OSG Integration Activity Report
Rob Gardner
Leigh Grundhoefer
OSG Technical Meeting
UCSD
Dec 16, 2004
12/16/2004 OSG Technical Meeting 2
Integration, Validation & Certification Integrate middleware services from technology providers
targeted for the OSG Provide testbed for evaluation and testing of new services
and applications Test and exercise installation and distribution methods Provide feedback to service providers and VO application
developers Allow contributions and testing of new, interoperable
technologies with established baseline services Email list – [email protected] and plone
12/16/2004 OSG Technical Meeting 3
Activity Model Requirements and schedule are determined with the OSG
deployment activity The specific program of work is driven by the
deliverables from the satellite activities Effort will be drawn from affiliated OSG projects
depending on the service Additional resources needed to support testbed infrastructure
Architectural coherence will maintained through participation with the blueprint group
Configuration coherence is maintained with the deployment group
12/16/2004 OSG Technical Meeting 4
Service Readiness Plan Purpose Service Description Packaging Description Dependencies: resources and services needed Test use cases identified Testing tools – clients, harness Defined metrics for success Effort to contribute to the OSG-IVC and schedule Links to appropriate documentation, WSDL, etc
12/16/2004 OSG Technical Meeting 5
Service Path (WIP)O
SG
Dep
loym
ent
Act
ivit
y
Metrics &Certification
Applicationvalidation
Application Software
Installation
OSG Integration Activity
Release Description
MiddlewareInteroperability
Software &packaging
Functionality & Scalability
Tests
Readiness plan adopted
Service deployment
OS
G O
per
atio
ns
Act
ivit
y
ReleaseCandidate
Readinessplan
Effort
Resources
feedback
12/16/2004 OSG Technical Meeting 6
Current Testbed Sites UF (CMS-DGT) UB (CCR-dev) UC (ATLAS DTG) ANL (ATLAS DTG) IU (ATLAS DTG) OU (ATLAS DTG) UTA (ATLAS DTG) ISI JLAB – to join
12/16/2004 OSG Technical Meeting 7
Integration Testbed Secure commitments to participate in this activity Site contact information to iGOC Upgrade to VDT 1.2.3 before 1.3.0 Validate existing services
VOMS GridCat MonALISA
Next meeting: January 6
12/16/2004 OSG Technical Meeting 8
Testbed Layout Proposed
Stable Productionrelease
DevelopmentRelease
dynamictesting resources
UF SRM server
Eg.
OSG Integration Testbed
Serviceplatform
applications, test harness, clients
12/16/2004 OSG Technical Meeting 9
OSG Service Integration Schedule Grid3 core middleware services, upgrade VDT Site security management, GUMS (Gabriele) Storage
Existing Grid3 mounted partitions ($DATA, $APP, ..) SRM-DRM Service Integration (Jorge, Alex) SRM-dCache (identify service proponent, assist SRP)
MIS under discussion at this meeting
12/16/2004 OSG Technical Meeting 10
SRM/DRM Integration Readiness First major integration activity Feedback given to initial plan from Jorge; new plan better
suited to the OSG Integration testbed and activity model Two sites minimum for integration test – client and server Installation and configuration Interoperable tests with other services Atomic testing: copy, read, move, delete Scalability tests including Queuing Application level tests – CMS and ATLAS to participate
12/16/2004 OSG Technical Meeting 11
GUMS Service Readiness Service proponent: G. Carcassi (BNL/PPDG);
preliminary readiness plan received 12/13 Testbed and installed instance setup at BNL Account pools - effect on applications & accounting GUMS package and installation instructions Gatekeeper callout to GUMS VOMS servers for each VO – verify Role-based AuthZ: role & access rights assignment
testing Feedback/questions on initial plan needed