    Operation Management

    Technical Concerns

    1 Correctness of Survey

    2 Drainage Installation

    3 * Electrical - DORECO

    * Solar pwered laps

    ! "aterline

    # "all $ %encing

    & Contractor's scope of wor(

  • 8/19/2019 Ops Richard

    2/92

    Issues Remarks

    Road Road 1 ) ! for concreting

    potential overow revise t+e drainage plan

    ,nderground wiring ased on dev't .lan

    safety possile su/ect for t+eft

    water distriution

    no fencing perit in +ouse construction

    onitoring y 0DI

    aterials anageent

    sand and gravel

    illing ased on accoplis+ent

    cost eective and ecient watersource is recoended4

    fuel for e5uipent andac+ineries

    6aor and 0aterials Contracte7cept for Ceent

  • 8/19/2019 Ops Richard

    3/92

    Option 1 Option 2

    ,se e7isting road as reference

    ig+t use t+e electrical connections4

    connect to t+e resevoir

    Centerline sta(ing for roads 8 Ifcontract-out s+ould e 6)0e7cept ceent8 if E)0 Is

    included8 onitoring of fuel wille ase on t+e actual tieused4

    drains will e installed wit+ t+e out+facing downstrea9 section on t+e trapcanal w+ere t+e pipe ends will elocated ust +ave a slope drop toinii:e;if not prevent< up+ill owt+roug+ +ydraulic /up4

    trocio agreed to facilitate to relocate t+ee7isting post

    relocate9 cost of transfer will es+ouldered y 0DI

    s+ould coplete t+econstruction of perieter fenceefore t+e installation of solarlaps4

    if t+e supply of water fro t+ereservoir is low8 ig+t as wellfollow t+e Developent peritapproval for water drilling4

    DODO and t+e rest of t+e 0ati crew willdo t+e construction and t+e Operationwill e t+e one to onitor

    0R to S. Oce9 =+eoretical vs4 actualwor( coparison

    Contractor will s+oulder t+epurc+ase of fuel-su/ect to auditased on accoplis+ent

    0DI will supply ceent for t+econtractor ;consider transportation costt+ of t+e ont+

  • 8/19/2019 Ops Richard

    4/92

    ?ll aterials will e included on

    t+e contract4

  • 8/19/2019 Ops Richard

    5/92

    Operation 0anageent ,pdates

    %or ?orsolo oes

    ?orsolo oes

    1 ,pdate on Drilling .erit Renewal

    2 ,pdate on D?R

    3 ,pdate for ?orsolo C6O? =itle

    ! %inali:ation of ?orsolo ouses ?)E

    # %inali:ation of ?-@ate and guard+ouse

  • 8/19/2019 Ops Richard

    6/92

    A"RB already ail t+e renewed perit4

    Suitted to ROD ut it ta(es 3 to ! ont+s for t+e released of t+e title - option to fastrac(s+ould we pay SO. and will e released in /ust one ont+ at #>>> pesos

  • 8/19/2019 Ops Richard

    7/92

    Hidalgo Homes - to do list

    Particular Issue

    1. block - t!o lots and houses

    ac( lling for lots 1

    2. "lock 12

    retaining wall

    #. "lock 1$

    #. %pcoming &TPs

    6aor and aterials

    $. clearing o' perimeter areas

    retaining wall will e discussed yaccounting and (tg4 will pursue

    need to construct foreasures

    on going 5uotation y sereo andBan5uirigo4

    standardi:ed contractodel unit

  • 8/19/2019 Ops Richard

    8/92

    Remarks Option

    and 2

    c+oose lower id

    c+oose lower id

    Done

    counterc+ec(ing ofcontractor's5outation

    still we +ave gain on sale;&>>8>>4>>< apro74

      safety cost will e counted as part oft+e sudivision developent

    counterc+ec(ing ofcontractor's5outation

    follow up t+e contractors forcoparisson

     price per contractors ust suit5outation for eac+ odel unit

  • 8/19/2019 Ops Richard

    9/92

    On @oing Construction

    Base on %ile

    "u(ers House Model

    Bloc( 2

    2 ?lagon8 erilito Del .ilar# Rollion8 'co Rusar Ri:al

    & Odocayen8 erson and Espaol8 C+arlene 6una

    Bloc( 3

    3 =anae8 0a4 Elena Ri:al

    # Barsalote8 erry Del .ilar

    & =oonas8 Reynaldo Ri:al

    1& .un8 Ela Ri:al

    2> Bolivar8 6enie 6ope: aena

    Bloc( !

    F ?leso8 ?lesandro 6una

    Bloc( #

    2 Cancelled - R%O 6ope: aena

    ! ?sara8 Aur+ia 6una

    & .awa(i8 %arra+ ?i:a Del .ilar

    Bloc( &

    Bloc( F

    Bloc( G

    & Halle/o8 Aoel .once

    G .once8 Aicolas Del .ilarBloc(

    Bloc( 1>

    Bloc( 11

    Bloc( 12

    Bloc( 13

    2 R%O 6ope:8 aena

    # Aestor @ranado 6una

    One-Storey

    J3> days

    J&> days

    J> days

    J12> days

  • 8/19/2019 Ops Richard

    10/92

     =wo-storey

    J3> days

    J&> days

    J> days

    J12> days

    J1#> days

    Ao progress since last assessent

     =rac(ing %older Content

    1 o Order S+eet

    2 Construction Standard Cost

    3 Aotice to .roceed

    ! .erits

    *Building .erit*Sanitary$ .luing .erit

    *Electrical .erit

    # ?pproved Site Developent .lan

    & ?ctual BOK

    F 3 copies of o Order Contract

  • 8/19/2019 Ops Richard

    11/92

     )ob Order * Contrator * o' da(s

    11 Raire: 1>$2!$2>1# 1$12$2>1& G>12 Ban5uirigo $1>$2>1# 1$12$2>1& 12!

    13 Ban5uirigo 11$21$2>1# 1$12$2>1& #2

    1F Ban5uirigo 1>$&$2>1# 1$12$2>1& G

    1G Ban5uirigo 1>$2F$2>1# 1$12$2>1& FF

    1! Ban5uirigo $1$2>1# 1$12$2>1& 11#

    2! Raire: G-an-1& 1$12$2>1& !

    1 Raire: 11$2G$2>1# 1$12$2>1& !#

    1# Ban5uirigo $1$2>1# 1$12$2>1& 11#

    1& Deeterio 2$&$2>1# 1$12$2>1& 3!>

    22 ?din #-an-1& 1$12$2>1& F

    23 Ban5uirigo &-an-1& 1$12$2>1& &

    ?din $1$2>1# 1$12$2>1& 11#

    21 Raire: 12$F$2>1# 1$12$2>1& 3&

    2> ?din 11$2F$2>1# 1$12$2>1& !&

     =arget L of ouse Copletion

    21L

    !2L

    #GL

    1>>L

    +ate ,tarteda(out/

    0ssessment+ate

  • 8/19/2019 Ops Richard

    12/92

     =arget L of ouse Copletion

    G433L

    1F4&3L

    3FL

    #&L

    1>>L

  • 8/19/2019 Ops Richard

    13/92

    Target ,tatus lectrical Pedestal

    #2L 2FL 3182#4131>3L &&L 11G8G&>4!#

    1#L 1>L

    G2L &FL 1#!81#>4>3

    #>L 2#L 1G8>>&4G

    F!L G3L 2F!8G2F4&G

    3L #L

    13L 13L

    #!L #FL 21F8&!F4#&

    2383#>42

    GL

    1>L

    #!L G>L 2F&4>> .aid -contracted to Raire:

    2#L 13L

    1!L 3L

    TargetMaterials

    Cost

    0ctual MaterialsCost

  • 8/19/2019 Ops Richard

    14/92

  • 8/19/2019 Ops Richard

    15/92

    Remarks

    for vericationfor verication

    for verication

    contractors wor(er were deployed to B#6&

    for verication

    for verication

    contractors wor(ers were deployed to Bloc( # 6ot & to eet t+e pouring sc+ed4 >1$13$2>1&

    for verication

  • 8/19/2019 Ops Richard

    16/92

  • 8/19/2019 Ops Richard

    17/92

    %or =urnover

    ,tatus Contractors

    Bloc( 2

    Bloc( 3

    Calustre8 Caren Aeed to a(e t+e pedestal8 re5uest tan( and installation of downspout

    1! Benaning8 0arites Installation of Downspout ?din

    1G?postol8 Ranin Aeed to a(e t+e pedestal8 re5uest tan( and installation of downspout Ban5uirigo

    1 ?o8 essica %or punc+list ?din

    Bloc( !

    1> 0agday ?din11 Dealocos %or turned over ?din

    Bloc( #

    & .awa(i

    Bloc( &

    2 %orones8 0a4 Heronica Aeed downspout ?din

    #Has5ue:8 osep+ Aeed to a(e t+e pedestal8 re5uest tan( and installation of downspout Ban5uirigo

    Bloc( F

    Bloc( G

    3 =an8 oy ain door8 painting8 =B door nad tiles in =B Deeterio

    # 6aga+it8 @arry 0ain door ?din

    Bloc(

    Bloc( 1>

    1& Hidola8 C+erry ?ntonia "aiting for pluer for tan( connection ?dinBloc( 11

    Bloc( 12

    Bloc( 13

  • 8/19/2019 Ops Richard

    18/92

    ater Tank pedestal lectrical Pedestal ,tatus

    Ongoing construction-?din need to a(e pedestal8 re5uest tan( and installation of Downspout

    Contracted to Raire: Installation of downspout ;waiting for contractor<

    Ongoing construction-?din need to a(e pedestal8 re5uest tan( and installation of Downspout

    ,pgraded featuresRefer ;.unc+list Report Ao4 1<

    Installation of downspout ;waiting for contractor<

    Ongoing construction-?din Contracted to Raire: need to a(e pedestal8 re5uest tan( and installation of Downspout

    Contracted to Raire: Aeed ain door8 painting and =B Door

    Aeed ain door

    Aeed pluer for tan( connection ;0?0?C

  • 8/19/2019 Ops Richard

    19/92

    SI=,?=IOA ?A?6MSIS .ROB6E0 ?

    .erieter "all

    14G 0 ;N< wall & t+ic( at least 0gt4 instru

    part of foundation wor(s$:ocalo done "+o

    "+o

    "+o

    Const%or

    Suppl

    Drainage

    water entering t+e sud4 - ay need for re-planning Cree( insi

    e7isting RC. line done at ?:alea

    ?ccess to Bac(

    Re-plan$nd out est access alignent Aeed for act

    Road Concreting

    .art of ?:alea done use as refere

    Road tracing party done

     =o nis+ Begonia8 Eup+oria8 %usc+ia e7cept

    road et4 %usc+ia$Begonia and Da+lia$Caella

    Include sidewal( eside ausoleuN

    ow aout t

    +ow aout u

    "ater line correctionN

    E7isting Barangay water line re-alignN Bei

    Spring water source include re+a

    .ower line

    DORECO line w+o will o

    Aeed for underground lig+ting Do we inclu

  • 8/19/2019 Ops Richard

    20/92

    Renegotiation wit+ popoy wit+ e7isting

  • 8/19/2019 Ops Richard

    21/92

      ?6MSIS DECISIOA ?A?6MSIS

    ction - in +ouse

      ill superviseN Dodo

      ill wor(N 0$I Crew

      ill onitor 5ualityN Pen

    ruction et+odN S+op drawings - lintel eaor(s 0anageent InventoryN

    ReplaceentN

    iesN

    @ravel ) Sand .opoy to SupplyN

    Ceent %ro davao Hity

      e par( wit+ la(e contractor to design N

    "e s+ould a(e preliinary

    design4 0ust avoid losingtoo any lots

    ust include e7isting drain

    ?ddress potential ac(ow

    %or planning4 Concreting up

    to t4 alindang - 1>

    ul eld verication include in scope of wor(s

    Ao concreting $graveling

    nce Surveyor part of contractor

    include in preliinary C?D

    le

     MesQ

    e e5uipentN .opoy to c+arge usN ow uc+N

    se of +is e5pt during

      ng usedN +ow uc+N Scope of wor(sN

      ilitation s+ould we do t+e waterlineN

    eN include coordination w$Doreco

    e electrical contractN up to tapping perit for our

    elcetrical eter

  • 8/19/2019 Ops Richard

    22/92

    contract +ow do we revise wit+out

    antagoni:ing +iN

  • 8/19/2019 Ops Richard

    23/92

    .O=EA=I?6 .ROB6E0 ?A?6MSIS

    Regular inspection sc+edule

    +ow to onitor$avoid pilferageN

    0onitoring$BillingN

    0onitoringN

    ust e guided y operations to

    avoid losing too any lots4

    +ig+est recorded ow rate &> lpsDesign ust e e7ile - in case

    we pus+ t+roug+ wit+ 0usli

    0eorial .ar(

    a(e C?D le s+owing scope of

    wor(s plus preliinary cree( line

    wit+ linear pond

    put in das+ed line on

    proposed re-plan

    anual c+ec(ing using tape

    ut progra of wor(s s+ould

    stat at ?:alea

    "+at if we ring our own ac(+oeN

    ?ny prole if we do t+e

    reservoir re+a and lay don t+e

    water lineN

  • 8/19/2019 Ops Richard

    24/92

    a(e ap8 a(e c+ec(list

    discuss verally8 if o(8 s+ow c+ec(list

    and include as addendu

  • 8/19/2019 Ops Richard

    25/92

    SI=,?=IOA ?A?6MSIS .ROB6E0 ?

    .erieter "all

    14G 0 ;N< wall & t+ic( at least 0gt4 instru

    part of foundation wor(s$:ocalo done "+o

    "+o

    "+o

    Const%or

    Suppl

    Drainage

    water entering t+e sud4 - ay need for re-planning Cree( insi

    e7isting RC. line done at ?:alea

    ?ccess to Bac(

    Re-plan$nd out est access alignent Aeed for act

    Road Concreting

    .art of ?:alea done use as refere

    Road tracing party done

     =o nis+ Begonia8 Eup+oria8 %usc+ia e7cept

    road et4 %usc+ia$Begonia and Da+lia$Caella

    Include sidewal( eside ausoleuN

    ow aout t

    +ow aout u

    "ater line correctionN

    E7isting Barangay water line re-alignN Bei

    Spring water source include re+a

    .ower line

    DORECO line w+o will o

    Aeed for underground lig+ting Do we inclu

  • 8/19/2019 Ops Richard

    26/92

    Renegotiation wit+ popoy wit+ e7isting

  • 8/19/2019 Ops Richard

    27/92

      ?6MSIS DECISIOA ?A?6MSIS

    ction - in +ouse

      ill superviseN Dodo

      ill wor(N 0$I Crew

      ill onitor 5ualityN Pen

    ruction et+odN S+op drawings - lintel eaor(s 0anageent InventoryN

    ReplaceentN

    iesN

    @ravel ) Sand .opoy to SupplyN

    Ceent %ro davao City

      e par( wit+ la(e contractor to design N

    "e s+ould a(e preliinary

    design4 0ust avoid losingtoo any lots

    ust include e7isting drain

    ?ddress potential ac(ow

    %or planning4 Concreting up

    to t4 alindang - 1>

    ul eld verication include in scope of wor(s

    Ao concreting $graveling

    nce Surveyor part of contractor

    include in preliinary C?D

    le

     MesQ

    e e5uipentN .opoy to c+arge usN ow uc+N

    se of +is e5pt during

      ng usedN +ow uc+N Scope of wor(sN

      ilitation s+ould we do t+e waterlineN

    eN include coordination w$Doreco

    e electrical contractN up to tapping perit for our

    elcetrical eter

  • 8/19/2019 Ops Richard

    28/92

    contract +ow do we revise wit+outantagoni:ing +iN

  • 8/19/2019 Ops Richard

    29/92

    .O=EA=I?6 .ROB6E0 ?A?6MSIS

    Regular inspection sc+edule

    +ow to onitor$avoid pilferageN

    0onitoring$BillingN

    0onitoringN

    ust e guided y operations to

    avoid losing too any lots4

    +ig+est recorded ow rate &> lpsDesign ust e e7ile - in case

    we pus+ t+roug+ wit+ 0usli

    0eorial .ar(

    a(e C?D le s+owing scope of

    wor(s plus preliinary cree( line

    wit+ linear pond

    put in das+ed line on

    proposed re-plan

    anual c+ec(ing using tape

    ut progra of wor(s s+ould

    stat at ?:alea

    "+at if we ring our own ac(+oeN

    ?ny prole if we do t+e

    reservoir re+a and lay don t+e

    water lineN

  • 8/19/2019 Ops Richard

    30/92

    a(e ap8 a(e c+ec(list discussverally8 if o(8 s+ow c+ec(list and includeas addendu

  • 8/19/2019 Ops Richard

    31/92

    SI=,?=IOA ?A?6MSIS .ROB6E0 ?

    .erieter "all

    14G 0 ;N< wall & t+ic( at least 0gt4 instru

    part of foundation wor(s$:ocalo done "+o

    "+o

    "+o

    Const%or

    Suppl

    Drainage

    water entering t+e sud4 - ay need for re-planning Cree( insi

    e7isting RC. line done at ?:alea

    ?ccess to Bac(

    Re-plan$nd out est access alignent Aeed for act

    Road Concreting

    .art of ?:alea done use as refere

    Road tracing party done

     =o nis+ Begonia8 Eup+oria8 %usc+ia e7cept

    road et4 %usc+ia$Begonia and Da+lia$Caella

    Include sidewal( eside ausoleuN

    ow aout t

    +ow aout u

    "ater line correctionN

    E7isting Barangay water line re-alignN Bei

    Spring water source include re+a

    .ower line

    DORECO line w+o will o

    Aeed for underground lig+ting Do we inclu

  • 8/19/2019 Ops Richard

    32/92

    Renegotiation wit+ popoy wit+ e7isting

  • 8/19/2019 Ops Richard

    33/92

      ?6MSIS DECISIOA ?A?6MSIS

    ction - in +ouse

      ill superviseN Dodo

      ill wor(N 0$I Crew

      ill onitor 5ualityN Pen

    ruction et+odN S+op drawings - lintel eaor(s 0anageent InventoryN

    ReplaceentN

    iesN

    @ravel ) Sand .opoy to SupplyN

    Ceent %ro davao City

      e par( wit+ la(e

    ul eld verication include in scope of wor(s

    Ao concreting $graveling

    nce Surveyor part of contractor

    include in preliinary C?D

    le

     MesQ

    e e5uipentN .opoy to c+arge usN ow uc+N

    se of +is e5pt during

      ng usedN +ow uc+N Scope of wor(sN

      ilitation s+ould we do t+e waterlineN

    eN include coordination w$Doreco

    e electrical contractN up to tapping perit for our

    elcetrical eter

    contractor and 0DI to design "e s+ould a(e

    preliinary design4 0ust avoid losing too any lots

    Design of t+e pond will e cater y PEA and +avetwo outlets fro t+e ain water ways ut Engr4

     =rocio dis agree t+e said design due to potentionover ow if we go against t+e ow4

  • 8/19/2019 Ops Richard

    34/92

    contract +ow do we revise wit+out antagoni:ing +iN

  • 8/19/2019 Ops Richard

    35/92

    .O=EA=I?6 .ROB6E0 ?A?6MSIS

    Regular inspection sc+edule

    +ow to onitor$avoid pilferageN

    0onitoring$BillingN

    0onitoringN

    ust e guided y operations to

    avoid losing too any lots4

    +ig+est recorded ow rate &> lpsDesign ust e e7ile - in case

    we pus+ t+roug+ wit+ 0usli

    0eorial .ar(

    a(e C?D le s+owing scope of

    wor(s plus preliinary cree( line

    wit+ linear pond

    put in das+ed line on

    proposed re-plan

    anual c+ec(ing using tape

    ut progra of wor(s s+ould

    stat at ?:alea

    "+at if we ring our own ac(+oeN

    ?ny prole if we do t+e

    reservoir re+a and lay don t+e

    water lineN

  • 8/19/2019 Ops Richard

    36/92

    a(e ap8 a(e c+ec(list discussverally8 if o(8 s+ow c+ec(list and includeas addendu

  • 8/19/2019 Ops Richard

    37/92

    ,IT%0TIO& 0&03,I,

    1 Design of Cainets 1 Bedr

    itc+

    2 Coputation of "all ?reas of eac+ ouse odels 2  

    including Stone .lasters and Carene upgrade

    # 0?@D?M ouse ,pgrade Cost Estiate # Su

    $ Coputation of 6una %loor upgrade- all granite tiles $ Su

    as re5uested y sir ess dated an4 2G8 2>1&

    4 6ayout of Site Developent .lan for 3& lots 4 .lott

    as re5uested y 0ar(eting t+roug+ sir Aino

    5

    6

    ,IT%0TIO& 0&03,I,

    1 ?orsolo oes Sales 0ap ,pdate 1 6ayo

    ;.lotting of ouse odel on Specic 6ots< su

    2 %loor .lan Rendering for 0anansala odel 2 =o do

    # ?orsolo @ate and @uard+ouse Design # Initial

    $ t+e t

    4

    7

    ,IT%0TIO& 0&03,I,

    1 Door 3- Oce and S+owroo 6ayout 1 Initial

    to

    2 Deo Stone .laster Boot+ Design Recoendation 2 =+e /

    re5uested y sir @eorge

    # # newl

    ,IT%0TIO& 0&03,I,

    1 S+op Drawings for Contractor 1  ased on 0ar(eting "is+ 6ist

    2

    ,IT%0TIO& 0&03,I,

    1 6ayout of Cree( 1  

    2  =oilet .lan and Details 2

    ,IT%0TIO& 0&03,I,

    1 .lotting of 6and =itles wit+ lot splitting ased on t+e SD. 1

    prepared y ?rc+itect o

    Design-6ayout of ,tone Plaster +ispla( ,amples on fraes

  • 8/19/2019 Ops Richard

    38/92

    .erieter "all

    14G 0 ;N< wall & t+ic( at least 0gt4 inst

    part of foundation wor(s$:ocalo done "+o

    "+o

    "+o

    Cons

    %or

    Suppl

    Drainage

    water entering t+e sud4 - ay need for re-planning Cree( ins

    e7isting RC. line done at ?:alea

  • 8/19/2019 Ops Richard

    39/92

  • 8/19/2019 Ops Richard

    40/92

  • 8/19/2019 Ops Richard

    41/92

    ?ccess to Bac(

  • 8/19/2019 Ops Richard

    42/92

    Re-plan$nd out est access alignent Aeed for a

    Road Concreting

    .art of ?:alea done use as refe

    Road tracing party done

     =o nis+ Begonia8 Eup+oria8 %usc+ia e7cept

    road et4 %usc+ia$Begonia and Da+lia$Caella

  • 8/19/2019 Ops Richard

    43/92

    Include sidewal( eside ausoleuN

    ow aout

  • 8/19/2019 Ops Richard

    44/92

    +ow aout

  • 8/19/2019 Ops Richard

    45/92

    "ater line correctionN

    E7isting Barangay water line re-alignN B

    Spring water source include re+

  • 8/19/2019 Ops Richard

    46/92

  • 8/19/2019 Ops Richard

    47/92

    .ower line

  • 8/19/2019 Ops Richard

    48/92

    DORECO line w+o will

  • 8/19/2019 Ops Richard

    49/92

    Aeed for underground lig+ting Do we incl

  • 8/19/2019 Ops Richard

    50/92

    Renegotiation wit+ popoy wit+ e7isti

  • 8/19/2019 Ops Richard

    51/92

    PRO"M 0&03,I,

    Hidalgo Homes

    o Cainets for c+ec(ing y ?rc+itect o/o

    n Cainets to update to t as-uilt plan

    Suitted to accounting and ar(eting c$o 0a'a aren

    itted to accounting and 0ar(eting c$o Sir 6eo

    itted to Sir ess

    d y ?lfred ;O =rainee

  • 8/19/2019 Ops Richard

    52/92

      ruction - in +ouse

      ill superviseN

      ill wor(N

      ill onitor 5ualityN

    ruction et+odN

    or(s 0anageent

    iesN

    @ravel ) Sand

    Ceent

      ide par( wit+ la(e

  • 8/19/2019 Ops Richard

    53/92

  • 8/19/2019 Ops Richard

    54/92

  • 8/19/2019 Ops Richard

    55/92

  • 8/19/2019 Ops Richard

    56/92

      taul eld verication

    rence

  • 8/19/2019 Ops Richard

    57/92

    t+e e5uipentN

  • 8/19/2019 Ops Richard

    58/92

    use of +is e5pt during

  • 8/19/2019 Ops Richard

    59/92

      ing usedN

      ailitation

  • 8/19/2019 Ops Richard

    60/92

  • 8/19/2019 Ops Richard

    61/92

  • 8/19/2019 Ops Richard

    62/92

    veN

  • 8/19/2019 Ops Richard

    63/92

    de electrical contractN

  • 8/19/2019 Ops Richard

    64/92

    g contract

  • 8/19/2019 Ops Richard

    65/92

    +CI,IO& 0&03,I, POT

    +CI,IO& 0&03,I, POT

    +CI,IO& 0&03,I, POT

    +CI,IO& 0&03,I, POT

    +CI,IO& 0&03,I, POT

    +CI,IO& 0&03,I, POT

  • 8/19/2019 Ops Richard

    66/92

    Dodo

    0$I Crew

    Pen

    S+op drawings - lintel ea

    InventoryN

    ReplaceentN

    .opoy to SupplyN

    %ro davao City

    contractor and 0DI to design "e s+oulda(e preliinary design4 0ust avoid losingtoo any lots

     and +ave two outlets fro t+e ain waterways ut Engr4 =rocio dis agree t+e saiddesign due to potention over ow if we goagainst t+e ow4

  • 8/19/2019 Ops Richard

    67/92

  • 8/19/2019 Ops Richard

    68/92

  • 8/19/2019 Ops Richard

    69/92

  • 8/19/2019 Ops Richard

    70/92

    include in scope of wor(s

    Ao concreting $graveling

    Surveyor part of contractor

    include in preliinary C?D

    le

  • 8/19/2019 Ops Richard

    71/92

     MesQ

    .opoy to c+arge usN ow uc+N

  • 8/19/2019 Ops Richard

    72/92

  • 8/19/2019 Ops Richard

    73/92

    +ow uc+N Scope of wor(sN

    s+ould we do t+e waterlineN

  • 8/19/2019 Ops Richard

    74/92

  • 8/19/2019 Ops Richard

    75/92

  • 8/19/2019 Ops Richard

    76/92

    include coordination w$Doreco

  • 8/19/2019 Ops Richard

    77/92

    up to tapping perit for our

  • 8/19/2019 Ops Richard

    78/92

    elcetrical eter

    +ow do we revise wit+out antagoni:ing+iN

  • 8/19/2019 Ops Richard

    79/92

    &TI0 PRO"M 0&03,I,

    &TI0 PRO"M 0&03,I,

    &TI0 PRO"M 0&03,I,

    &TI0 PRO"M 0&03,I,

    &TI0 PRO"M 0&03,I,

    &TI0 PRO"M 0&03,I,

  • 8/19/2019 Ops Richard

    80/92

    Regular inspection sc+edule

    +ow to onitor$avoid pilferageN

    0onitoring$BillingN

    0onitoringN

    ust e guided y operations to

    avoid losing too any lots4

    +ig+est recorded ow rate &> lps

    Design ust e e7ile - in case

    we pus+ t+roug+ wit+ 0usli

    0eorial .ar(

    a(e C?D le s+owing scope of

  • 8/19/2019 Ops Richard

    81/92

    wor(s plus preliinary cree( line

  • 8/19/2019 Ops Richard

    82/92

    wit+ linear pond

  • 8/19/2019 Ops Richard

    83/92

  • 8/19/2019 Ops Richard

    84/92

    put in das+ed line on

    proposed re-plan

    anual c+ec(ing using tape

  • 8/19/2019 Ops Richard

    85/92

    ut progra of wor(s s+ould

    stat at ?:alea

    "+at if we ring our own ac(+oeN

  • 8/19/2019 Ops Richard

    86/92

  • 8/19/2019 Ops Richard

    87/92

    ?ny prole if we do t+e

    reservoir re+a and lay don t+e

  • 8/19/2019 Ops Richard

    88/92

    water lineN

  • 8/19/2019 Ops Richard

    89/92

  • 8/19/2019 Ops Richard

    90/92

  • 8/19/2019 Ops Richard

    91/92

  • 8/19/2019 Ops Richard

    92/92

    a(e ap8 a(e c+ec(list discussverally8 if o(8 s+ow c+ec(list andinclude as addendu