9

OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

Embed Size (px)

Citation preview

Page 1: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)
Page 2: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

OPTIONAL

The second lifting guide rail is ready for the secondary lifting trolley(optional part).

Page 3: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)
Page 4: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

Power SwitchTurn it clockwise to connect the circuit

"UP" buttonLong press it to lift the platforms

Indicatorwhich will light when the power switch opens.

"LOCK" buttonPress it to lock the lift

"DWON" buttonLong press it to lower the platforms

Buzzer

Page 5: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

The air cylinder

The safety pawl

The safety gear

Page 6: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

Locking function

1.Long press the button "UP"/"DOWN",the safety pawl will be lifted by air cylinder.

2.Release the button "UP"/"DOWN",the safety pawl will fall to the safety gear itself.

3.When press the button "lock",the lift will first lowering a little,and then the safety pawl moves to the nearest safety gear to lock the lift tightly.LOCKED

TIGHTLY

Page 7: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

Unlocking function

Long press the button "DOWN" to unlock and lower the lift.

UNLOCKED

Page 8: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)

Turn the ball valve on the control box anticlockwise

1.Long press the button "UP" to lift the second lift trolley.

2.Long press the button "DOWN" to lower the second lift trolley.

BALL VALVE

Page 9: OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part)