22
Optimization of the Piston cooling oil jet using Particleworks with modeFRONTIER David Percival – EnginSoft UK Rod Giles – Royal Enfield

Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

Optimization of the Piston cooling oil jet using

Particleworks with modeFRONTIER

David Percival – EnginSoft UK

Rod Giles – Royal Enfield

Page 2: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Royal Enfield - History

Longest established motorcycle company with continuous

production - since 1901

Redditch, UK 1901 - 1970

Chennai, India 1955 - present

Part of Eicher Group since 1994

Fastest growing motorcycle brand

30,000 units in 2005

720,000 units in 2018-19

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 2

Page 3: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Background

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 3

LS410

Himalayan

Royal Enfield is working on the LS410 engine for the

Himalayan bike

Adequate cooling of the Piston is essential in Engine

design

A poorly cooled Piston will warp over time affecting

the lifetime and reliability of the bike

Page 4: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Problem

No way of calculating oil distribution or cooing effect

Rely on physical testing and hardness analysis

Inaccurate results – poor reliability

Increases time to Market

Decreases profits

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 4

Page 5: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com 2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 5

“How can we be sure the

piston will not overheat

and warp?”

Page 6: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com 2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 6

Initial process

Page 7: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Initial Simulation

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 7

CAD Model Build Simulation

Page 8: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com 2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 8

Camera’s motion

linked to Piston

motion

Results - Distribution

Page 9: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Results – HTC Mapping

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 9

Page 10: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Drainage Flowrate

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 10

Drainage

holes

Draining

flowrate < 5%

of total flowrate

Probes

Page 11: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Drainage Flowrate

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 11

Average flowrate = 2.4% of

total flowrate

Page 12: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Initial project - Conclusions

Using Particleworks we are able:

Calculate the HTC distribution of the oil jet

Calculate the flowrate of oil draining out of the piston to the

cylinder

This allows Royal Enfield to identify issues during the

design process

Saving time and money during physical testing and prototypes

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 12

Page 13: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

ADDED VALUE PROJECT

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 13

Page 14: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Simulation Led Design

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 14

Page 15: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Particleworks - modeFrontier A Particleworks API was created by EnginSoft

UK

The node introspects the Particleworks model

and finds all parameters we can vary

Parameters are dragged into the GUI and

modeFRONTIER modifies the model and

launches pre-processing, solver and post-

processing

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 15

Page 16: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Simulation time reduction Mappings averaged over an entire cycle are

identical throughout simulation

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 16

Averaged from 0.2-0.24s

(8 cycles)

Averaged from 0.2-0.208s (1

cycle)

Averaged from 0.08-0.016s

(1 cycle)

Page 17: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Simulation time reduction Mappings averaged over an entire cycle are

identical throughout simulation

Flowrate though drainage holes is uniform

throughout simulation

Hence we are able to shorten the length of

the simulation to only 2 cycles (0.016s)

Simulation time can be reduced to 15-20

minutes

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 17

Page 18: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Design Modifications

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 18

-15° ≤ x Rotation ≤ 15°

-15° ≤ z Rotation ≤ 15°

1.2mm ≤ Nozzle diameter ≤ 2mm

Page 19: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Workflow

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 19

Local

Local

Cluster

Page 20: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Results

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 20

Rot X Rot Z Dia Avg HTC Num > 0 Flowrate

-6.1° -8.1° 1.906 826.27 658581 4%

Rot X Rot Z Dia Avg HTC Num > 0 Flowrate

-9.8° -15° 1.953 827.59 637548 2.6%

Rot X Rot Z Dia Avg HTC Num > 0 Flowrate

0° 0° 1.2 812.93 644866 2.4%

+1.80%

+2.13% +1.64%

-1.13%

Page 21: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

Ongoing work

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 21

Page 22: Optimization of the Piston cooling oil jet using Particleworks with … · 2020. 2. 18. · Royal Enfield - History Longest established motorcycle company with continuous production

www.caeconference.com

THANK YOU FOR YOUR ATTENTION

2019, 28 - 29 October 35th INTERNATIONAL CAE CONFERENCE AND EXHIBITION 22