15
OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload & processing tasks customize your processing using PAGES simple data quality analysis improve survey accuracy constrain to local networks publishing support (limited)

OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Embed Size (px)

Citation preview

Page 1: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

OPUS Projects (beta) status and plans

Improved solutions for simultaneous or repeated observationsharvest data from multiple observersshare upload & processing taskscustomize your processing using PAGESsimple data quality analysisimprove survey accuracyconstrain to local networkspublishing support (limited)

Page 2: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

options:projects & publishing

yoursolution

mark description

IGS & NGS base stations & site information filesIGS antenna calibrations & satellite orbits & reference framesUNAVCO teqc converterPAGES baseline processor var. geophysical modelsNGS geodetic toolkit

yourGPS data

standard geodetic data

OPUSOnline Positioning User Service

JGE 2013 v1free, fast, easy, consistent coordinates

geodesy.noaa.gov/OPUS

Page 3: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Static: OPUS determines your position with a differential GPS static solution, using hours of data.

This process is repeated 4x from other CORS.

baseline 1

baseline 3

baseline 4

baseline 2

baseline 5

Page 4: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

OPUS-projects: first, run OPUS to harvest all project data

OPUS automatically forms sessions from simultaneously observed marks, enabling multi-baseline processing and adjustment of redundant observations.

Page 5: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Why complicate OPUS?

2013-08-14 OPUS Projects 5

solution HATFIELD solution MCCOY

OPUS Session Adjustment

Page 6: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

solution HATFIELD solution MCCOY

Why complicate OPUS?

2013-08-14 OPUS Projects 6

OPUS Session Adjustment

session 001

Page 7: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Why complicate OPUS?

2013-08-14 OPUS Projects 7

OPUS Session Adjustment

session 002

session N

solution HATFIELD solution MCCOYsession 001

Page 8: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Why complicate OPUS?

2013-08-14 OPUS Projects 8

network adjustment

OPUS Session Adjustment

session 002

session N

solution HATFIELD solution MCCOYsession 001

Page 9: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

What’s all that really mean for me?OPUS solutions = pretty good, but each treated as

independent and assumes “perfect” CORS.Sessions = simultaneously-observed marks processed

together in sessions increases consistency. Adjustments = interlinking sessions through network

adjustments increases accuracy.

2013-08-14 OPUS Projects 10

Page 10: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

Limitations?• Internet is required.

• Training is required for project managers.

• OPUS Static data restrictions apply.Dual-frequency static, 2 - 48 hours duration

• Project size.1 – 100 marks per session< a few hundred data files total

2013-08-14 OPUS Projects 13

Page 11: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

OPUS Projects 14

OPUS Projects TrainingBecause of its increased complexity, training is required to be an OPUS Projects manager. These workshops are usually two day in length and small so that there is ample time forone-on-one interaction with the instructor.

Check the NGS training center schedule for upcoming workshops run by NGS.

2013-08-14

Page 12: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &
Page 13: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &
Page 14: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

User guidein finaldevelopment

Page 15: OPUS Projects (beta) status and plans Improved solutions for simultaneous or repeated observations harvest data from multiple observers share upload &

OPUS Projects 18

The OPUS upload page is the access point for all things OPUS.

2013-08-14