OPERATIONS AND MAINTENANCE OF THE BULK STORAGE

FACILITY FOR PETROLEUM PRODUCTS OF ENGEN NAMIBIA

WALVIS BAY DEPOT

ENVIRONMENTAL MANAGEMENT PLAN

Assessed by: Assessed for:

Tel.: +264-61 257411 July 2019 Tel.: +264-61-296 9000

Page 2: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk
Page 3: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Project: ENVIRONMENTAL MANAGEMENT PLAN FOR THE OPERATIONS

AND MAINTENANCE OF THE ENGEN NAMIBIA BULK STORAGE

FACILITY FOR PETROLEUM PRODUCTS IN WALVIS BAY

Report

Version/Date

Final

July 2019

Prepared for: ENGEN Namibia (Pty) Ltd

P.O. Box 5306

Ausspanplatz

Windhoek

Namibia

Lead Consultant Geo Pollution Technologies (Pty) Ltd

PO Box 11073

Windhoek

Namibia

Main Project

Team

Pierre Botha

(B.Sc. Geology/Geography); (B.Sc. (Hons) Hydrology/Hydrogeology)

André Faul

(B.Sc. Zoology, Biochemistry); (B.Sc. (Hons) Zoology); (M.Sc. Conservation

Ecology); (Ph.D. Medical Bioscience)

Cite this

document as:

Botha P, Faul A, 2019 July. Environmental Management Plan for the

Operations and Maintenance of the Engen Namibia Bulk Storage Facility

for Petroleum Products in Walvis Bay

Copyright Copyright on this document is reserved. No part of this document may be

utilised without the written permission of Geo Pollution Technologies (Pty)

Ltd.

Report

Approval

20190722

Engen Namibia

EMP Update

Page 4: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk
Page 5: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Table of Contents

1 OBJECTIVES OF THE EMP ..................................................................................................................... 1

2 THE EMP ..................................................................................................................................................... 1

2.1 LAND USE, PLANNING, DESIGN, OPERATIONS – IDENTIFIED IMPACTS ............................................................. 1 2.2 LAND USE, PLANNING, DESIGN, OPERATIONS – MITIGATING MEASURES ........................................................ 2

3 THE IMPLEMENTATION OF THE EMP ............................................................................................... 2

4 CONCLUSIONS ......................................................................................................................................... 23

5 REFERENCES ........................................................................................................................................... 23

List of Tables TABLE 1. PLANNING FOR OPERATIONS, MAINTENANCE AND FUTURE DECOMMISSIONING OF

THE PROJECT ......................................................................................................................... 3 TABLE 2. THE OPERATIONAL PHASE .................................................................................................... 5 TABLE 3. MAINTENANCE (CONSTRUCTION) PHASE ........................................................................... 12 TABLE 4. DECOMMISSIONING PHASE ................................................................................................. 19

Page 6: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk
Page 7: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

1 OBJECTIVES OF THE EMP ENGEN Namibia (Pty) Ltd (hereafter referred to as ENGEN Namibia) operates an existing bulk fuel

storage facility in Walvis Bay. Their environmental management plan (EMP) provides management

options to ensure impacts of operations and potential maintenance (construction activities) are

minimised. An EMP is a tool used to take pro-active action by addressing potential problems before

they occur. This should limit the corrective measures needed, although additional mitigation measures

might be included if necessary. The EMP acts as a stand-alone document, which can be used during

the various phases (planning, construction, operational and decommissioning) of any proposed activity

or development. All contractors and sub-contractors taking part in the operations and site maintenance

of this facility should be made aware of the contents of the EMP, so as to plan the relevant activities

accordingly in an environmentally sound manner.

The objectives of the EMP are:

to include all components of the various activities;

to prescribe the best practicable control methods to lessen the environmental impacts associated

with the operations and maintenance of the bulk fuel storage facility;

to monitor and audit the performance of operational and maintenance personnel in applying such

controls; and

to ensure that appropriate environmental training is provided to responsible operational and

maintenance personnel.

ENGEN Namibia implements an environmental management system based on the ISO 14001

standard. At the heart of an EMS is the concept of continual improvement of environmental

performance with resulting increases in operational efficiency, financial savings and reduction in

environmental, health and safety risks. An effective EMS would need to include the following

elements:

A stated environmental policy which sets the desired level of environmental performance;

An environmental legal register;

An institutional structure which sets out the responsibility, authority, lines of communication and

resources needed to implement the EMS;

Identification of environmental, safety and health training needs;

An environmental program(s) stipulating environmental objectives and targets to be met, and work

instructions and controls to be applied in order to achieve compliance with the environmental

policy; and

Periodic (internal and external) audits and reviews of environmental performance and the

effectiveness of the EMS.

2 THE EMP The following general guidance for the EMP is based on the findings of the EIA and risk assessment

carried out by Geo Pollution Technologies (Botha et al. 2014).

2.1 Land Use, Planning, Design, Operations – Identified Impacts The following is the summary of the key findings of the EIA:

The current zoning (industrial) still designates the area as suitable for the continued operations

of the bulk fuel storage facility;

The immediate neighbours constitute like industry;

The risk of an accident/incident causing fires or explosions is still considered to be high.

Human factors are still being considered and the best engineering still goes in to maintaining a

very safe depot. If a fire or explosion was to occur, and the necessary engineered structures

were not in place, there would be a significant possible impact on the adjoining industrial

properties.

Soil and groundwater pollution is possible where fuel spills occur and are not contained.

Page 1 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 8: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

2.2 Land Use, Planning, Design, Operations – Mitigating Measures The following is a summary of the proposed Management Plan, which will make the bulk fuel

storage facility safe taking into consideration all the risk perceptions raised by all stakeholders:

To prevent product loss through ruptures of pipeline or hose during the offloading operations,

all nozzles on the rail tankers, road tankers and storage tanks are fitted with excess flow check

valves. These are designed to allow only specific flow rates and the moment it exceeds this,

the process is stopped. Small quantities lying in the hose that could leak would be captured by

spill containment structures.

Fire and explosion events are prevented through adherence to South African National

Standards (SANS).

The existence firefighting equipment and emergency water reservoir are deemed adequate to

meet with possible emergencies. Refer to the company’s emergency plan for bulk fuel storage

facilities.

The bulk fuel storage facility does not cause any substantial ecological threat to the

environment in the vicinity of Walvis Bay. Contamination of soils or groundwater is

prevented through safe work practices, engineered safety devices and spill containment

structures.

3 THE IMPLEMENTATION OF THE EMP Tables 1 to 4 outline the management of the environmental elements that may be affected by the

different activities, grouped in each phase of development. These groups are as follows:

Planning Phase

Operational Phase

Maintenance Phase

Decommissioning Phase

The EMP is a living document that must be prepared in detail, and regularly updated, by the proponent

as the project progress and evolve. The tables below act as a guideline for the EMP to be established

by the proponent. Impacts addressed and mitigation measures proposed are seen as minimum

requirements which have to be elaborated on. Delegation of mitigation and reporting activities should

be determined by the proponent and included in the EMP.

All monitoring results must be reported on as indicated and submitted to the Ministry of Environment

and Tourism as per their regulations and requirements. These are required for any future renewals of

the environmental clearance certificate.

Page 2 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 9: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Tab

le 1

.

Pla

nn

ing f

or

Op

erati

on

s, M

ain

ten

an

ce a

nd

Fu

ture

Dec

om

mis

sion

ing o

f th

e P

roje

ct

Act

ivit

y

Ob

jecti

ve

Act

ion

T

imin

g

Pro

of

of

Co

mp

lia

nce

R

esp

on

sib

le B

od

y

Co

mp

liance

T

o

com

ply

w

ith

all

leg

al

req

uir

em

ents

fo

r th

e o

per

atio

ns

of

the

bu

lk f

uel

sto

rage

faci

lity

in N

am

ibia

.

Ap

ply

fo

r o

r re

new

al

l nec

essa

ry

per

mit

s

fro

m t

he v

ario

us

min

istr

ies,

lo

cal

auth

ori

ties

and

an

y o

ther

bo

die

s th

at g

over

ns

the b

ulk

sto

rage

of

fuel

in N

am

ibia

.

Fin

alis

e nego

tiat

ions

and

re

solv

e an

y

outs

tand

ing

issu

es,

if

an

y,

over

th

e

allo

cati

on o

f use

r ri

gh

ts a

nd

zo

nin

g o

f th

e

pro

per

ty

on

whic

h

the

bulk

fu

el

sto

rage

faci

lity

is

loca

ted

.

Duri

ng

no

rmal

ongo

ing

op

erat

ions

as

wel

l as

p

oss

ible

futu

re

dec

om

mis

sio

nin

g

of

the

facil

ity

All

co

ntr

acts

, p

erm

its,

cert

ific

ates

and

o

ther

le

gal

do

cum

ents

on f

ile.

Pro

po

nen

t

Ap

po

intm

ents

T

o

appo

int

rep

uta

ble

contr

acto

rs

and

o

per

atio

nal

per

sonnel

an

d

esta

bli

sh

the

EM

P,

a le

gal

re

quir

em

ent

that

form

s p

art

of

the

contr

act

wit

h

the

contr

acto

r an

d e

mp

loyee

s.

Ap

po

int

a co

ntr

acto

r an

d

emp

loyee

s and

ente

r in

to a

n a

gre

em

ent

wh

ich i

ncl

ud

es t

he

EM

P.

Ensu

re

that

th

e co

nte

nts

o

f th

e E

MP

ar

e

und

erst

oo

d

by

the

con

trac

tor,

su

b-

contr

acto

rs,

em

plo

yee

s and

al

l p

erso

nnel

wh

o w

ill

be

pre

sent

on s

ite.

Duri

ng

no

rmal

ongo

ing

op

erat

ions

as

wel

l as

p

oss

ible

futu

re

dec

om

mis

sio

nin

g

of

the

facil

ity

Co

ntr

acts

on f

ile

Pro

po

nen

t; C

ontr

acto

r

Man

agem

ent

Est

abli

sh a

managem

ent

syst

em

to

imp

lem

ent

and

m

onit

or

Hea

lth,

Safe

ty

and

Envir

on

ment.

Mak

e p

rovis

ions

to

hav

e a

Hea

lth,

Saf

ety

and

E

nvir

on

men

tal

Co

ord

inat

or

to

imp

lem

ent

the

EM

P

and

o

ver

see

occ

up

atio

nal

hea

lth

and

sa

fety

as

w

ell

as

gen

eral

envir

on

menta

l re

late

d c

om

pli

ance

at

the

site

.

Hav

e th

e fo

llo

win

g

em

ergen

cy

pla

ns,

equip

ment

and

p

erso

nnel

in

p

lace

to

d

eal

wit

h a

ll e

mer

genci

es:

Ris

k

Managem

ent

/ M

itig

atio

n

/

Envir

on

menta

l M

anagem

ent

Pla

n/

Em

ergency

Res

po

nse

P

lan

and

H

SE

Man

uals

Ad

equat

e

pro

tect

ion

and

in

dem

nit

y

insu

rance

co

ver

fo

r in

cid

ents

;

Duri

ng

no

rmal

ongo

ing

op

erat

ions

as

wel

l as

p

oss

ible

futu

re

dec

om

mis

sio

nin

g

of

the

facil

ity

Do

cum

enta

tio

n o

n f

ile

Per

sonal

P

rote

ctio

n

Eq

uip

ment

(PP

E)

on s

ite

Sig

nage

rela

ted

to

rest

rict

ed

area

s, d

anger

ou

s ar

eas,

and

PP

E r

equir

ements

on s

ite

Em

ergency

resp

on

se

mat

eria

l o

n s

ite

Pro

po

nen

t; C

ontr

acto

r

Page 3 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 10: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Act

ivit

y

Ob

jecti

ve

Act

ion

T

imin

g

Pro

of

of

Co

mp

lia

nce

R

esp

on

sib

le B

od

y

Co

mp

ly w

ith t

he

pro

vis

ions

of

all

rele

van

t

safe

ty s

tand

ard

s;

Pro

ced

ure

s,

equip

men

t and

m

ater

ials

req

uir

ed f

or

emer

gen

cie

s.

Res

tora

tio

n

Fu

nd

/Insu

rance

To

es

tab

lish

a

fund

/insu

ran

ce

for

futu

re

env

iro

nm

enta

l

rest

ora

tio

n

or

po

lluti

on

rem

edia

tio

n i

f ev

er r

equir

ed.

To

esta

bli

sh

a fu

nd

fo

r fu

ture

ec

olo

gic

al

rest

ora

tio

n o

f th

e p

roje

ct s

ite

sho

uld

pro

ject

acti

vit

ies

ceas

e and

th

e si

te

is

dec

om

mis

sio

ned

an

d

env

iro

nm

enta

l

rest

ora

tio

n

or

po

lluti

on

rem

edia

tio

n

is

req

uir

ed.

Duri

ng

no

rmal

ongo

ing

op

erat

ions

as

wel

l as

p

oss

ible

futu

re

dec

om

mis

sio

nin

g

of

the

facil

ity

Fin

anci

al

stat

em

ents

o

f

rest

ora

tio

n f

und

/insu

rance

Pro

po

nen

t

Rep

ort

ing

T

o e

stab

lish

a r

epo

rtin

g s

yst

em

to r

epo

rt o

n m

onit

ori

ng a

spec

ts

of

con

stru

ctio

n,

op

erat

ion

and

dec

om

mis

sio

nin

g a

s o

utl

ined

in

the

EM

P.

Est

abli

sh

a re

po

rtin

g

syst

em

to

re

po

rt

on

asp

ects

o

f o

per

atio

ns,

m

ainte

nan

ce

and

dec

om

mis

sio

nin

g a

s o

utl

ined

in t

he

EM

P.

Kee

p

mo

nit

ori

ng

re

po

rts

on

file

fo

r

sub

mis

sio

n

wit

h

Env

iro

nm

enta

l C

lear

ance

Cer

tifi

cate

re

new

al

app

licat

ions

wh

ere

nee

ded

.

Duri

ng

no

rmal

ongo

ing

op

erat

ions

as

wel

l as

p

oss

ible

futu

re

dec

om

mis

sio

nin

g

of

the

facil

ity

Mo

nit

ori

ng R

epo

rts

Pro

po

nen

t; C

ontr

acto

r

Envir

on

menta

l

Cle

aran

ce

Ren

ew

al

To

re

new

th

e E

nv

iro

nm

enta

l

Cle

aran

ce

Cer

tifi

cate

every

thre

e yea

rs.

Ap

po

int

a sp

ecia

list

en

vir

on

menta

l

consu

ltan

t to

up

dat

e th

e E

IA a

nd

EM

P a

nd

app

ly

for

renew

al

of

the

Envir

on

menta

l

Cle

aran

ce C

erti

fica

te.

Pri

or

to

exp

iry

of

Envir

on

menta

l

Cle

aran

ce C

erti

fica

te

Ren

ew

ed

Env

iro

nm

enta

l

Cle

aran

ce C

erti

fica

te

Pro

po

nen

t;

Ind

epen

den

t S

pec

iali

st

Co

nsu

ltant

Page 4 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 11: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Tab

le 2

.

Th

e O

per

ati

on

al

Ph

ase

C

rite

ria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

Sk

ills

,

Tech

no

log

y

&

Dev

elo

pm

en

t

En

hanced

skil

ls a

nd

tec

hno

log

y t

ran

sfer

to

the

Ero

ng

o

coas

tal

reg

ion

and

sub

seq

uen

t p

rom

oti

on

of

eco

no

mic

develo

pm

en

t.

Tra

inin

g

mu

st

be

pro

vid

ed

to

Nam

ibia

ns

to

ult

imat

ely

em

plo

y a

pre

do

min

antl

y N

am

ibia

n w

ork

forc

e.

Co

pie

s o

f tr

ainin

g

cert

ific

atio

n

or

manag

eria

l

refe

rence

s o

n f

ile.

Su

mm

ary

rep

ort

b

ased

on

actu

al

trai

nin

g

and

th

e

enhance

men

t o

f sk

ills

an

d

tran

sfer

o

f te

chno

log

y

sho

uld

be

com

pil

ed.

Pro

po

nen

t

HIV

/AID

S,

In-

mig

rati

on

,

Info

rm

al

Set

tlem

en

ts

an

d

Pro

per

ty P

rice

s

Incr

ease

d

spre

ad

of

HIV

/AID

S;

Incr

ease

d i

nfl

ux t

o W

alvis

Bay o

r o

ther

area

s o

f th

e co

ast;

In

crea

sed

in

form

al

sett

lem

ent

and

as

soci

ated

p

rob

lem

s;

Pro

per

ty p

rice

s.

Res

tric

ted

em

plo

ym

ent

for

loca

l p

eop

le

only

sh

ould

b

e

pra

ctic

ed.

Dev

iati

ons

fro

m t

his

pra

ctic

e sh

ould

be

just

ifie

d

appro

pri

atel

y.

Ed

uca

tio

nal

pro

gra

ms

on H

IV/A

IDs.

Su

mm

ary

rep

ort

b

ased

o

n

educa

tio

nal

p

rogra

mm

es

and

trai

nin

g c

ond

uct

ed.

Su

mm

ary

rep

ort

an

d

revie

w

of

em

plo

yee

dem

ogra

phic

s.

Pro

po

nen

t

Em

plo

ym

en

t

The

faci

lity

p

lays

an im

po

rtan

t ro

le in

pro

vid

ing e

mp

loym

ent

to l

oca

ls.

If

skil

ls

exis

t lo

call

y

Nam

ibia

ns

mu

st

be

em

plo

yed

.

Alt

ernat

ivel

y tr

ainin

g

mu

st

be

pro

vid

ed to

N

am

ibia

ns

to

ult

imat

ely

em

plo

y

a p

red

om

inan

tly

Nam

ibia

n

wo

rkfo

rce.

Dev

iati

ons

fro

m

this

p

ract

ice

sho

uld

b

e ju

stif

ied

app

rop

riat

ely.

Su

mm

ary

rep

ort

b

ased

o

n

em

plo

yee

rec

ord

s.

Pro

po

nen

t

Tra

ffic

T

he

bulk

fuel

sto

rage f

acil

ity

is

loca

ted

wit

hin

an i

nd

ust

rial

are

a. M

ovem

ent

of

traf

fic

to a

nd

fro

m t

he

site

is

asse

ssed

.

Tru

cks

mu

st e

nte

r and

lea

ve

the

site

s fo

r

ever

y l

oad

ing a

nd

off

-lo

adin

g e

ven

t.

The

dis

trib

uti

on o

f fu

el b

y tr

uck

fr

om

the

bulk

fuel

sto

rage

faci

lity

wil

l var

y i

n

inte

nsi

ty d

epen

din

g o

n d

em

an

d.

Lim

ited

par

kin

g fo

r tr

ucks

exis

ts in

th

e st

reet

s

lead

ing t

o t

he

entr

ance

s.

Due

to th

e nat

ure

o

f th

e neig

hb

ouri

ng

ind

ust

ries

, tr

ucks

wil

l fr

equen

t th

e ar

eas

aro

und

th

e b

ulk

fu

el

sto

rag

e fa

cili

ty.

Up

load

ing

of

fuel

is

no

rmal

ly

duri

ng

wo

rkin

g

ho

urs

.

Ho

wever

, al

low

ing e

xte

nd

ed f

uel

ling

tim

es a

fter

ho

urs

may

red

uce

co

ngest

ion.

The

pro

po

nen

t to

get

her

w

ith

the

nei

ghb

ouri

ng

ind

ust

ries

may h

ave t

o c

on

ven

e a

mee

ting t

o

dis

cuss

a

wo

rkab

le

solu

tio

n

sho

uld

tr

aff

ic

con

ges

tio

n

bec

om

e a

sig

nif

icant

pro

ble

m.

Car

efu

l p

lan

nin

g

and

sched

uli

ng o

f tr

uck a

rriv

al f

or

up

load

ing e

vents

m

ight

be

req

uir

ed.

Furt

her

mo

re:

Tru

cks

sho

uld

no

t b

e a

llo

wed

to

par

k i

n t

he s

treets

,

ou

tsid

e t

he e

rven

, fo

r ex

ten

ded

per

iod

s o

f ti

me.

Tru

ck

s are

no

t all

ow

ed

ou

tsid

e t

he d

ep

ot

ear

lier

than

on

e h

ou

r p

rio

r to

th

e d

epo

t o

pen

ing

tim

e,

an

d s

ho

uld

leav

e w

ith

in a

n h

ou

r aft

er

dep

ot

clo

sin

g t

ime.

A re

gis

ter

of

trucks

arri

vin

g

and

lea

vin

g t

he

pre

mis

es

must

be

kep

t.

A r

epo

rt s

ho

uld

be

com

pil

ed

of

the

dai

ly n

um

ber

of

truck

s

pro

cess

ed a

t th

e ro

ad g

antr

ies.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g t

raff

ic i

ssues

sho

uld

be

reco

rded

in t

he

rep

ort

and

corr

ecti

ve

acti

on t

aken n

ote

d.

Pro

po

nen

t

Page 5 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 12: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

This

m

ay

cau

se

traf

fic

dis

rup

tio

ns,

esp

ecia

lly d

uri

ng

tim

es o

f in

cre

ased

fuel

dem

and

and

wh

en t

rucks

are

wai

tin

g i

n

the

stre

et t

o g

ain a

cces

s to

the r

esp

ecti

ve

ind

ust

ries

.

Pro

per

sig

nag

e t

o d

irec

t tr

affi

c sh

ould

be

in p

lace

.

A

spee

d

lim

it

of

40

k

m/h

is

re

com

mend

ed

for

the

ind

ust

rial

are

a.

Fir

e a

nd

Ex

plo

sion

Ha

zard

Vo

lati

le fu

els

like

unle

aded

p

etro

l ca

n

rele

ase

consi

der

able

vap

our

at

tem

per

ature

s even b

elo

w a

mb

ient,

wh

ich

read

ily

form

fl

am

mab

le

mix

ture

s.

Vap

ours

set

tle

to g

round

lev

el

and

may

reac

h,

via

dra

ins

and

oth

er u

nd

ergro

und

pas

sages,

ig

nit

ion so

urc

es re

mo

te fr

om

the

po

int

of

rele

ase.

P

rod

uct

ca

n

accu

mula

te a

sta

tic

char

ge,

w

hic

h m

ay

cause

a f

ire

or

exp

losi

on.

Exp

osu

re

of

the

pro

duct

to

th

e ai

r o

r

gro

und

wher

e i

t ca

n b

e ig

nit

ed

co

uld

be

as a

res

ult

of

the

foll

ow

ing

inci

den

ts o

r

acti

ons

at t

he

po

ints

of

rece

ipt,

sto

rage

and

up

load

ing :

-

Fuel

rec

eip

t (f

rom

fuel

ship

tanker

s, r

oad

gan

trie

s an

d p

ipel

ines)

and

lo

adin

g (

road

and

rai

l gan

trie

s):

Bre

akag

e o

f o

fflo

adin

g p

ipe

Co

up

lin

g m

alf

un

cti

on

Co

nta

inm

en

t in

suff

icie

nt

Pu

mp

an

d p

ipeli

ne f

ail

ure

en

rou

te

to s

tora

ge o

r g

an

trie

s

Op

en

ele

ctr

ical

equ

ipm

en

t o

r

ele

ctr

ical

inst

all

ati

on

s

Valv

e m

alf

un

cti

on

Gask

et,

valv

es

or

pu

mp

seal

leak

s

Un

au

tho

rise

d

en

try

of

rail

loco

mo

tiv

e e

nte

rin

g r

ail

gan

try

Ru

nn

ing

of

tan

ker

tru

ck

en

gin

es

at

gan

try

(en

gin

e

suck

in

fu

el

Fir

e F

igh

tin

g a

nd

Fir

e P

rev

enti

on

:

All

fir

e p

reca

uti

ons

and

fir

e c

ontr

ol

at t

he

new

sit

e m

ust

be

in

acco

rdan

ce

wit

h

SA

NS

1

00

89

, o

r b

ette

r.

Fir

efig

hti

ng

mea

sure

s as

p

er

the

Mat

eria

l S

afet

y

Dat

a S

hee

ts

of

the

pro

duct

s sh

ould

be

adher

ed t

o.

SA

NS

1

00

89

is

ad

op

ted

b

y

the

Min

istr

y

of

Min

es

and

Ener

gy

as

the

nati

onal

st

an

dar

d.

The

pro

po

sed

fa

cili

ty

exce

eds

the

SA

NS

safe

ty d

ista

nce

s. S

afe

ty d

ista

nce

s giv

en

by S

AN

S w

ork

on t

he

pre

mis

es t

hat

if

the

sett

ing

-out

of

the

site

and

the

safe

ty d

ista

nce

s to

the

nea

rest

ad

jace

nt

pro

per

ty

are

adher

ed t

o,

then

an

y d

evel

op

ment

can b

e sa

fely

buil

t o

n

the

nei

ghb

ouri

ng p

rop

erty

. It

is

spec

ific

ally

ap

pro

pri

ate

to

com

ply

wit

h t

hes

e st

and

ard

s, a

s th

e p

rop

onen

t w

ould

have

no

co

ntr

ol

on t

he

futu

re p

lacem

ent

of

faci

liti

es a

round

the

pro

po

sed

fac

ilit

y.

In a

dd

itio

n t

o t

his

, al

l p

erso

nn

el h

ave

to b

e se

nsi

tise

d a

bo

ut

resp

onsi

ble

fir

e p

rote

ctio

n m

eas

ure

s an

d g

oo

d h

ouse

kee

pin

g

such

as

the

rem

oval

o

f fl

am

mab

le

mat

eria

ls

inclu

din

g

rub

bis

h,

dry

veg

etati

on,

and

hyd

roca

rbo

n-s

oaked

so

il f

rom

the

vic

init

y o

f th

e in

stal

lati

on.

Reg

ula

r in

spec

tio

ns

sho

uld

be

carr

ied

out

to c

hec

k f

or

these

mat

eria

ls a

t th

e si

te.

It

mu

st

be

assu

red

th

at

suff

icie

nt

wat

er

is

avail

able

fo

r

fire

fig

hti

ng p

urp

ose

s. T

he

bu

lk f

uel

sto

rage

faci

lity

sho

uld

ensu

re t

hat

the

vo

lum

e o

f w

ater

rem

ains

adeq

uat

e fo

r fi

re

pro

tect

ion

and

is

ac

cord

ing

to

the

SA

NS

1

00

89

spec

ific

atio

ns.

A ho

list

ic fi

re p

rote

ctio

n an

d p

reven

tio

n p

lan is

nee

ded

.

This

p

lan

mu

st

incl

ud

e an

em

ergency

resp

onse

p

lan,

fire

fig

hti

ng p

lan and

sp

ill

reco

ver

y p

lan fo

r d

eali

ng w

ith

A r

epo

rt s

ho

uld

be

com

pil

ed

of

all

inci

den

ts r

epo

rted

. T

he

rep

ort

sh

ould

co

nta

in

dat

es

wh

en

fire

d

rill

s w

ere

cond

uct

ed

and

w

hen

fi

re

equip

ment

was

test

ed.

Pro

po

nen

t

Page 6 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 13: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

vap

ou

rs,

cau

sin

g

tru

ck

to

m

isfi

re

an

d c

reate

ig

nit

ion

so

urc

e)

Gro

un

din

g

an

d

bo

nd

ing

cab

les

defe

cti

ve

Dri

vin

g

off

w

ith

o

fflo

ad

ing

p

ipe

an

d e

art

h c

able

co

nn

ecte

d

Fail

ure

to

sto

p p

um

ps

fro

m g

an

try

resu

ltin

g i

n o

verf

illi

ng

of

tan

ks

Pip

e

cou

pli

ng

/no

zzle

p

op

pin

g

off

tan

k n

ozzle

Dra

in b

ack

facil

ity c

ou

pli

ng

/no

zzle

po

pp

ing

ou

t o

f ta

nk

in

let

No

t fo

llo

win

g p

roce

dure

s

Wo

rkin

g

on

u

nd

er

pre

ssu

rise

d

pip

eli

nes

Cell

ph

on

es

an

d o

pen

fla

mes

Sp

ille

d

pro

du

ct

fro

m

leak

ing

valv

es

an

d n

ozzle

s

Ho

use

keep

ing

Leak

ing

tan

ks

Leak

ing

pip

eli

nes

Sto

rage:

No

t fo

llo

win

g

pro

ced

ure

s fo

r

co

rrect

sto

rag

e

Po

or

ho

use

keep

ing

(c

lean

lin

ess

an

d p

ack

ing

)

Fla

mm

ab

le

org

an

ic

mate

rial

no

t

rem

ov

ed

(p

lan

ts,

pap

er

&

dir

ty

rag

s)

Heat

ex

po

sure

in

su

n

Cell

ph

on

es

an

d o

pen

fla

mes

Reck

less

d

riv

ing

in

frast

ructu

re

co

llis

ion

Ov

erf

illi

ng

sto

rag

e t

an

ks

Bro

ken

o

r cra

ck

ed

b

un

d

wall

s

leak

ing

p

rod

uct

to

sou

rce

of

ign

itio

n o

ff s

ite

spil

ls.

Exp

erie

nce

has

sho

wn

that

the

bes

t ch

ance

to

rap

idly

pu

t

out

a m

ajo

r fi

re i

s in

the

firs

t 5

min

ute

s. I

t is

im

po

rtan

t to

reco

gnis

e th

at a

resp

on

sive

fire

p

reven

tio

n p

lan d

oes

no

t

sole

ly i

ncl

ud

e th

e av

aila

bil

ity o

f fi

refi

ghti

ng e

quip

men

t, b

ut

mo

re im

po

rtan

tly,

it in

vo

lves

pre

med

itat

ed m

easu

res

and

acti

vit

ies

to t

imeo

usl

y p

revent,

curb

and

avo

id c

ond

itio

ns

that

may r

esult

in f

ires

. A

n i

nte

gra

ted

fir

e p

reven

tio

n p

lan

sho

uld

be

dra

fted

bef

ore

“st

art-

up

” o

f th

e fa

cili

ties

. S

pec

ial

no

te m

ust

be

taken o

f th

e re

gula

tio

ns

stip

ula

ted

in s

ecti

ons

47

and

48

of

the P

etro

leu

m P

rod

uct

s an

d E

ner

gy A

ct,

19

90

(Act

No

. 1

3 o

f 1

99

0).

Page 7 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 14: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

Po

orl

y s

eale

d c

on

tain

men

t

Hea

lth

, S

afe

ty &

Sec

uri

ty

Duri

ng

op

erat

ional

tim

es,

all

pro

ced

ure

s

for

off

load

ing,

sto

rage

and

lo

adin

g

of

fuels

ca

n p

ose

a ri

sk to

p

eop

le.

Thes

e

risk

s ar

e as

sess

ed

in

term

s o

f th

e

pre

dic

ted

im

pac

t if

they o

ccur.

Typ

ical

exam

ple

s ar

e:-

Tri

pp

ing o

ver

an e

arth

ing c

able

Fal

lin

g

off

th

e

rail

ta

nker

o

r

tanker

tru

ck

Bre

athin

g i

n e

xce

ssiv

e fu

mes

Sli

pp

ing o

n w

et s

urf

aces

Pro

duct

co

nta

ct

wit

h

eyes

and

skin

Sta

ff

no

t w

eari

ng

pro

tect

ive

clo

thin

g

Musc

ula

r in

jury

fr

om

in

corr

ect

lift

ing t

ech

niq

ues

Wo

rkin

g a

t hei

ghts

Sec

uri

ty r

isks

asso

ciat

ed w

ith t

heft

and

sab

ota

ge.

All

Healt

h a

nd

Safe

ty s

tan

dard

s sp

ecif

ied

in

th

e L

ab

ou

r

Act

sho

uld

be c

om

pli

ed

wit

h.

All

sta

ff m

em

bers

to

be b

riefe

d a

bo

ut

the p

ote

nti

al

risk

s o

f

ex

po

sure

to

hyd

rocarb

on

s o

r in

juri

es

on

sit

e.

Ad

here

to

th

e f

oll

ow

ing:

Hea

lth

and

Safe

ty R

eg

ula

tio

ns

per

tain

ing t

o p

erso

nal

pro

tect

ive

clo

thin

g,

firs

t ai

d k

its

bei

ng a

vai

lab

le o

n

site

, w

arnin

g s

ign

s, e

tc.;

Sel

ecte

d p

erso

nnel

sho

uld

be

trai

ned

in f

irst

aid

. T

he

conta

ct d

etai

ls

of

all

em

erg

en

cy

serv

ices

mu

st

be

read

ily a

vail

ab

le;

Perm

it t

o w

ork

syst

em

s an

d s

ecu

rity

ch

eck

s;

Derm

al

co

nta

ct

wit

h h

yd

rocar

bo

ns

mu

st b

e a

vo

ided

an

d a

ll p

rod

ucts

han

dle

d a

cco

rdin

g t

o t

heir

MS

DS

.

A r

epo

rt s

ho

uld

be

com

pil

ed

of

all

inci

den

ts r

epo

rted

. T

he

rep

ort

sh

ould

co

nta

in

dat

es

wh

en t

rain

ing w

as

cond

uct

ed

and

w

hen

sa

fety

eq

uip

men

t

and

str

uct

ure

s w

ere

insp

ecte

d

and

mai

nta

ined

.

Pro

po

nen

t

Air

Qu

ali

ty

Gas

es

wh

ich

are

det

rim

enta

l to

li

vin

g

org

anis

ms

are

asse

ssed

u

nd

er

this

sect

ion.

Man

y

pet

role

um

p

rod

uct

s ar

e

vo

lati

le a

nd

vap

ours

can

acc

um

ula

te i

n

the

envir

on

ment.

Hyd

roca

rbo

n vap

ours

w

ill

no

rmal

ly b

e

rele

ased

d

uri

ng lo

adin

g an

d o

fflo

adin

g

pro

ced

ure

s an

d i

f sp

ills

occ

ur.

Fuel

sp

ills

, es

pec

iall

y

UL

P,

wil

l q

uic

kly

vap

ori

ze

and

emis

sio

ns

wil

l d

isper

se q

uic

kly

do

wn

win

d a

nd

hyd

roca

rbon

gas

ses

are

hea

vie

r th

an a

ir.

Sta

ff a

nd

cli

ents

sho

uld

be

kep

t aw

ay f

rom

are

as w

her

e la

rge

spil

ls o

ccur,

res

ult

ing i

n s

trong v

apo

urs

, unti

l th

e vap

ours

hav

e d

isp

erse

d

6

Mo

nth

ly

test

ing

of

air

at

var

ious

poin

ts

arou

nd

th

e

stora

ge

tanks,

p

ipel

ines

,

imm

edia

te

vic

init

y

of

the

pro

per

ty

and

se

lect

ed

dis

tance

s fu

rther

aw

ay

fro

m

outs

ide

of

the

pro

per

ty.

More

freq

uen

t te

stin

g

sho

uld

com

pla

ints

be

rece

ived

or

if a

n

incr

ease

in

re

leas

ed

gas

es

is

susp

ecte

d.

All

data

to

be c

om

pil

ed

in

a

rep

ort

an

d

rev

iew

ed

b

y

an

ind

ep

en

den

t sp

ecia

list

.

Pro

po

nen

t;

Ind

epen

den

t

Sp

ecia

list

Co

nsu

ltant

Page 8 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 15: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

Nois

e

No

ise

po

lluti

on w

ill

exis

t d

ue

to h

eav

y

veh

icle

s and

tra

ins

acce

ssin

g t

he

site

to

tran

spo

rt f

uel

to

and

fro

m t

he

site

s.

The

dep

ot

is s

ituat

ed i

n a

n i

nd

ust

rial

are

a so

ther

e is

no

rest

rict

ion

on

the

tim

es

of

op

erat

ion.

The

Wal

vis

B

ay

Mun

icip

alit

y d

oes

no

t have

an

y g

uid

elin

es w

ith r

esp

ect

to

no

ise

levels

b

ut

the

Wo

rld

H

ealt

h

Org

aniz

atio

n

(WH

O)

guid

elin

e

on

maxim

um

n

ois

e le

vels

(G

uid

elin

es

for

Co

mm

unit

y N

ois

e, 1

99

9)

to p

reven

t hea

rin

g i

mp

airm

ent

is

foll

ow

ed.

This

lim

its

no

ise

level

s in

ind

ust

rial

are

as t

o a

n

aver

age

of

70

d

B o

ver

a

24 ho

ur

per

iod

w

ith m

axim

um

no

ise

level

s no

t ex

ceed

ing 1

10

dB

duri

ng t

he

per

iod

.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

exce

ssiv

e no

ise

sho

uld

be

reco

rded

wit

h n

ote

s

on a

ctio

ns

taken.

All

co

mpla

ints

and a

ddit

ional

dat

a,

if

avai

lab

le,

to

be

com

pil

ed i

n a

rep

ort

.

Pro

po

nent

Wa

ste

Prod

uct

ion

Th

e

ab

ilit

y

of

a

pro

du

ct

to

act

as

a

wast

e w

hic

h m

ust

be c

lean

ed

up

. T

hese

can

be s

oil

s th

at

beco

me c

on

tam

inate

d

wit

h

fuel.

D

om

est

ic

wast

e

fro

m

bin

s,

off

ices

an

d

ab

luti

on

facil

itie

s.

Co

nta

min

ati

on

o

f fu

el

thro

ug

h

accid

en

tal

mix

ing

of

pro

du

cts

resu

lts

in

wast

e.

Co

nsu

lt

the

rele

vant

MS

DS

fo

r hand

lin

g

haz

ard

ou

s

sub

stance

s. C

on

tam

inat

ed f

uel

pro

duct

s th

at

can

no

lo

nger

be

use

d

in

the

mar

ket

m

ust

b

e tr

ansf

erre

d

to

was

te

oil

recy

cli

ng

faci

liti

es

wher

e p

oss

ible

o

r d

isp

ose

d

of

in

the

haz

ard

ous

was

te s

ecti

on o

f th

e m

unic

ipal

du

mp

at

Wal

vis

Bay

.

Oil

-Wat

er S

epar

ato

rs m

ust

reg

ula

rly b

e cl

eaned

.

Fo

r ef

fluent

dis

char

ge,

the

Wal

vis

Bay M

un

icip

alit

y m

ust

be

consu

lted

to

ob

tain

the

late

st r

egula

tio

ns

per

tain

ing t

o

allo

wab

le s

ew

age

inp

ut.

Co

nta

min

ated

so

ils

can b

e re

med

iate

d i

n a

cco

rdan

ce w

ith

acce

pte

d p

roce

dure

s at

a s

ite

ded

icat

ed f

or

this

purp

ose

.

All

oth

er d

om

esti

c w

ast

e sh

ou

ld b

e d

isp

ose

d o

f re

gula

rly.

A r

egis

ter

of

haza

rdo

us

wast

e

dis

po

sal

sho

uld

be

kep

t. T

his

sho

uld

in

clud

e ty

pe

of

wast

e,

vo

lum

e

as

well

as

dis

po

sal

meth

od

/fac

ilit

y.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

was

te

sho

uld

b

e

reco

rded

wit

h n

ote

s o

n a

ctio

n

taken

.

All

dat

a to

be

com

pil

ed in

a

report

.

Pro

po

nent

Grou

nd

wa

ter,

Su

rfa

ce

Wa

ter

an

d

So

il

Con

tam

ina

tio

n

Po

rou

s su

rface

su

bst

rate

ca

n

allo

w

haza

rdo

us

and

ec

olo

gic

ally

d

etri

men

tal

sub

stan

ces

to

seep

do

wn

to

the

wat

er

table

.

Lim

ited

surf

ace

runo

ff f

rom

the

site

s is

exp

ecte

d d

ue

to l

ow

rai

nfa

ll.

Runo

ff o

f

poll

uta

nts

fro

m t

he

tanks

is n

ot

exp

ecte

d

to r

each

any n

earb

y s

urf

ace

wat

er d

ue

to

the

bund

w

alls

an

d

the

des

ign

of

the

faci

lity

.

Gro

und

wat

er i

s no

t uti

lize

d i

n t

he

area

The

foll

ow

ing

mea

sure

s m

ust

b

e em

plo

yed

to

p

reven

t

spil

lage

into

su

rfac

e w

ate

r d

rain

age

channels

and

gro

und

wat

er s

ourc

es:-

Sp

ill

contr

ol

stru

cture

s an

d

pro

ced

ure

s m

ust

b

e in

pla

ce a

cco

rdin

g t

o S

AN

S 1

00

89

sta

nd

ard

s o

r b

ette

r,

incl

ud

ing im

po

und

ing ar

ou

nd

th

e lo

adin

g ar

eas

by

bund

ing w

ith a

pp

rop

riate

slo

pes

of

1:1

00

.

All

fu

elli

ng

sho

uld

b

e ca

rrie

d

out

on

surf

aces

pro

vid

ed f

or

this

purp

ose

. E

.g.

Co

ncr

ete

slab

s w

ith

regula

rly m

ain

tain

ed s

eals

bet

wee

n s

lab

s.

The

pro

ced

ure

s fo

llo

wed

to

p

reven

t en

vir

on

men

tal

dam

age

duri

ng

serv

ice

and

m

ainte

nance

, an

d

A r

epo

rt s

ho

uld

be

com

pil

ed

of

all

spil

ls

or

leak

ages

rep

ort

ed.

The

rep

ort

sh

ould

conta

in

the

foll

ow

ing

info

rmat

ion

:

dat

e an

d

dura

tio

n

of

spil

l

pro

duct

sp

ille

d

vo

lum

e o

f sp

ill

rem

edia

l ac

tio

n t

aken

Co

mp

aris

on

o

f p

re-

exp

osu

re

bas

elin

e d

ata

Pro

po

nent,

Ind

epend

ent

Sp

eci

alis

t C

onsu

ltan

t

Page 9 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 16: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

for

hum

an

consu

mp

tio

n

but

sho

uld

nev

erth

eles

s be

pro

tect

ed.

Pro

per

co

nta

inm

ent

mec

han

ism

s

inst

alle

d s

ho

uld

co

nfi

ne

any r

elea

se t

hat

mig

ht

tak

e p

lace

fro

m s

pil

lages

duri

ng

op

erati

on

of

the f

aci

lity

.

com

pli

ance

w

ith

thes

e

pro

ced

ure

s,

incl

ud

ing

the

corr

ect

use

o

f su

mp

s an

d

regula

r re

po

rtin

g

of

spil

lages,

m

ust

b

e au

dit

ed

and

co

rrec

tio

ns

mad

e

wh

ere

nec

essa

ry.

Pro

per

tra

inin

g o

f o

per

ato

rs m

ust

be

cond

uct

ed o

n a

regula

r b

asis

.

An

y s

pil

lage

of

mo

re t

han 2

00

l m

ust

be

rep

ort

ed a

s

per

the

Pet

role

um

Pro

duct

s L

icen

se.

Sp

ill

clea

n-u

p k

it m

ust

be

avail

able

on s

ite

as p

er t

he

rele

van

t M

ater

ial

Saf

ety

Dat

a S

hee

ts

Pro

per

bund

are

as a

t th

e ra

il g

antr

y r

ight

up

to

the

exit

gat

e w

ill

ensu

re t

hat

an

y p

rod

uct

lea

ked

on t

he

pre

mis

es i

s co

llec

ted

.

Co

nti

ngen

cies

for

the

changes

in

pre

ssure

and

tem

per

ature

bet

wee

n W

alvis

Bay

and

the d

esti

nat

ion

mu

st b

e in

pla

ce w

hen f

illi

ng r

ail

tan

ker

s in

Wal

vis

Bay

. O

ver

fill

ing o

f th

e ta

nk

s in

Wal

vis

Bay c

an c

ause

pro

duct

lo

ss o

n r

oute

as

rele

ase

val

ves

co

mp

ensa

te

for

vo

lum

e chan

ges

due

to l

ow

er p

ress

ure

and

hig

her

tem

per

ature

s at

the

des

tinati

on.

Rail

tan

ker

s ar

riv

ing

in

the

mo

rnin

g

could

re

leas

e li

quid

fu

el

as

tem

per

ature

s ri

se.

If t

hes

e ta

nker

s ar

e no

t p

osi

tio

ned

over

b

und

ed

area

s,

soil

co

nta

min

atio

n

wil

l o

ccur.

Duri

ng t

he r

ain

y s

easo

n,

this

fuel

can b

e ca

rrie

d a

way

to n

earb

y d

rain

age

syst

em

s o

r in

filt

rati

on t

ow

ard

s th

e

wat

er t

able

can

ensu

e.

Reg

ula

r gro

und

wat

er m

onit

ori

ng f

or

the

pre

sence

of

hyd

roca

rbo

ns.

wit

h

po

st

rem

edia

tio

n

dat

a (e

.g.

soil

hyd

roca

rbo

n

conce

ntr

atio

ns)

Co

py o

f d

ocu

men

tati

on

in

wh

ich

spil

l w

as

rep

ort

ed t

o M

inis

try o

f

Min

es a

nd

Ener

gy

6

Mo

nth

ly

test

ing

of

gro

un

dw

ate

r fo

r

hy

dro

carb

on

s at

var

ious

poin

ts

arou

nd

th

e st

ora

ge

tanks

and

p

ipel

ines

. M

ore

freq

uen

t te

stin

g s

hould

a l

eak

be

susp

ecte

d.

All

data

to

be c

om

pil

ed

in

a

rep

ort

an

d

rev

iew

ed

b

y

an

ind

ep

en

den

t sp

ecia

list

.

Imp

act

o

f

Lig

hti

ng

o

n

Bir

ds

Th

e

imp

act

of

bri

gh

t li

gh

ts

on

b

ird

s

flyin

g a

t n

igh

t.

All

lig

hts

dir

ecte

d d

ow

nw

ard

s to

wo

rkin

g s

urf

aces

.

Duri

ng o

per

atio

ns

min

imu

m l

igh

tin

g r

equir

ed m

ust

be

use

d

at n

ight.

Nes

ting o

f b

ird

s sh

ould

be

dis

coura

ged

.

Reg

ula

r in

spec

tio

n

mu

st

be

per

form

ed t

o m

onit

or

for

bir

d

imp

acts

. M

itig

atio

n m

easu

res

mu

st

be

invest

igat

ed

and

imp

lem

ente

d i

f re

quir

ed.

All

dat

a to

be

com

pil

ed i

n a

rep

ort

.

Pro

po

nent

Vis

ua

l Im

pa

ct

Th

is

is

an

im

pact

that

aff

ects

th

e

No

sp

ecif

ic m

easu

res

need

to

be i

mp

lem

en

ted

to

main

tain

a

sim

ilar

vis

ual

imp

act

to

oth

er

ind

ust

rial

bu

ild

ing

s.

A r

epo

rt s

ho

uld

be

com

pil

ed

ever

y

of

all

com

pla

ints

Pro

po

nent

Page 10 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 17: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

aest

heti

c a

pp

eara

nce.

If

pro

per

ly

main

tain

ed

, th

e

infr

ast

ructu

re

wil

l n

ot

hav

e

a

sig

nif

ican

t eff

ect

on

th

e v

isu

al

ho

rizo

n

as

it

wil

l b

e

sim

ilar

to

the

oth

er

stru

ctu

res

in t

he i

nd

ust

rial

are

a.

Ro

uti

ne

main

ten

an

ce o

n i

nfr

ast

ructu

re w

ill

en

sure

th

at

the

lon

gev

ity

o

f st

ructu

res

is

max

imis

ed

. H

ow

ev

er,

it

is

imp

ort

an

t th

at

the

real

inte

gri

ty

of

the

stru

ctu

res

is

co

nsi

dere

d i

n t

he l

on

g t

erm

an

d n

ot

just

ap

peara

nces.

rep

ort

ed

and

re

med

iati

on

acti

on t

aken.

Cu

mu

lati

ve

Imp

act

Th

ese

are

im

pacts

on

th

e e

nv

iro

nm

en

t,

wh

ich

re

sult

fr

om

th

e

incre

men

tal

imp

act

of

the

acti

on

w

hen

ad

ded

to

oth

er

past

, p

rese

nt,

an

d

reaso

nab

ly

fore

seeab

le f

utu

re a

cti

on

s re

gard

less

of

wh

o

un

dert

ak

es

such

o

ther

acti

on

s.

Cu

mu

lati

ve

imp

acts

can

re

sult

fr

om

ind

ivid

uall

y

min

or,

b

ut

coll

ecti

vely

sig

nif

ican

t acti

on

s ta

kin

g p

lace o

ver

a

peri

od

o

f ti

me.

In

rela

tio

n

to

an

acti

vit

y,

it

mean

s th

e

imp

act

of

an

acti

vit

y

that

in

itse

lf

may

n

ot

be

sig

nif

ican

t,

may

b

eco

me

sig

nif

ican

t

wh

en

ad

ded

to

th

e

ex

isti

ng

an

d

po

ten

tial

imp

acts

resu

ltin

g f

rom

sim

ilar

or

div

ers

e a

cti

vit

ies

or

un

dert

ak

ing

s in

the a

rea.

Po

ssib

le c

um

ula

tive

imp

acts

ass

oci

ated

wit

h

the

op

erati

onal

ph

ase

in

clud

e

incr

ease

in

tr

affi

c fr

equenti

ng

the

site

and

alo

ng t

he s

ecti

on o

f ro

ad n

ear

the

fuel

dep

ot

due

to i

ncr

ease

d d

em

and

fo

r

fuel

and

th

e

nee

d

to

per

form

re

gula

r

mai

nte

nance

. T

her

efo

re i

ncr

ease

in n

ois

e

may

occ

ur

and

em

issi

ons

fro

m

these

veh

icle

s ca

n

dec

reas

e th

e ai

r q

ual

ity

aro

und

th

e p

rop

ose

d

esta

bli

shm

ent.

Wea

r an

d t

ear

on t

he

road

and

incr

ease

d

risk

o

f ro

ad

traf

fic

inci

den

ces

could

incr

ease

.

Ad

dre

ssin

g e

ach o

f th

e in

div

idual

im

pac

ts a

s d

iscuss

ed a

nd

reco

mm

end

ed

in

the

EM

P

wo

uld

re

duce

th

e

cum

ula

tiv

e

imp

act.

Rev

iew

ing b

ian

nual

and

an

nu

al r

epo

rts

for

any n

ew

or

re-

occ

urr

ing

im

pac

ts

or

pro

ble

ms

wo

uld

aid

in

id

enti

fyin

g

cum

ula

tive

imp

acts

and

hel

p in

p

lann

ing,

if

the

exis

tin

g

mit

igat

ions

are

insu

ffic

ient.

Su

mm

ary r

eport

bas

ed o

n a

ll

oth

er i

mp

acts

mu

st b

e cr

eate

d

to g

ive

an o

ver

all

ass

ess

men

t

of

the

imp

act

of

the

Op

erat

ional

Phas

e.

Pro

po

nent

Page 11 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 18: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

Acc

um

ula

ted

la

ck

of

mai

nte

nan

ce

on

bund

w

alls

and

tan

ks

could

red

uce

the

inte

gri

ty s

afe

ty o

f th

e w

ho

le d

epo

t an

d

affe

ct

man

y o

f th

e im

pac

ts d

iscu

ssed

.

Tab

le 3

. M

ain

ten

an

ce (

Co

nst

ruct

ion

) P

hase

C

rit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

En

ha

nce

d

skil

ls

an

d

tech

no

log

y

tra

nsf

er

to

Wa

lvis

B

ay

a

nd

sub

seq

uen

t

pro

mo

tio

n

of

eco

no

mic

dev

elo

pm

en

t

Peo

ple

nee

d

skil

ls

to

per

form

thei

r jo

bs.

The

tech

no

log

y t

o d

o

som

ethin

g

is

oft

en

no

t fo

und

loca

lly.

Dev

elo

pm

ent

of

peo

ple

and

te

chno

log

y

are

key

to

eco

no

mic

dev

elo

pm

ent.

Tra

inin

g m

ust

be

pro

vid

ed t

o N

am

ibia

ns

to u

ltim

atel

y

em

plo

y a

pre

do

min

antl

y N

am

ibia

n w

ork

forc

e.

Tra

ined

p

erso

nnel

to

b

e is

sued

w

ith

trai

nin

g

cert

ific

ates

or

manager

ial

refe

rence

let

ters

.

Co

pie

s o

f tr

ainin

g c

erti

fica

tio

n o

r

man

ager

ial

refe

rence

s o

n f

ile.

Su

mm

ary r

epo

rt b

ased

on a

ctual

trai

nin

g a

nd

the

enhance

men

t o

f

skil

ls a

nd

tra

nsf

er o

f te

chno

log

y

sho

uld

be

com

pil

ed.

Pro

po

nen

t; D

irec

tors

& P

ubli

c

Rel

atio

ns

per

sonnel

.

Incr

ease

d

spre

ad

o

f H

IV/

AID

S;

Incr

ease

d in

flu

x

to

Wa

lvis

B

ay

;

Incr

ease

d

info

rm

al

sett

lem

en

t a

nd

ass

ocia

ted

pro

ble

ms;

Red

uce

d

pro

pert

y v

alu

es

New

and

ex

isti

ng

devel

op

men

ts

attr

act

peo

ple

w

ho

se

ek

wo

rk.

This

in

tu

rn

can

in

crea

se

the

exte

nt

of

info

rmal

se

ttle

men

ts

and

its

ass

oci

ated

pro

ble

ms.

The

incr

ease

d

truckin

g

and

dis

trib

uti

on

of

go

od

s fr

om

Wal

vis

B

ay

could

co

ntr

ibute

to

the

spre

ad o

f H

IV /

AID

S.

Res

tric

ted

em

plo

ym

ent

for

loca

l p

eop

le o

nly

sho

uld

be

pra

ctic

ed.

Dev

iati

ons

fro

m

this

p

ract

ice

sho

uld

b

e

just

ifie

d a

pp

rop

riat

ely.

Ed

uca

tio

nal

pro

gra

ms

on H

IV/A

IDs.

Su

mm

ary

rep

ort

b

ased

o

n

educa

tio

nal

p

rogra

mm

es

and

trai

nin

g c

ond

uct

ed.

Rep

ort

an

d re

vie

w o

f em

plo

yee

dem

ogra

phic

s.

Pro

po

nen

t; D

irec

tors

& P

ubli

c

Rel

atio

ns

Per

sonnel

.

Em

plo

ym

en

t T

he

const

ruct

ion

ind

ust

ry

pla

ys

an

imp

ort

ant

role

in

p

rovid

ing

em

plo

ym

ent

to l

oca

ls.

If sk

ills

ex

ist

loca

lly N

am

ibia

ns

mu

st b

e em

plo

yed

.

Alt

ernat

ivel

y t

rain

ing

must

be

pro

vid

ed t

o N

am

ibia

ns

to

ult

imate

ly

em

plo

y

a p

red

om

inan

tly

Nam

ibia

n

wo

rkfo

rce.

D

evia

tio

ns

fro

m

this

p

ract

ice

sho

uld

b

e

just

ifie

d a

pp

rop

riat

ely.

Su

mm

ary

rep

ort

b

ased

o

n

em

plo

yee

rec

ord

s.

Pro

po

nen

t; D

irec

tors

& P

ubli

c

Rel

atio

ns

Per

sonnel

.

Tra

ffic

T

he

pro

po

sed

si

tes

are

locat

ed

wit

hin

the

tow

n’s

ind

ust

rial

are

a.

At

the

tan

k f

arm

s, d

iver

sio

n o

f tr

affi

c m

ay b

e re

quir

ed

wh

en cr

anes

an

d fl

atb

ed tr

uck

vehic

les

freq

uen

t th

e

Vis

ual

ob

serv

atio

n o

f im

pac

ts o

n

traf

fic

sho

uld

be

mad

e.

Co

ntr

acto

r, P

ropo

nen

t

Page 12 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 19: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

Mai

nte

nan

ce

and

co

nst

ructi

on

acti

vit

ies

are

exp

ecte

d

to

hav

e

som

e im

pac

t o

n t

he

mo

vem

en

t o

f

traf

fic

to

the

site

w

hen

const

ruct

ion

mat

eria

l an

d

equip

ment

must

be

tran

spo

rted

to

the

site

. C

ranes

and

fla

tbed

tru

cks

may f

req

uent

the

site

.

site

when i

nst

alli

ng t

he

fuel

tank

s.

Sho

uld

ro

ad c

losu

re o

ccur,

the

con

trac

tor

must

lia

ise

wit

h

neig

hb

ours

w

ho

m

ight

be

imp

acte

d.

The

contr

acto

r m

ust

al

so

liai

se

wit

h

the

rele

vant

traff

ic

dep

artm

ent

to

ensu

re

that

tr

affi

c fl

ow

alo

ng

the

affe

cte

d

route

is

m

inim

ally

d

isru

pte

d.

Alt

ernat

ive

road

s sh

ould

b

e cl

earl

y

ind

icat

ed

wit

h

sig

ns

and

/or

per

sonnel

dir

ecti

ng t

raff

ic.

An

y

traff

ic

com

pla

ints

re

ceiv

ed

mu

st

be

taken

up

w

ith

th

e

rele

van

t auth

ori

ties

and

dis

cuss

ed

wit

h t

he

Pro

po

nen

t.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Fir

e

Fla

mm

ab

le

pro

du

cts

lik

e fu

el,

lub

rica

nts

, p

ain

ts

use

d

duri

ng

const

ruct

ion

po

se

a ri

sk

of

fire

and

exp

losi

on th

rou

gh im

pro

per

han

dli

ng.

All

eq

uip

ment

and

to

ols

must

co

mp

ly w

ith s

tand

ard

s

wh

ich

allo

w

cert

ain

too

ls

and

eq

uip

ment

nea

r

flam

mab

le s

ourc

es.

Safe

ty d

ista

nce

s m

ust

be

adher

ed

to a

s w

ell

as s

afe

wo

rk p

roce

dure

s. S

afe

ty t

alk

s and

job

haza

rd a

nal

ysi

s to

be d

one b

efo

re w

ork

sta

rts.

Fir

efig

hti

ng m

easu

res

as p

er t

he

Mat

eria

l S

afet

y D

ata

Shee

ts o

f th

e p

rod

uct

sho

uld

be

adher

ed t

o.

In a

dd

itio

n t

o t

his

, al

l p

erso

nnel

have

to b

e se

nsi

tise

d

abo

ut

resp

onsi

ble

fi

re p

rote

ctio

n m

easu

res

and

go

od

ho

use

kee

pin

g

such

as

the

rem

oval

o

f fl

am

mab

le

mat

eria

ls

incl

ud

ing

rub

bis

h,

dry

veget

atio

n,

and

hyd

roca

rbo

n-s

oaked

so

il

fro

m

the

vic

init

y

of

the

const

ruct

ion.

Reg

ula

r in

spec

tio

ns

sho

uld

be

carr

ied

out

to c

hec

k f

or

thes

e m

ater

ials

at

the

site

.

All

fu

el

sto

rage

and

han

dli

ng

fa

cili

ties

in

Nam

ibia

mu

st c

om

ply

wit

h s

tric

t sa

fety

dis

tance

s as

pre

scri

bed

by S

AN

S.

SA

NS

is

ado

pte

d b

y t

he

Min

istr

y o

f M

ines

and

Ener

gy a

s th

e nat

ional

sta

nd

ard

. If

the

sett

ing

-out

of

the

site

and

th

e sa

fety

d

ista

nce

s to

th

e nea

rest

adja

cent

pro

per

ty

wer

e ad

her

ed

to,

then

an

y

dev

elo

pm

ent

can

be

safe

ly b

uil

t o

n t

he

nei

ghb

ouri

ng

pro

per

ty.

It m

ust

be

assu

red

that

su

ffic

ient

fire

fig

hti

ng r

eso

urc

es

are

avai

lab

le.

A h

oli

stic

fir

e p

rote

ctio

n a

nd

pre

ven

tio

n

pla

n

is

nee

ded

. T

his

ho

list

ic

pla

n

must

in

clu

de

an

em

ergency

resp

onse

p

lan

an

d

fire

fig

hti

ng

pla

n.

Reg

ula

r su

rveys

of

the

fire

-fig

hti

ng

equip

ment

and

Sup

erv

isio

n o

f w

ork

is

re

qu

ired

and

re

po

rts

of

safe

and

u

nsa

fe

pra

cti

ce

to

be

bro

ug

ht

to

the

atte

nti

on

of

the

HS

E &

SM

.

An

y in

cid

en

ts re

po

rted

m

ust

b

e

reco

rded

to

geth

er

wit

h

step

s

taken

to

mit

igat

e th

e im

pac

ts.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Co

ntr

acto

r, P

ropo

nen

t

Page 13 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 20: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

wat

er s

up

ply

sho

uld

be

carr

ied o

ut.

Exp

erie

nce

has

sho

wn t

hat

th

e b

est

chance

to

rap

idly

put

out

a m

ajo

r fi

re is

in

th

e fi

rst

5

min

ute

s. It

is

imp

ort

ant

to

reco

gnis

e th

at

a re

spo

nsi

ve

fire

pre

ven

tio

n p

lan d

oes

no

t so

lely

incl

ud

e th

e av

ail

abil

ity

of

fire

fi

ghti

ng

eq

uip

ment,

b

ut

mo

re im

po

rtan

tly,

it

invo

lves

p

rem

edit

ated

m

easu

res

and

ac

tivit

ies

to

tim

eou

sly p

revent,

curb

and

avo

id c

ond

itio

ns

that

may

resu

lt

in

fire

s.

An

inte

gra

ted

fi

re

pre

ven

tio

n

pla

n

sho

uld

be

dra

fted

bef

ore

co

nst

ruct

ion c

om

mence

s.

Healt

h,

Safe

ty

an

d S

ecu

rit

y

Duri

ng

mai

nte

nan

ce

and

const

ruct

ion

phas

es

contr

acto

rs

acce

ss

the

site

s.

Dif

fere

nt

exca

vat

ion,

eart

hm

ovin

g

and

tran

spo

rt

equip

men

t w

ill

be

onsi

te.

This

in

crea

ses

the

po

ssib

ilit

y o

f in

juri

es.

A h

igh r

isk

to

site

se

curi

ty

and

per

sonnel

hea

lth

and

sa

fety

ex

ists

d

uri

ng

this

per

iod.

All

H

ealt

h

an

d

Safe

ty

stan

dard

s sp

ecif

ied

in

th

e

Lab

ou

r A

ct

sho

uld

b

e

co

mp

lied

w

ith

. T

he

resp

on

sib

le

con

tracto

r m

ust

en

sure

th

at

all

st

aff

mem

bers

are

b

riefe

d

ab

ou

t th

e

po

ten

tial

risk

s o

f

inju

ries

on

sit

e.

Th

e co

ntr

acto

r sh

ou

ld

be o

bli

ged

to

ad

here

to

th

e

foll

ow

ing

:

Ad

here

to

H

ealt

h

an

d

Safe

ty

Reg

ula

tio

ns

pert

ain

ing

to

p

ers

on

al

pro

tecti

ve clo

thin

g,

firs

t

aid

kit

s, w

arn

ing

sig

ns,

etc

.;

En

sure

th

at

ad

eq

uate

em

erg

en

cy

facil

itie

s,

inclu

din

g f

irst

aid

kit

s, a

re a

vail

ab

le o

n s

ite;

In

co

nsu

ltati

on

w

ith

th

e

Walv

is

Bay

Tra

ffic

Dep

art

men

t,

dev

ise

an

d

sub

mit

a

traff

ic

man

ag

em

en

t p

rog

ram

me

for

secti

on

s o

f th

e

road

s to

be c

lose

d o

r tr

aff

ic d

ivert

ed

if

necess

ary

du

rin

g t

he d

eli

very

of

eq

uip

men

t an

d e

xcav

ati

on

of

pip

eli

ne t

ren

ch

es;

The

contr

acto

r m

ust

use

lo

cal

med

ia t

o m

ake

the

pub

lic

aw

are

of

con

stru

cti

on

ac

tivit

ies

that

m

ay

po

se s

afet

y r

isk

s;

Pro

per

bar

rica

des

and

sig

nage m

ust

be

in p

lace

to

war

n

and

d

irec

t p

edes

tria

n

and

vehic

le

traff

ic

aw

ay f

rom

co

nst

ruct

ion s

ites

;

Eq

uip

men

t th

at

mu

st b

e l

ocked

aw

ay o

n s

ite a

nd

mu

st b

e p

laced

in

a w

ay

th

at

do

es

no

t en

co

ura

ge

Invento

ry

of

nec

essa

ry

info

rmat

ion

and

ad

min

istr

ativ

e

do

cum

enta

tio

n t

o b

e kep

t.

An

y in

cid

ents

m

ust

b

e re

cord

ed

wit

h

acti

on

taken

to

p

reven

t

futu

re o

ccurr

ence

s.

A re

po

rt sh

ould

b

e co

mp

iled

o

f

all

inci

dents

rep

ort

ed.

The

rep

ort

sho

uld

co

nta

in

dat

es

when

trai

nin

g

wer

e co

nd

uct

ed

and

wh

en

safe

ty

equip

ment

and

stru

cture

s w

ere

insp

ecte

d

and

mai

nta

ined

.

Co

ntr

acto

r, P

ropo

nen

t

Page 14 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 21: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

cri

min

al

acti

vit

ies;

Ind

uct

ion

trai

nin

g

for

all

who

en

ter

the

site

is

req

uir

ed;

and

Sec

uri

ty p

erso

nnel

to

pre

ven

t u

nau

tho

rise

d e

ntr

y

of

the

con

stru

ctio

n s

ite

Ref

er to

E

mer

gency R

esp

on

se G

uid

ebo

ok 2

00

8 an

d

asso

ciat

ed S

AN

S d

ocu

ment,

MS

DS

and

manag

em

ent

syst

em

manuals

.

Un

der

gro

un

d

Uti

liti

es

Mai

nte

nan

ce

and

co

nst

ruct

ion

may

incl

ud

e ex

cavat

ions.

Und

ergro

und

uti

liti

es

like

tele

com

munic

atio

ns,

wat

er s

up

ply

and

se

wer

s ar

e at

ri

sk o

f bei

ng

dam

aged

.

Thes

e im

pac

ts

may

resu

lt

in

sect

ions

of

Wal

vis

Bay

bei

ng l

eft

wit

ho

ut

amen

itie

s.

Ap

po

inti

ng

q

uali

fied

an

d

rep

uta

ble

co

ntr

acto

rs

is

ess

en

tial.

P

rop

er tr

ain

ing

o

f co

nst

ructi

on

p

ers

on

nel

wo

uld

red

uce t

he p

oss

ibil

ity o

f th

e i

mp

act

occu

rrin

g.

Th

e

con

tracto

r m

ust

d

ete

rmin

e

ex

actl

y

wh

ere

am

en

itie

s an

d

pip

eli

nes

are

si

tuate

d

befo

re

co

nst

ructi

on

co

mm

en

ces,

e.g

. g

rou

nd

p

en

etr

ati

ng

rad

ar s

urv

eys

or

sim

ilar

to r

ed

uce t

he r

isk

. L

iais

on

wit

h

the

Mu

nic

ipali

ty

an

d

sup

pli

ers

o

f se

rvic

es

is

ess

en

tial.

Em

erg

en

cy

pro

ced

ure

s an

d

co

nta

ct

deta

ils

of

em

erg

en

cy

resp

on

se

team

s fo

r d

eali

ng

w

ith

th

e

po

ssib

le

con

seq

uen

ces

of

this

im

pact

mu

st

be

in

pla

ce b

efo

re c

on

stru

cti

on

co

mm

en

ces.

Map

s an

d l

oca

tio

n i

nfo

rmat

ion o

f

exis

ting u

nder

gro

und a

men

itie

s o

n

file

.

A r

egis

ter

of

all

inci

den

ts m

ust

be

mai

nta

ined

. T

his

sh

ould

in

clude

mea

sure

s ta

ken

to e

nsu

re t

hat

such

inci

den

ts a

re n

ot

repea

ted.

All

in

form

atio

n a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Contr

acto

r, P

roponen

t

Du

st

Dust

may b

e gener

ated

duri

ng

the

mai

nte

nance

and

co

nst

ructi

on

acti

vit

ies.

T

his

m

ight

be

aggra

vat

ed

duri

ng

per

iod

s o

f

stro

ng

w

ind

s.

Dust

o

ccu

rs

regula

rly

in

Wal

vis

B

ay

du

ring

the

win

ter

mo

nth

s w

hen e

aste

rly

win

ds

occ

ur.

The

nat

ure

of

the s

oil

in

Walv

is

Bay

is

such

that

it

is m

ois

t d

ue

to

freq

uen

t fo

g a

nd

mis

t ra

in,

an

d a

s

a re

sult

of

a ver

y s

hal

low

wat

er

tab

le.

The

dust

im

pac

t w

ould

thu

s

be

lim

ited

to

p

erio

ds

of

stro

ng

It is

re

com

mend

ed th

at re

gu

lar

dust

su

pp

ress

ion b

e

incl

ud

ed d

uri

ng co

nst

ructi

on

w

hen

d

ust

b

eco

mes

an

issu

e. P

erso

nnel

are

to

be

issu

ed w

ith d

ust

mas

ks

for

hea

lth r

easo

ns

wh

en n

eed

ed.

Reg

ula

r v

isu

al i

nsp

ecti

on

.

A

com

pla

ints

re

gis

ter

mu

st

be

main

tain

ed

, in

w

hic

h

any

com

pla

ints

fro

m t

he

com

mu

nit

y

mu

st

be

log

ged

. C

om

pla

ints

mu

st

be

inv

est

igate

d

an

d,

if

ap

pro

pri

ate

, ac

ted

up

on

.

All

in

form

atio

n a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Co

ntr

acto

r, P

rop

onent

Page 15 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 22: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

east

erly

w

ind

s w

hen

lar

ger

san

d

par

ticl

es c

an b

e tr

ansp

ort

ed.

No

ise

N

ois

e p

oll

uti

on w

ill

exis

t d

ue

to

hea

vy v

ehic

les

acce

ssin

g t

he s

ites

wit

h

mai

nte

nance

an

d

const

ruct

ion

mat

eria

ls.

Cem

ent

mix

ing,

dri

llin

g

and

exca

vati

ng

may

be

som

e ad

dit

ional

n

ois

e

pro

duci

ng a

ctiv

itie

s.

The

Wal

vis

Bay M

unic

ipal

ity h

as n

o r

egula

tio

ns

wit

h

regar

d t

o n

ois

e le

vel

s. T

he

bulk

fuel

sto

rage

faci

lity

is

situ

ate

d i

n a

n i

nd

ust

rial

are

a s

o t

her

e i

s no

rest

rict

ion

on

the

tim

es

of

op

erat

ion.

The

Wo

rld

H

ealt

h

Org

aniz

ati

on

(WH

O)

guid

elin

e o

n

max

imu

m

no

ise

level

s (G

uid

elin

es

for

Co

mm

unit

y

No

ise,

19

99

) to

pre

ven

t hea

rin

g im

pai

rment

can b

e fo

llo

wed

d

uri

ng

the

const

ruct

ion p

has

e. T

his

lim

its

no

ise

level

s to

an

aver

age

of

70

dB

over

a 2

4 h

our

per

iod

wit

h m

axim

um

no

ise

level

s no

t ex

ceed

ing 1

10

dB

duri

ng t

he

per

iod

. It

is r

eco

mm

end

ed t

hat

a s

urv

ey o

f th

e no

ise

level

s b

e

carr

ied

out

if c

om

pla

ints

are

rec

eived

.

A

com

pla

ints

re

gis

ter

must

be

mai

nta

ined

in

w

hic

h

any

com

pla

ints

fr

om

th

e co

mm

unit

y

must

be

logged

. C

om

pla

ints

must

be

inves

tigat

ed a

nd, if

appro

pri

ate,

acte

d u

po

n.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Co

ntr

acto

r, P

rop

onent

Wast

e

Pro

du

cti

on

Th

e

abil

ity

of

pro

du

cts

an

d

bu

ild

ing

ru

bb

le t

o a

ct

as

a w

ast

e

wh

ich

m

ust

b

e

cle

an

ed

u

p

or

rem

ov

ed

off

-sit

e.

Mai

nte

nan

ce

and

co

nst

ructi

on

acti

vit

ies

wil

l p

rod

uce

w

aste

in

the

form

o

f d

om

est

ic

wast

e,

buil

din

g

rub

ble

o

r an

y

oth

er

wast

e as

a

resu

lt

of

spil

lage

or

leak

age

fro

m

clea

nin

g

and

pai

nti

ng m

ater

ials

.

Due

to t

he

nat

ure

of

som

e h

azar

do

us

mat

eria

ls,

they

sho

uld

b

e d

isp

ose

d o

f in

an

ap

pro

pri

ate

way

at

an

app

rop

riat

ely

class

ifie

d

wast

e d

isp

osa

l fa

cil

ity

e.g.

asb

esto

s co

nta

inin

g m

ater

ial.

See

the

Mat

eria

l S

afe

ty

Dat

a S

hee

ts a

vai

lab

le f

rom

su

pp

lier

s if

the

use

r is

no

t

sure

ho

w t

o d

isp

ose

of

the

sub

stan

ce.

Lia

ise

wit

h t

he

mu

nic

ipali

ty

reg

ard

ing

was

te

an

d

app

rop

riat

e

han

dli

ng

of

haz

ard

ous

wast

e.

Tem

po

rary

w

ast

e

dis

po

sal

facil

itie

s sh

ould

be

pre

sent

on

site

. T

his

sh

ould

in

clu

de

separa

te

co

nta

iners

fo

r p

rod

ucts

th

at

can

be

re-u

sed

or

recycle

d.

Rem

oval

o

f w

aste

sh

ou

ld

be

at

reg

ula

r (w

eek

ly)

inte

rval

s,

or

so

on

er

if

ne

ce

ssa

ry,

to

mai

nta

in

vis

ual

ord

erli

ness

, b

ut

mo

re s

o t

o n

ot

giv

e t

ime

for

liq

uid

was

te t

o en

ter

the so

il s

ub

stra

te.

Dry

was

te i

s

at r

isk o

f in

crea

sin

g t

he

du

st /

lit

ter

imp

act

so s

ho

uld

be

rem

oved

reg

ula

rly

.

A

regis

ter

of

haz

ard

ou

s w

aste

dis

po

sal

sho

uld

b

e kep

t.

This

sho

uld

in

clud

e ty

pe

of

wast

e,

vo

lum

e as

wel

l as

dis

po

sal

met

ho

d/f

acil

ity.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

was

te

sho

uld

b

e

reco

rded

w

ith

no

tes

on

acti

on

taken

.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Co

ntr

acto

r, P

rop

onent

Gro

un

dw

ate

r

/

Su

rfa

ce

Wate

r

Co

nta

min

ati

on

Po

rous

surf

ace

sub

stra

te

can

allo

w h

azar

do

us

and

eco

logic

ally

det

rim

enta

l su

bst

ance

s to

se

ep

All

p

reca

uti

ons

are

to

be

taken

to

p

reven

t

conta

min

atio

n

of

the

soil

as

this

co

uld

ente

r th

e

eco

syst

em

.

A re

po

rt

form

fo

r al

l sp

ills

o

r

leak

s d

uri

ng

c

on

str

uc

tio

n is

to

be

com

ple

ted

b

y

Co

ntr

acto

r

Co

ntr

acto

r,

Pro

po

nent,

Ind

epen

dent

Specia

list

Co

nsu

ltant

Page 16 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 23: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

do

wn

to

the

wat

er t

able

eit

her

at

the

loca

tio

n

of

the

spil

lage

or

afte

r b

ein

g

was

hed

aw

ay

b

y

surf

ace

flo

w.

Lea

kag

es

fro

m

con

stru

cti

on

veh

icle

s, a

ccid

enta

l sp

ills

of

fuel

,

pai

nts

and

oth

er c

hem

ical

s m

igh

t

occ

ur.

Gro

und

wat

er m

ight

spre

ad

po

lluta

nts

to

nei

ghb

ou

ring

rece

pto

rs

and

m

ay

crea

te

an

imp

act

on

und

ergro

und

infr

astr

uct

ure

.

Ap

po

inti

ng

quali

fied

an

d

rep

uta

ble

co

ntr

acto

rs

is

esse

nti

al.

Pro

per

tr

ainin

g

of

const

ruct

ion

per

son

nel

wo

uld

red

uce

the

po

ssib

ilit

y o

f th

e im

pac

t o

ccurr

ing.

An

y s

pil

l o

f fu

el o

f 2

00

l o

r m

ore

mu

st b

e re

po

rted

and

rem

edia

tio

n m

ust

take

pla

ce a

s so

on a

s p

oss

ible

.

Po

llute

d s

oil

and

buil

din

g r

ub

ble

must

be

tran

spo

rted

aw

ay

fro

m

the

site

to

an

ap

pro

ved

, ap

pro

pri

atel

y

clas

sifi

ed

wast

e d

isp

osa

l si

te.

Hyd

roca

rbo

n

po

llute

d

soil

may b

e re

med

iate

d.

Co

nfi

rm

MS

DS

in

form

atio

n

for

any

fuel

s,

oil

s,

lub

rica

nts

or

chem

ical

s th

at m

ust

be

dis

card

ed.

and

sub

mit

ted

to

th

e pro

po

nent.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Heri

tag

e

Imp

act

Pro

tect

ion

of

cult

ura

l re

sou

rces

fall

s und

er t

he

Nat

ional

Her

itag

e

Act

(A

ct

27

o

f 2

00

4)

and

the

Nat

ional

Mo

nu

ments

Act

No

28

of

19

69 a

s am

end

ed u

nti

l 1

97

9 -

Min

istr

y

of

Yo

uth

, N

atio

nal

Ser

vic

e, S

po

rt a

nd

Cu

lture

.

If

an

y

arch

aeo

logic

al

rem

ain

s su

ch

as

trea

sure

s,

accu

mula

tio

ns

of

bo

nes

or

shel

ls a

nd

ash

du

mp

s ar

e

unco

ver

ed a

t an

y s

tage,

the

co

ntr

acto

r sh

all

sto

p w

ork

imm

edia

tely

and

co

nta

ct

the

rele

van

t auth

ori

ties

. If

hu

man

rem

ain

s o

r b

uri

al

site

s ar

e u

nco

ver

ed,

the

mat

ter

has

to

be

imm

edia

tely

rep

ort

ed t

o t

he

nea

rest

Nam

ibia

n P

oli

ce O

ffic

e. N

o w

ork

may c

onti

nue a

t th

e

site

unti

l th

e re

levan

t auth

ori

ty h

as i

ssued

per

mis

sio

n

to d

o s

o.

Reco

rd

of

an

y

dis

cov

erie

s an

d

pro

of

of

no

tifi

cati

on

s to

auth

ori

ties

on f

ile.

All

info

rmati

on a

nd

rep

ort

ing t

o

be

incl

ud

ed i

n a

rep

ort

.

Co

ntr

acto

r; P

rop

onen

t

Cu

mu

lati

ve

Imp

act

Thes

e ar

e im

pac

ts

on

th

e

envir

on

ment,

w

hic

h

resu

lt

fro

m

the

incr

em

enta

l im

pac

t o

f an

acti

on w

hen

ad

ded

to

oth

er p

ast,

pre

sent,

an

d

reas

on

ably

fore

seea

ble

fu

ture

ac

tio

ns

regar

dle

ss

of

who

und

erta

kes

such

oth

er

acti

on

s.

Cu

mu

lati

ve

imp

acts

ca

n

resu

lt

fro

m

ind

ivid

ual

ly

min

or,

b

ut

coll

ecti

vel

y

sig

nif

icant

acti

ons

takin

g

pla

ce

over

a

per

iod

o

f

tim

e. I

n r

elat

ion t

o a

n a

ctiv

ity,

it

mea

ns

the

imp

act

of

an ac

tivit

y

that

in

it

self

m

ay

no

t b

e

Ad

dre

ssin

g e

ach o

f th

e in

div

idual

im

pac

ts a

s d

iscuss

ed

and

re

com

mend

ed

in

the

EM

P

wo

uld

re

duce

th

e

cum

ula

tive

imp

act.

Su

mm

ary

rep

ort

o

r clo

se-o

ut

rep

ort

bas

ed o

n a

ll o

ther

im

pac

ts

mu

st b

e cr

eate

d t

o g

ive

an o

vera

ll

asse

ssm

ent

of

the im

pac

t o

f th

e

Co

nst

ruct

ion P

has

e.

Co

ntr

acto

r; P

rop

onen

t

Page 17 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 24: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Crit

eria

N

atu

re

Mit

iga

tio

n

Mo

nit

orin

g

Resp

on

sib

le B

od

y

sig

nif

icant,

b

ut

may

bec

om

e

sig

nif

icant

wh

en

add

ed

to

the

exis

tin

g

and

p

ote

nti

al

imp

acts

resu

ltin

g f

rom

sim

ilar

or

div

erse

acti

vit

ies

or

und

erta

kin

gs

in th

e

area

.

Po

ssib

le

cum

ula

tive

imp

acts

asso

ciat

ed

wit

h

the

con

stru

cti

on

phas

e in

clud

e in

crea

se in

tr

affi

c

freq

uen

tin

g t

he s

ite.

This

im

pac

t

wil

l ho

wever

be

sho

rt l

ived

. T

his

wil

l al

so

ag

gra

vat

e no

ise

level

s

wh

en

com

bin

ed

wit

h

the

no

ise

gen

erat

ed

by

con

stru

cti

on.

Co

nst

ruct

ion

site

s te

nd

to

d

raw

peo

ple

lo

okin

g fo

r em

plo

ym

ent.

Incr

ease

d

traf

fic

toget

her

w

ith

incr

ease

d

mo

vem

ent

of

peo

ple

aro

und

the

const

ruct

ion

s si

te m

ay

lead

to

am

pli

fied

hea

lth

and

safe

ty r

isks.

Page 18 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 25: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Tab

le 4

. D

eco

mm

issi

on

ing P

ha

se

Cri

teri

a

Natu

re

Mit

igati

on

M

on

itori

ng

Res

pon

sib

le B

od

y

Was

te P

roduct

ion

The

abil

ity o

f pro

duct

to a

ct a

s a

was

te

whic

h m

ust

be

clea

ned

up.

Upon

dec

om

mis

sio

nin

g

was

te

wil

l be

pro

duce

d i

n t

he

form

of

buil

din

g r

ubble

,

obso

lete

eq

uip

men

t an

d

stru

cture

s,

obso

lete

or

resi

dual

pro

duct

s an

d

equip

men

t or

stru

cture

s th

at c

an b

e use

d

else

wher

e or

sold

as

scra

p.

To r

educe

the

amo

unt

of

was

te a

ll r

e-usa

ble

pip

elin

es, p

um

ps,

tanks,

val

ves

an

d

oth

er

equip

men

t m

ust

be

rem

oved

to

anoth

er s

ite

ow

ned

by E

NG

EN

Nam

ibia

or

sold

.

Those

ite

ms

that

can

not

be

use

d a

gai

n m

ust

be

scra

pped

in

the

appro

pri

ate

man

ner

.

Upon dem

oli

tio

n of

the

buil

din

gs

and co

ncr

ete

the

rubble

must

be

rem

oved

fro

m t

he

pro

per

ty a

nd

tak

en t

o a

n a

ppro

ved

dum

psi

te d

esig

nat

ed b

y t

he

Wal

vis

Bay

Munic

ipal

ity.

Reh

abil

itat

ion

if

nec

essa

ry

are

to

be

do

ne

usi

ng

funds

des

ignat

ed f

or

the

purp

ose

.

Reg

ula

r vis

ual

insp

ecti

on.

A r

egis

ter

of

was

te p

roduce

d

and d

isposa

l m

ethods

sho

uld

be

mai

nta

ined

.

Pro

po

nen

t; C

ontr

acto

r

Eco

logic

al I

mpac

t O

per

atio

ns

span

nin

g

man

y

yea

rs

may

crea

te

new

hab

itat

fo

r fa

una

and

flora

.

Upon

dec

om

mis

sio

nin

g

thes

e hab

itat

s

wil

l be

des

tro

yed

.

EN

GE

N N

am

ibia

wo

uld

hav

e to

ensu

re t

hat

no n

ew h

abit

at

is c

reat

ed f

or

flora

and f

auna.

Bef

ore

dec

om

mis

sionin

g t

he

HS

E w

ould

nee

d t

o i

nsp

ect

ever

y s

truct

ura

l fa

cili

ty t

o e

nsu

re

that

the

dis

man

tlin

g a

nd r

emo

val

of

any s

truct

ure

wo

uld

not

affe

ct

any

org

anis

m

that

has

bec

om

e dep

enden

t on

those

stru

cture

s fo

r su

rviv

al, sh

elte

r or

bre

edin

g.

Wher

e new

hab

itat

s w

ere

crea

ted,

that

is

no

w o

ccupie

d b

y

fauna

or

flora

, E

NG

EN

Nam

ibia

must

co

nta

ct M

ET

or

oth

er

appro

pri

ate

org

aniz

atio

ns

to e

stab

lish

the

conse

rvat

ion s

tatu

s

of

it.

The

poss

ibil

ity

of

relo

cati

ng

the

fauna

or

flora

m

ust

be

inves

tigat

ed an

d ex

ecute

d.

Should

th

e sp

ecie

s be

list

ed as

vuln

erab

le t

o e

xti

nct

ion,

or

wors

e, a

mee

ting s

hould

be

hel

d

wit

h M

ET

in o

rder

to d

eter

min

e th

e ap

pro

pri

ate

han

dli

ng o

f

the

situ

atio

n.

A r

eport

should

be

com

pil

ed

of

any fa

una

and fl

ora

th

at

esta

bli

shed

it

self

o

n

the

pre

mis

es.

The

report

sho

uld

incl

ude

all

acti

ons

taken

to

relo

cate

or

dea

l w

ith

the

situ

atio

n.

Pro

po

nen

t; C

ontr

acto

r

Em

plo

ym

ent

&

Sec

ure

F

uel

Supply

Dec

om

mis

sio

nin

g

of

the

bulk

fu

el

stora

ge

faci

lity

may

lea

d t

o r

etre

nch

men

ts

or

re-l

oca

tion o

f st

aff

no l

onger

req

uir

ed.

Fuel

su

pply

to

th

e re

gio

n

may

b

e

neg

ativ

ely i

nfl

uen

ced i

f al

tern

ativ

e bulk

fuel

st

ora

ge

faci

liti

es ca

nno

t han

dle

th

e

dem

and.

Pla

n i

n a

dvan

ce f

or

mee

ting t

he

Lab

our

Act

s re

quir

emen

ts

for

retr

ench

ing o

f st

aff

if r

equir

ed.

Wher

e poss

ible

sta

ff c

an b

e re

loca

ted t

o a

noth

er f

acil

ity o

r

tow

n w

her

e busi

nes

s co

nti

nues

in t

he

sam

e w

ay.

Alt

ernat

ive

fuel

co

mpan

ies

must

b

e in

form

ed

of

the

dec

om

mis

sionin

g p

lans

to a

llo

w t

hem

to a

deq

uat

ely p

lan f

or

Duri

ng n

orm

al o

per

atio

ns

of

the

dep

ot

a su

mm

ary r

eport

must

be

com

pil

ed

that

incl

udes

th

e ap

pro

pri

ate

pla

ns

for

han

dli

ng

of

emplo

yee

s sh

ould

the

dep

ot

be

dec

om

mis

sio

ned

. T

he

report

sh

ould

in

clude

Pro

po

nen

t; D

irec

tors

&

Publi

c R

elat

ions

per

sonnel

or

Hum

an

Res

ourc

e D

epar

tmen

t.

Page 19 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 26: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teri

a

Natu

re

Mit

igati

on

M

on

itori

ng

Res

pon

sib

le B

od

y

incr

ease

d d

eman

d o

f fu

el i

n t

he

regio

n.

budget

ing f

or

retr

ench

men

ts

and

poss

ible

al

tern

ativ

e

posi

tio

ns

else

wher

e.

A s

um

mar

y r

eport

sho

uld

be

com

pil

ed

wit

h

EN

GE

N

volu

mes

o

f fu

el han

dle

d in

ord

er

to

appro

pri

atel

y

cate

r

for

the

incr

ease

in

dem

and

for

fuel

at

alte

rnat

ive

dep

ots

.

Dust

D

ust

w

ill

be

gen

erat

ed

duri

ng

the

Dec

om

mis

sio

nin

g

Phas

e an

d

mig

ht

be

aggra

vat

ed

duri

ng

per

iod

s of

stro

ng

win

ds.

It i

s re

com

men

ded

that

reg

ula

r dust

suppre

ssio

n b

e in

cluded

in t

he

Dec

om

mis

sionin

g P

has

e, w

hen

dust

bec

om

es a

n i

ssue.

Per

sonnel

sho

uld

be

issu

ed w

ith d

ust

mas

ks

for

hea

lth a

nd

safe

ty r

easo

ns.

Acc

um

ula

tio

n o

f ru

bb

le s

ho

uld

not

be

allo

wed

and m

ust

be

taken

to t

he

dum

psi

te w

ithin

rea

sonab

le t

ime.

Reg

ula

r vis

ual

insp

ecti

on.

A

com

pla

ints

re

gis

ter

must

be

mai

nta

ined

, in

whic

h a

ny

com

pla

ints

fr

om

th

e

com

munit

y m

ust

be

logged

.

Co

mp

lain

ts

must

be

inves

tigat

ed

and,

if

appro

pri

ate,

act

ed u

pon.

Pro

po

nen

t; C

ontr

acto

r

Nois

e

No

ise

po

lluti

on w

ill

exis

t d

ue

to h

eav

y

veh

icle

s ac

cess

ing

th

e si

te

to

coll

ect

rub

ble

fr

om

d

em

oli

shed

b

uil

din

g

mat

eria

ls.

Cra

nes

may

be

ere

cted

fo

r

rem

ovin

g

the

hu

ge

sto

rage

tan

ks.

Ham

mer

s,

dig

ger

s and

d

rill

s w

ill

be

use

d.

The

dep

ot

is s

ituat

ed i

n a

n i

nd

ust

rial

are

a s

o th

ere

is no

rest

rict

ion

on

the

tim

es

of

op

erat

ion.

The

Wal

vis

B

ay

Mun

icip

alit

y d

oes

no

t have

an

y g

uid

elin

es w

ith r

esp

ect

to

no

ise

level

s b

ut

the

Wo

rld

H

ealt

h

Org

aniz

atio

n

(WH

O)

guid

elin

e o

n

maxim

um

n

ois

e le

vel

s (G

uid

elin

es

for

Co

mm

unit

y N

ois

e, 1

99

9)

to p

reven

t hea

rin

g i

mp

airm

ent

is

foll

ow

ed.

This

lim

its

no

ise

level

s in

ind

ust

rial

are

as t

o a

n

aver

age

of

70

d

B o

ver

a

24 ho

ur

per

iod

w

ith m

axim

um

no

ise

level

s no

t exce

edin

g 1

10

dB

duri

ng t

he

per

iod

. D

uri

ng

dec

om

mis

sio

nin

g no

ise

level

s m

ight

be

hig

her

. T

his

w

ill

ho

wev

er b

e sh

ort

liv

ed.

All

per

sonnel

mu

st b

e is

sued

wit

h

hea

rin

g p

rote

cto

rs a

nd

nei

gh

bo

urs

must

be

no

tifi

ed o

f th

e

tim

e and

dura

tio

n o

f d

eco

mm

issi

onin

g.

No

tice

of

the

start

of

the

dec

om

mis

sio

nin

g

sho

uld

b

e giv

en

to

the

loca

l

auth

ori

ties

wit

h a

n i

nvit

atio

n t

o g

ive

feed

bac

k a

t an

y t

ime

wit

h r

egar

ds

the

no

ise

imp

act.

A

com

pla

ints

re

gis

ter

must

be

mai

nta

ined

, in

whic

h a

ny

com

pla

ints

fr

om

th

e

com

munit

y m

ust

be

logged

.

Co

mp

lain

ts

must

be

inves

tigat

ed

and,

if

appro

pri

ate,

act

ed u

pon.

Pro

po

nen

t; C

ontr

acto

r

Vis

ual

Im

pac

t T

his

is

an

imp

act

that

aff

ects

th

e

aest

het

ic a

pp

eara

nce

Vis

ual

imp

act

could

p

ose

o

ne

of

the

mo

st

sig

nif

icant

imp

acts

. V

isual

im

pac

ts c

ould

be

lim

ited

thro

ugh k

eep

ing

A

com

pla

ints

re

gis

ter

must

be

mai

nta

ined

, in

whic

h a

ny

Pro

po

nen

t; C

ontr

acto

r

Page 20 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 27: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teri

a

Natu

re

Mit

igati

on

M

on

itori

ng

Res

pon

sib

le B

od

y

all

dec

om

mis

sio

ned

ar

eas

clea

n an

d o

rder

ly at

al

l ti

mes

.

Go

od

ho

use

kee

pin

g a

lso

red

uce

s th

e ri

sk o

f in

juri

es.

No

tice

of

the

star

t o

f th

e d

eco

mm

issi

onin

g s

ho

uld

be

giv

en t

o t

he

loca

l au

tho

riti

es w

ith a

n i

nvit

atio

n t

o g

ive

feed

bac

k a

t an

y

tim

e w

ith r

egar

ds

the

vis

ual

im

pac

t.

com

pla

ints

fr

om

th

e

com

munit

y m

ust

be

logged

.

Co

mp

lain

ts

must

be

inves

tigat

ed

and,

if

appro

pri

ate,

act

ed u

pon.

Gro

und

wat

er,

Surf

ace

Wat

er

and

Soil

Conta

min

atio

n

Po

rous

surf

ace

sub

stra

te

can

allo

w

un

wan

ted

haz

ard

ous

and

eco

logic

ally

det

rim

enta

l su

bst

ance

s to

see

p d

ow

n t

o

the

wat

er t

able

.

All

pre

cauti

ons

are

to b

e ta

ken

to

pre

ven

t co

nta

min

ati

on o

f

the

soil

as

this

co

uld

ente

r th

e ec

osy

stem

. L

eakages

fro

m

veh

icle

s m

ight

occ

ur

esp

ecia

lly i

f th

ey a

re s

ervic

ed o

n s

ite.

Car

e m

ust

b

e ta

ken

to

av

oid

co

nta

min

ati

on

of

soil

an

d

gro

und

wat

er.

Gro

und

wat

er

mig

ht

spre

ad

po

lluta

nts

to

nei

ghb

ouri

ng

re

cep

tors

an

d

may

crea

te

an

imp

act

on

und

ergro

und

uti

liti

es (

i.e.

fre

sh w

ater

sup

ply

to

buil

din

gs,

sew

erag

e sy

stem

). P

oll

uta

nts

in t

he

soil

and

buil

din

g r

ub

ble

mu

st b

e tr

ansp

ort

ed aw

ay fr

om

th

e si

te to

an ap

pro

ved

,

app

rop

riat

ely c

lass

ifie

d w

aste

dis

po

sal

site

.

Co

nfi

rm M

SD

S i

nfo

rmat

ion

fo

r an

y r

em

ainin

g f

uel

s, o

ils

or

lub

rica

nts

that

mu

st b

e d

isca

rded

.

Reg

ula

tio

ns

on s

ew

erag

e d

ischar

ge

and

the

chem

ical

s th

at

may a

nd

may n

ot

be

put

into

the

sew

erag

e sy

stem

mu

st b

e

foll

ow

ed.

Rep

ort

fo

rm f

or

all

spil

ls o

r

leak

s is

to

be

com

ple

ted

by

Co

ntr

acto

r fo

r E

NG

EN

Nam

ibia

and

su

bm

itte

d

to

the

HS

E.

A

bas

elin

e st

ud

y

mu

st

be

carr

ied

o

ut

afte

r th

e

dec

om

mis

sio

nin

g.

This

is

to

asse

ss t

he

cond

itio

n o

f so

il

sub

stra

te

and

an

y

gro

und

wat

er

pre

sent.

Co

mp

aris

on

s w

ith

pre

-

const

ruct

ion b

asel

ine

dat

a is

to

be

mad

e and

an

y

dis

crep

anci

es

mu

st

be

add

ress

ed

bef

ore

th

e si

te

can b

e si

gned

over

.

Pro

po

nen

t; C

ontr

acto

r

Hea

lth,

Saf

ety

and S

ecuri

ty

Duri

ng

the

Dec

om

mis

sio

nin

g

Phas

e

sim

ilar

ri

sks

to

hum

an

bei

ngs

as

wit

h

pre

vio

us

phas

es w

ill

be

pre

sent.

Once

the

tanks

and

pip

elin

es

hav

e bee

n

empti

ed

com

ple

tely

o

f th

eir

conte

nts

re

sidual

amo

unts

of

fuel

m

ight

exis

t.

All

oth

er

risk

s as

soci

ated

wit

h d

emoli

tio

ns

must

be

consi

der

ed.

The

dec

om

mis

sio

nin

g o

f a

bulk

fuel

sto

rage

faci

lity

can

cau

se

seri

ous

hea

lth

and

safe

ty

risk

s to

w

ork

ers

on

site

.

Occ

upat

ional

ex

posu

res

are

norm

ally

re

late

d

to

der

mal

conta

ct

wit

h

fuel

s an

d

inhal

atio

n

of

fuel

vap

ours

duri

ng

han

dli

ng o

f su

ch p

roduct

s. F

or

this

rea

son a

deq

uat

e m

easu

res

must

be

bro

ught

in p

lace

to e

nsu

re s

afet

y o

f st

aff

on s

ite,

and

incl

udes

: (P

rovid

e fo

rms

for

all

end u

sers

who m

onit

or)

Pro

per

tra

inin

g o

f o

per

ato

rs;

Fir

st a

id t

reat

ment;

Med

ical

ass

ista

nce

;

Em

ergency t

reat

ment;

Pre

ven

tio

n o

f in

hal

atio

n o

f fu

mes

(fu

el);

Pro

tect

ive

clo

thin

g,

foo

twea

r, g

loves

and

bel

ts;

safe

ty

go

ggle

s and

sh

ield

s;

A

regis

ter

of

all

inci

den

ts

must

be

mai

nta

ined

. T

his

sho

uld

in

clude

mea

sure

s

taken

to

en

sure

th

at

such

inci

den

ts

do

not

repea

t it

self

.

Pro

po

nen

t; C

ontr

acto

r

Page 21 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 28: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

Cri

teri

a

Natu

re

Mit

igati

on

M

on

itori

ng

Res

pon

sib

le B

od

y

Man

uals

and

tra

inin

g r

egar

din

g t

he

corr

ect

hand

lin

g o

f

mat

eria

ls a

nd

pac

kag

es

sho

uld

be

in p

lace

and

up

dat

ed

as

new

o

r up

dat

ed

MS

DS

’ b

eco

me

avail

able

; R

isk

s

mig

ht

be

low

er b

ut

stil

l exis

t esp

ecia

lly i

f ta

nks

mu

st b

e

ente

red

fo

r in

spec

tio

ns.

Co

nfi

ned

Sp

ace

Tra

inin

g w

ill

be

req

uir

ed.

24

-ho

ur

secu

rity

surv

eill

ance

in

cas

e o

f o

pp

ort

unis

tic

acti

vit

ies.

Fir

e an

d

Explo

sion H

azar

d

Res

idual

hydro

carb

ons

could

be

pre

sent

and

mig

ht

pose

a

risk

to

th

e te

ams

dis

man

tlin

g

the

var

ious

stru

cture

s.

Fir

e

and/o

r ex

plo

sion e

ven

ts a

re s

till

poss

ible

.

Var

ious

inte

rnat

ional

occ

upat

ional

hea

lth

and

safe

ty

per

form

ance

s sh

ould

be

consu

lted

fo

r sp

ecif

ic r

egula

tio

ns

regar

din

g t

he d

eco

mm

issi

onin

g o

f th

e fa

cili

ty t

o e

nsu

re a

ll

risk

s ar

e m

itig

ated

. A

ll r

elev

ant

regu

lati

on

s an

d p

reca

uti

ons

sho

uld

be

in p

lace

as

it w

as d

uri

ng t

he

Op

erat

ional

Phas

e. I

n

add

itio

n t

o t

his

, al

l p

erso

nnel

have

to b

e se

nsi

tise

d a

bo

ut

resp

onsi

ble

fir

e p

rote

ctio

n m

eas

ure

s an

d g

oo

d h

ouse

kee

pin

g

such

as

the

rem

oval

o

f fl

am

mab

le

mat

eria

ls

inclu

din

g

rub

bis

h,

dry

veg

etati

on,

and

hyd

roca

rbo

n-s

oaked

so

il f

rom

the

vic

init

y o

f th

e fu

el s

tora

ge

faci

lity

. R

egu

lar

insp

ecti

ons

sho

uld

sti

ll b

e ca

rrie

d o

ut

to i

nsp

ect

and

tes

t fi

re f

ighti

ng

equip

ment

and

po

lluti

on

co

ntr

ol

mat

eria

ls a

t th

e fu

el s

tora

ge

faci

lity

. A

ll

fire

p

reca

uti

on

s an

d

fire

co

ntr

ol

at

the

fuel

sto

rage

faci

lity

mu

st b

e in

acc

ord

ance

wit

h S

AN

S,

or

bet

ter.

The

ho

list

ic f

ire

pro

tect

ion a

nd

pre

ven

tio

n p

lan s

ho

uld

sti

ll

be

uti

lise

d.

Exp

erie

nce

has

sh

ow

n t

hat

the

bes

t ch

ance

to

rapid

ly p

ut

out

a m

ajor

fire

is

in t

he

firs

t 5 m

inute

s. I

t is

import

ant

to r

eco

gnis

e th

at a

res

ponsi

ve

fire

pre

ven

tio

n p

lan

does

not

sole

ly

incl

ude

the

avai

lab

ilit

y

of

fire

fi

ghti

ng

equip

men

t, b

ut

more

im

port

antl

y,

it in

volv

es pre

med

itat

ed

mea

sure

s an

d a

ctiv

itie

s to

tim

eousl

y p

reven

t, c

urb

and a

void

condit

ions

that

may

res

ult

in f

ires

.

A

regis

ter

of

all

inci

den

ts

must

be

mai

nta

ined

on

a

dai

ly

bas

is.

This

sh

ould

incl

ude

mea

sure

s ta

ken

to

ensu

re t

hat

such

inci

den

ts d

o

not

repea

t it

sel

f.

Pro

po

nen

t; C

ontr

acto

r

Page 22 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019

Page 29: OPERATIONS AND MAINTENANCE OF THE BULK ...eia.met.gov.na/screening/917_20190701f_emp_engen_bulk...The following is a summary of the proposed Management Plan, which will make the bulk

4 CONCLUSIONS The above Environmental Management Plan, if properly implemented will help minimise adverse

impacts on the environment. Where impacts occur, immediate action must be taken to reduce the

escalation of effects associated with these impacts. To ensure the relevance of this document to the

specific stage of project, it needs to be reviewed throughout all phases.

The Environmental Management Plan should be used as an on-site reference document during all

phases of the proposed project, and auditing should take place in order to determine compliance with

the EMP for the proposed site, and Parties responsible for transgression of the EMP should be held

responsible for any rehabilitation that may need to be undertaken.

Monitoring reports must be kept available for possible submission with future renewal applications for

environmental clearance certificates. Prior to clearance renewal a summary report based on all

monitoring and reporting must be prepared for submission to MET.

5 REFERENCES Botha P, Faul A, Hooks P; 2014 October. Environmental Impact Assessment for the Upgrade and

Operations of the Engen Namibia Bulk Storage Facility for Petroleum Products in Walvis Bay

Page 23 of 23

Geo Pollution Technologies (Pty) LtdEngen Walvis Bay Bulk Fuel Storage Facility - EMP - July 2019