Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Option B Refined
San Diego
Escondido
Murrieta
Riverside/Corona
East San Gabriel
Valley Ontario Airport
Palmdale
Anaheim
Norwalk Los Angeles
Burbank
Bakersfield
Kings/Tulare (Potential Station)
Fresno
Merced
Modesto
Stockton
Sacramento
San Jose Redwood City or Palo Alto
(Potential Station)
Transbay Transit Center
Millbrae-SFO
Gilroy
Engineering Plans
Burbank to Los Angeles
Volume 8 Link Union Station (Link US) by Metro
April 2019
PRELIMINARY ENGINEERING FOR PROJECT DEFINITION (PEPD)
CALIFORNIA HIGH-SPEED TRAIN PROJECTVALLEY/RIVER SUBDIVISION
BURBANK TO LOS ANGELES - OPTION SB REFINEDBURBANK TO LOS ANGELEVOLUME 8
LINK UNION STATION (LINK US) BY METRO
CALIFORNIAHIGH-SPEED
TRAIN PROJECTMAP
PROJECTLOCATION
+
+
+
+
PROJECT LOCATION MAP
COUNTYLOS ANGELES
AL
AM
ED
A
AV
E
GR
AN
DVIE
W
AVE
CO
LO
RA
DO
BL
VD
GL
EN
DA
LE
BL
VD
FL
ET
CH
ER
DR
BR
OA
DW
AY
MAI
N
ST
SO
NO
RA
AV
E BR
OA
DW
AY/
BR
AZIL ST
VE
RD
UG
O
WA
SH
LOS ANGELES RIVER
FIR
ST STREET
SE
GME
NT
TO
AN
AHEIM
LOS
AN
GELES
SE
GME
NT
LOS
AN
GELES
BURB
AN
K T
O
FL
OW
ER
ST
AR
RO
YO
SE
CO
CH
AN
NE
L
WE
ST
ER
N
AV
E VE
NT
UR
A
FW
Y (S
R-134
LE
ND
AL
E
FW
Y (S
R-2)
RO
YO
SE
CO
PK
WY (S
R-110)
SP
RI
NG
ST
(TAYLOR YARD)
METROLINK CMF
GOLDEN STATE F
WY (I-5
)
GLENDALECITY OF
LOS ANGELESCITY OF
CH
ASE
DR
CHE
VY
METROLINKGLENDALE
UNION STATION
LOS ANGELES
LO
S
FE
LIZ
RD
TO ANAHEIM
CHANNEL
BURBANK WESTERN
LA-
A ST
A S190+00
LIN
KUS ST
A 146+11.6
8 =
EN
D B-L
A C
HST PR
OJECT
OF THIS LOCATIONFOR WORK SOUTHSUBMITTAL (VOLUME 8)REFER TO LINKUSLINKUS STA 65+55.03B-LA STA 3697+99.27 =
GOLDEN STATE FWY (I-5)
BURBANKCITY OF
VE
RD
UG
O
AV
E
OLI
VE
AV
E
BU
RB
AN
K
BL
VDBUENA VISTA ST
HOLLYWOOD WAY
MA
GN
OLI
A
BL
VD
VICTORY BLVDTO PALMDALE
SAN FERNANDO R
D
OF THIS LOCATIONFOR WORK NORTH
PEPD SUBMITTAL (VOLUME 7)REFER TO SENER P-BP-B STA 2254+47.54
B-LA STA 3026+28.25 =
AIRPORT
BURBANK
EMPIR
E
AVE
VANOWEN ST
02000 2000 4000
1"=2000'SCALE APPLICABLE FOR FULL SIZE ONLY
)
NOT FOR CONSTRUCTION
FOR INTERNAL USE ONLYDESIGNED BY
C. CUSSONDRAWN BY
C. CUSSONCHECKED BY
K. PIRBAZARIIN CHARGE
K. PIRBAZARIDATE
04/30/2019
PEPD
RECORD SET
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED TRAIN PROJECTCALIFORNIA HIGH-SPEED TRAIN PROJECTCALIFORNIA HIGH-SPEED TRAIN PROJECT
BURBANK TO LOS ANGELES
PEPD
VOLUME 8
PROJECT LOCATION MAP
CONTRACT NO.
HSR14-39
DRAWING NO.
GE-A0801SCALE
NO SCALESHEET NO.
BURBANK
SACRAMENTO
SAN FRANCISCO
SAN DIEGO
MERCED
FRESNO
SAN JOSE
BAKERSFIELD
PALMDALE
LOS ANGELES
ANAHEIM
DATE CHK APPBYREV DESCRIPTION
OPTION B REFINED ALIGNMENT
G AR
boschal
I:\
Projects\4017456\4017456_0001\90_
CA
D
Models and
Sheets\
K2
L\
Sheets\
Vol 8\
K2
L-
GE-
A0801.dgn
4:14:54
PM
3/26/2020
t
:/
PEPD INDEX OF VOLUMES
VOLUME NO. CONTENT
VOLUME 1 GENERAL
TRACK ALIGNMENT
RIGHT-OF-WAY IMPACT
VOLUME 2 GENERAL
AERIAL STRUCTURES
TUNNEL
RETAINING WALLS
VOLUME 3 GENERAL
GRADE SEPARATIONS
ROADWAY IMPROVEMENTS
VOLUME 4 GENERAL
UTILITIES
GRADING AND DRAINAGE
TRACTION POWER FACILITIES SITE
COMMUNICATION SYSTEM SITE
AUTOMATIC TRAIN CONTROL SITE
VOLUME 5 GENERAL
STATIONS
MAINTENANCE FACILITIES
TRACKSIDE ACCESS
VOLUME 6 GENERAL
CONSTRUCTION PHASING PLANS
VOLUME 7 GENERAL
BURBANK AIRPORT STATION
VOLUME 8 GENERAL
LINK UNION STATION (LINK US) BY LA METRO
NOT FOR CONSTRUCTION
FOR INTERNAL USE ONLYDESIGNED BY
C. CUSSON
DRAWN BY
C. CUSSON
CHECKED BY
K. PIRBAZARI
IN CHARGE
K. PIRBAZARIDATE
04/30/2019
PEPD
RECORD SET
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED TRAIN PROJECT CALIFORNIA HIGH-SPEED TRAIN PROJECTCALIFORNIA HIGH-SPEED TRAIN PROJECT
BURBANK TO LOS ANGELES
PEPD
INDEX OF VOLUMES
CONTRACT NO.
HSR14-39
DRAWING NO.
GE-A0810
SCALE
NO SCALE
SHEET NO.
VOLUME NO. CONTENT
boschal
I:\
Projects\4017456\4017456_0001\90_
CA
DModels
and
Shee
s\
K2
L\
Sheets\
Vol
8\
K2
L-
GE-
A0810.dgn
4:38
38
PM
3/26
2020
REV DATE BY CHK APP DESCRIPTION
OPTION B REFINED ALIGNMENT
VOLUME 8 - GENERAL, LINK UNION STATION (LINK US) BY LA METRO
GENERAL
DRAWING NO. DRAWING TITLE
GE-A0800 COVER SHEET VOLUME 8
GE-A0801 PROJECT LOCATION MAP VOLUME 8
GE-A0810 INDEX OF VOLUMES
GE-A0811 INDEX OF DRAWINGS VOLUME 8
LINK UNION STATION (LINK US) BY LA METRO
DRAWING NO. DRAWING TITLE
FIGURE 2-5 FINAL EIR PROJECT FOOTPRINT (THROAT SEGMENT) (MAP 1 OF 5)
FIGURE 2-6 FINAL EIR PROJECT FOOTPRINT (THROAT, CONCOURSE AND RUN-THROUGH SEGMENT)
(MAP 2 OF 5)
FIGURE 2-7 FINAL EIR PROJECT FOOTPRINT (RUN-THROUGH SEGMENT) (MAP 3 OF 5)
DESIGNED BY
C. CUSSON
DRAWN BY
C. CUSSON
CHECKED BY
K. PIRBAZARI
IN CHARGE
K. PIRBAZARIDATE
04/30/2019
PEPD
RECORD SET
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED TRAIN PROJECCALIFORNIA HIGH-SPEED TRAIN PROJECCALIFORNIA HIGH-SPEED TRAIN PROJEC
BURBANK TO LOS ANGELES
PEPD
INDEX OF DRAWINGS
VOLUME 8 - SHEET 1 OF 1
CONTRACT NO.
HSR14-39
DRAWING NO.
GE-A0811
SCALE
NO SCALE
SHEET NO.
T
DATE CHK APPBYREV DESCRIPTION
T T
OPTION B REFINED ALIGNMENT
boschal
I:\
Projects\4017456\4017456_0001\90_
CA
D
Models and
Sheets\
K2
L\
Sheets\
Vol 8\
K2
L-
GE-
A0811.dgn
4:40:04
PM
3/26/2020
Link Union Station – Final EIR 2.0 Project Description
June 2019
Figure 2-5. Final EIR Project Footprint (Throat Segment) (Map 1 of 5)
HIGH SPEED RAIL TOENVIRONMENTALLY CLEAR:
- Electrify high-speed rail tracks
2-19
Link Union Station – Final EIR June 2019 2.0 Project Description
Figure 2-6. Final EIR Project Footprint (Throat, Concourse, and Run-Through Segment) (Map 2 of 5)
HIGH SPEED RAIL TOENVIRONMENTALLY CLEAR:
- Modifications to platforms 2 and 3.
HIGH SPEED RAIL TOENVIRONMENTALLY CLEAR:
- Electrify high-speed rail tracks
HIGH SPEED RAIL TOENVIRONMENTALLY CLEAR:
- Electrify high-speed rail tracks
2-21
Link Union Station – Final EIR June 2019 2.0 Project Description
Figure 2-7. Final EIR Project Footprint (Run-Through Segment) (Map 3 of 5)
HIGH SPEED RAIL TOENVIRONMENTALLY CLEAR:
- Electrify high-speed rail tracks
2-23