basics 

Thermal ThermalConductivity Diffusivity

Material (Btu/hr-ft-F) (ft2/day)

Dense Rock 2.00 1.2Average Rock 1.40 0.96Heavy Soil, saturated 1.40 0.84Heavy Soil, damp 0.75 0.60Heavy Soil, dry 0.50 0.48Light Soil, damp 0.50 0.48Light Soil, dry 0.20 0.26

GLHP Design Basics 

Page 13: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Thermal Conductivity Test

Required Test Duration – A minimum test duration of 36 hours is recommended, with a preference toward 48 hours.

TC Test:  $8,000 to $12,000

GLHP Design Basics 

Thermal Conductivity Test 

Page 14: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Thermal Conductivity Test 

Thermal Conductivity Test 

Page 15: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Thermal Conductivity Test 

Thermal Conductivity Test 

Drillers Need to Know to bid competitively

Page 16: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Thermal Conductivity Test 

Thermal Conductivity Test 

Page 17: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Thermal Conductivity (k) = 

3.412 (BTU/Whr) * W(watts)4 x L(ft of loop) x Slope(F)

Thermal Conductivity Test 

Ground Loop Site Layouts

Page 18: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Reverse Return Piping for Ground Loop

Each Bore hole has identical pressure dropSo no balancing valves required under ground

GLHP Design 

Ground Loop Site Layout 

Page 19: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Valve Vault  

400 Foot Bore Hole Layout 

Ground Loop Site Layout 

Page 20: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

400 Foot Bore Hole Layout 

Ground Loop Site Layout 

400 Foot Bore Hole Layout 

Ground Loop Site Layout 

Page 21: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Mechanical Room 

Ground Loop Site Layout 

Page 22: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Site Layout 

Page 23: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Drilling Holes

&

Installing Pipe 

Page 24: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity
Page 25: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity
Page 26: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Typical vertical bore detail

Vertical Loop Cross Section 

Page 27: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Typical vertical bore detail

Vertical Loop Pipe with U‐Bend 

Typical vertical bore detail

Vertical Loop Pipe with U‐Bend 

Page 28: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

PE 3408 HDPE (High Density Polyethylene Pipe) 

1” IPS SDR‐111.25” IPS SDR‐112” IPS SDR‐113”  IPS SDR‐15.54” IPS SDR‐15.56” IPS SDR‐15.5 8” IPS SDR‐15.5

Standard Dimension Ratio (SDR) is the Side Wall Thickness to the Pipe Diameter Ratio

GLHP Design 

Typical vertical bore detail

PE Pipe Cell Classification PE 355434C

PE: Polyethylene3: Density (0.941 ‐ 0.955 g/cm3)5: Melt Index (ASTM D‐1693, 10.1.4) 

Molecular Weight5: Flexural Modulus4: Tensile Strength at Yield3: Environmental Stress Crack Resistance4: Hydrostatic Design Basis at 23CC: Color and UV Stabilizer

GLHP Design 

Page 29: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Selecting Pipe Size for the Bore Hole

GLHP Design 

Selecting Pipe Size for the Bore Hole

GLHP Design Design Goal: 15 Ft H2O pressure dropfor entire ground loop

Page 30: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Vertical bore without backfill

BentoniteGrout backfill

Geothermal pipe

Page 31: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Grout 

Standard Bentonite Grout =  0.43 TC

Select Grout =  0.85 TC

Thermally Enhanced orThermal Select Grout      =  1.0 to 1.4 TC

Adding silica sand increases the TC but also increases cost in both material and time

Grout

Page 32: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Grout

49 % Increase in Grout

600 Ton School Application - North Royalton, Ohio

North Royalton Middle School

Page 33: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity
Page 34: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Middle School, Ohio

Page 35: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Middle School, Ohio

• Built in 1996

• 1600 Students

• 239,000 square feet

• 140 units (average size 3 tons )

• 414 total tons

• 240 bore holes at 330 ft deep

Middle School, Ohio

• Mechanical HVAC System was installed for $ 10 per square ft 

($ 2.4 million). 

Ground Loop Portion Turn Key Cost:  $ 500,000

$ 6.30 per foot of bore hole

• System projected to operate at 25 cents per square ft. 

System actually operating at 18 cents per square ft.

Page 36: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Murray High School 

New Public School built in 2006 

Loop Field Layout

Construction Cost Comparison 

1st Year Operating Cost Comparison 

316 – 300’ boreholes Under North Parking Lot

High School Ground Loop Field

Page 37: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

High School – Row of Vertical Loops 

High School – Rows Connected  

Page 38: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

High School – Back Filling the Trenches  

High School – Finished Ground Loop   

Page 39: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

MECHANICAL SYSTEM SAVINGS

• Conventional System Bid:   $19.00 / sq ft

• Ground Source System Bid:

Mechanical/Plumbing bid: $3,065,161

Loop Field bid: $930,784

Total: $3,995,945

Mechanical Cost:            $3,995,945 / 267,256 sq ft  =  $14.95 /sq ft  

• Construction Cost Savings: 267,256 sq ft  x  $4.05 /sq ft  =  $1,082,387.00

• Total Bore Hole Length:  316 holes x 300 ft deep = 94,800 feet of bore hole

Ground Loop Installed cost:  $930,784/94,800 =  $9.20 per foot of bore hole

• Annual Geothermal System Utility Costs – Murray High School

Electricity  =  $156,505.11 (96%)

Natural Gas = $6,521.05 (4%)

Total  = $163,026.16

Cost / sq ft = $163,026 / 267256 sq ft = $0.61 / sq ft

• Annual Utility Costs ‐ Comparable School, Salt Lake Valley

Cost / sq ft= $0.86 / sq ft

of which: Electrical = 77%

Gas           = 23%

• Yearly Operating Cost Savings

$0.86 ‐ $0.61  =  $0.25 /sq ft

$0.25 /sq ft x 267,256 sq ft  =  $66,814.00      (29%) Annual Savings

UTILITY COST (First Year)

Page 40: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Hybrid GLHP Systems

• Cooling Load is out of balance with the Heating Load

• Property Area is insufficient

• Reduce First Cost of the Ground Loop by taking advantage of the Part Load Operation of the Building

Hybrid GLHP Systems

Cooling Load is out of balance with the Heating Load

• Clark County School District (Las Vegas)

60% ground loop plus fluid cooler allows for winter, spring and fall operation on ground loop but runs a fluid cooler at peak loads.

• Lincoln Public Schools

Boiler hybrid to eliminate anti‐freeze and the 30% pumping penalty from anti‐freeze.

Page 41: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Hybrid GLHP SystemsCooling Load is out of balance with the Heating Load

Property Area is insufficient

Hybrid GLHP Systems

Page 42: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Take Advantage of Part Load Operation

Commercial Building Loads are only 50% or less of the Peak Load 

for 80% ‐ 90% of the Year

Hybrid GLHP Systems

Take Advantage of Part Load Operation

50% of the hours In the year

27% Flow

80% of the hoursIn the year

54% Flow

552 GPM System (2.8 GPM/ton) with VFD Pumping

Hybrid GLHP Systems

Page 43: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Hybrid GLHP SystemsTake Advantage of Part Load Operation

Bin Weather Data:  8760 Hours/Year

205 Hours or 2.3% 

Hybrid GLHP SystemsTake Advantage of Part Load Operation

Page 44: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Cooling Tower Project

Project name: Las Vegas Motor Speedway

Description:  Media Center64,000 Sq. ft.Vertical Loop w/ Cooling Tower

Ground Temperature: 73.5 – 77.5ºF

Cooling load: 4,500,000 BTUH (375 tons)EFLH (cooling): 1325 ‐ 1000

Heating load: 2,640,000 BTUH (220 tons)EFLH (heating): 400

Hybrid GLHP Systems

Hybrid Loop Field W/ Cooling Tower

Loop Details Hybrid Full Geo

Number of bores: 150 563

Depth of bores: 400 feet 400 feet 

Bore hole spacing: 25 feet 25 feet

Loop field installed costs: $ 780,000 $ 2.1 million

Building energy consumption/yr: $ 98,000 $ 92,700

Maintenance costs / yr: $ 11,856 $ 8,250

Summary 

Hybrid Loop installed costs reduced by  $ 1,320,000 

Operating costs increased by $ 5,300 / yr.

Maintenance increase $ 3,606 / yr.

Hybrid GLHP Systems

Page 45: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Hybrid Loop Field W/ Cooling Tower

Loop Details Hybrid Full Geo

Number of bores: 150 563

Depth of bores: 400 feet 400 feet 

Bore hole spacing: 25 feet 25 feet

Loop field installed costs: $ 780,000 $ 2.1 million

Building energy consumption/yr: $ 98,000 $ 92,700

Maintenance costs / yr: $ 11,856 $ 8,250

Summary 

Hybrid Loop installed costs reduced by  $ 1,320,000 

Operating costs increased by $ 5,300 / yr.

Maintenance increase $ 3,606 / yr.

Hybrid GLHP Systems

Turn Key Cost about $13 per ft of bore hole

Pond Loops

Page 46: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Spacer

Page 47: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Surface Water / Lake Loop

Great River Medical Center – Burlington, Iowa2002 ASHRAE Technology Award1500 Tons in a 15 Acre Man‐made Lake

Pond Loop 

Page 48: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

SOFTWARE VENDOR

GLD2010 Gaia Geothermal

GLHEPRO 4.0 IGSHPA

ECA ELITE SOFTWARE, INC. BRYAN, TX

Geo CALC FERRIS STATE UNIVERSITY, BIG RAPIDS, MI

GchpCalc ENERGY INFORMATION SERVICES, Tuscaloosa, AL

GL‐SOURCE KANSAS ELECTRIC UTILITY, TOPEKA, KS

G L Design GBT, Inc., Maple Plain, MN

GS2000 Buildings Group, Natural Resources Canada

LUND Programs University of Lund, Sweden

Wright‐Loop Wrightsoft, Lexington, MA

75.5 Connected Tons of GLHP’s97/77 F Summer; 28 F Winter

Ground Loop Software 

Page 49: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

Ground Loop Software 

Page 50: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

1.19     Thermal Conductivity 

74.6  F  Ground Temperature

Ground Loop Software 

Ground Loop Software 

Alt # 1

Alt # 2

Alt # 3

Basis of Design

Page 51: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Loop Cost Impact

Basis of Design:60 bore holes x 305 ft per hole x $10/ftTotal:  $ 183,000.00

Add for Alt #1:60 bore holes X 5 ft per hole = 300 bore ftPlus 8 holes X 310 ft = 2,480 bore ftTotal: 2,780 bore ft X $10/ft = $ 27,800.00

Add for Alt # 2:16 holes X 305 ft = 4,880 bore ftTotal: 4,880 bore ft X $10/ft = $ 48,800.00

Add for Alt # 3:60 holes X 10 ft per hole = 600 bore ftPlus 16 holes X 315 ft = 5,040 bore ftTotal: 5,640 bore ft X $10/ft = $ 56,400.00

Efficiency Effect on Ground Loop 

Alt # 1

Alt # 2

Alt # 3

Basis of Design

Building and Heat PumpInformation

Ground and LoopInformation

Ground Loop Software 

Page 52: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

Ground Loop Software 

Page 53: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

Ground Loop Peak Water  Temperature Design

Ground Loop Software 

Page 54: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Building and Heat PumpInformation

Ground and LoopInformation

Ground Loop Software 

Ground Loop Software 

Page 55: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

Ground Loop Software 

Page 56: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Software 

Ground Loop Software 

Page 57: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Peak Water  Temperature Design

Ground Loop Software 

If Guessing at 1.0 Thermal ConductivityGround Loop Software 

Page 58: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Using correct 1.44 Thermal ConductivitySaved 9,708 feet of bore hole drilling

Ground Loop Software 

Hybrid with 20% BoilerReduces bore hole drilling by another 10,384 feet 

Ground Loop Software 

Page 59: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Ground Loop Peak Water TemperaturesAre only for brief periods of time

Ground Loop Software 

Ground Loop Software 

Page 60: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Maximum Peak Loop Temperature in 30 years during the cooling mode

Ground Loop Software 

Loop Design Using Original Peak Loop Temperatures and the resulting WSHP Efficiencies 

Ground Loop Software 

Page 61: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Modify the Peak Loop Temperatures resulting in new WSHP Efficiencies (19.4 EER versus 16.9 EER) at the system’s maximum peak.  Now model the energy savings properly

GLD 2009

Maximum Average Loop temperature during the cooling mode is even lower than 80F

Page 62: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

WSHP Basics – System Schematic 

WSHP Basics – System Schematic 

I told you this is

IMPORTANT

Page 63: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

LEED‐NC Version 3.0

Energy and Atmosphere  Credit 1: Optimize Energy Performance 

Points are awarded for exceeding the prerequisite energy performance for the entire building 

LEED‐NC Version 3.0

Energy and Atmosphere  Credit 1: Optimize Energy Performance 

Baseline ASHRAE 90.1 for GLHP: 13.4 EER

Most GLHP’s at AHRI Rating (77 F EWT): 

17.0 EER to 30.0 EER

20 EER = 49% Increase  

Page 64: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Life Cycle Costs

Life Cycle Costs

Page 65: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Life Cycle Costs

Life Cycle Costs

Page 66: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

Installed Las Vegas Schools

Sep 09 - Aug 10 School Year

Usage (kWh) Area (SqFt)

Total Use 

(kWh/SqFt) 

NWCTA 548 2,105,712.83 217,000.00 9.7

Information Needed To Price the Ground Loop:

Thermal Conductivity Test

Building Loads

GLHP Efficiency

Page 67: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity

IMPORTANT

Model the Building Operating Efficiency Properly

Take Advantage of Tax Incentives

Page 68: Other Names for Ground Loop - rockymtnashrae.com...Heat Recovery To OA AHU: 125 F Hot Water Water ‐to ... 3.412 (BTU/Whr) * W(watts) 4 x L(ft of loop) x Slope( F) Thermal Conductivity