4
ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

Embed Size (px)

Citation preview

Page 1: ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

ORIS

SAGE SuiteRecent Release Update

Ciara Nic Mhathúna

Office of Research Information Services

Page 2: ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

ORIS

March 17th SAGE Release

• New Look SAGE Suite– Revised navigation and form design for SAGE, SPAERC, and SERA

• New ASTRA Global Edit Role– Ability to edit all routed eGC1s for a unit

• SAGE Budget Phase II– Internal UW Sub-budgets

– Subcontracts

– Fabrication budgets

Page 3: ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

ORIS Summary of Post-Release Activity

Fixed:– PI “approval required” notification email link incomplete

– IACUC & Bothell reviewers unable to approve

– Double entries in eApprovals

– OSP’s system SPAERC running slow

– Print problems

Fixing:– Robust solution to the print problems: Adobe PDF

– Preparer access to the approval graph

Page 4: ORIS SAGE Suite Recent Release Update Ciara Nic Mhathúna Office of Research Information Services

ORIS

Budget Training sessions

• New Learning Guides available on the SAGE support site

• Drop-in sessions– Bring along any materials you need to help prepare your budget, or

an Excel printout of a previously developed Budget

• Times (two sessions, 1½ hour each)– April 13th, 9am-12pm, Health Sciences Building

– TBC

• Register for drop-in sessions at sage.washington.edu