24
sustainability of regulated infrastructure industries South African Economic Regulators Conference of 2012 Deon Joubert 21 August 2012

Optimal pricing for sustainability of regulated infrastructure industries

  • Upload
    ranger

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Optimal pricing for sustainability of regulated infrastructure industries . South African Economic Regulators Conference of 2012 Deon Joubert 21 August 2012. Main criteria to be analysed . Full recovery of all prudent costs incurred over life cycle Price stability - PowerPoint PPT Presentation

Citation preview

Page 1: Optimal pricing for sustainability of regulated infrastructure industries

Optimal pricing for sustainability of regulated infrastructure industries

South African Economic Regulators Conference of 2012

Deon Joubert21 August 2012

Page 2: Optimal pricing for sustainability of regulated infrastructure industries

Main criteria to be analysed

2

Full recovery of all prudent costs incurred over life cycle

Price stability

Electricity will be analysed as an example of an infrastructure industry

Page 3: Optimal pricing for sustainability of regulated infrastructure industries

Costs incurred in generating electricity

3

Acquisition cost of asset Operating and maintenance cost (fixed

cost) Fuel cost (variable cost)

Page 4: Optimal pricing for sustainability of regulated infrastructure industries

Costs incurred in generating electricity(cumulative over life cycle) (illustrative)

4

‘Constant’ Rand billion

Page 5: Optimal pricing for sustainability of regulated infrastructure industries

Costs incurred in generating electricity (cumulative over life cycle, levelised) (illustrative)

5

‘Constant’ Rand billion

Levelised Cost of Electricity (or LUEC: Levelised Unit

Electricity Cost)

Page 6: Optimal pricing for sustainability of regulated infrastructure industries

6

‘Constant’ Rand billion

Costs incurred in generating electricity(cumulative over life cycle, discounted) (illustrative)

Page 7: Optimal pricing for sustainability of regulated infrastructure industries

7

Basic regulatory formula for annual electricity revenue determination

AR = PE + O&M + Depreciation + Return on Capital (i.e. %ROA x RAB)

AR/sales volume = ave. tariff

Same as %WACC x total

capital

Note: the actual annual capital expenditure (cash capex) is not directly recovered in the revenue of that year

Page 8: Optimal pricing for sustainability of regulated infrastructure industries

8

Asset related ‘building blocks’

‘Constant’ Rand billion

Basic regulatory formula for annual electricity revenue determination

Revenue

‘building

blocks’

Pays for interest on

capitalPays for

redemption of capital (debt principle or

equity)

Page 9: Optimal pricing for sustainability of regulated infrastructure industries

Two main regulatory methods* to quantify the asset-related ‘revenue building blocks’ : depreciated historical cost (HC) inflation-indexed or depreciated

replacement cost (DRC)

* in typical cost-of-service type of revenue regulation

9

Page 10: Optimal pricing for sustainability of regulated infrastructure industries

Depreciated historical cost method:

10

Page 11: Optimal pricing for sustainability of regulated infrastructure industries

Illustrative revenue – first operational year of new power station

‘Constant’ Rand billion HC method

11

Page 12: Optimal pricing for sustainability of regulated infrastructure industries

Illustrative revenue – first two operational years of new power station

Note reduction

‘Constant’ Rand billion HC method

12

Page 13: Optimal pricing for sustainability of regulated infrastructure industries

Illustrative revenue – first three operational years of new power station

Note reduction

‘Constant’ Rand billion HC method

Both depr. and ROA

reducing

13

Page 14: Optimal pricing for sustainability of regulated infrastructure industries

Illustrative revenue profile – full operational life of new power station

‘Constant’ Rand billion

Revenue (and tariff)

essentially covering O&M

and PE

PV of life cycle depr. and ROA revenue = initial asset

acquisition cost

HC method

14

Page 15: Optimal pricing for sustainability of regulated infrastructure industries

Severe tariff instability for single asset, at replacement

‘Constant’ Rand billion HC methodReplaceme

nt

15

No change in LCOE at

replacement

Page 16: Optimal pricing for sustainability of regulated infrastructure industries

Tariff instability moderated with multiple assets at regular intervals

‘Constant’ Rand billion HC method

Average revenue /

tariff

16

Ave. LCOE

Page 17: Optimal pricing for sustainability of regulated infrastructure industries

‘Constant’ Rand billion

Significant tariff instability with ‘two assets’* at larger interval

HC method

Average revenue /

tariff

Uncertainty re whether incr. will

happen could cause funding difficulty

* or, two similar groups or ‘batches’ of assets17

Page 18: Optimal pricing for sustainability of regulated infrastructure industries

Inflation-indexed or depreciated replacement cost method:

18

Page 19: Optimal pricing for sustainability of regulated infrastructure industries

Illustrative revenue profile – full operational life of new power station

‘Constant’ Rand billion DRC method

19

Starts lower, ends

higher than on

HC More gradual

reductionPV of life cycle depr. and ROA

revenue = initial asset acquisition cost

Page 20: Optimal pricing for sustainability of regulated infrastructure industries

Much less tariff instability for single asset, at replacement (vs. HC)

‘Constant’ Rand billion DRC method

20

Replacement

vs. HC

Page 21: Optimal pricing for sustainability of regulated infrastructure industries

Tariff instability well moderated with multiple assets at regular intervals

‘Constant’ Rand billion DRC method

21

Average revenue /

tariff

vs. HC

Page 22: Optimal pricing for sustainability of regulated infrastructure industries

Tariff instability manageable, even with ‘two assets’* at larger interval

‘Constant’ Rand billion DRC method

* or, two similar groups or ‘batches’ of assets22

Average revenue /

tariff

vs. HC

Page 23: Optimal pricing for sustainability of regulated infrastructure industries

Conclusions Both regulatory revenue methodologies recover all life

cycle costs – an important aspect of sustainability In discounted PV terms the life cycle revenues are equal

to one another (no tariff premium for DRC) and the asset-related revenues are equal to initial asset acquisition cost

HC very vulnerable to significant tariff instability – which could also cause funding difficulty (which could threaten sustainability)

DRC much more stable and robust to large intervals between asset investments (ave. fleet tariff approaches stability of LCOE)