15
Fiona Aldous Wagdy Anis FAIA H. Jay Enck, PE David Lang, AIA Dirk Meyer, AIA Jesse Wadeson Wiss Janney Elstner Associates Wiss Janney Elstner Associates Commissioning & Green Building Solutions Ballinger GSA Clark Construction

Order of Presentations

Embed Size (px)

DESCRIPTION

Order of Presentations. 10.30am-12 noon October 21, 2010. Dirk Meyer, AIA GSA David Lang, AIA Ballinger Jesse Wadeson Clark Construction H. Jay Enck, PE Commissioning & Green Building Solutions, Inc. Fiona Aldous Wiss Janney Elstner Associates, Inc Wagdy Anis, FAIA - PowerPoint PPT Presentation

Citation preview

Page 1: Order of Presentations

Fiona Aldous Wagdy Anis FAIA

H. Jay Enck, PE David Lang, AIA Dirk Meyer, AIA Jesse Wadeson

Wiss Janney Elstner

Associates

Wiss Janney Elstner

Associates

Commissioning & Green Building

Solutions

Ballinger GSA Clark Construction

Page 2: Order of Presentations

2

Order of Presentations

Perspectives on Exterior Enclosure Commissioning

Dirk Meyer, AIA GSA

David Lang, AIABallinger

Jesse WadesonClark Construction

H. Jay Enck, PECommissioning & Green Building Solutions, Inc.

Fiona AldousWiss Janney Elstner Associates, Inc

Wagdy Anis, FAIAWiss Janney Elstner Associates, Inc.

10.30am-12 noonOctober 21, 2010

Page 3: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

3

An Architect’s Perspective on BECx

WISCONSIN INSTITUTES FOR DISCOVERYMadison, Wisconsin

ITERATIVE FEEDBACK LOOPS & HIGH-PERFORMANCE GREEN BUILDINGS

Page 4: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

4

Wisconsin Institutes for Discovery (WID-MIR)

INTERDISCIPLINARY COLLABORATIVE RESEARCH FACILITY

Page 5: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

5

Wisconsin Institutes for Discovery (WID-MIR)

3 THIRD FLOORRESEARCH NEIGHBORHOODS

Page 6: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

6

WID-MIR Building Enclosure Co-Development Team

Owner

ConstructionManager

Architect

I.P.D.Collaborative

Team

Ballinger Findorff

University of Wisconsin& WARF

MortensonUihlein-Wilson

MorgridgeInstitute for

Research

CS&E

Linel Signature

Protean

H.J. Martin

NBKGraef

AEI

PSJ

Wiss Janney Elstner Associates

Olin

Huffman Facility Development

IntegratedProject Delivery

Team

Enclosure CommissioningOwner’s Representative

Kawneer

Architect’sConsultants

EnclosureContractors

WISCONSIN INSTITUTES FOR DISCOVERY

Enclosure Peer Review

Page 7: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

7

The Future of High-Performance Green BuildingsBuildings Technology R&D VisionEnable designs of new buildings and retrofitsof existing buildings that over the life cycle:

• Produce as much energy as they consume (NZEB).

• Double the service life of building materials, products, and systems and minimize life cycle impacts.

• Reduce domestic water use by 50% (to 50 gal/day per person), maximize water recycling and rainwater harvesting, and minimize stormwater runoff.

• Achieve breakthrough improvements in indoor occupant health, productivity, and comfort.

Figure 3. Approach for Achieving Net-Zero Energy Buildings

2000 20302010 2020

Page 8: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

8

Holistic High-Performance Green Building Enclosures

Durability

EnergyEfficiency

HumanComfort

High-PerformanceSustainability

Social Environmental

Economic

Thermal Comfort

Modulated Daylight

View

Details That Last

Airtightness

Thermal Resistance

ModulatedPermeability

Solar Shading

Daylighting

Materials That Last

Thermal Mass

Good Indoor Air Quality

Ease of Maintenance

Water Resistance &Condensation

Control

OccupantControllability

TripleBottom Line

Page 9: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

9

Human Comfort: Building Enclosure as Third Skin

FIRST SKIN SECOND SKIN THIRD SKIN

Modulated PermeabilityThermal ResistanceWater Resistance

AirtightnessUV Resistance

Daylight & View

Vapor PermeabilityThermal ResistanceWater ResistanceWind Resistance

UV ResistanceLayered & Adaptable

Modulated PermeabilityThermal Regulation

Water ResistancePhotosensitive

Page 10: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

10

Durability: Expiration Date of Building Enclosure

Werner SobekHouse R128

Stuttgart, Germany2000 A.D.

Triple Glazed Units

Life Expectancy of Wall:30 Years +

HadrianPantheon

Rome, Italy126 A.D.

Concrete with Brick Surface

Life Expectancy of Wall:1884 Years +

BallingerWisconsin Institutes for Discovery

Madison, Wisconsin2010 A.D.

Terra Cotta Rainscreen on Concrete Block

Life Expectancy of Wall:100 Years +

LIGHTWEIGHT WALL INTERMEDIATE WEIGHT WALL HEAVYWEIGHT WALL

Page 11: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

11

Energy Efficiency: Building Energy Flow Diagram

Integrated Building Design Seeks System Synergies to Reduce Inefficiencies and Waste

High-PerformanceBuilding Enclosure

Adapted from: Buro Happold Consulting Engineers andJ. Lovell, “Building Envelopes: An Integrated Approach”

Building Enclosure

Solar Hot Water & PV

IntegratedBuilding Systems

Low-Energy RadiantCooling & Heating System

Geoexchange System

Page 12: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

12

Integrated Design Process: Recommended Reading

OPTIMIZED ENCLOSURE DESIGN

INTEGRATED BUILDING SYSTEMS

HIGH-PERFORMANCEGREEN BUILDING

Holistic SustainabilityHuman Comfort

DurabilityEnergy Efficiency

Radiant Heating & CoolingDisplacement Ventilation

Low EnergyLow Maintenance

Modulated PermeabilityThermal ResistanceWater Resistance

AirtightnessUV Resistance

Daylight & View

TOTALBUILDING

Cx

Page 13: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

13

Integrated Design Process: Iterative Feedback Loops

Page 14: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

14

BECx Process: Iterative Feedback Loops

BECx Feedback LoopsEnable Improved Quality of

Building Enclosure

Page 15: Order of Presentations

Perspectives on Exterior Enclosure Commissioning

15

BECx Process: High-Performance Decision Analysis

“Good Enough” Is Not Enough Anymore