2
BOARD OF DIRECTORS ENGINEERING & CONSTRUCTION CONTRACTS UNDERTAKEN TO DATE 2018 ANNUAL TURNOVER (*including intercompany sales) ENGINEERING & CONSTRUCTION GROUP COMPANIES EXECUTIVE COMMITTEE (EC) Chairman of the Board Vice Chairman of the Board M. Sera İnce (VP) F. Olcay Ertürk (VP) Mehmet Ertem (VP) İbrahim Karaağaç (VP) Gürsel Yılmaz (VP) Hüseyin Çalın (VP) Necdet Bayram (VP) Tamer Perk (VP) Tayfun Tanlak (VP) Asil Gümrükçü (VP) Salih Kasranoğlu (VP) S. Ünal Nakipler (VP) Çağrı Ertürk (VP) Levent Aşçı (VP) Ceyhun Tutkun (VP) Ertuğrul Çar (VP) Alparslan Tansuğ (VP) Yavuz Aktürk (Director) Onur Kaya (Director) Öner Koyudemir (Mng) Korcan Özsoy (Mng) M.Emin Yılmaz (Mng) Mustafa Eşitgen (Mng) Leyla Yüksel (Mng) Ali Aslan (Mng) Fatih Çil (Mng) Deniz Arkun (Mng) Erkal Bekman (Mng) Kaan Aksu (Mng) Özgür Aksu (Mng) Gizem Özsoy (Mng) Kutay Demirören (Mng) President and Chairman Sinan Tara Haluk Gerçek Civil / Structural Engineering Architectural Engineering Energy Engineering Project Director – Civil Project Director – Civil Project Director – Civil Project Director – Civil Project Director – Power Project Director – OG&C Project Director – OG&C Project Director – OG&C Equipment Group Project Director – OG&C Project Director – Civil Human Resources Project Director – OG&C ENKA Foundation Finance Quality, HSE & Integrity Quality Health, Safety & Env. Corporate Communications Information Technologies Accounting Finance Financial Control HR & Administration Security Legal Affairs Legal Affairs Investor Relations Corporate Supply Chain Mehmet Tara ÇİMTAŞ Chairman of the Board Vice Chairman of the Board Board Member Board Member Cimtas Pipe Cimtas Pipe Cimtas Ningbo Çimtaş Precision Machining Mehmet Tara (CB) Cem Geyik Naz Türer Orkun Sarısoy (GM) Metin Oğuz (GM) Sencer Aydın (GM) Emrah Erçen (GM) Onur Öztürk (Deputy GM) EC - Executive Committee , VP - Vice President, GM - General Manager, CB - Chairman of the Board, Mng - Manager ENKA POWER Chairman of the Board General Director Vice President Power Plants Manager Selim Gülçelik Fatih Güven Aziz Saltık Tahsin Kösem ENKA 63 YEARS >76 Projects / US$ 9 Billion OIL, GAS & PETROCHEMICALS >31 Projects / US$ 10 Billion POWER PLANTS >107 Projects / US$ 11 Billion INFRASTRUCTURE PROJECTS >322 Projects / US$ 19 Billion BUILDING WORKS 34% US$ 1.0 Billion ENGINEERING & CONSTRUCTION 50% US$ 1.5 Billion POWER GENERATION 6% US$ 165 Million TRADE 10% US$ 329 Million REAL ESTATE In 46 countries >500 PROJECTS EPCC, EPC, PC, or C only Projects with in-house resources and on direct hire basis CAPABILITY Ranked among the ENR’s Top International Contractors since 1981 ENR LIST Historical contract value >US$ 49 Billion Marine Fleet worth of US$ 46.4 Million on the Caspian Sea >20 VESSELS Management > 997 Design Engineering > 150 Staff > 3,163 Craft > 15,690 EMPLOYEES > 20,000 Construction equipment and machinery park worth of US$ 351 Million >3,700 PCS Market Cap (traded publicly in Borsa Istanbul) >US$ 5 Billion Certified to ISO, ASME and OHSAS Standards CERTIFICATION ENGINEERING FOR A BETTER FUTURE FOUNDED IN 1957 1,600 MW 820 MW 1,580 MW GEBZE CCPP ADAPAZARI CCPP İZMİR ALİAĞA CCPP ENGINEERING FOR A BETTER FUTURE POWER 163,000 m 2 Total Rentable Area CITY CENTER INVESTMENT B.V. 76,000 m 2 Total Rentable Area ENKA INVEST 61,500 m 2 Total Rentable Area MOSKVA KRASNYE HOLMY 30,518 m 2 Total Rentable Area MOSENKA 400,000 m 2 Total Rentable Area ENKA TC ENGINEERING FOR A BETTER FUTURE REAL ESTATE 10 Shopping Malls in Russia 850,000 m 2 Smart Building Technologies and in-house facility management services MANAGEMENT Owns 10% of the Class A Office Stock in Moscow 377,224 m 2 Total Managed Area 1.35 Million m 2 Residential area in Moscow 4,500 m 2 Among the Russian Real Estate Developers 5 TH PLACE Swissotel with 235 Keys 5 Star Business Hotel Installed Combined Cycle Capacity 4,000 MW GE’s 9F Advanced Gas Path (AGP) Technology 9F AGP Collective Annual Generation Capacity 32 Billion kWh Produced Since Commence- ment 440 Billion kWh Availability Record 99.8% Investment US$ 2.04 Billion Stringent Program of Risk Mitigation and Prevention Risk Management of Turkey’s overall electricity demand 11% ÇİMTAŞ STEEL BUSINESS LINES ÇİMTAŞ FEATURED PROJECTS ÇİMTAŞ GROUP COMPANIES Major Projects >100 Access to a human resource pool >4,000 Employees In total 4 Subsidiaries with 7 Fabrication Shops SUBSIDIARIES Countries Operation >40 Number of customers around the world >100 Certified to ISO, ASME, AISC, API, AS 9100, AWS & EN, Nadcap and GOST CERTIFICATION 46 YEARS OF EXPERIENCE Fenced Area 120,000 m 2 Covered Area 60,000 m 2 Employees 2,500 Manufacturing 160,000 t Fabrication 40,000 t CIMTAS PIPE Gemlik - Turkey Fenced Area 55,250 m 2 Covered Area 27,000 m 2 Employees 400 Fabrication 20,000 t CİMTAS NINGBO Ningbo - China Fenced Area 212,000 m 2 Covered Area 43,000 m 2 Employees 400 Production 35,000 t ÇİMTAŞ MODULE & SHIPYARD Gölcük - Turkey Fenced Area 12,000 m 2 Covered Area 11,500 m 2 Employees 200 Production 7,000 components Manufacturing 430,000 output hours ÇİMTAŞ PRECISION MACHINING Gemlik - Turkey OSMANGAZI SUSPENSION BRIDGE TURKEY MUSCAT INTERNATIONAL AIRPORT PROJECT SULTANATE OF OMAN THE NEW YORK WHEEL PROJECT USA BESMAYA CCPP 1,500 MW IRAQ SABINE PASS LNG TERMINAL PROJECT- TRAINS 1-5 USA SOUTH HELWAN CCPP PROJECT (1,950 MW) EGYPT MAKKAH CLOCK TOWER PROJECT K.S.A. 4 th longest in the world 30,000 tons of Structural Steel 183 m in diameter with a total weight of 4,000 tons 14,500 tons of Structural Steel World’s 2 nd tallest building 3,850 tons of Pipe Spool REAL ESTATE COMPANIES ENKA TC CCI & ENKA INVEST MOSENKA & MKH Murat Duran (GM) Emre Yılmaz (GM) Burak Can (GM) TRADE COMPANIES AIRENKA ENTAŞ ENKA PAZARLAMA ENKA PAZARLAMA ENKA SYSTEMS Alparslan Tansuğ (GM) Güler Tacettinoğlu (GM) Şükrü Eltutar (CB) Nadir Akgün (GM) Mustafa Eşitgen (GM) KASKTAŞ General Manager İ. Rasin Düzceer ENKA FOUNDATION General Manager Alparslan Tansuğ Cem Çeliker (Legal) Oğuz Kırkgöz (Oil, Gas & Petrochemicals) Burak Özdoğan (Moscow Projects) Gökhan Sağnaklar (Vice Chairman of EC) Zafer Gür (Special Projects) Özger İnal (Infrastructure) Fehmi Bayramoğlu (Power Plants) Hakan Kozan (Oil, Gas & Petrochemicals) İlhan Gücüyener (Chief Financial Officer) MODULARIZATION Over 11,000 ton Produced 25 Units Shipped Process Skids and Modules Boilers and HRSGs / Pipe Racks Engineering / Fabrication / Assembly OFFSHORE STRUCTURES Floating Offshore Platforms Monopiles / Jack-up Platforms Jackets PRESSURIZED EQUIPMENT Over 50,000 ton Production 16,000 Units Shipped HIC Tested Carbon Steel Alloy Materials / Stainless Steel Cladded or Overlaid Steel Plates STEEL WIND TOWERS Over 125,000 ton Production Over 1,500 Towers Shipped Over 2,000 MW Power Mass Production / Mechanical Assembly / Electrical Assembly / Field Service INSTALLATION Over 650,000 ton Installed in total at 3 continents, 15 countries Structural / Piping / Hook-up Mechanical / Electrical STRUCTURAL STEEL Over 500,000 ton Fabrication High Rises / Steel Bridges Industrial Buildings / Airports Stadiums / Power, Oil & Gas Plants Fabrication >1 Million tons Installation >650,000 tons Fabrication >145,000 mt/year Manufacturing capacity >150,000 mt/year

OSMANGAZI Chairman of the Board SUSPENSION BRIDGE … · 2020-03-03 · MUSCAT INTERNATIONAL AIRPORT PROJECT SULTANATE OF OMAN THE NEW YORK WHEEL PROJECT USA BESMAYA CCPP 1,500 MW

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OSMANGAZI Chairman of the Board SUSPENSION BRIDGE … · 2020-03-03 · MUSCAT INTERNATIONAL AIRPORT PROJECT SULTANATE OF OMAN THE NEW YORK WHEEL PROJECT USA BESMAYA CCPP 1,500 MW

BOARD OF DIRECTORS

ENGINEERING & CONSTRUCTION CONTRACTS UNDERTAKEN TO DATE

2018 ANNUAL TURNOVER (*including intercompany sales)

ENGINEERING & CONSTRUCTION

GROUP COMPANIES

EXECUTIVE COMMITTEE (EC)

Chairman of the BoardVice Chairman of the Board

M. Sera İnce (VP)F. Olcay Ertürk (VP)Mehmet Ertem (VP)İbrahim Karaağaç (VP)Gürsel Yılmaz (VP)Hüseyin Çalın (VP)Necdet Bayram (VP)Tamer Perk (VP)Tayfun Tanlak (VP)Asil Gümrükçü (VP)Salih Kasranoğlu (VP)S. Ünal Nakipler (VP)Çağrı Ertürk (VP) Levent Aşçı (VP)Ceyhun Tutkun (VP)Ertuğrul Çar (VP)

Alparslan Tansuğ (VP)Yavuz Aktürk (Director)Onur Kaya (Director)Öner Koyudemir (Mng)Korcan Özsoy (Mng)M.Emin Yılmaz (Mng)Mustafa Eşitgen (Mng)Leyla Yüksel (Mng)Ali Aslan (Mng)Fatih Çil (Mng)Deniz Arkun (Mng)Erkal Bekman (Mng)Kaan Aksu (Mng) Özgür Aksu (Mng)Gizem Özsoy (Mng)Kutay Demirören (Mng)

President and Chairman

Sinan TaraHaluk Gerçek

Civil / Structural Engineering Architectural Engineering

Energy EngineeringProject Director – Civil Project Director – CivilProject Director – Civil Project Director – Civil

Project Director – PowerProject Director – OG&CProject Director – OG&CProject Director – OG&C

Equipment GroupProject Director – OG&C

Project Director – CivilHuman Resources

Project Director – OG&C

ENKA FoundationFinance

Quality, HSE & IntegrityQuality

Health, Safety & Env.Corporate Communications

Information Technologies Accounting

Finance Financial Control

HR & AdministrationSecurity

Legal AffairsLegal Affairs

Investor RelationsCorporate Supply Chain

Mehmet Tara

ÇİMTAŞ

Chairman of the Board Vice Chairman of the Board

Board MemberBoard Member

Cimtas PipeCimtas Pipe

Cimtas NingboÇimtaş Precision Machining

Mehmet Tara (CB)Cem GeyikNaz TürerOrkun Sarısoy (GM)Metin Oğuz (GM)Sencer Aydın (GM)Emrah Erçen (GM)Onur Öztürk (Deputy GM)

EC - Executive Committee , VP - Vice President, GM - General Manager, CB - Chairman of the Board, Mng - Manager

ENKA POWERChairman of the Board

General Director Vice President

Power Plants Manager

Selim GülçelikFatih GüvenAziz SaltıkTahsin Kösem

ENKA 63 YEARS

>76 Projects / US$ 9 Billion

OIL, GAS & PETROCHEMICALS

>31 Projects / US$ 10 Billion

POWERPLANTS

>107 Projects / US$ 11 Billion

INFRASTRUCTUREPROJECTS

>322 Projects / US$ 19 Billion

BUILDINGWORKS

34%US$ 1.0 Billion

ENGINEERING & CONSTRUCTION

50% US$ 1.5 Billion

POWER GENERATION

6%US$ 165 Million

TRADE

10% US$ 329 Million

REALESTATE

In 46 countries

>500 PROJECTS

EPCC, EPC, PC, or C only Projects with in-house resources and on direct hire basis

CAPABILITY

Ranked among the ENR’s Top International Contractors since 1981

ENR LIST

Historical contract value

>US$ 49 Billion

Marine Fleet worth of US$ 46.4 Million on the Caspian Sea

>20 VESSELS

Management > 997Design Engineering > 150Staff > 3,163Craft > 15,690

EMPLOYEES > 20,000Construction equipment and machinery park worth of US$ 351 Million

>3,700 PCS

Market Cap (traded publicly in Borsa Istanbul)

>US$ 5 Billion

Certified to ISO, ASME and OHSAS Standards

CERTIFICATION

ENGINEERING FOR A BETTER FUTURE

FOUNDED IN 1957

1,600 MW820 MW

1,580 MW

GEBZE CCPP

ADAPAZARI CCPP

İZMİR ALİAĞA CCPP

ENGINEERING FOR A BETTER FUTURE

POWER

163,000 m2

Total Rentable Area

CITY CENTERINVESTMENT B.V.

76,000 m2

Total Rentable Area

ENKAINVEST

61,500 m2

Total Rentable Area

MOSKVA KRASNYE HOLMY

30,518 m2

Total Rentable Area

MOSENKA

400,000 m2

Total Rentable Area

ENKATC

ENGINEERING FOR A BETTER FUTURE

REAL ESTATE

10 Shopping Malls in Russia

850,000 m2

Smart Building Technologies and in-house facility management services

MANAGEMENT

Owns 10% of the Class A Office Stock in Moscow

377,224 m2

Total Managed Area

1.35 Million m2

Residential area in Moscow

4,500 m2

Among the Russian Real Estate Developers

5TH PLACE

Swissotel with 235 Keys

5 Star Business Hotel

Installed Combined Cycle Capacity

4,000 MW

GE’s 9F Advanced Gas Path (AGP) Technology

9F AGP

Collective Annual Generation Capacity

32 Billion kWh

Produced Since Commence-ment

440 Billion kWhAvailability Record

99.8%

Investment

US$ 2.04 Billion

Stringent Program of Risk Mitigation and Prevention

Risk Management

of Turkey’s overall electricity demand

11%

ÇİMTAŞ STEEL BUSINESS LINES

ÇİMTAŞ FEATURED PROJECTS

ÇİMTAŞ GROUP COMPANIES

Major Projects

>100

Access to a human resource pool

>4,000 Employees

In total 4 Subsidiaries with 7 Fabrication Shops

SUBSIDIARIES

Countries Operation

>40

Number of customers around the world

>100

Certified to ISO, ASME, AISC, API, AS 9100, AWS & EN, Nadcap and GOST

CERTIFICATION

46 YEARS OF EXPERIENCE

Fenced Area 120,000 m2

Covered Area 60,000 m2

Employees 2,500Manufacturing 160,000 tFabrication 40,000 t

CIMTAS PIPEGemlik - Turkey

Fenced Area 55,250 m2

Covered Area 27,000 m2

Employees 400Fabrication 20,000 t

CİMTAS NINGBONingbo - China

Fenced Area 212,000 m2

Covered Area 43,000 m2

Employees 400Production 35,000 t

ÇİMTAŞ MODULE & SHIPYARDGölcük - Turkey

Fenced Area 12,000 m2

Covered Area 11,500 m2

Employees 200Production 7,000 componentsManufacturing 430,000 output hours

ÇİMTAŞ PRECISION MACHININGGemlik - Turkey

OSMANGAZI SUSPENSION BRIDGE

TURKEY

MUSCAT INTERNATIONAL AIRPORT PROJECT

SULTANATE OF OMAN

THE NEW YORK WHEEL PROJECT

USA

BESMAYA CCPP 1,500 MW

IRAQ

SABINE PASS LNG TERMINAL PROJECT-

TRAINS 1-5USA

SOUTH HELWAN CCPP PROJECT

(1,950 MW)EGYPT

MAKKAH CLOCK TOWER PROJECT

K.S.A.

4th longest in the world

30,000 tons of Structural Steel

183 m in diameter with a total weight of 4,000 tons

14,500 tons of Structural SteelWorld’s 2nd tallest building

3,850 tons of Pipe Spool

REAL ESTATE COMPANIESENKA TC

CCI & ENKA INVESTMOSENKA & MKH

Murat Duran (GM)Emre Yılmaz (GM)Burak Can (GM)

TRADE COMPANIESAIRENKA

ENTAŞENKA PAZARLAMAENKA PAZARLAMA

ENKA SYSTEMS

Alparslan Tansuğ (GM)Güler Tacettinoğlu (GM)Şükrü Eltutar (CB)Nadir Akgün (GM)Mustafa Eşitgen (GM)

KASKTAŞGeneral Managerİ. Rasin Düzceer

ENKA FOUNDATIONGeneral ManagerAlparslan Tansuğ

Cem Çeliker (Legal)

Oğuz Kırkgöz (Oil, Gas & Petrochemicals)

Burak Özdoğan(Moscow Projects)

Gökhan Sağnaklar (Vice Chairman of EC)

Zafer Gür (Special Projects)

Özger İnal (Infrastructure)

Fehmi Bayramoğlu (Power Plants)

Hakan Kozan (Oil, Gas & Petrochemicals)

İlhan Gücüyener(Chief Financial Officer)

MODULARIZATION

Over 11,000 ton Produced25 Units Shipped

Process Skids and ModulesBoilers and HRSGs / Pipe Racks

Engineering / Fabrication / Assembly

OFFSHORESTRUCTURES

Floating Offshore PlatformsMonopiles / Jack-up Platforms

Jackets

PRESSURIZEDEQUIPMENT

Over 50,000 ton Production16,000 Units Shipped

HIC Tested Carbon SteelAlloy Materials / Stainless Steel

Cladded or Overlaid Steel Plates

STEEL WINDTOWERS

Over 125,000 ton ProductionOver 1,500 Towers Shipped

Over 2,000 MW PowerMass Production / Mechanical

Assembly / Electrical Assembly / Field Service

INSTALLATION

Over 650,000 ton Installedin total at 3 continents,

15 countriesStructural / Piping / Hook-up

Mechanical / Electrical

STRUCTURAL STEEL Over 500,000 ton FabricationHigh Rises / Steel Bridges Industrial

Buildings / Airports Stadiums / Power, Oil & Gas Plants

Fabrication

>1 Million tons

Installation

>650,000 tons

Fabrication>145,000 mt/year

Manufacturing capacity>150,000 mt/year

Page 2: OSMANGAZI Chairman of the Board SUSPENSION BRIDGE … · 2020-03-03 · MUSCAT INTERNATIONAL AIRPORT PROJECT SULTANATE OF OMAN THE NEW YORK WHEEL PROJECT USA BESMAYA CCPP 1,500 MW

FEATURED PROJECTS

FEATURED PROJECTS

FEATURED PROJECTSFEATURED PROJECTS

Experience International Design & Build capacity for motorways and tunnels

Motorway Tunnel

63 YEARS ENGINEERING 1,000 KM 22,500 M

> 500 Overpasses, Underpasses and Bridges with Total Area of 800,000 m2

Carried out over 200 Million m3 fill and 300 Million m3 excavation works

> 10 Million ton Asphalt and 30 Million ton Subbase & CTB

STRUCTURES EARTHWORKS PAVEMENT

Construction equipment capacity in a single motorway project

HSE record without LTI Historical project value

4,000 42 Million MHRs US$ 11 Billion

«First Private Investment Power Plant Project» in Central Iraq.

«First Combined Cycle Power Plant Projects owned and operated by Iraq Ministry of Electricity».

Reliable and efficient power for the production facilities of Nizhnekamskneftekhim.

«Largest Power Plant» when they were commissioned and the «First Combined Cycle Power Plant» and «First Conversion to Combined Cycle Power Plant» project in Northen Iraq.Sulaymaniah CCPP - ENR «Best Global Project of the year 2017» in Power&Industrial Category.

Samawa 750 MW & Dhi Qar 750 MW Power Plants

Nizhnekamsk 495 MW Power Plant

Besmaya 1,500 MW Combined Cycle Power Plant

ENR «Best Global Project of the year 2013» in Power and Industrial Category.

The first extension to the Yajva Power Plant since 1965 and increased capacity to 1,036 MW.

Yajva State District Power Plant Erbil 1,500 MW Combined Cycle Power Plant and its sister project Sulaymaniyah 1,500 MW Combined Cycle Power Plant

ENGINEERING FOR A BETTER FUTURE ENGINEERING FOR A BETTER FUTURE

OIL, GAS & PETROCHEMICALS INFRASTRUCTURE PROJECTS

ENGINEERING FOR A BETTER FUTURE

POWER PLANTS

Experience

47 YEARS

Since 2000

>100 Million MHRs

Turbine - Generators Installation

90

GECOL, MOE Iraq, MGH Mass Global, Qaiwan Group, E.ON Russia, Nvgres Holding LTD (TNK-BP Int. Ltd. and OGK-1) (NHL)

CLIENTS

30 individual power plants in 5 different countries

GLOBALLY

Historical project value

US$ 10 Billion

HSE record without LTI

40 Million MHRs

Installed capacity experience

>20 GW

6 Coal Fired Power Plants with a total capacity of 4,070 MW

14 Combined Cycle Power Plants with a total capacity of 14,546 MW

6 Simple Cycle Power Plants with a total capacity of 2,836 MW

ENGINEERING FOR A BETTER FUTURE

BUILDING WORKS

Delivered a range of significant urban development and public buildings (fast-track) projects across Oman, Libya, Saudi Arabia and Russia; such as White House, Duma Building, Borisow Military Housing, Slonim Military Housing in Russia and Sirte Bay Hotel & Conference Center and Brega New Town in Libya

Engineered, managed and built some of the most complex civil projects of the modern era in the di-verse and challenging environments. Many of these projects have been selected by industry surveys as best-in-class globally or in their respective regions

FAST TRACK QUALITY CONSTRUCTION ENGINEERING

Long track record for building construction services across the world under two main categories: contracting projects and invest-ment projects

SCOPEHSE record without LTI

Historical project value

134 Million MHRs

US$ 19 Billion

Business centers & high rises, public buildings, malls & shopping centers, urban development, industrial plants and embassy compounds

322 PROJECTSExperience

44 YEARSAround the world

>76 PROJECTSHistorical contract value

US$ 9 Billion

Since 1993

>200 Million MHRs

Working with major international clients such as BP, Chevron, ExxonMobil, Shell, Lukoil and other N/IOCs

CLIENTS

Trakya 1,200 MW Combined Cycle Power

Plant

«Largest Thermal Power Plant» and «First Combined Cycle

Power Plant» in Turkey (when It was commissioned)

Bursa 1,400 MW Combined Cycle Power

Plant

«Largest Thermal Power Plant» in Turkey

(when It was commissioned)

Gebze, Adapazarı & Izmir 4,000 MW Combined

Cycle Power Plants

«Largest Private Financing Projects» of Turkey

Gebze 1,600 MW Combined Cycle Power

Plant

«Largest Thermal Power Plant» in Turkey

Berezovskaya 800 MW Coal Fired Power Plant

«Largest Coal Fired Power Plant» in Russia

• 82 Business Centers and High Rises, 3.4 million m2 Total Area

• 73 Industrial Plants, 650k m2 Total Area

• 46 Malls and Shopping Centers, 2.3 million m2 Floor Area

• 45 Public Buildings, 2 million m2 Construction Area

• 34 Urban Development Projects, 3.6 million m2 Construction Area

• 26 USA Embassy Compounds, 528k m2 Construction Area

Kashirskaya Plaza Multifunctional Trade CenterMoscow, Russia

Paveletskaya Plaza Moscow, Russia

The Naberezhnaya Tower Moscow, Russia

Moscow International House of Music

Moscow, Russia

The Eurasia TowerMoscow, Russia

Desalination Plants Derna, Soussa, Zawia & Zuara,

Libya

FC Shakhtar Stadium Donbass Arena

Ukraine

Automobile Plant ConstructionsTurkey and Russia

USA Embassy Compounds

Afghanistan / Algeria / Bosnia and Herzegovina / Bahamas / Burundi / Cameroon / Djibouti / Dominican Republic / Equatorial Guinea / Greece / Guinea / India / Kenya / Mali / Mauritania / Mexico / Nepal / Netherlands / Papua New Guinea / Paraguay / Russia / Saudi Arabia / Sierra Leone / Sri Lanka / Turkey / Turkmenistan

BUILDING WORKS KEY FIGURES

Perinatal Medical Centers Lapino and Ufa

Russia

SOUTH SUDAN

s

SOUTH SUDAN

s

KAZAKHSTAN

SOUTH SUDAN

s

SOUTH SUDAN

s

31 projects in 5 countries76 projects in 7 countries

52 1695

2

481

2

22 2

22 2

11

111

1 1

1

111

1

1

11

1

31

1

6886 75

23

10

1031

1413 49 48

3 1

1

111

11

1

4

3

3

3

• International Road Federation (IRF), «Program Management» award in 2012

• Engineering News Records (ENR) Magazine’s Global Best Competition 2013, «The Best Global Project Award» in the category of «Roads and Highways» around the world

• 2016 GRAA (Global Road Achievement Awards) Winner of the Environmental Mitigation category selected by IRF

• The largest infrastructure project in Romania

• Connecting Romania to Western Europe and forms one of the fundamental parts of the country’s motorway system

• The largest public contract ever signed in Albania

• Reduces transportation time from 8 hours to 2 hours

• Including a tunnel structure of 11 km length

• Links Croatia and its touristic destinations to Pan - European Transportation Corridor

• Honored with the 2004 Croatian Contractor Safety Award

• Links Turkey to Trans-European Motorway Corridor

• One of the largest single construction projects ever undertaken in Turkey

• Almost 6,000 Turkish employees

• 6 to 8 Lanes

KOSOVO MOTORWAY

AUTOSTRADA TRANSYLVANIA MOTORWAY

KOSOVO

ROMANIA

ALBANIA

CROATIA

TURKEY

RRESHEN-KALIMASH MOTORWAY

BREGANA-ZAGREB-DUBROVNIK MOTORWAY

ANKARA - GEREDE MOTORWAY

Engineering for a Better Future

Engıneering, Procurement, Constructıon, Fabrıcatıon, Commıssıonıng & Start-up

2020

Kashagan Oil Field Development Project - Kazakhstan

Expansion of South Caucasus Pipeline Project (SCPx) - Georgia Majnoon Oil Field Development Project - Iraq

Sakhalin Island ProjectsSakhalin II & I OPF and Dekastri - Russia

Khabarovsk Refinery, Structural Steel and Mechanical & Erection Works - Russia

TENGIZ Projects - Kazakhstan

CSC New Tank Farm ProjectAdditions to Tengiz Oil Processing Facilities

2014 - 2019

SGP – Second Generation Plant ProjectWorld’s largest single-train sour crude processing facility

2003 - 2008

SGI – Sour Gas Injection ProjectNewly introduced re-injection technology (depth 7 km)

2003 - 2007

Train 5 ProjectAdditions to Tengiz Oil Processing Facilities

1997 - 2000

Engineering, Procurement, Fabrication, Modularization, Construction, Commissioning & Start up

SERVICESUpstream: Oil & Gas Treatment Facilities, Storage FacilitiesMidstream: Oil & Gas Pipelines, Pump Stations, Compressor Stations, Tank FarmsDownstream: Oil Refineries, Gas Processing Facilities, Petrochemical Plants

MARKETSHSE record without LTI

105 Million MHRs

OIL

, GA

S &

PET

RO

CH

EMIC

ALS

POW

ER P

LAN

TS

INFR

AST

RU

CTU

RE

BUIL

DIN

G W

OR

KS

Balmumcu Mahallesi, Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / Istanbul / TurkeyP : +90 (212) 376 10 00 (pbx) F : +90 (212) 272 88 69E : [email protected] W: www.enka.com

2

1

1

1

107 projects in 15 countries 322 projects in 39 countries

1

1