Options to Manage Electricity Demand and Increase Capacity in Santa Delano County Jon Cook Jeff Kessler Gabriel Lade Geoff Morrison Lin’s Lackeys

Options to Manage Electricity Demand and Increase Capacity in Santa Delano County

  • Upload
    bjorn

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Options to Manage Electricity Demand and Increase Capacity in Santa Delano County. Lin’s Lackeys. Jon Cook Jeff Kessler Gabriel Lade Geoff Morrison. Project Overview. Assess options available to Santa Delano Electric Company (SDEC) to handle load growth and increased EV penetration - PowerPoint PPT Presentation

Citation preview

Page 1: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Options to Manage Electricity Demand

and Increase Capacity in

Santa Delano County

Jon CookJeff Kessler

Gabriel LadeGeoff MorrisonLin

’s La

ckey

s

Page 2: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Project OverviewAssess options available to Santa Delano Electric Company (SDEC) to handle load growth and increased EV penetration

Options Assessed New transmission & distribution infrastructure Demand response & time-varying pricing Controlled EV charging Battery storage

Lin’s Lackeys

Page 3: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Benefits of EV Adoption California’s Low Carbon Fuel Standard $42 million to $420 million in revenue

$20 to $200 per LCFS credit

External Benefits $109 to $263 from reductions in criteria pollutants

Lin’s Lackeys

Page 4: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Summary of Recommendations1. Expand grid to accommodate population

growth

2. $20 per month surcharge for L2 chargers

3. Install smart meters

4. Increase grid reliability w/ battery storage (450MWh)

5. Use dynamic pricing

Lin’s Lackeys

Page 5: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Implementation Impacts1. Rate change of $0.00/kWh to $0.002/kWh

2. Grid expansion costs: $66 million (if all EV load shifted)

3. EV Load shift program: $682 million in costs entirely offset by $20 per month surcharge

4. Install smart meters: $219 million in savings

5. Improved grid reliability: $124 million in savings

6. Dynamic pricing: $65 million in savings

Lin’s Lackeys

Page 6: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Costs of Load Growth Problem: Load growth from increasing population and increased EV penetration. Solutions: Install controlled level 2 chargers for EVs;

Dynamic pricing (CPP, TOU, or RTP).

Lin’s Lackeys

Page 7: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Peak Load Growth Scenarios

Lin’s Lackeys

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

7000

7200

7400

7600

7800

8000

8200

8400

8600

8800

9000

Population Only Max EV and Population (Level 1) 5% Load GrowthCEC Load Growth Max EV and Population (Level 2)

Peak

Cap

acity

(MW

)

Page 8: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

EV Load Shift (Level 2)

Lin’s Lackeys

-1000000

1000000

3000000

5000000

7000000

9000000Shifted EV Load Average Load

Time of Day

Pow

er L

oad

(kW

)

-1000000

1000000

3000000

5000000

7000000

9000000BAU EV Load Average Load

Time of Day

Pow

er L

oad

(kW

)

Page 9: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Cost of Shifting Load Free level 2 chargers that let utility control charge times Costs recovered by $20/month surcharge on level 2 charger owners

Monthly surcharge mitigates equity concerns

Lin’s Lackeys

Page 10: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Costs of Load Growth by 2030Cost projections of grid expansion: Due to population growth: $66 million (Range: $32-202 million)

Due to population + EV growth: All Level 2: $692 million Controlled Level 2: $66 million

Lin’s Lackeys

Page 11: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Demand Response Average load impact of 0.005 to 0.006 kW/household

Dynamic Pricing pilot suggests $7M in annual savings for SDEC $65M

Conduct additional pilots Compare impacts of RTP with TOU and CPP

Lin’s Lackeys

Page 12: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Battery Storage and Smart Meters Smart meters save money Non-smart meters cost $430 million Smart meters cost $211 million

450 MWh of battery storage offers increased reliability Saves rate payers up to $392 million

Costs rate payers $268 million

Lin’s Lackeys

Page 13: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Summary of Recommendations1. Expand grid to accommodate population

growth

2. $20 per month surcharge for L2 chargers

3. Install smart meters

4. Increase grid reliability w/ battery storage

5. Use dynamic pricing

Lin’s Lackeys

Page 14: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Questions?

Lin’s Lackeys

Page 15: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Summary of Costs

Lin’s Lackeys

Page 16: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Determining EV Adoption

Vehicle Purchase Model Projected vehicle use 9% turnover rate per year

EV Diffusion Model Modeled after HEV uptake in SF

Lin’s Lackeys

Page 17: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Electric Vehicle Adoption

Lin’s Lackeys

Page 18: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Diffusion Curves

Lin’s Lackeys

Page 19: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

EV Load Profile

Charging follows a normal distribution

87% of charging between 5 and 8 pm Average charge for 23 miles of daily travel

Lin’s Lackeys

Page 20: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Seasonal Loads in SDEC Territory

Lin’s Lackeys

Page 21: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Temperature vs. Wholesale Price

Lin’s Lackeys

Page 22: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Cost of Load Growth Detail Assume expansion of load up to 5% requires expansion of substations and transformers.

Assume expansion beyond 5% requires new substations and transformers as well as upgrades to lines and feeders.

Use data provided by Ms. Alesia Gonzales and yearly projections of demand growth to calculate discounted sum of expansion costs, assuming upgrades undertaken as needed.

Lin’s Lackeys

Page 23: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Cost of Load Growth Detail (cont.)

Lin’s Lackeys

  $/MW System Peak Mean St. DevAverage Capital

CostsSubstation/Transformers $43,064 $18,903

Lines/Feeders $237,644 $100,906Marginal Capital

CostsSubstation/Transformers $91,062 $94,919

Lines/Feeders $447,964 $589,524Average O&M

CostsSubstation/Transformers $424 $306

Lines/Feeders $7,671 $4,470

Load Demand % Growth

Substation/Transformers & Lines/ Feeder %

Upgrades

Mean Costs Expanding

Yearly O&M Costs

1% 5% $238,933 $3,5882% 8% $382,293 $5,7413% 10% $477,867 $7,1774% 14% $669,013 $10,0475% 18% $860,160 $12,918

Page 24: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Modeling Long-Term Contracts Most of SDEC’s electricity comes from long-term contracts Use existing year of load and wholesale price data to simulate future load service costs

Contracts are good for a range of potential loads (avg. load for a given hour ± 1 std. dev.)

Price per kWh for contract is determined by avg. wholesale cost for that hour

If forecasted load is greater than max contract load, then extra power must be bought from wholesale market at spot price (vice versa for selling extra power)

Lin’s Lackeys

Page 25: Options to  Manage Electricity Demand and Increase Capacity in  Santa Delano County

Modeling Long-Term Contracts

Lin’s Lackeys

Load (kW)

Contract coverage

For all hours h ending 01:00 – 00:00

Avg. Load in hour h

Y(+ 1 s.d.)

X(- 1 s.d.)

0

Contract provides Y, B-Y must be bought on wholesale market

B

A

Contract provides entire load (A)

Contract provides X, X-C is sold on wholesale market