June 1, 2009 12GeV Upgrade - Beam Transport “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

“Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Embed Size (px)

DESCRIPTION

12GeV Upgrade - Beam Transport. “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts. June 1, 2009. Outline. Introduction Beam Transport S/R Layouts Status/Summary. Introduction. - PowerPoint PPT Presentation

Citation preview

Page 1: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

June 1, 2009

12GeV Upgrade - Beam Transport

“Option B”Spreader/Recombiner Design Review

Beam Transport S/R Layouts

Page 2: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Outline

• Introduction• Beam Transport S/R Layouts• Status/Summary

Page 3: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Introduction• The 12GeV upgrade requires

extensive modifications to the spreader and recombiner regions of the machine

• These are the most congested regions in the beam transport system

• Goal to reuse as much of the existing hardware as possible– Complicated by incomplete

documentation of girders/bracketry

• The 12GeV 2008 layouts never progressed beyond the rough 2D songsheet level

Page 4: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Introduction – cont’d

Option B Layouts:– Established symmetry between spreader/recombiner

• Reduces layout design effort– Fewer unique dipole bracket designs– Step height ratios are consistent between S/R

» Allows consistent quad layout between S/R– Include new septa layout(Tief layout) in the east spreader– Rotates several existing girders to “fix” element sequence

(BPM-Quad-Correctors) – Ops request– Quads positioned based on step height ratios– Requires no change to matching section quad girder layouts– Significant effort has been made to gather and model as-built

S/R information

Page 5: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts

• Two spreader regions– East and west spreaders

• Three recombiner regions– East, west and transport recombiners

Page 6: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – East Spreader

Current Configuration

June 2008 12GeV Configuration

Page 7: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – West Spreader

Current Configuration

June 2008 12GeV Configuration

Page 8: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – East Spreader

12GeV Option B Configuration

•Replaced 2m dipole in Hall D line with three 1m dipole magnets

•Rotated 3S03 girder to put BPM upbeam of quad

•Added BPM in 7 line, IPM7S03A per I&C’s CR 08-040

•Incorporated the Tiefenback septa layout

•Quadrupoles match requirements set by Alex

•Layout requires only three girders be rebuilt and minor mods to three others

Highlights…

June 2008 12GeV Configuration

Page 9: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – East Recombiner

•Rotated 1, 3, 5, & 7 line girders in the “step” to put BPM upbeam of the quad (exceptions: 3R08 & 7R08)

•Added BPM in line 7, IPM7R07A per I&C’s CR 08-040

•Quadrupoles match requirements set by Alex

•Layout requires only two girders to be rebuilt and minor mods to two others

Highlights…

12GeV Option B Configuration

June 2008 12GeV Configuration

Page 10: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – West Spreader

Highlights…

12GeV Option B Configuration

•Added BPMs in lines 6 &8, IPM6S03A & IPM8S03A per I&C’s CR 08-040

•Quadrupoles match requirements set by Alex

•Layout requires only one girder to be rebuilt and minor mods to five others

June 2008 12GeV Configuration

Page 11: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – West Recombiner

Highlights…12GeV Option B Configuration

•Added BPMs in lines 6 & 8, IPM6R07A & IPM8R07A per I&C’s CR 08-040

•Quadrupoles match requirements set by Alex

•Layout requires minor mods to five girders

June 2008 12GeV Configuration

Page 12: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport S/R Layouts – Transport Recombiner

Highlights… 12GeV Option B Configuration

•Added vertical correctors at 6T09, 8T07, & 8T09 to meet 12GeV BdL specs

•New correctors required small shifts in the 6 & 8 line quads relative to the data transmitted to Alex… preparing request to CASA to evaluate alternate AT quad layout for use in all west S/Rs

•Quadrupoles match requirements set by Alex

•Layout requires minor mods to eight girders in the “step”

June 2008 12GeV Configuration

Page 13: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Status/Summary

• Still expect small changes to the S/R layouts• Design efforts are focused on items not likely to be impacted by layout

changes– Will hold-off on the design of the vertical support stands until layout

has “totally frozen after feedback from this review” • Dipole & girder support arm locations laid in to the 95% level… still

refining a few areas– Bracket designs ~80% complete

• We have nearly completed the new and modified quad girder designs and associated detail drawings

• New and modified dipole vacuum chambers designs are ~50% complete– Looks like ~50% of the total will be recycled from existing machine

• Will begin detailed septa vacuum chamber design this month

Page 14: “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

Beam Transport Layouts – Selected Images