Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Danko van der Laan
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
1
Outline
•
•
•
•
•
•
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
2
Conductor on Round Core cables
• • • • •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
3
Science behind CORC cables: strain management
76 K
εirr
εm
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
4
Relation between Tc(ε) and Jc(ε) in YBCO
δ
ε ε
ε ε
Tc, Jc Tc, Jc ε
I
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
5
Anisotropic in-plane reversible strain effect in CC
a
b
α = 0° α = 45° α = 90°
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
6
Strain effect on Ic of CORC cables
εopp.
σ
σ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
7
CORC cable development for accelerator magnets
•
•
• • •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
8
Testing of CORC cables at high fields
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
9
CORC cable test facilities in the U.S.
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
10
Early CORC accelerator cable development
μ
• • •
• •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
11
CORC cable machine
• •
• •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
12
Improvement in CORC cable quality
• •
• •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
13
Early CORC cable terminations
• • • •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
14
New CORC cable terminations
• • • •
•
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
15
Current densities in early CORC cables
μ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
16
Thinner tape substrates are coming!
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
17
Effect of substrate thickness on minimum former size
• μ• •
•
α ε μ ε μμ
• μ• μ• μ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
18
CORC cable wound from tapes with 38 μm substrate
α
• μ• • • • • • • •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
19
Contact resistance at 4.2 K and 17 T
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
20
Performance at 4.2 K and 17 T
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
21
Projected Je 4.2 K and 20 T
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
22
Current status
Phase II SBIR DOE-High Energy Physics Award DE-SC0009545
μ
μ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
23
Tapes with enhanced pinning are becoming available
0 20 40 60 80 100 120 1400
50
100
150
200
250
300
350 SP 7.5% Zr; 4 mm; 38 um sub. SP 15% Zr; 4 mm; 50 um sub. SP 15% Zr; 3 mm; 50 um sub. SP 15% Zr; 2 mm; 50 um sub.
I c(4.
2K, 2
0T, B
IIc)
Ic(77K, SF)
6 8 10 12 14 16 18 20 22200
250
300
350
400
450
500
550
600
650 SN1 SN2 SN3
I c(4.
2K, B
IIc)
B, T
248.8 A
• • μ• •
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
24
Tapes with thicker films are becoming available
μ
μ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
25
CORC cable performance projections
μ μ
μ
μ
μμ
μ μ
μ μ
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
26
Summary
• • •
• μ• •
• • •
• μ••
•
IEEE/CSC & ESAS SUPERCONDUCTIVITY NEWS FORUM (global edition), July 2015. Invited presentation M1OrA-01 given at CEC-ICMC 2015, Tucson, USA, June 28 – July 2, 2015.
27