OPERATIONS UPDATE

OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

OPERATIONS UPDATE

Page 2: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

2

This presentation contains forward-looking statements which are made pursuant to safe harbor provisions of the Private Securities Litigation Reform Act of 1995. These forward-looking statements include statements, among other things, concerning: effects on our financial statements and guidance resulting from certain module manufacturing changes and associated restructuring activities; our business strategy, including anticipated trends and developments in and management plans for our business and the markets in which we operate; future financial results, operating results, revenues, gross margin, operating expenses, products, projected costs (including estimated future module collection and recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates and capital expenditures; our ability to continue to reduce the cost per watt of oursolar modules; the impact of public policies, such as tariffs or other trade remedies imposed on solar cells and modules; our ability to expand manufacturing capacity worldwide; our ability to reduce the costs to construct PV solar power systems; research and development programs and our ability to improve the conversion efficiency of our solar modules; sales and marketing initiatives; and competition. These forward-looking statements are often characterized by the use of words such as "estimate," "expect," "anticipate," "project," "plan," "intend," "seek," "believe," "forecast," "foresee," "likely," "may," "should," "goal," "target," "might," "will," "could," "predict," "continue" and the negative or plural of these words andother comparable terminology. Forward-looking statements are only predictions based on our current expectations and our projections about future events. You should not place undue reliance on these forward-looking statements. We undertake no obligation to update any of these forward-looking statements for any reason. These forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause our actual results, levels of activity, performance or achievements to differ materially from those expressed or implied by these statements. These factors include, but are not limited to, the matters discussed in Item 1A "Risk Factors," of our most recent Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, and other filings with the Securities and Exchange Commission.

FORWARD-LOOKING STATEMENTS

Page 3: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

MANUFACTURING CAPACITY OUTLOOK

Page 4: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

4

MODULE CAPACITY | NOVEMBER ‘16 ROADMAP

-

1,000

2,000

3,000

4,000

5,000

6,000

2017 2018 2019 2020

Series 4 Series 6

MW

4,000

2018-2020

Series 4 1,100

Series 6 8,500

9,600

Page 5: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

5

MODULE CAPACITY | DECEMBER ‘17 PLAN OF RECORD

-

1,000

2,000

3,000

4,000

5,000

6,000

2017 2018 2019 2020

Series 4 S4 Extension Series 6

MW

5,700

2018-2020

Series 4 4,400

Series 6 9,350

13,750

Page 6: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

6

HOW WE GET TO OVER 6 GW’S CAPACITY

Q1 Q2 Q3 Q4

2017

Q1 Q2 Q3 Q4

2018

Q1 Q2 Q3 Q4

2019

Q1 Q2 Q3 Q4

2020

MALAYSIA S4 FACTORY 1 – 1000MW NAMEPLATE

MALAYSIA S4 FACTORY 2 – 1000MW NAMEPLATE

OHIO S6 FACTORY – 600MW NAMEPLATE

MALAYSIA S6 FACTORY 1 – 1200MW NAMEPLATE

VIETNAM S6 FACTORY 1 – 1200MW NAMEPLATE

VIETNAM S6 FACTORY 2 – 1200MW NAMEPLATE

MALAYSIA S6 FACTORY 2

Page 7: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

7

SERIES 6 FACTORY #1 | 600MWPERRYSBURG, OHIO

• Production Equipment Installed

• 1st Complete Module Produced

• Q1 2018: Plant Qualification Complete

• Q2 2018: UL/IEC Certification

• Q2 2018: Production Shipments Begin

Page 8: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

8

PERRYSBURG FACTORY TRANSFORMATION

DECEMBER 2016

Page 9: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

9

Page 10: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

10

SERIES 6 FACTORY #2 | 1.2GWKULIM, MALAYSIA

• Plant Fit-Up Complete

• Coater Installation Complete

• Frontend Equipment 50% Installed

• Equipment Deliveries Top 25%

• Q2 2018: 1st Complete Module

• Q3 2018: Plant Qualification Complete

• Q3 2018: Production Shipments Begin

• Q1 2019: Full Capacity Achieved

Page 11: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

11

SERIES 6 FACTORY #3 | 1.2GWDONG NAM, VIETNAM 1

• Facility Ready for Tool Installation

• 1st Coater In-Transit

• Hiring In Progress

• Q1 2018: Tool Move-In & Coater Install

• Q3 2018: 1st Complete Module

• Q4 2018: Plant Qualification Complete

Page 12: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

12

NEW SERIES 6 FACTORY | 1.2GWDONG NAM, VIETNAM 2

• Pilings and Groundwork Complete

• Steel Sub-Structure Ready to Begin

• Hiring in Progress

• Q3 2018 Ready for Equipment

• Q1 2019 1st Complete Module

• Q2 2019 Plant Qualification Complete

Page 13: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

CAPEX & CPW FORECASTS

Page 14: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

14

SERIES 6 CAPEX: BEATING OUR EXPECTATIONS

$0.00

$0.10

$0.20

$0.30

$0.40

$0.50

$0.60

$0.70

Series 4 Series 6 Greenfield (shared site) Series 6 Brownfield plus conversions

Capex per watt

Page 15: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

15

2016 2020E

Co

st p

er W

att

S6 IMPACT

(FORM FACTOR)EFFICIENCY

IMPROVEMENTMFG COST

REDUCTION LINE RUN RATE

INCREASE

DRIVERS OF COST REDUCTION | MODULE

2020 is Lead Line Cost per Watt. Not to Scale

100%

~60%

Page 16: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

16Assumes North America 100MW Tracker plant without ODC. 2020 is Lead Line Cost per Watt. Not to Scale

2016 2020E

Co

st p

er W

att

MODULES6 IMPACT ON

BOS

EFFICIENCY

IMPACT ON BOS

EPC COST

REDUCTION

DRIVERS OF COST REDUCTION | FULL SYSTEM

System Module

100%

<60%

Page 17: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

17

MODULE COST PER WATT | SERIES 4

2020 is Lead Line Cost per Watt. Not to Scale

2016 2017 2018E 2019E 2020E

100%

Co

st p

er W

att 70%

86%

Page 18: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

INTRODUCING SERIES 6

Page 19: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates

© C

op

yri

gh

t F

irs

t S

ola

r, I

nc

. 5

De

ce

mb

er

20

17

19

• Same proven manufacturing process

• Same reliable, high energy-yield cell

• Higher Efficiency

• Improved BOS installation cost

• Framed with standard structure compatibility

SERIES 6: COMPELLING FOR US AND OUR CUSTOMERS

SERIES 4

120Wp

SERIES 6440Wp

Page 20: OPERATIONS UPDATE...recycling costs), warranties, solar module technology and cost reduction roadmaps, restructuring, product reliability, investments in unconsolidated affiliates