27
Office 1 1 742,40 m 2 Office 2 2 621 m 2 «ORGHIMproject» Design Institute

«ORGHIMproject» Design Instituteorghim.ua/en/company/presentation/copy_of_Presentation...Togliattiazot PJSC Togliatti Russian Federation Design documents 01A Ammonia unit at Togliattiazot

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • Office 1 1 742,40 m2

    Office 2 2 621 m2

    «ORGHIMproject» Design Institute

  • Corporative Structure of Private Joint-Stock Company Severodonetsky ORGHIM

  • About the Institute

    ORGHIMproject Design Institute (DI ORGHIMproject) was established in 2009 based on Special Design Bureau (was established in 2004). Activities of the Institute include practically all system design fields, in particular: • Chemical industry • Oil refining and gas processing • Oil and gas field development • Petrochemical industry • Hydrocarbons storage and trans-

    shipment terminals • Power generating industry • Environment and infrastructure

    protection

  • Types of activities Activities of production departments: - Technical and economic assessment; - Technical and economic calculations; - Feasibility studies; - Business plan; - Projects (design documentation for foreign Customers); - Basic and detail design adaptation to the Customer country

    standards; - General design engineering; - Preparation of design assignment and technical attachments thereto; - Preparation of technical requirements for Customer tenders; - Detailed design engineering; - As-built documents; - Cost estimate documents; - Equipment manufacturing supervision; - Equipment acceptance; - Construction supervision; - Project supporting during expert examination; - Service Package for construction management; - Project adaptation to infrastructure of the Customer production site; - Survey and inspection of production facilities; - Project implementation risk assessment; - Development of recommendations and procedures; - Other.

    Activities of auxiliary departments: - Hardware and software providing; - Providing with standards and norms; - Development of 3D design data base; - Work planning; - Marketing and PR; - Project issuing

  • Organizational chart of ORGHIMproject Design Institute

  • Personnel of ORGHIMproject Design Institute

    Total Number of the Design Institute employees – 289 persons Average age of the employees – 46 years old

    0 5 10 15 20 25 30 35 40 45

    Group for computer-aided design Equipment purchasing group

    Translation group Planning department

    Archives Marketing and PR department

    Technical department Environment protection group

    Plot plan group Interconnections group

    Group for low-voltage electric devices Engineering documentation development group

    Heat insulation group Cost estimation department

    Civil department No. 2 Civil department No. 1

    HVAC and dust cleaning department Water supply and sewage department

    Electrical department Instrumentation department

    Process department No. 4 Process department No. 3 Process department No. 2 Process department No. 1

    Project managers Administration

  • Authorization documents Ukraine Russian Federation Republic of Kazakhstan

    Republic of Belarus Republic of Uzbekistan

  • Quality management system

  • Software

    Item No SOFTWARE description SOFTWARE assignment

    1 2 3

    1. Graphics – 2D, 3D, Visualization 1.1 «AutoCAD» Graphic editor

    1.2 «VetCAD» AutoCad utility set is targeted at the engineers that are involved into industrial and civil building design

    1.3 «Autodesk Building Design Suite Premium 2020 Russian» Software complex for 3D design, modeling visualization

    1.4 «Bentley AutoPLANT 3D» 3D design system for pipelines, equipment, steel structures

    2. Calculating Software 2.1 «Pro/II» Comprehensive process simulation

    2.2 «Prevalve» Calculate and select types of direct action safety valves (and safety valve manifolds equipped with switching devices) which are installed on vessels, tanks and in process pipelines

    2.3 «Hydrosystem» To perform thermal and hydraulic calculations as well as to select diameters of the pipelines which are used to pump liquid or gaseous products and gas-liquid mixtures

    2.4 «Isolation» Optimum choice of heat insulating structures and materials, calculation of minimum required heat insulating layer, selection of product size, estimation of work scope and total amount of materials, design documentation release

    2.5 «Autodesk Robot Structural Analysis Professional 2020» Software package for structural calculation and engineering

    2.6 «FOK COMPLEKS» Software system engineering of isolated foundations for frame building and facilities columns as well as strip foundations

    2.7 «Flowmeter ISO» Software system for calculation of media flow rate according to GOST8.586.(1, 2, 3, 4, 5) – 2005, to ISO 5167 (1, 2, 3:2003) and AGA-3 REPORT No 3 (for natural gas) as well as for flow rate calculation by means of special flow restrictors under Regulatory document 50-411-83

    2.8 «ProTreat» Tools for virtual reality modeling and calculation of facilities in the gas purification industry

    2.9 «GidrV» Program for hydraulic ducts calculation. It is provided for computer calculation of ventilation and mechanical forced aspiration systems as well as for free ventilation systems

  • Software (continued)

    Item No Software description Software assignment

    1 2 3

    2.10 «Start Prof» Pipe strength calculation

    2.11 «Passat» Stability and strength design of tanks, vessels and their elements

    2.12 «Dym» Calculation of smoke forced and exhaust ventilation systems

    2.13 «Potoк» Heating system engineering

    2.14 «VSV» Ventilation system calculation

    2.15 «RTI» Calculation of building heat loss

    2.16 «KALOR» Calculation of calorific installations

    2.17 «Fire SAFETY» Explosion and fire safety design and reference system

    2.18 «Toksy+ RISK» Software system to estimate the accident consequences involving emission release and risk values

    2.19 PK «Ecolog» Air pollution estimates (Unified Program of air pollution estimation ). It implements the provision « Analysis of air pollutant concentration found in the industrial emissions (General reference documentation - 86). State Committee for Hydrometeorology

    2.20 «Ecolog Noise» Noise impact assessment on environment and evaluation of noise exposure outgoing from area sources at any point

    2.21 «Mining works» Program for hazardous emission calculation for the equipment used in the open pit mining

    2.22 «АTP-ECOLOG» Program for emission amount released by fleet vehicles and vehicles production plants

    2.23 «VANISH PAINT» Program is designed to calculate emission release while applying vanish paint materials

    2.24 «WELDING» Provided for calculation of emission release during welding

    2.25 «Hazard class calculation» Calculation of waste hazard class for the environment according to “Criteria”

    2.26 «MPE-ECOLOG» Program for development and formation of maximum permissible emission draft standard matrix

    2.27 «WASTES» Program for preparation of standard drafts for waste production and limits

  • Software (continued)

    Item No. Software deswcription Software assignment

    1 2 3

    2.28 «ERA» Air emission calculation (according to the Norms of the Republic of Kazakhstan)

    2.29 «LIRA» Software system for automated civil structure engineering

    2.30 «WinSteel 7 Prof» Electronic international steel grade translator which is provided for prompt and easy search of analogue of foreign steel type

    3. Searching Systems of Regulatory Documents

    3.1 «NormaCS» Information and reference searching system of RF regulatory documents

    3.2 «IS PARAGRAPH» Information and reference searching system of Kazakhstan regulatory documents (Codes and Specifications )

    3.3 «Stroi-Inform PRO» Information and reference searching system of Ukrainian regulatory documents

    4. Diary and Network Scheduling

    4.1 «Primavera P6 Enterprise Project Portfolio Management» Project management

    5. Cost Estimating Software

    5.1 «IBK» Program for computer cost assessment of new construction, debottlenecking, modernization and retrofitting

    5.2 «Grand-Smeta» (Russia) Software system for cost estimating and checking as well as for creating report of completed works according to various certificate forms, making up of estimate documents in full range to estimate the construction cost

    5.3 «PIR System» (Russia) Computer system to estimate design and survey work cost

    5.4 «АВС 4» (Russia, Kazakhstan) To develop estimate and life documentation by all members of investment process

    Besides Specialists perform some works connected with software PDMS AVEVA and Tekla Structures

  • COMPLETED PROJECTS OF NOTE

    (SINCE 2014)

  • AMMONIA/METHANOL/UREA COMPLEX, UNIT FOR RAW (RIVER) WATER TRATMENT PRODUCTION CAPACITY: 1,200 m3/hr. Client: Ammoni OJSC (Kazan, Russian Federation) Phase: Design (Stage P) & Detailed Design Year of completion: 2014

  • COMPLEX FOR VGO HIGH CONVERSION AT KHABAROVSK OIL REFINERY Client: Technicas Reunidas (Madrid, Spain) Phase: Detailed documents (adaptation to existing Russian Federation norms and regulations) Year of completion: 2014

  • SECOND TRAIN OF LOW-TONNAGE UNIT (MTU) FOR MOTOR FUELS OF EURO-5 EMISSION STANDARD Client: Condensate JSC (Aksay, Republic of Kazakhstan) Phase: Design & Detailed documents Year of completion: 2015

  • M-3 UREA PLANT. TECHNICAL REVAMP TO INCREASE CAPACITY UP TO 1,600 T/DAY AT PrJSC SEVERODONETSK AZOT ASSOCIATION Client: Casale SA (Lugano, Switzerland) Phase: Design & Detailed documents Year of completion: 2015

  • Construction of Complex for gas extraction, treatment and liquefaction, offloading of LNG and gas condensate at South Tambey Gas Condensate Field Client: BRANCH OF GENERAL PERTNERSHIP "SOUTH TAMBEY LNG“ (Sabetta Settlement, Yamal District, Yamalo-Nenets Autonomous District, Russian Federation)

    Rendering services in field of engineering and technical management and supporting documents preparation meeting SRO norms and regulations as well as RF norms and regulations in course of construction works

    Year of completion: 2016

  • METHANOL AND AMMONIA PLANT COMPLEX WITH CAPACITY OF 450,000 TPY AND 135,000 TPY RESPECTIVELY Client: JSC Shchekinoazot (Shchekino, Russian Federation) Rendered complex of works: - FEED; - Investment feasibility study; - Technical maintenance, acceptance and examination of Licensor

    basic design; - Development of design documents; - Development of detailed documents; Including General Designer functions. Year of completion: 2017

  • Revamping Project of Water Treatment units of Electrical stations k.94, k.94/1, k.94/3, k.199a, Water Supply facility of Power Production. Client: Shchekinoazot UCC (Shchekino, Russian Federation) Stage: Design (Stage P) Year of completion: 2018

  • REVAMPING OF C.5026 OF NON-CONCENTRATED NITRIC ACID PRODUCTION FACILITY FOR PRODUCTION RATE INCREASE Заказчик: "KuibyshevАzot" PJSC (Togliatti, Russian Federation) Stage: Design (Stage P) & Detailed Design Year of Completion : 2018

  • POLYETHYLENE PRODUCTION PLANT CONSTRUCTION PROJECT (ASTRAKHAN REG, RUSSIAN FEDERATION) Client: FINPROM LLC (Moscow, Russian Federation ) Phase: Feasibility study year of completion : 2019

  • Projects in Progress No. Client Region Works

    1 "KuibyshevАzot" PJSC Togliatti, Russian Federation

    -Technical Inspection of existing constructions -Design Documentation Package development and Authority Engineering for State Expertise Examination -Detail design and engineering survey for Revamping of k.502b Weak Nitric Acid production plant with capacity increasing

    2 Shchekinoazot UCC Shchekino, Russian Federation Detailed Design for Revamping Project of Water Treatment units of Electrical stations k.94, k.94/1, k.94/3, k.199a, Water Supply facility of Power Production

    3 Shchekinoazot UCC Shchekino, Russian Federation Engineering services for development of operational and maintenance documents (ETD) for M-500 Methanol Production Plant

    4 Shchekinoazot UCC Shchekino, Russian Federation Design work package "Project for connection of M-500 Methanol Production Plant to natural gas pipeline at the industrial site of Shchekinoazot UCC"

    5 Shchekinoazot UCC Shchekino, Russian Federation Detailed Design for the Revamping Project of Water Treatment units of М-450 к.956/07, Water Supply facility of Power Production

    6 FINPROM LLC Moscow, Russian Federation

    Feasibility study Astrakhan Polyethylene Plant

    7 Shchekinoazot UCC Shchekino, Russian Federation Detailed Design for construction of the new piperack p.M-1

    8 PromTechEngineering LLC Russian Federation, Moscow

    Ulyanovsk, Russian Federation

    Design documents Production complex for production of 2-ethylhexanol with a production capacity of 75 thousand mtpy related. Utilities, Infrastructure & Off-site facilities

    9 Shchekinoazot UCC Shchekino, Russian Federation Development of design and detailed documents «Start-up steam pipeline Р operat. = 5,5 МPa, Т=420 °C for М-500 Methanol Production Plant»

    10 Amursky Gas Processing Plant (GAZPROM group) Amursky region, Russian Federation

    Detailed drawings set development Development of detailed drawing sets for sewage lift stations for Amursky GPP facility

  • Projects in Progress No. Client Region Works

    11 Transnational Company Kazchrome JSC, Aktobe Ferroalloy Plant

    Aktobe, Republic of Kazakhstan

    Detailed design Reconstruction of aspiration systems of crushing and screening complex (DSK-600) in area of Start-up Division at Melting Shop No. 4 of Aktobe Ferroalloy plant, a branch of Transnational Company Kazchrome JSC

    12 Metafrax JSC Gubakha, Russian Federation Development of operation and maintenance documents

    13 Togliattiazot PJSC Togliatti Russian Federation

    Design documents 01A Ammonia unit at Togliattiazot PJSC under project "Technical modernization of Unit No. 01A control"

    14 Shchekinoazot UCC Shchekino, Russian Federation

    Design and detailed documents Bringing the quality of artesian water of Vozdremsky water intake to SanPin 2.1.4.1074-01 requirements (potable water quality)

    15 Shchekinoazot UCC Shchekino, Russian Federation

    Revamping of pumping station at Shchekino State District Power Plant in order to increase production capacity up to 2500 m3/h

    and others

  • Clients and Partners

  • Occupational Health and Safety Policy

    Priority of life and health of workers, strict observance of industrial safety requirements are fundamental principles in the activities of society. The Company has a labor protection and industrial safety management system. The administration is obliged constantly strive to improving conditions and safety of all the Company employees and safety of the work performed. Employees are obliged to know and comply with requirements of regulatory acts on labor protection and industrial safety, to take care of personal safety and health, as well as safety and health of other people when executing the work.

  • Contact information

    Head Office of Private Joint-Stock Company "Severodonetsky ORGHIM“ Location / Mailing address: 32, prospect Gvardeisky, Severodonetsk, Lugansk Region, 93411, Ukraine Tel.: +38 (06452) 2-85-25 Fax: +38 (06452) 2-85-19 e-mail: [email protected] Design Institute «ORGHIMproject» Location / Mailing address: 6, Nauki St., Severodinetsk, Lugansk Region, 93406, Ukraine Tel.: +38 (0645) 70-14-56 Fax: +38 (06452) 5-49-30 e-mail: [email protected]

    mailto:[email protected]:[email protected]

  • We are looking forward for cooperation!

    www.orghim.ua [email protected]

    February 2020

    http://www.orghim.ua/mailto:[email protected]

    Слайд номер 1Слайд номер 2Слайд номер 3Слайд номер 4Слайд номер 5Слайд номер 6Слайд номер 7Слайд номер 8Слайд номер 9Слайд номер 10Слайд номер 11�COMPLETED PROJECTS of note�(since 2014)Слайд номер 13Слайд номер 14Слайд номер 15Слайд номер 16Слайд номер 17Слайд номер 18Слайд номер 19Слайд номер 20Слайд номер 21Слайд номер 22Слайд номер 23Слайд номер 24Слайд номер 25Слайд номер 26�We are looking forward for cooperation!������www.orghim.ua� [email protected] ��February 2020�