Page 1: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 1

OSLC PLM WorkgroupWorking notes

18th Jan 2011

Page 2: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 2

Attendees

Rainer Ersch Mike Loeffler Pascal Vera Gray Bachelor (Chair) Sky Matthews Annap Derebail Samit Mehta Keith Collyer Steve Speicher Scott Bosworth A welcome to Nick Crossley

Page 3: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 3

Agenda

Please refer to the wiki

Page 4: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 4

Effectivity parms

Page 5: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 5

Notes about the analysis of the PLM Context from STEP Viewpoints have

Effectivity Specification

Option value Used to form rules

These configure the P_V_D Product_configuration of the effectivity & variant

options, versions Precise or set

Product_specification is a sub-level of configuration E.g. a test config

Page 6: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 6

Assumption

At the start of the Scenario the CR has a PLM context assigned

The scenario results in an update of the PLM context (arising from the changes made to meet the new/changed Requirement)

Reassignment of PLM Context from other CRs is out of scope initially

Page 7: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 7

Remarks about the PLM context in ALM

In the our scenario the CR needs to make available Product class, spec, the configuration and its intent

What is the context in ALM for our Requirement ? Project Baselines

Simple approach is the link the Requirement to the PLM Context provided by the CR This supports the basic approach within the scenario

Is it sufficient to link the prevailing ALM context to the PLM Context provided by the CR ? Can think of this as the CR providing the context Not if need to manage variants within ALM

Page 8: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 8

Update of action plan

Recap of the RM Context analysis by Gray/Ian

Setup the example in TCE by Mike Setup the example in RTC T

Page 9: OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Jan18th 2011 9

Update of action plan

Recap of the RM Context analysis by Gray/Ian

Setup the example in TCE by Mike Setup the example in RTC TBD