10200 South Kedzie Avenue Evergreen Park, IL 60805 800.499.0400 | 708.499.0400 | Fax 708.499.4620 P/N:A740151961, REV: F 4/16/2013 OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3, OPO-4, OPO-4HW For ALL service related issues – Please call Florida Plastics: 8:30am–5:00pm CST/6:30am-3:00pm PST: 800 – 499 - 0400 PreSell Main Board (shown as Standard 4 column)

OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Embed Size (px)

Citation preview

Page 1: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

10200 South Kedzie Avenue

Evergreen Park, IL 60805

800.499.0400 | 708.499.0400 | Fax 708.499.4620

P/N:A740151961, REV: F

4/16/2013

OPO-Standard Installation Instructions Manual Version

OPO-1, OPO-3, OPO-4, OPO-4HW

For ALL service related issues – Please call Florida Plastics:

8:30am–5:00pm CST/6:30am-3:00pm PST:

800 – 499 - 0400

PreSell Main Board (shown as Standard 4 column)

Page 2: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 2 of 25

P/N:A740151961, REV: F

4/16/2013

Introduction

The OPO Drive Thru System is a triple dayparting menu board system that is used to display custom

POP selections for your products. The system consists of Main boards and Presell boards.

Getting Familiar with Terms OPO- 4 4 Column, Standard, Manual Main Board

OPO-4HW 4 Column, Standard, High Wind, Manual Main Board

OPO-3 3 Column, Standard, Manual Main Board

OPO-1 1 Column, Standard, Manual Presell Board

Each system comes broken down into a pedestal assembly, triangular columns, top tie beam & rain

caps and hardware kits.

See Spec Drawings for “As Shipped”.

Identification of the columns for the boards is critical to operation & service. Please note below the

labels associated with each column. The Labeling is “Lane 1, Column 1 = L1C1”.

Main Board - Inside Lane PreSell Main Board - Outside Lane

Viewed from Customer’s Vantage Point – Front of Menu Boards

(MAIN BOARDS SHOWN AS STANDARD 4 COLUMN FOR ILLUSTRATION PURPOSE)

Please note:

� The OPO menu boards are suitable for wet locations.

� Protective “blue tape” is for shipping purposes only!

� After installation:

• Gently remove the protective plastic from the face of the door

• Gently remove the blue plastic/tape that protects the lamps and sockets during

shipping.

L1C1

L1C2

L1C3

L1C4

L1C5

L2C1

L2C2

L2C3

L2C4

Page 3: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 3 of 25

P/N:A740151961, REV: F

4/16/2013

Page 4: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 4 of 25

P/N:A740151961, REV: F

4/16/2013

Page 5: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 5 of 25

P/N:A740151961, REV: F

4/16/2013

Page 6: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 6 of 25

P/N:A740151961, REV: F

4/16/2013

Page 7: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 7 of 25

P/N:A740151961, REV: F

4/16/2013

Safety Warning

ALL INSTALLATION, SERVICE, AND MAINTENANCE MUST BE

PERFORMED BY A QUALIFIED ELECTRICIAN � This dayparting menu board is intended to be installed in accordance with the requirements of

Article 600 of the National Electrical Code and/or other applicable local codes. This includes

grounding and bonding of the menu board.

� Perform all installation, service, and maintenance in compliance with OSHA, local and safety codes.

� Turn off all power before installation or servicing this menu board system.

Notify Florida Plastics (Customer Service @ 800-499-0400) immediately with

any problems.

Installation of this drive thru system has both mechanical and electrical work. Electric access to the

main menu board is not only through the center of the foundation base plate, but there are multiple

other locations.

Tools Required ladder 10’

level 3’

screw drivers (flat & Philips), magnetic bit holder

small tip / flat blade screw driver (jewelers)

wire striper wire tape (pulling)

permanent marking pen

3/8” nut driver

adjustable wrench

box end wrenches – ¾”’, 9/16”, 15/16”

circuit tester

seal tite whips

conduit

12 AWG wire (minimum per McDonalds)

Page 8: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 8 of 25

P/N:A740151961, REV: F

4/16/2013

Page 9: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 9 of 25

P/N:A740151961, REV: F

4/16/2013

Page 10: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 10 of 25

P/N:A740151961, REV: F

4/16/2013

Page 11: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 11 of 25

P/N:A740151961, REV: F

4/16/2013

Page 12: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 12 of 25

P/N:A740151961, REV: F

4/16/2013

Site Prep Wiring Details NOTE: Validate the site is ready for this new product line.

Page 13: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 13 of 25

P/N:A740151961, REV: F

4/16/2013

Page 14: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 14 of 25

P/N:A740151961, REV: F

4/16/2013

Installation – Mechanical / Electrical

Mounting PreSell Pedestal and Column – Rear View

Step 1

• Install a leveling nut and

washer over each anchor

bolt.

Step 2

Pull wiring

thru conduit.

Step 3

Install pedestal to fit over

conduits and anchor bolts

onto leveling washers-

• Level pedestal base and

validate

Note:

Jog Switch opening to the

REAR

FEED WIRING UP THRU

PEDESTAL AND OUT JOG

SWITCH OPENING

ON DEMAND power

Refer to Wiring Schematic Details

* Power Feed (AC) Wiring Schematic- see pg. 13

• Validate pedestal is LEVEL

• Utilize pedestal slots to align board for

best customer viewing!

• Completely tighten all double nuts on

the anchor bolts.

• See exploded detail below.

NUT

NUT

WASHER

PEDESTAL BASE

WASHER

LEVELING NUT

Page 15: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 15 of 25

P/N:A740151961, REV: F

4/16/2013

Step 4 Mount Triangle Assembly

• Route 3 wires from triangle assembly down center pole thru jog switch opening.

• Tighten all ½” HS bolts /column hardware following hardware sequence below.

Hardware Sequence

Nut

Lock washer

Triangle base plate

Pedestal cap plate

Flat washer

Bolt

ON DEMAND power supply

Note: Typical hardware

configuration for all columns

LONG end faces to the rear

HIGH side faces to the front

Refer to Wiring Schematic Details

* Power Feed (AC) Wiring Schematic- see pg. 13

Step 5 Mount PS Raincap Beam

• Open door

• Remove 3/8” bolt from top of

center post in triangle to secure

Raincap to beam.

• Install Raincap Beam

• Re-install 3/8” bolt along with

second 3/8” bolt from hardware

kit.

• Completely tighten ½” pedestal

mount bolts.

Step 6

Secure Raincap to Raincap

Beam using #10 Hardware:

• Provided in

Hardware Kit

Step 7 Wiring Termination

• Terminate and ground “ON DEMAND”

power supply.

Page 16: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 16 of 25

P/N:A740151961, REV: F

4/16/2013

Installation – Mechanical/ Electrical

Mount Main Menu Board Pedestal and Columns – Rear View ENSURE SELECTION OF MOUNTING HOLES IN PEDESTAL ALLOWS FOR PROPER SIGN SET BACK FROM ALL CURBS.

IF THERE ARE NO OBSTRUCTIONS – PLACE PEDESTAL AS FAR TO THE RIGHT AS POSSIBLE (FROM VIEWING FACE).

Step 1

Install a leveling nut and

leveling plate over each

anchor bolt.

Refer to Wiring Schematic Details

* Power Feed (AC) Wiring Schematic- see pg. 13

ON DEMAND

power supply Step 2

Pull wiring

thru conduit.

Step 3

• Install pedestal to fit over conduits and anchor

bolts onto leveling plates- Level pedestal base

and validate

• Jog Switch opening to the REAR

• Feed wiring up thru pedestal and out

Switch opening

Page 17: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 17 of 25

P/N:A740151961, REV: F

4/16/2013

FOUNDATION CONNECTION DETAIL

• Validate pedestal is LEVEL

• Utilize pedestal slots to align board for best

customer viewing!

• Completely tighten all double nuts on

the anchor bolts.

• See exploded detail below.

NUT

NUT

LEVELING PLATE

PEDESTAL BASE

LEVELING PLATE

LEVELING NUT

Step 4 Install Column #4

• Mount triangle assembly to

cap plate with hardware.

• Route 1 wire from triangle

assembly down center pole

thru adjacent jog switch

opening.

• Leave hardware “hand

tightened” until Rain Cap

Beam has been installed.

On Demand

power supply

Hardware Sequence

Nut

Lock washer

Triangle base plate

Pedestal cap plate

Flat washer

Bolt

Page 18: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 18 of 25

P/N:A740151961, REV: F

4/16/2013

Step 5 Install Triangles 3 thru 1

Repeat install sequence for Columns # 3, #2 and #1.

• Each column has AC Power Feed.

• Validate each column has been labeled accordingly.

• Leave ½” HS Bolts finger tight until Beam and Raincap

are installed.

HIGH side faces to the front

LONG end faces to the rear

Step 6 Install Rain Cap Beam

• Open door

• Remove 3/8” bolt from top of center post in triangle to

secure Raincap to beam.

• Install Raincap Beam

• Re-install 3/8” bolt along with second 3/8” bolt from

hardware kit.

• Completely tighten ½” triangle mount bolts.

• Repeat for ALL columns!

Step 7 Install Rain Cap

Secure Raincap to Raincap Beam using #10 Hardware:

• Provided in Hardware Kit

Page 19: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 19 of 25

P/N:A740151961, REV: F

4/16/2013

Step 8 Wiring Termination

• Terminate and ground “ON

DEMAND” power supply thru

ON/OFF switch.

Refer to Wiring Schematic Details

* Power Feed (AC) Wiring Schematic- see pg. 13

Note the direction that the columns rotate

(COUNTERCLOCKWISE)

ON DEMAND

Switch

Access Cover

Page 20: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 20 of 25

P/N:A740151961, REV: F

4/16/2013

Page 21: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 21 of 25

P/N:A740151961, REV: F

4/16/2013

Validation Checklist * Validate all components are functioning when system is powered up.

1. Locate both On Demand and Always On circuits at service panel. Must be labeled!

Refer to page 13 - OIT Enclosure Termination Detail schematic.

2. Validate boards are fully lit.

3. Validate all TOP and BOTTOM bushings are current version.

4. Turn each column, one at a time, for B-L-S and lock into place validating pull pins are

working correctly.

5. Installers to properly mark the Product or ID Label, located on the back of each column

reflector.

Installers need to identify and check:

• Product type (i.e., Automated or

Manual)

• Product Line (OPO-1, OPO-2, OPO-3,

OPO-4)

• Special Features (S= SHORT, HW=HIGH

Wind Load)

• See sample label for more detail.

Page 22: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 22 of 25

P/N:A740151961, REV: F

4/16/2013

DISCUSSION WITH STORE STAFF

• NEVER turn 2 adjacent columns at the same time

• Post OIT magnet with contact phone number information in a convenient

location for all staff.

Page 23: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 23 of 25

P/N:A740151961, REV: F

4/16/2013

OPO Outdoor Menu Board Parts Policy & Procedures

As a contracted Outdoor Menu Board Sign Installer, you are required to purchase all parts from Florida

Plastics International. Installing unauthorized parts into a Florida Plastics Outdoor Menu Board will

void all installation and/or product warranties.

Ordering Parts in Warranty

Ordering Non Warranty Parts

• Sign Installer should call Florida

Plastics at 800.499.0400 for a Return

Authorization

• Florida Plastics will generate a Call

Tag to allow the Sign Installer to

return defective part

• Part(s) will be shipped to the Sign

Installer ( may be shipped to the

McDonald’s restaurant directly if

communicated at the time of the

order)

• Invoice sent to the Sign Installer

• Sign Installer packages defective

part, calls to schedule pickup

• Defective part shipped back to

Florida Plastics

• Florida Plastics receives RA and part

and credits Sign Installer account

• If part received is not defective, the

Sign Installer will be invoiced

• Call Florida Plastics at 800.499.0400

to order part or FAX PO to

708.499.4620

• Part(s) will be shipped to Sign Installer

or contracted Service Provider (Part

may be shipped to McDonald’s

restaurant directly if communicated

at the time of the order)

• Invoice for the non-warranty part(s)

will be sent to Sign Installer or

contracted Service Provider

• Sign Installer or contracted Service

Provider will invoice the restaurant

directly for any associated labor,

travel, parts charges.

Page 24: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 24 of 25

P/N:A740151961, REV: F

4/16/2013

Sign Installation Warranty

Warranty Statement

Florida Plastics requires the authorized Sign Installer to provide a 60 day installation warranty from the

date of installation. The warranty provides that the OPO Menu Board was installed according to the

Florida Plastics guidelines as outlined in the Installation Manual using Florida Plastics approved parts

and materials. Failure to install per instructions will result in Installer liability. In the event that

additional work and/or parts are required to properly install the sign, all incurred costs will be the

responsibility of the Installer.

Spare Parts – see details on OPO Parts Policy & Procedures

All parts must be provided by Florida Plastics.

You may purchase an inventory of spare parts which will be credited as used and failed parts

returned or

You may order parts as needed from Florida Plastics.

Installation Failure Cost Expectations

If Florida Plastics receives a service call from a restaurant that is in the install warranty period, and

determines that an on-site visit is needed, Florida Plastics will notify the Sign Company so that the

service call can be dispatched to the original Sign Installer.

If Florida Plastics responds to a service call and it is determined that the failure is the result of the

installation workmanship and is within the warranty period of 60 days, the Sign Installer will reimburse

Florida Plastics its actual labor costs, not to exceed $75 without prior authorization. The Sign Installer

will also reimburse Florida Plastics actual travel costs up to $75 without prior authorization. Approval

for all labor and travel expenses that exceed these caps will be requested of the Sign Installer, prior to

any work being performed.

Product Failure Cost Expectations

During the warranty period, if it is determined that the failure is a product failure and not the result of

the installation, Florida Plastics will reimburse the Sign Installer its actual labor costs, not to exceed $75

without prior authorization from Florida Plastics. Florida Plastics will also reimburse the Sign Installer

actual travel costs up to $75 without prior authorization from Florida Plastics. All labor and travel

expenses that exceed these caps must be pre-approved by Florida Plastics. Invoice must reference

Florida Plastics initiated service call number.

To all Installers:

Please complete the Installation Close Out form on the

following page.

Fax completed form to Florida Plastics @ 708-499-4620.

Thank you.

Page 25: OPO-Standard Installation Instructions - Personapersonasigns.com/media/files/McDonalds/Drive Thru/Installation...OPO-Standard Installation Instructions Manual Version OPO-1, OPO-3,

Page 25 of 25

P/N:A740151961, REV: F

4/16/2013

Installation Close Out Form