Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
OPSB & RSD
SCHOOL PROJECTS
IN 2015-2016
June 19, 2015
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
[CELLRANGE]
[CELLRANGE]
Contracts to be awarded during 2015 -2016 30% DBE Goal
OPSB & RSD Small Projects Contracts
to Be Awarded During 2015-2016
HOW TO FIND OUT MORE
ON UPCOMING PROJECTS
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Recovery School District Projects • State of Louisiana Procurement and Contract Network:
• All RSD projects can be found on the State of Louisiana Procurement and Contract Network (LaPAC)
website: http://wwwprd1.doa.louisiana.gov/OSP/LaPAC/pubMain.cfm
• State of Louisiana Procurement and Contract Network Bids by Department State Education
OR
• Type the following direct link in the address bar:
http://wwwprd1.doa.louisiana.gov/osp/lapac/dspBid.cfm?search=department&term=14 • Note: LaPAC does not post the advertisement until the specified 1st advertisement date
• All Projects will advertise in the Times-Picayune and The Advocate. (New Orleans/Baton Rouge Edition)
• Keep Track of the RSD’s Construction Program through the Monthly Superintendents’ Reports
• www.rsdla.net/
• Click on Departments, New Orleans School Facilities Master Plan, Monthly Superintendents’ Reports
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Orleans Parish School Board Projects
• All OPSB projects can be found on the Orleans Parish School Board (OPSB) website: http://www.opsb.us/
• Click on “Solicitations”. Projects will be listed under “Facilities Department” OR
• Click on use the following direct link: http://www.opsb.us/solicitations/
• All Projects will advertise in the Times-Picayune.(New Orleans/Baton Rouge Edition)
• Keep Track of the OPSB’s Construction Program through the Monthly Capital Construction Reports
• www.rebuildingnolaschools.com
• Click on OPSB Capital Construction Report
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Requirements to Bid on
RSD and OPSB Capital Projects • Classification 1 - Louisiana General Contractor’s License
• Exception – Demolition Specialty Allowed for Demolition Projects Only
• Bid Security for five percent (5%) of total bid
• Certified check drawn on a bank insured by the FDIC OR
• Cashier's check drawn on a bank insured by the FDIC OR
• Bid Bond
• Written by a surety company licensed to do business in Louisiana and signed by the surety's agent or attorney-in-fact
AND
• Surety must be listed on the current U.S. Department of the Treasury Financial Management Service list of approved bonding companies as approved for an amount equal to or greater than the amount for which it obligates itself in the Bond
OR
• Must be a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A.M. Best's Key Rating Guide
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
UPCOMING RSD
REFURBISHMENT
PROJECTS
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Abridged Scopes of Work for Refurbishments Available on RSD Website:
www.rsdla.net RSD Procurement Capital Projects Procurement 2015 Projected Quarterly Bid Schedule
Live Oak Elementary School (RSD)
• Architect – Verges Rome Architects, APC
• Scope of Work – Refurbishment
• 1st Advertisement – July 2015
• Construction Bid Opening
August 2015
• Estimated Construction Value Range –
$ 9 Million - $11 Million
• Funding Source – FEMA
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Live Oak Elementary School (RSD)
Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Dumpster pad upgrades
• Repair cracks in stucco
• Repair retaining wall at Constance St.
• Install new traffic topping for Library roof access
• Install new ceiling and grid throughout
• Install new interior sub-floor on 2nd and 3rd floors and VCT throughout
• Convert locker room to Pre-K classrooms
• Replace interior doors and all windows
• Install new elevator
• Reconfigure restrooms on the 1st floor
• Install new restrooms on the 2nd and 3rd floors
• Install new Light fixtures throughout
• Kitchen upgrades (new floor, air curtain, etc.)
• Upgrade sprinkler system
Laurel Elementary School (RSD)
• Architect – Mahlum Scairono Martinez JV
• Scope of Work – Refurbishment
• 1st Advertisement – June 2015
• Construction Bid Opening
July 2015
• Estimated Construction Value Range – $6.8 Million - $7.2 Million
• Funding Source – FEMA, CDBG
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Laurel Elementary School (RSD) Abridged Scope of Work
Scope of work includes, but is not limited to the following:
Building 1: Repair precast concrete panel at stairs.
Install new Built‐up Roof system-(demo existing roof)
Install new aluminum storefront windows.
Replace hollow metal doors and frames with new (includes demo & hardware)
Replace AHU's (including controls)
Install dedicated 100% fresh air units (estimated 18,000 CFM: cost should include
associated electrical and structural modifications
Replace cooling tower.
Repair/Replace nonoperational receptacles, lighting fixtures, and lighting switches,
including switch additions.
Building 2: Tuck point entire brick veneer exterior of the building.
Replace windows with new custom wood window systems to match the style and
aesthetics of the original design.
Provide 2" thick insulated panels on interior and exterior of existing louvers at stair
towers.
• Upgrade electrical service in order to accommodate new mechanical system.
Lafayette Elementary School (RSD)
• Architect – N-Y Associates, Inc.
• Scope of Work – Refurbishment
• 1st Advertisement – June 2015
• Construction Bid Opening
August 2015
• Estimated Construction Value Range – $4.0 Million - $4.3 Million
• Funding Source – FEMA
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Lafayette Elementary School (RSD)
Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Install new dumpster pad
• Install new CMU wall at dumpster enclosure
• Install new vinyl tile flooring at (2nd and 3rd floors)
• Conduct repairs at exterior concrete ramp
• Replace all exterior doors, windows and frames
• Install new toilet partitions in rest rooms
• Upgrade existing light fixtures to meet energy
requirements
• Upgrade layout of telecomm room per industry standards
(clearances, power, cooling, etc.)
• Install new central bell and wireless clock system
• Install GFI-protected outlets at drinking fountains
Kitchen Group Refurbishments Various Schools (RSD)
• Architect
N-Y Associates, Inc.
SCNZ Architects
• Scope of Work
Refurbishment of existing
School Kitchens
• 1st Advertisement
March 2016
• Construction Bid Opening
April 2016
• Estimated Construction
• Value Range
• $.5 Million -1.0 Million
• Funding Source – FEMA
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Bauduit Elementary School (RSD)
• Architect – Duplantis Design Group PC
• Scope of Work – Refurbishment
• 1st Advertisement – July 2015
• Construction Bid Opening – Aug. 2015
• Estimated Construction Value Range
$3.5 Million - $4.2 Million
• Funding Source – FEMA, CDBG
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Bauduit Elementary School (RSD)
Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Install new exterior doors, frames, and windows
• Install new VCT Flooring in main corridors
• Install new built‐up roof system (including demolition)
• Install new chilled water HVAC system with dedicated 100% fresh air unit
• Install hot & cold water service at dumpster location
• Install new lighting at1st floor classrooms and at stairwell
• Replace existing receptacles in the kitchen to GFI type per code
UPCOMING OPSB
RENOVATION PROJECTS
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Benjamin Franklin Elementary School (OPSB)
• Architect – N-Y Associates, Inc.
• Scope of Work – Renovation
• 1st Advertisement – June 2015
• Construction Bid Opening –
July 2015
• Estimated Construction Value Range –
• $ 1.7 Million - $2.1 Million
• Funding Source – FEMA
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Benjamin Franklin Elementary School (OPSB)
Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Mortar Repointing and vegetation removal
• Plaster Repair/ Replacements
• Replace Exterior Doors with Code Compliant doors and hardware
• Install Plywood Sheer walls at cloakroom walls
• Replace Damaged Lintels
• Replace and or repair roof system at stairs (structural repairs, new scuppers and
downspout)
• Conduct repairs to underground storm water drainage system
• Install new or repair windows as required
Eleanor McMain High School Roof Replacement-Manitenance
Upgrades (OPSB)
• Architect – Duplantis Design
Group
• Scope of Work – Roof Replacement-Various Maintenance Work
• 1st Advertisement –
May 2015
• Construction Bid Opening – June 2015
• Estimated Construction Value Range
• $ 5.5 Million - $6.5 Million
• Funding Source –General
• Fund & Harrah’s
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Eleanor McMain High School Maintenance
Upgrades (OPSB) Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Floor Repairs
• Replacement of Corridor Doors
• Restroom/Drinking Fountain Upgrades
• Replacement of Classroom Fan Coil Units and Controls
• Underground Sewer Upgrades
• Major Kitchen Upgrades
• Upgrades to Fire Alarm System
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Eleanor McMain High School Roof Replacement
(OPSB) Abridged Scope of Work
Scope of work includes, but is not limited to the following:
• Roof System Replacement (including Parapet Walls)
• Installation of New Pavers at Roof Courtyard
• Stucco Repairs
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Bethune-A. P. Tureaud School (OPSB)
• Architect – Chenevert Architects
• Scope of Work – Refurbishment
• 1st Advertisement – July 2015
• Construction Bid Opening – Aug 2015
• Estimated Construction Value Range
$ 4.5 Million - $ 5.0 Million
• Funding Source – FEMA, CDBG
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Bethune-A P Tureaud Schools (OPSB)
Abridged Scope of Work
Scope of work includes, but is not limited to the following:
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
• (Bethune):
• Pointing of Bricks
• Resealing Windows
• Resealing Lintels
• Resealing Cast Stone Jambs
• Resealing Exterior Door Frames
• Roof Replacement
• MEP Upgrades
• Kitchen Upgrades
• Wall Repairs/Repainting
• (A.P. Tureaud):
• Roof Repair
• Pointing of Bricks
• Resealing Windows
• Resealing Lintels
• Resealing Cast Stone Jambs
• Resealing Exterior Door Frames
Timbers III - Building Controls (OPSB)
• Architect – N-Y Associates, Inc.
• Scope of Work – Design & Installation of New Building Controls
• 1st Advertisement – TBD
• Construction Bid Opening – TBD
• Estimated Construction Value Range
$1 Million - $1.1 Million
• Funding Source – OPSB General Fund
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
Jo Ellen Smith Medical-Demolition (OPSB)
• Architect – Verges Rome Architects, APAC
• Scope of Work – Demolition
• 1st Advertisement – SOQ Submission−May 26, 2015
• Construction Bid Opening – TBD
• Estimated Construction Value Range – $2.5 Million – $3.0 Million
• Funding Source – FEMA
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
UPCOMING RSD & OPSB
REFURBISHMENT
PROJECTS
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
RSD & OPSB REFURBISHMENTS • Project Architect Value Status • Lafayette Elementary N-Y Associates $4,275,000 1st Adv.Jun
• Livingston Modular Demo GAEA Consultants $ 283,000 1st Adv. Nov-16
• Live Oak Elementary Verges Rome $9,630,536 1st Adv. July
• Cohen-Kitchen N-Y Associates $ 350,000 1st Adv.Jan-16
• Thurgood Marshall Mahlum Scairono $1,450,000 1st Adv. Sept.
• McDonogh #32 Byron Stewart $4,160,446 1st Adv. Sept.
• Johnson Elementary SCNZ Architects $2,641,458 1st Adv. Sept.
• Andrew Jackson N-Y Associates $1,275,000 1st Adv. Aug
• Laurel Elementary Mahlum Scairono $4,000,000 1st Adv. Jun-24
• Albert Wicker SCNZ $ 170,000 1st Adv. Jan.-16
• Bethune-A.P.Tureaud Chenevert Architects $4,700,000 1st Adv. July
• Bauduit Elementary Duplantis Design Group $4,293,655 1st Adv. Jun
• Gaudet Elementary SCNZ $2,400,000 1st Adv. Sept.
• Fisher Elementary SCNZ $2,300,000 1st Adv. Sept.
• McMain Roof Duplantis Design Group $2,600,000 1st Adv. May
• McMain Maintenance Duplantis Design Group $3,604,000 1st Adv. May
• Banneker-Kitchen SCNZ $ 250,000 1st Adv. Jan-16
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
*Abridged Scopes of Work for Refurbishments Available on RSD Website:
www.rsdla.net RSD Procurement Capital Projects Procurement
2015 Projected Quarterly Bid Schedule
RSD Disadvantaged Enterprise (DBE)
Participation Summary
• New & Renovations:
DBE Contractors secured subcontracts on 19 projects as of May 31, 2015.
The DBE subcontracts value is $69,304,090 of the $343,291,077 total of
awarded contracts.
• Stabilization/Demolition/Mothballing:
DBE Contractors secured subcontracts on 35 projects as of April 30, 2015.
The DBE subcontracts value is $10,346,378 of the $ 36,184,670 total of
awarded contracts.
• Total Amount of Contracts: $ 379,475,747
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
RSD Disadvantaged Enterprise (DBE)
Participation Summary
• Design-Build New:
• DBE Contractors secured subcontracts on 3 projects as of May 31, 2015. The DBE
subcontracts value is $ 34,691,592 of the $109,137,557 total of awarded contracts.
• Stabilization & Demolition Contracts: $ 36,184,670
• New Construction & Renovation Contracts: $343,291,077
• Design-Build New Construction: $109,137,557
• Total Amount of Contracts: $488,613,304
• Total Amount of RSD DBE Contracts: $114,342,060 (23.40%)
•
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
OPSB Disadvantaged Enterprise (DBE)
Participation Summary
• New & Renovations:
DBE Contractors secured subcontracts on 12 projects as of May 31, 2015.
The DBE subcontracts value is $54,086,557 of the $199,371,360 total of awarded
contracts.
• Stabilization/Demolition/Mothballing:
DBE Contractors secured subcontracts on 2 projects as of December 31, 2014.
The DBE subcontracts value is $296,520 of the $902,999 total of awarded contracts.
• Total Amount of Contracts: $ 200,274,359
• Total Amount of OPSB DBE Contracts: $ 54,383,077
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.
QUESTIONS?
This report is for general information only. All dates and estimated construction
values are estimates and subject to change at any time without advance notice.