 OTC 25405-MS  Analytical Development of Seastate Limits Associated to the Abandonment Operations of a Structurally Compromised Subsea Well T. N. Turner and N. Murdoch, Atkins Energy - Oil & Gas, 920 Memorial City Way, Suite 700, Houston, TX 77024. Copyright 2014, Offshore Technology Conference This paper was prepared for presentation at the Offshore Technology Conference held in Houston, Texas, USA, 5–8 May 2014. This paper was selected for presentation by an OTC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Offshore Technology Conference and are subject to correction by the author(s). The material does not necessarily reflect any position of the Offshore Technology Conference, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Offshore Technology Conference is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of OTC copyright.  Abstract When drilling a subsea well, a loss of structural integrity of the conductor can lead to a substantial reduction in the well's ability to resist the axial and lateral loads imposed by the drilling riser and BOP. This can then lead to hazardous conditions and increased risks to the asset performing the drilling as well as the personnel onboard. This may leave the operator with no choice but to abandon the well. In this situation, the hazards associated with the loss of integrity must also be considered when planning the abandonment operation itself. This paper presents a case study that details the analysis methods used to develop seastate limits for the abandonment of a subsea well with compromised structural integrity. The well's high pressure and low pressure housings were observed by ROV inspection to have become un-latched during drilling. The inspection also revealed substantial conductor subsidence which suggested a failure of the 30” conductor and 20” surface casing cement jobs. Initial investigations indicated the well lacked the required levels of structural integrity to resist the loads involved with drilling to total depth. As a result, the decision was taken by the operator to suspend and then  permanently abandon the well. This paper discusses the technical approach used to develop the seastate limits imposed during the abandonment operation. The methodology utilized advanced non-linear finite element analysis techniques in conjunction with a novel statistical treatment of previously recorded in-situ BOP motion data. Introduction An operator began drilling a subsea well in a water depth of approximately 105m using a traditional semi-submersible drilling rig. While running the 13-3/8" casing string, a remotely operated vehicle (ROV) observed movement in the BOP  bulls-eye during a routine survey. Further inspection identified that the high pressure (HP) and low pressure (LP) housings had become un-latched and were separated by approximately 0.6m. The separation also suggested a failure in both the 30" conductor and 20" surface casing cement jobs. The conductor had insufficient axial support given it had subsided downward into the seabed after becoming unlatched from the HP housing. The conductor continued to subside, coming to rest approximately 1.5m below the original mudline elevation. Following the discovery of the wellhead separation, Atkins was commissioned to undertake a series of structural analyses to establish the consequences of the wellhead separation and provide guidance as to whether it was appropriate to continue drilling. This culminated in the well being temporarily suspended citing concerns over the ability of the 20" surface casing to support the weight of the freestanding BOP should there be a need to disconnect the riser and the lower marine riser package (LMRP). In the months following the suspension, the operator commissioned Atkins and the wellhead supplier to perform a number of studies to investigate the feasibility of recovering the well and to evaluate possible recovery schemes. Although initial conceptual studies indicated that a recovery scheme might have been feasible from a technical standpoint, the operator advised Atkins that they had taken the decision to permanently abandon the well.

OTC 25405 MS TNTurner (Submitted)

  • Upload
    tt3340

  • View
    10

  • Download
    0

Embed Size (px)

DESCRIPTION

OTC 25405

Citation preview

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    1/15

    OTC 25405-MS

    Analyt ical Development of Seastate Limits Associated to the AbandonmentOperations of a Structurally Compromised Subsea WellT. N. Turner and N. Murdoch, Atkins Energy - Oil & Gas, 920 Memorial City Way, Suite 700, Houston, TX 77024.

    Copyright 2014, Offshore Technology Conference

    This paper was prepared for presentation at the Offshore Technology Conference held in Houston, Texas, USA, 58 May 2014.

    This paper was selected for presentation by an OTC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not beenreviewed by the Offshore Technology Conference and are subject to correction by the author(s). The material does not necessarily reflect any position of the Offshore Technology Conference, itsofficers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Offshore Technology Conference is prohibited. Permission toreproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of OTC copyright.

    Abstract

    When drilling a subsea well, a loss of structural integrity of the conductor can lead to a substantial reduction in the well's

    ability to resist the axial and lateral loads imposed by the drilling riser and BOP. This can then lead to hazardous conditionsand increased risks to the asset performing the drilling as well as the personnel onboard. This may leave the operator with no

    choice but to abandon the well. In this situation, the hazards associated with the loss of integrity must also be considered

    when planning the abandonment operation itself. This paper presents a case study that details the analysis methods used to

    develop seastate limits for the abandonment of a subsea well with compromised structural integrity.

    The well's high pressure and low pressure housings were observed by ROV inspection to have become un-latched during

    drilling. The inspection also revealed substantial conductor subsidence which suggested a failure of the 30 conductor and

    20 surface casing cement jobs. Initial investigations indicated the well lacked the required levels of structural integrity to

    resist the loads involved with drilling to total depth. As a result, the decision was taken by the operator to suspend and then

    permanently abandon the well.

    This paper discusses the technical approach used to develop the seastate limits imposed during the abandonment operation.The methodology utilized advanced non-linear finite element analysis techniques in conjunction with a novel statistical

    treatment of previously recorded in-situ BOP motion data.

    Introduction

    An operator began drilling a subsea well in a water depth of approximately 105m using a traditional semi-submersible

    drilling rig. While running the 13-3/8" casing string, a remotely operated vehicle (ROV) observed movement in the BOP

    bulls-eye during a routine survey. Further inspection identified that the high pressure (HP) and low pressure (LP) housingshad become un-latched and were separated by approximately 0.6m. The separation also suggested a failure in both the 30"

    conductor and 20" surface casing cement jobs. The conductor had insufficient axial support given it had subsided downward

    into the seabed after becoming unlatched from the HP housing. The conductor continued to subside, coming to restapproximately 1.5m below the original mudline elevation.

    Following the discovery of the wellhead separation, Atkins was commissioned to undertake a series of structural analyses to

    establish the consequences of the wellhead separation and provide guidance as to whether it was appropriate to continuedrilling. This culminated in the well being temporarily suspended citing concerns over the ability of the 20" surface casing to

    support the weight of the freestanding BOP should there be a need to disconnect the riser and the lower marine riser package

    (LMRP).

    In the months following the suspension, the operator commissioned Atkins and the wellhead supplier to perform a number ofstudies to investigate the feasibility of recovering the well and to evaluate possible recovery schemes. Although initial

    conceptual studies indicated that a recovery scheme might have been feasible from a technical standpoint, the operator

    advised Atkins that they had taken the decision to permanently abandon the well.

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    2/15

    2 OTC 25405-MS

    To prepare for the abandonment, Atkins was contracted to perform further structural analysis of the well in order to define the

    seastate conditions (i.e. permissible wave height and wave period combinations) where it would be safe to re-latch the BOPand drilling riser to the well to facilitate the abandonment. The seastate limits would assist the operator with managing the

    risk associated with the abandonment and ensure that the structural and pressure containment integrity of the well did not

    become further compromised.

    System Description and General Behavior

    While drilling the well, a typical top tensioned riser system was employed. It consisted of a tensioner system, an upper flexjoint (UFJ), and a telescopic joint, a series of slick and pup joints, a lower flex joint (LFJ) and a subsea LMRP/BOP stack.

    The space-out of the riser system is presented as a simplified schematic in Figure 1a. A schematic of the subsea equipment

    stack latched to the well is shown in Figure 1b. This shows the top of the LP housing 1.5m below the mudline elevation

    corresponding to a wellhead separation of approximately 3.8m. This is the separation that was recorded prior to suspension of

    the well.

    (a) (b)Figure 1 Riser Space-out (a) and Post-separation Well Space-out (b)

    The conductor consisted of a 30x1.5 X52 LP housing extension joint followed by three 30x1 X52 conductor joints

    followed by a 30x1 X52 shoe joint. The conductor was originally drilled and set in a 36 pre-drilled hole. The surface

    casing string comprised a 21" HP housing extension followed by a series of 40ft long joints of 20"x0.625 X56 casing. All

    joints were connected using threaded connectors. The stick-up to the top of the HP housing was approximately 3.2m. Thewell had a 13-3/8" P-110 intermediate casing string landed on the wellhead just before it was suspended. There was a degree

    of uncertainty in both the magnitude and the orientation of the conductors initial inclination though available evidence

    suggested that it was unlikely to be much more than 0.5.

    LMRP

    BOP

    15.73m

    10.57m

    17.33m

    101.15m

    96.58m

    90.48m

    78.29m

    3.2m

    0.0m

    119.41m

    129.37m

    131.40m

    128.23m

    105.0m

    Mudline

    HPHousingDatum

    TopofBOPLFJCentreofRotationTopofRiserAdapter

    DrillFloorUFJCentreofRotationTopofTJ InnerBarrelTopofTJOuterBarrel

    MSL

    Topof15'PupJointTopof20'PupJointTopof40'PupJoint

    Topof4x50'SlickJoints0.0m

    1.50m

    14.54m

    26.73m

    38.92m

    51.11m

    63.30m

    3.2m

    10.56m

    15.72m

    17.33m

    LMRP

    BOP

    MudlineLPHousing

    30"RL4

    30" RL4

    30" RL4

    30" RL4

    30"Shoe

    WHDatum

    TopofBOP

    LFJC.o.R

    TopofAdapter

    1069m20"Shoe

    230m20"Bondedto

    Formation

    3.36m20"RL4S

    35.00m20" TOC

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    3/15

    OTC 25405-MS 3

    The soil in the region was known to consist of very loose, silty sand at the surface overlying strata of stiffer clay and sand.

    This was based on the findings of a borehole. The support provided by the soil in the immediate vicinity of the well was

    however subject to some uncertainty given the subsidence of the conductor. However, the dynamic response of the well andthe stresses generated in the various components were found to be governed by the movement of the surface casing within the

    conductor. As such, the degree of lateral support provided by the soil was not believed to fundamentally influence the

    response of the well in the subsided configuration.

    The postulated behavior of the well under lateral riser loading is described in Figure 2. This figure illustrates the tendency forthe HP housing extension to bear against the inside of the LP housing forming a pivot point. Depending on the severity of the

    response, secondary contact may develop further down inside the conductor. At any given instant, the BOP inclination ismade up of a dynamic component superimposed on top of a mean static component. The dynamic component is generated by

    wave induced vessel motion transmitted to the BOP via the riser.

    Initially, the BOP and un-cemented 20" casing freestand witha very low lateral stiffness. This means a small lateral load atthe LFJ causes the BOP to lean over and take up a stableposition with the outside of the HP housing extension incontact with the inside of the LP housing.

    Once the HP housing extension makes contact with the insideof the LP housing, the BOP effectively pivots about the point ofcontact. The relatively low lateral stiffness of the BOP and 20"casing means that the BOP angle increases at a similar rate tothe lower riser angle. The BOP angle remains approximately0.1 higher than the lower riser angle due to the initial BOPangle of 0.2 developed prior to the HP housing extensioncoming into contact with the inside of the LP housing.

    Secondary contact occurs approximately 12m below mudlineresulting in an increase in the lateral stiffness of the system.The rate of increase in BOP angle is much reduced beyondthis point such that the lower riser angle becomes greaterthan the BOP angle.

    Figure 2 General Behavior of Well and Subsea Equipment Stack under Lateral Riser Loading

    One of the inputs that was thoroughly investigated in earlier assessments was the top of cement (TOC) level in theconductor/surface casing annulus. A distinction was made between the elevation where the cement was considered to be

    sufficiently competent that it bonded the conductor and surface casing together (or bonded the surface casing to the

    formation) and the elevation where there was degraded cement in the annulus acting as a spacer.

    The elevation where cement was considered to be sufficiently competent to bond the conductor and surface casing together

    was estimated to be 230.0m below mudline. This was based on the downward movement of the 20" surface casing recorded

    Mudline

    TOC

    Riser

    Tension

    Contact

    Gravity

    Riser anglelessthan

    BOPangle

    Mudline

    TOC

    Riser

    Tension

    Contact

    Gravity

    Riser angle

    similarto

    BOPangle

    Secondarycontact

    Mudline

    TOC

    Riser

    Tension

    Contact

    Gravity

    Riser anglegreaterthan

    BOPangle

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    4/15

    4

    c

    t

    a

    i

    r

    f

    i

    a

    t

    a

    hen the 13-3/asing was con

    he elevation

    o be 35.0m t

    elow. For the

    nnulus acting

    ecorded Da

    efore drilling

    arameters rel

    tention wasowever, follo

    ecovering the

    timeline of

    5th

    25th

    26

    th

    5th

    8th

    plot showin

    arked increas

    elieved to hainal resting pl

    itial drilling

    bserved durin

    essel motion

    eave) were re

    eriod (Tz) der

    eviation of ve

    comparison

    nd sway moti

    ote is that theat the record

    t the well cenas making to

    ecordings fro

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.600.70

    0.80

    0.90

    1.00

    05/04

    StandardDeviatio

    n(deg)

    8" casing wassidered to be e

    here there w45.0m belo

    purpose of th

    as a spacer bel

    ta Available

    the well, th

    ting to the r

    to use the rewing the well

    well. The data

    ajor events d

    pril

    April

    Aprilay

    ay

    the hourly s

    e in the inclin

    e first separatace, 1.5m bel

    operation, the

    these five da

    (heave, surge

    corded by se

    ived from the

    ssel surge and

    between Figu

    ons were elev

    vessel motiod surge moti

    er was somethe recorded s

    strain gauge

    06/04

    07/04

    08/04

    09/04

    10/04

    landed. As thffectively bon

    s cement in t mudline bas

    e abandonmen

    ow 35.0m bel

    From Origin

    operator de

    sponse of th

    corded data tead failure, t

    was then used

    ring initial dri

    : BOP l

    : Point

    : ROV i: Condu

    : BOP

    andard deviat

    tions is evide

    d. Between thw mudline.

    behavior of t

    ys.

    Figure

    sway, roll, pi

    sors onboard

    water surfacesway in the 0.

    e 4 and Figur

    ted and times

    sensor was lns provided a

    hat distorteday, but doub

    s located on t

    11/04

    12/04

    13/04

    14/04

    15/04

    Pre Sep

    depth of 230.ded to the for

    e annulus actid on a revie

    t analysis, it

    w mudline.

    al Drilling

    ided to use i

    drilling vess

    o calibrate ee data was us

    as input to th

    lling of the we

    nded on HP

    here housing

    nspection firstctor comes to

    nlatched

    ion of BOP i

    t on the 25th

    e 3rdof May as the same dr

    e riser and w

    Hourly Stan

    tch and yaw)

    the rig. Time

    elevation reco

    5s to 20s band

    e 5 indicates t

    where the sig

    cated far forgood reflectio

    y the vessels over the reli

    e lower riser

    16/04

    17/04

    18/04

    19/04

    20/04

    ration

    0m is below tation and rest

    ng as a spacer of the recor

    as assumed t

    peration

    t as an oppo

    el, riser, and

    isting riser aed as input to

    abandonmen

    ll is presented

    ousing

    s are first beli

    observes seprest with top o

    clination in t

    f April, whic

    nd the 8thofilling rig was

    ell system du

    ard Deviation

    and water sur

    histories of s

    rdings are pre

    width are pres

    here is a gene

    nificant wave

    ard but onlyn of the surge

    aw. Attemptsbility of the r

    ere used to d

    21/04

    22/04

    23/04

    24/04

    25/04

    Date

    e conductorrained in the a

    was subject tded BOP and

    at there was

    tunity to imp

    BOP stack.

    alysis methothe analysis u

    study.

    below for ref

    ved to have s

    ration betweef LP housing

    o orthogonal

    corresponds t

    ay, the top oto be used fo

    ing abandon

    of BOP Inclinat

    ace elevation

    ignificant wa

    sented in Figu

    ented in Figur

    ral correlation

    height was in

    lightly starboat the well ce

    were made toecorded yaw

    velop a time

    26/04

    27/04

    28/04

    29/04

    30

    04

    Sepa

    hoe, this is thxial direction.

    some uncertlower riser i

    ement in the

    lement a cam

    etocean data

    dologies andndertaken to a

    rence.

    parated

    housings.5m below m

    directions is

    o the instance

    the LP housithe abandon

    ent was expe

    ion

    (compensated

    e height (Hs)

    re 4. Time his

    5.

    between time

    excess of 1.0

    rd of the wellnter, but the r

    calculate theotions meant

    istory of the l

    01/05

    02/05

    03/05

    04/05

    ration

    OT

    depth where

    inty. This waclination data

    conductor/sur

    paign to reco

    was also rec

    improve theirscertain the fe

    dline

    resented in F

    where the hou

    g was withinent as was u

    ted to be sim

    for the effect

    and mean ze

    tories of hourl

    s where the v

    . An importa

    s centerline.presentation

    ontribution thhis was not s

    wer riser tens

    06/05

    07/05

    08/05

    09/05

    RX

    RY Un

    25405-MS

    he surface

    estimateddescribed

    ace casing

    rd various

    rded. The

    accuracy.asibility of

    igure 3. A

    sings were

    0.5m of itssed for the

    ilar to that

    s of vessel

    o crossing

    y standard

    essel surge

    nt point to

    his meantf the sway

    at the yawccessful.

    ion.

    11/05

    12/05

    13/05

    BOPlatched

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    5/15

    I

    c

    s

    TC 25405-MS

    evelopmen

    he objectiveperation coul

    t was initially

    ave response

    essels excursenchmark the

    omplex and d

    lthough thereeant the use

    tatistical treatroposed inste

    1) Use tinclin

    2) Establvesselthe L

    aband

    3) Establcrossi

    the 274) Use t

    and di

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    14/03

    SignificantWaveHeight,Hs

    (m)

    0.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.30

    14/03

    StandardDeviation(m)

    of Analysis

    f the analysibe carried ou

    intended that

    simulations t

    ion from wellresponse of t

    namically se

    was confidenof FE modeli

    ment of thed. The metho

    e riser and wetion where ke

    ish relationshi

    surge and swhousing was

    onment).

    ish relationsh

    g period andthof May.e above relati

    rection combi

    18/03

    20/03

    22/03

    24/03

    18/03

    20/03

    22/03

    24/03

    Figure 4 Si

    Figure 5

    Methodolo

    was to establt without furth

    beam type fi

    o facilitate th

    center line) ae FE model a

    sitive nature o

    ce that the FEng alone to e

    eastate, vesseology propos

    ll system beay well compo

    ps between th

    y. This step cbetween 1.0

    ps between t

    he wave direc

    onships to est

    ations.

    28/03

    30/03

    01/04

    03/04

    05

    04

    28/03

    30/03

    01/04

    03/04

    nificant Wave

    ourly Standard

    y

    ish, with reaser compromisi

    ite element (

    e developmen

    d seastate chagainst the BO

    f the BOP res

    model couldtablish dyna

    l motion, andd was as follo

    FE model alents become

    e BOP dyna

    nsidered dataand 1.5m be

    e vessel sur

    tion. This step

    blish the max

    07/04

    09/04

    11/04

    13/04

    15

    04

    07/04

    09/04

    11/04

    13/04

    15

    04

    Height and Me

    Deviation of V

    onable confidng the structu

    E) model of t

    t of envelope

    racteristics. Dresponse rec

    onse was not

    eventually beic seastate li

    BOP motionws:

    eady developverstressed.

    ic inclination

    recorded durilow the mudli

    e and sway

    considered th

    imum expecte

    17/04

    19/04

    21/04

    23/04

    25/04

    Date

    17/04

    19/04

    21/04

    23/04

    25

    04

    Date

    n Zero Crossin

    essel Surge an

    nce, the seastal integrity of

    he riser and w

    describing s

    ring an earlyordings descri

    easily capture

    calibrated, thits was aban

    data recorde

    d to perform

    in the fore/af

    g the periodne (i.e. simila

    otion and th

    e much larger

    d BOP inclina

    27/04

    29/04

    01/05

    03/05

    05/05

    27/04

    29/04

    01/05

    03/05

    05

    05

    Housing Separat

    and BOP Latche

    Housing Separa

    and BOP Latch

    g Period

    d Sway

    ate conditionsthe well.

    ell system be

    fe combinati

    phase of the sbed above, it

    in the FE mo

    limited naturdoned and a

    d during the

    imple static a

    t and port/star

    etween the 3rd

    r to the positi

    e significant

    data set betwe

    tion for a ran

    07/05

    09/05

    11/05

    13/05

    15/05

    07/05

    09/05

    11/05

    13/05

    15/05

    ed

    d

    ed

    ed

    where the ab

    sed to perfor

    ns of vessel

    udy, while attecame appar

    del.

    e of the projeethodology

    initial drilling

    alysis to deri

    board directio

    and the 8thofon it would b

    ave height,

    en the 14th of

    e of wave hei

    17/05

    19/05

    21/05

    23/05

    25/05

    Hs

    Tz

    17/05

    19/05

    21/05

    23/05

    25/05

    Sway

    Surge

    5

    ndonment

    irregular

    offset (the

    empting tont that the

    t scheduleased on a

    operation

    e the BOP

    ns and the

    May whenin during

    mean zero

    March and

    ht, period

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8.0

    9.0

    10.0

    27/05

    MeanZe

    roCrossingPeriod,

    Tz

    (s)

    27/05

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    6/15

    6 OTC 25405-MS

    5) Based on knowledge of the BOP inclination where one of the well components first becomes overstressed (asderived from the FE analysis) the combinations of wave height, period and direction where the BOP inclination

    would result in the stresses in the well components exceeding permissible limits could be determined.

    The philosophy behind the above approach was that the operator would have weather forecast information available that

    would define the upcoming significant wave height, period, and direction. By knowing whether such wave heights, periods,

    and directions were likely to cause overstress of critical well components, informed decisions could be taken regarding

    latching or disconnecting the BOP and LMRP from the well.

    Derivation o f Permissible BOP Inclinations

    An initial static analysis was executed to establish the variation in the structural utilization of the various components of the

    well system as the BOP inclination increased. This enabled the BOP inclination where critical well components became

    overstressed to be established.

    The analysis was performed using a Flexcom (MSC Kenny, 2013) FE model that represented:

    the floating vessel, characterized by prescribed displacements at the drill floor

    the upper flex joint

    the marine riser

    the lower flex joint

    the subsea drilling equipment the HP housing, HP housing extension and the surface casing modeled to the depth of the conductor shoe

    the conductor and its interaction with the surface casing (captured using pipe-in-pipe elements)

    non-linear p-y and t-z soil springs used to represent the axial and lateral restraint provided by the soil

    The model was subjected to an incrementally increasing vessel offset in order to generate an incrementally increasing lateral

    load at the LFJ and hence an incrementally increasing BOP inclination. At each increment, axial forces and bending momentswere extracted and used to calculate combined axial and bending utilizations of the various well components. Checks

    incorporated allowable stress factors from API-RP2A-WSD.

    The results of the analyses were used to produce a chart showing the relationship between BOP inclination and the utilization

    of each component as shown in Figure 6. This indicated that the maximum permissible BOP inclination was 1.43 prior tocutting and pulling the 13-3/8 casing and 1.96 following removal of the 13-3/8 casing. These limiting inclinations

    incorporate a 0.5 allowance for the initial inclination of the conductor.

    Figure 6 Variation in Component Utilization wit h BOP Inclination

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

    Utilisation

    BOP Inclination (deg)

    21" HP Housing Extension

    20"x0.625" X56 Surface Casing

    30"x1.5" X52 LP Housing Extension

    30"x1" X52 Conductor

    30"x1.5" RL-4 Connector (95ksi)

    30"x1" RL-4 Connector (70ksi)

    21" HP Housing Extension (No13-3/8" Casing)

    20"x0.625" X56 Surface Casing (No13-3/8" Casing)

    30"x1.5" X52 LP Housing Extension (No13-3/8" Casing)

    30"x1" X52 Conductor (No13-3/8" Casing)

    30"x1.5" RL-4 Connector (95ksi) (No13-3/8" Casing)

    30"x1" RL-4 Connector (70ksi) (No13-3/8" Casing)

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    7/15

    OTC 25405-MS 7

    It should be noted that the permissible BOP inclinations derived in this part of the assessment were also provided in the

    operating guidance document presented to the operator at the end of the study. Although it was recognized that permissible

    BOP inclinations were of less practical use in planning operations, their derivation from simple static analysis meant theywere considered to be reasonably robust and therefore served as support to the more uncertain seastate limits.

    Another item derived from the Flexcom analysis was the BOP inclination where the 20x0.625 X56 surface casing reached

    its full plastic capacity and starts to form a plastic hinge. This was established on a relatively simple basis by defining an

    equivalent ultimate utilization as:

    UC

    where yis the yield stress, ais the axial stress, bis the bending stress and SFis the shape factor (the ratio between theplastic and elastic section moduli). The above unity check equation was required as the Flexcom model did not include

    material plasticity. The checks identified that the surface casing would reach its ultimate capacity at BOP inclinations of

    2.72 and 3.23 before and after removal of the 13-3/8 casing respectively. These values again include an allowance of 0.5

    for initial out of verticality of the conductor.

    It was recognized that the above approach was simplistic and would not capture the effects of local buckling. For this reason,

    a detailed nonlinear finite element analysis (using 3D shell elements) was performed to better substantiate the BOP

    inclinations where the ultimate capacity of the system would be reached. This is further described in the following section.

    Further iterations of the Flexcom analysis were performed to establish the sensitivity of the maximum permissible BOP

    inclination to variations in the riser top tension. This was aimed at identifying whether there were any further practicalmeasures that could be taken to increase the permissible BOP inclinations and, hence, extend the permissible seastate limits.

    However, it was found that the permissible BOP inclinations were not particularly sensitive to riser top tension.

    Derivation of Seastate Limits

    Correlation between BOP Motion and Vessel Motion

    General

    The first part of the procedure used to develop the seastate limits involved deriving a relationship between the vessel motionand the BOP dynamic motion during the period between the 3 rdand the 8thof May (the period when the LP housing was

    between 1.0m and 1.5m below mudline). This initially involved the derivation and comparison of a select number of vesselsurge/sway and BOP inclination spectra to establish if a correlation existed between the frequency content of the two signals.

    The upper plots in Figure 7 present the vessel surge and sway spectra and the water surface elevation spectra for two alternate

    one hour periods on the 4thof May and the 6thof May. The lower plots present the BOP inclination spectra during the same

    periods. The first point to note from Figure 7 is that in both cases the majority of the BOP response occurs in the 5.0s to 10.0s

    bandwidth. The second point to note is that in both cases the vessel motion spectra also show a significant amount of contentwithin this bandwidth. However, it is apparent that for the case shown in right hand plots of Figure 7, there is a significant

    amount of vessel motion content in the 10.0s to 15.0s bandwidth. This does not appear to translate into any significant BOP

    motion.

    Review of further spectra indicated that the majority of the BOP response was in the 5.0s to 10.0s bandwidth irrespective of

    whether the vessel exhibited a second response peak in the 10.0s to 15.0s bandwidth. The reason for this trend was believed

    to be due to the natural period of the BOP stack lay in the 5.0s to 10.0s range. This meant that it was prone to excitation bythe vessel motion in this bandwidth and relatively unaffected by the vessel motion in the 10.0s to 15.0s bandwidth.

    Based on the above observation, it was postulated that a relationship between the vessel motion and the BOP motion could be

    established by comparing the standard deviation of vessel motion in the 5.0s to 10.0s bandwidth and the standard deviation ofBOP motion over the full bandwidth.

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    8/15

    8 OTC 25405-MS

    Vessel/Wave Motion Vessel/Wave Motion

    BOP Response Spectra BOP Response Spectra

    Record for 00:00 - 01:00 4th May Record for 14:00 - 15:00 6th May

    Figure 7 Vessel Motion and Seastate Spectra (top) and BOP Response Spectra (bottom) for May 4th and May 6th

    Development of Relationship

    Following the above observation, the standard deviations of vessel motion in the 5.0s to 10.0s bandwidth and the standard

    deviations of BOP motion over the full bandwidth for each hour between the beginning of the 3rdof May and the end of the

    7thof May were extracted.

    The left plot in Figure 8 presents the standard deviation of BOP inclination in the fore/aft direction plotted against the

    standard deviation of vessel surge. The right hand plot presents the standard deviation of BOP inclination in the

    port/starboard direction plotted against the standard deviation of vessel sway.

    The blue data points in Figure 8 are taken from instances when the mean BOP inclination was in a direction similar to theplane of the BOP motion. For example, the blue points in the left hand plot are from instances when the BOP had a

    prominent mean inclination in the forward direction and the blue points in the right hand plot taken from instances when theBOP had a prominent mean inclination in the starboard direction. The red data points in both of the plots in Figure 8 aretaken from instances when the BOP did not have a prominent mean inclination in the plane of motion. The trend lines in

    Figure 8 are associated only with the blue data points.

    The first point to note from Figure 8 is that in both cases, although there is some scatter in the data, there is a reasonable (andrelatively linear) trend between the vessel motion and the BOP motion when the mean inclination is in a direction close to

    that of the dynamic motion. The correlation is believed to be better during these instances because the HP housing extension

    is expected to have been pressed up against the inside of the LP housing with the BOP/HP housing/surface casing string

    pivoting about this point in a reasonably uniform fashion. At instances when the mean BOP inclination was in a directionperpendicular to the plane of the dynamic motion, it is possible that there would have been more movement of the HP

    housing extension and surface casing within the conductor such that the motion may have been less uniform. This may be

    why the correlation with the vessel motion is not so good during these instances.

    Majority ofvessel

    response is in5s to 10sbandwidth.

    Vessel exhibitssignificant

    response in both

    the 5s to 10sbandwidth andthe 10s to 15s

    bandwidth. The

    latter does nottranslate intoBOP motion.

    RiserNatural

    Period

    Majority ofBOP

    response is in5s to 10s

    bandwidth.

    Majority ofBOP responseis in 5s to 10s

    bandwidth with

    minimal BOPresponse in 10s

    to 15s

    bandwidth.

    RiserNatural

    Period

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    9/15

    OTC 25405-MS 9

    The second point to note from Figure 8 is that for motion in the fore/aft direction, the BOP inclination is 9.9 times the vessel

    surge but for the port/starboard direction, the BOP inclination is 4.6 times the vessel sway. This implied the BOP wasapproximately twice as sensitive to vessel motion in the fore/aft direction as it was to motion in the port/starboard direction.

    The reason for this is not entirely clear though three possible explanations were identified.

    The first possible explanation is the natural period of the BOP stack is different in the two orthogonal directions, such that the

    level of excitation caused by vessel motion in the two directions is not consistent. However, in order for the natural period tobe different in the two directions it would require either the foundation stiffness or the lateral mass of the BOP to be different

    in the two directions. Work performed to calibrate the foundation stiffness suggests there was not much difference in thefoundation stiffness in the two orthogonal directions. Furthermore, the only way differences in the lateral mass could be

    significant is if the BOP was substantially asymmetric (i.e. causing different hydrodynamic added mass under motion in the

    two orthogonal directions). In practice, inherent uncertainty exists when estimating the added mass for such a

    hydrodynamically complex structure; however, available BOP drawings gave no indication that the added mass would be

    particularly different in the two orthogonal directions.

    The second possible explanation is that the recorded vessel sway motions contained a yaw component, meaning these were

    consistently higher than the sway at the drill center location. This would have resulted in the ratio between recorded sway and

    BOP inclination in the port/starboard direction appearing artificially low in comparison to the ratio between vessel surge andthe BOP inclination in the fore/aft direction.

    The third possible explanation is that the positioning of the choke and kill lines around the circumference of the riser could

    have affected the load transmitted into the well in the two orthogonal directions.

    Due to the complexity of the system response and the limited time frame that was available to complete the study, it was not

    possible to definitively prove or disprove any of the above three theories. There remained a possibility that all three theories

    could have contributed to the observed trends. Notwithstanding the inability to resolve the anomaly, the fact that the same,well configuration, BOP, riser system, vessel and vessel heading were to be used during the abandonment as were used

    during initial drilling, meant that it was considered appropriate to adopt the directionally dependent relationships between

    vessel motion and BOP motion in the assessment.

    Figure 8 Relationsh ip between Standard Deviation of BOP Inclination wi th Vessel Surge (left) and Vessel Sway (right)

    Correlation between Vessel Motion and Seastate

    Initial Review

    The second part of the procedure used to derive the seastate limits involved developing a relationship between the seastate

    parameters (wave height, period and direction) and the vessel motions. This considered an extended data set covering the

    period between the 14thof March and the 27th of May.

    Plots showing the relationship between the standard deviation of surge and sway in the 5.0s to 10.0s bandwidth and thesignificant wave height are presented in Figure 9. Figure 9 shows there is a considerable amount of scatter in the data, which

    suggests there were factors other than the significant wave height which were dictating the magnitude of the vessel motion.

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    10/15

    10 OTC 25405-MS

    The two most likely factors identified were the mean zero crossing period of the seastate and the direction of wave

    propagation relative to the vessel.

    Figure 9 Relationship between Wave Height and the Standard Deviation of Vessel Surge (left) and Vessel Sway (right)

    Treatment of DirectionalityWave directionality recordings were not available. Therefore an attempt was made to establish the dominant wave direction

    at each one hour instance using the ratio between the surge and the sway standard deviations in the 5.0s to 10.0s bandwidth.

    The philosophy behind this approach was that in cases where the wave approached the rig in a head seas direction, the surge

    motions would be significantly larger than the sway motions. Similarly, for cases where the waves approached the rig in a

    beam seas direction, the sway motions would be significantly larger than the surge motions.

    A plot showing the resultant motion in the 5.0s to 10.0s bandwidth normalized with respect to wave height plotted against the

    dominant direction of the motion is presented in Figure 10. The first point to note from Figure 10 is that the data is

    concentrated around a direction of 60 with none of the data points at an angle of less than 30. This could be interpreted tomean that the majority of the waves approached from a direction close to quartering. This was likely to be partly true because

    the vessel was orientated to point North West and it was known from regional metocean data that a significant proportion of

    the waves propagate from North to South and would therefore have approached the vessel from a quartering direction.However, it was thought the observation was also partly a result of wave spreading effects, which meant that even when the

    dominant wave direction was in a predominantly head or beam seas direction, there was still an appreciable amount of vessel

    motion in the direction perpendicular to the direction of wave approach.

    A second point to note from Figure 10 is that the magnitude of the vessel motion is slightly higher when the dominant wavedirection tends towards 90. This suggested the vessel exhibited a more onerous response under beam seas waves than it did

    under head or quartering seas waves. This was consistent with the response predicted by available analytically derived vessel

    RAOs.

    Based on the above, it became clear that it was not possible to conclusively define the direction of wave approach from the

    vessel motions. It was, however, considered appropriate to split the data set into points that were consistent with a

    head/quartering seas direction and points that were consistent with a beam seas direction.

    Figure 11 and Figure 12 present plots showing the relationship between the standard deviation of surge and sway in the 5.0sto 10.0s bandwidth and the significant wave height for the head/quartering and beam seas dominated data points,

    respectively. Although there is still considerable scatter in the data, it is appreciably less than was observed in Figure 10 prior

    to splitting the seastates based on their directionality.

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    11/15

    OTC 25405-MS 11

    Figure 10 Resultant Vessel Motion w ith respect to Dominate Wave Direction

    Figure 11 Relationshi p between Significant Wave Height in the Head/Quartering Sea Direction wi th Standard Deviation of VesselSurge (left) and w ith Standard Deviation of Vessel Sway (right)

    Figure 12 Relationship between Significant Wave Height in the Beam Sea Direction with Standard Deviation of Vessel Surge (left)and with Standard Deviation of Vessel Sway (right)

    Treatment of Wave Period

    The effect of wave period was taken into account by further sub-dividing the directional data sets into 0.5s wide wave period

    bands. For brevity, plots showing the relationship between the standard deviation of surge and sway in the 5.0s to 10.0sbandwidth and the significant wave height for alternate wave periods are not presented here.

    Derivation of Seastate Limits

    BOP Inclination Standard Deviations

    The first activity involved with deriving the seastate limits was to establish the standard deviation of resultant BOP

    inclination associated with a range of significant wave height and mean zero crossing period combinations for the twoalternate directional data sets (i.e. head/quartering and beam directions). This was achieved using the relationships between

    BOP motion and vessel motion and the relationships between vessel motion and seastate described above. For each

    Sway DominatedSurge Dominated

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    12/15

    12 OTC 25405-MS

    significant wave height and mean zero crossing period combination, the resultant standard deviation of BOP inclination,

    BOP, was calculated as follows:

    9.9 4.6

    Where surgeis the standard deviation of vessel surge and swayis the standard deviation of vessel sway. The factors of 9.9 and4.6 were taken from the trend lines in the left and right plots in Figure 8, respectively. As noted earlier, the trend lines in

    Figure 8 are associated with only the blue data points as these points are associated with the more uniform motion producedwhen the mean BOP inclination is in the same plane as the orientation of the dynamic motion. This is when the response was

    expected to be most onerous such that neglecting the red points associated with less uniform motion was not considered

    unreasonable.

    Ratio between Standard Deviation and Maximum Inclination

    The second activity was to convert the hourly standard deviations of resultant BOP inclination into an hourly most probable

    maximum BOP dynamic inclination.

    In assessment of offshore structures, it is common practice to assume the peaks in the water surface elevation are Rayleighdistributed so the most probable maximum amplitude in 1000 cycles (a typical number of waves in a 3 hour seastate) is equal

    to 3.72 times the standard deviation (1.86 times the significant wave amplitude). It is only appropriate to apply this ratio toresponse variables if the peaks in the signal are also Rayleigh distributed.

    The non-linear and dynamically sensitive nature of the BOP response, coupled with one hour instances being studied, meant

    there were concerns that it may not be appropriate to apply the factor of 3.72 in the case. The recorded inclinometer data was

    processed further to establish the ratio between the hourly maximum and the hourly standard deviation of inclination

    experienced in practice. The results of this are shown in Figure 13.

    Figure 13 Ratio between Hourly Peak BOP Inclination and Hour ly Standard Deviation of BOP Inclination

    The average of the ratio over the period of interest was found to be 4.43, which was rounded up to 4.5 for use in deriving theseastate limits. It is acknowledged that the above approach is relatively crude and possibly non-conservative. It is also

    possible that further analysis of the available data would have enabled a more statistically representative value for the most

    probable maximum response in a one hour period to be determined. However, such analysis would have been highly time

    consuming and it was not clear that it would result in a ratio significantly different to 4.5.

    Derivation of Acceptable Seastates

    The resultant BOP inclination standard deviations under a range of significant wave height, mean zero crossing periodcombinations were converted into most probable maximum BOP inclination amplitudes using the ratio defined above. These

    were then presented in the form of a scatter diagram type plot as shown in Figure 14. Figure 14 was derived from the

    head/quartering seas data set with a similar plot derived for the beam seas seastates.

    The shading in Figure 14 is based on the following:

    Green : BOP inclination such that stresses in all well components are within permissible limits.

    Red : BOP inclination such that API allowable stresses are exceeded (BOP inclination in excess of 0.93).

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    13/15

    OTC 25405-MS 13

    Black : BOP inclination such that the ultimate plastic capacity of the surface casing is exceeded (BOP

    inclination in excess of 2.22).

    The inclinations of 0.93 and 2.22 defined above are both 0.5 less than those derived from the static FE analysis described

    earlier. This was to provide an additional 0.5 allowance for mean inclination of the BOP resulting from excursion of the rig

    from the well center.

    Within allowablelimits

    Allowablestressesexceeded

    Failure ofsurface casingexpected

    Figure 14 Most Probable Maximum Peak Dynamic BOP Inclination Ampli tude (degrees) for comb inations of Hsand Tz(Head/Quartering Seas)

    The plot in Figure 14 is applicable to the scenario where the 13-3/8" casing is still in place. Additional (less restrictive) plots

    applicable to the case after the 13-3/8" casing had been cut and pulled were also produced.

    Derivation of Ultimate Capacity Using Nonlinear Finite Element Analysis

    Given that the seastate limits were highly restrictive, there was a need to better understand the risk associated with exceedingthem. For this reason, further non-linear, finite element analysis of the conductor and surface casing was performed to better

    define the ultimate plastic capacity of the upper surface casing. This would allow a better understanding of the BOP

    inclination at which the surface casing pipe would be expected to locally buckle and collapse. In particular, it was consideredimportant to know how soon after the plastic capacity is reached that local buckling would occur and how abrupt the failurewould be. The analysis would also provide confirmation that local buckling of the 21 HP housing extension (where it bears

    against the inside of the LP housing) would not occur prior to failure of the 20x0.625 X56 surface casing.

    Due to the limited available timeframe coupled with the inherent complexities involved with performing non-linear buckling

    analysis, it was agreed with the operator that a relatively simple approach would be taken. The main simplification made wasto approximate the conductor and the soil as being rigid. It was considered acceptable to make this approximation, as it was

    known from previous work that the stresses in the upper surface casing were governed by the deformation of the surface

    casing and HP housing extension within the conductor. The additional, and relatively small, deflections of the conductorwithin the soil have a secondary effect on the surface casing stresses.

    The finite element model presented in Figure 15 was developed for analysis in ABAQUS (Dassault Systmes Simulia Corp.,

    2012) and represents the inner and outer casing components installed between an elevation of 35m below the mudline (which

    was the assumed TOC) extending upwards to the top of the HP housing, 3.2m above the mudline. The model exploits thesymmetric nature of the well structure using a single symmetric boundary condition applied through the center of the well

    geometry. The FE model did not include the 13-3/8 casing. This is because the 13-3/8 casing would be expected to provide

    a degree of restraint to the surface casing, limiting the consequences of any local buckling. As such, the scenario where the13-3/8 casing has already been cut and pulled was expected to represent the worst case for analysis.

    As can be seen in Figure 15, the FE model includes only the inner surface of the 30 conductor, the LP housing, the LPhousing extension, and the 30 connectors. These components are all represented with rigid shell elements. Modeling the

    conductor as a rigid shell meant that a bit of conservatism would be introduced to the results. This is because the lateral

    contact force transmitted by the HP housing extension upon contact with the LP housing would be dissipated wholly through

    deformation of the inner string. However, in reality, this lateral contact force would also result in some local and globaldeformation of the conductor as well as the surrounding soil.

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    14/15

    14 OTC 25405-MS

    The geometry of the inner string included the 20" surface casing, the 21 HP housing extension and the 20" connectors.

    These components were modeled using deformable four node general purpose non-linear shell elements. The HP housingwas represented with non-linear beam elements because this component is very stiff compared to the rest of the inner string.

    This was also because contact surfaces were unnecessary for the HP housing considering its location above the top of the LP

    housing. Connectivity between the HP housing and HP housing extension was achieved by means of kinematic couplings

    between the interface nodes of these components.

    Non-linear elastic-plastic material properties were assigned to the surface casing and HP housing extension. Surface based

    contact pairs were used to simulate the interaction between the inner and outer strings.

    Modeling the deformation of the surface casing as it would occur with increasing amounts of BOP inclination was achieved

    in a similar manner to the static analysis completed in Flexcom; however, as the detailed FE model only represented the

    portion of the well up to the top of the HP housing, the effect of incrementally increasing the vessel offset was simulated by

    applying an equivalent, incrementally increasing, set of lateral (shear) and bending loads to the node at the top of the HPhousing. These loads were derived from the static analysis previously conducted in Flexcom. Local element shear, effective

    tension, and bending were extracted from the appropriate element within the Flexcom model and applied as a follower force

    to the top node of the HP Housing in the detailed FE model. Loads of a secondary nature (e.g. hydrostatic pressures and

    buoyancy) were omitted from the FE model on the basis that these forces would have little effect on the results and wouldlikely have required disproportionate amount of modeling effort.

    Figure 15 Detailed Finite Element Model of the Conductor and Surface Casing Strings

    Initial inclination of the conductor was not modeled. Instead, this was accounted for by simply subtracting 0.5 from theangles at which certain levels of stress and deformation in the surface casing were observed (similar to that done in the

    Flexcom analysis). Figure 16 presents the relationship between the bending moment at the top of the HP housing and the

    plastic strains at the critical cross section in the surface casing against the BOP inclination.

    HP Housing(Beam Elements)

    TOC Fixity(-35m)

    21 x HP Housing Extension

    Inner Surface of LP Housing

    (Rigid)

    30 x 1-1/2 X52 LP HousingExtension

    20 x 5/8 Connector

    20 x 5/8 X56 Surface

    Casing

    Inner Surface of 30x1Connector (Rigid)

    20 x 5/8 X56 SurfaceCasing

    20 x 5/8 Connector

    Inner Surface of 30 x 1 X52Conductor Pipe (Rigid)

  • 5/24/2018 OTC 25405 MS TNTurner (Submitted)

    15/15

    OTC 25405-MS 15

    Figure 16 HP Housing Bendi ng Moment & Plastic Strain at Sample Location Plotted With Respect to BOP Inclination

    The following observations were made from the results of the detailed FE analysis:

    The BOP inclination of 3.8 where the full plastic moment capacity of the surface casing is reached is reasonablywell represented by the Flexcom model and the simplified calculation procedure outlined previously.

    The surface casing is capable of sustaining loads associated with a BOP inclination of up to approximately 3.8 (3.3once conductor initial inclination is allowed for) before inelastic material behavior leads to large permanent

    deformation of the surface casing.

    Analysis suggests that failure would ultimately come in the form of local buckling occurring in the surface casingbody. The buckle would likely develop in the surface casing a few inches underneath the top 20 connector.

    The onset of the buckling failure would occur gradually and not in such a manner that results in a rapid, catastrophiccollapse of the casing. BOP inclinations in excess of 5.5 can be tolerated without collapse of the surface casingthough the well would have sustained significant permanent deformation by this stage.

    Local buckling of the 21 HP housing extension (where it bears against the inside of the LP housing) is not expectedto occur prior to the surface casing forming a plastic hinge.

    The FE analysis therefore provided some assurance that if down-hole conditions were such that disconnecting the BOP,

    LMRP and riser would have introduced significant risks, remaining connected to the well in seastates where the API based

    permissible BOP inclinations were slightly exceeded would be unlikely to result in a sudden, unstable collapse of the surfacecasing.

    Conclusions

    The loss of integrity of a subsea wells conductor can lead to a dramatic reduction in a wells ability to resist the axial andlateral loads imposed by the drilling riser and BOP. This can lead to the well having to be abandoned and force abandonment

    operations to adhere to very restrictive seastate limits.

    This paper has described how finite element analysis was used in combination with statistical processing of previously

    recorded seastate, vessel motion and BOP motion data to define the permissible seastate conditions where safe abandonment

    of a well with compromised structural integrity could be performed. Advanced non-linear finite element analysis was alsoused to understand the risk associated with exceeding the API allowable stress based seastate limits.

    References

    API. (2010). Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms - Working Stress Design API-RP2A-WSD (21st ed.). Washington, D.C.

    Barltrop, & Adams. (1991). Dynamics of Fixed Marine Structures (3rd ed.). Oxford: Butterworth-Heinemann Ltd.Dassault Systmes Simulia Corp. (2012). Abaqus v6.12 User Manuals. Providence, RI, USA.MSC Kenny. (2013). Flexcom User Manuals (Version 8 ed.). Galway, Ireland.

    Plastic hingeformation

    Onset ofLocal

    Buckling