Org Details

Embed Size (px)

Citation preview

  • 7/27/2019 Org Details

    1/5

    3.2 Manufacturing unitsLaguna Clothing has two manufacturing unit. One is at Jigani(Bangalore) and

    the other one is at Kanakapura.Production in Jigani unit started in 2006. This unit has 550workers and its

    capacity is 4500 shirts/day .While the other factory at Kanakapura was set up in

    2009.It has 1124 workers and its capacity is 6000 shirts/day.

    3.3 Supply Chain

    Fabric

    Besides Monti India, Soktas, Raymond,

    Morajee, Arvind, Vardhaman and

    Ashima

    Chinese mills Lu Thai and Younger

    Italian Mills Monti, Leggiuno

    Trims & Accessories

    Wendler, Chageurs, Fredenberg, DHJ,

    Permess, Kufner Interlinings

    Wide range of buttons including dyed

    and embossed and fine mother of pearl

    Local suppliers of thread, labels, hand tags, packaging material

    Import of special trims from China

    3.4 Lead Times

    Handlooms: Average lead time 1 week; Fast track: 3 days

    Sample Length: Average Lead time 3 weeks; Fast track: 2 weeks

    CAD within two days

    Shirt and Salesman samples: According to requirement

    Lead time for fabric:

    Yarn dyed: 8 weeks

    11

    Fig 3.1: Laguna Clothing suppliers

  • 7/27/2019 Org Details

    2/5

    Piece dyed: 6-7 weeks( 4 weeks if greige fabric is available)

    3.5 Work flow in departments

    The workflow of Laguna Clothing Pvt. Ltd is a planned and coordinated effort

    from all the departments. Focusing on the Quality, audit is performed at every

    stage of manufacture right from pre-production to post production. Following are

    the departments of Laguna :

    1. Merchandising Department

    2. Sampling

    3. Warehouse Department

    4. CAD Department

    5. Cutting Department

    6. Sewing Departments

    7. Finishing Department

    8. Quality Assurance

    9. Industrial Engineering

    10.CSO Department

    11.Training Department

    12.Maintenance Department

    13.Human Resource & Administration Department

    All these departments are directly or indirectly related to the process of

    production. The following flowchart gives the clear picture as to how the

    work flows in the departments, which are directly involved for the process

    of production right from receipt and conformation of order to purchase

    than production to final finishing processes:

    12

  • 7/27/2019 Org Details

    3/5

    13

    BUYER MERCHANDISER SAMPLING

    MERCHANDISERORDERCONFIRMED

    CADSUPPLIER

    PURCHASE

    WAREHOUSESEWING

    PACKAGING CSO AUDIT

    DISPATCH

    FINISHING

    Sends techpack

    Sends sample

    Tech packsend

    Correction in

    samples

    BUYER

    Sendssample

    Gives totalfabricconsumption Orders

    fabric

    CUTTING

    Afterinspection

    Gives marker

  • 7/27/2019 Org Details

    4/5

    3.6 Material flow

    14

    Fig 3.2: Work Flow at Laguna

    FABRICINHOUSE

    INSPECTION ISSUED TOCUTTING

    CUTTING

    SPREADINGFUSING

    BUNDLING

    SEWINGTRIM AND EXAMEND OF LINE AUDIT

    DISPATCH

  • 7/27/2019 Org Details

    5/5

    15

    Fig 3.3: Material Flow at Laguna