Operational Plan 2019/2020
May 2019
Yass Valley Council would like to take this opportunity to
thank our community for their contributions to the Regional
Community Strategic Plan which has provided the basis for
the development of Council’s Delivery Program and
Operational Plan.
Acknowledgements
Contents
Our Councillors 4............................................................................
Message from the Mayor .............................................................5
What is an Operational Plan? ..................................................... .6
We are working towards our community’s goals.........................7
Our Environment ..................................................................8
Our Economy ..................................................................... 16
Our Community ................................................................. 21
Our Infrastructure 30..............................................................
Our Civic Leadership……………………………………………………....44
Statement of Revenue Policy .................................................... 52
Fees and Charges ...................................................................... 62
Annual Budget ...........................................................................85
Identified Projects 2018/2019 ...................................................92
Long Term Financial Plan update ..............................................94
Draft Operational Plan 2019/2020Operational Plan 2019/2020 3
Our Councillors
Mayor Rowena
Abbey
Cr Cecil Burgess Cr Allison Harker Cr Geoff Frost Cr Mike Reid
Cr Michael McManus Cr Jasmin Jones Cr Kim Turner Cr Nathan Furry
Draft Operational Plan 2019/2020Operational Plan 2019/2020 4
On behalf of my fellow Councillors I am proud to present the 2019/2020 Operational Plan which includes the 2019/2020 Budget, Fees & Charges and Rates Charges for Yass Valley.
The individual projects and activities that will be undertaken in 2019/2020 to achieve the commitments made in the Delivery Program 2017-2021 are detailed in this Operational Plan.
The framework for our Plan is based on our 2016-2036 Regional Community Strategic Plan (CSP) that identifies the community’s priorities and expectations for the next twenty years. It also contains budget information, outlining how Council will fund the delivery of each of the key projects.
The activities and projects are based on the actions outlined in the four year Delivery Program. Together, this Plan will keep Council on track to deliver on our community goals in our Regional CSP.
The Operational Plan allocates responsibility for each project or activity to a program area of Council. This is then filtered into program area plans, project plans and individual work plans. It is supported by Council’s 2019/2020 Budget, which outlines the capital works program and key infrastructure projects Council will carry out in the same financial year. Council has in place a number of mechanisms for measuring the success or effectiveness of each of the activities. Progress on each of the commitments is monitored regularly and reported back to Council in six monthly and annual reports.
2019/2020 is going to be another big year for Yass Valley, with a large focus on key infrastructure upgrades. 11 load-limited timber bridges will have been replaced or undergoing replacement which will have a significant economic benefit to the region’s agricultural sector. This major infrastructure program is due to Council successfully obtaining $2.485M funding through round 3 of the NSW Government's Fixing Country Roads
Program. Council was able to match the grant funding (50/50) due to funds raised through the Special Rate Variation introduced in 2016/2017.
With the introduction of the SRV Council made a promise to the community that the additional rate income raised would be directed into infrastructure projects. The Timber Bridge Replacement Program is evidence of this. Originally it would have taken 25+ years to fund such an extensive infrastructure upgrade. Through the SRV this current Program will now be completed by 2020.
Yass Valley is a growing and prosperous regional community, and as a Council we understand our responsibility to be planning for and preparing for the continuing needs of our community. We have a lot we want to achieve and while we are on track we still have some ground to make up to where we want to be. With your support and engagement we hope to achieve many things as a community, continuing to make Yass Valley a wonderful place to live, work and play.
Rowena Abbey
Mayor, Yass Valley
Message from the Mayor
Draft Operational Plan 2019/2020Operational Plan 2019/2020 5
What is an Operational Plan?
The Operational plan supports the Delivery Program and sets out Yass Valley Council’s planned activities for 2019/2020.
The operational plan identifies the individual projects and activities that will be undertaken within the next financial year to achieve the actions made in the Delivery Program.
The Operational Plan allocates responsibilities for each activity and identifies how their effectiveness will be measured.
The Operational Plan includes Council’s detailed annual budget, statement of revenue policy, including the proposed rates, fees and charges for the financial year.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 6
We are working towards our community’s goals
The community of Yass Valley outlined their goals and aspirations for the place they live during the development of our Regional Community Strategic Plan (CSP). Yass Valley Council has considered these goals and aspirations in developing the Delivery Program and Operational Plan to ensure that Council is working towards the achievement of the community’s goals. We have set out this plan along the 5 strategic pillars so that the links to the CSP are easily identified and we have developed measures to demonstrate how we are progressing towards these goals.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 7
Our Environment CSP Strategy EN1
Protect and enhance the existing natural environment, including flora and fauna native to the region
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION - EN1.1
Protect our natural assets in line with community values
EN1.1.1 Ensure assessment of development applications protects our natural environment
EN1.1.2 Plans of management will be developed for all council owned community land
DELIVERY PROGRAM ACTION - EN1.2
Work with Office of Environment & Heritage to maintain a network of connected native vegetation (including reserves and council land)
EN1.2.1 Amend the Yass Valley Local Environmental Plan (LEP) Natural Resources Biodiversity Map to incorporate updated data
EN1.2.2 Maintain an Accredited Assessor under the Biodiversity Conservation Act 2016
WE WILL MEASURE PROGRESS BY:
Ensuring the Yass Valley LEP incorporates the most current biodiversity data
The number of Council owned or managed properties surveyed for their Biodiversity Values
WE WILL MEASURE PROGRESS BY:
The number of development applications which have considered environmental values in their assessmentHaving Plans of management adopted by Council
Draft Operational Plan 2019/2020Operational Plan 2019/2020 8
CSP Strategy EN1 Protect and enhance the existing natural environment,
including flora and fauna native to the region
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION - EN1.3
Meet obligations for weed control in the Yass Valley Local Government Area
EN1.3.1 Maintain a Biosecurity Weeds Officer to undertake duties as required under the provisions of the Biosecurity Act and associated programs (Weed Action Program)
WE WILL MEASURE PROGRESS BY:
Developing a Project Plan for the Biosecurity Weed Officer Implementing a program for weed control in the local
government area (LGA) Recording the number of inspections undertaken in the LGA
on Council maintained land Recording the number of inspections undertaken in the LGA
on private property Reporting monthly to NSW Department of Primary Industry
(DPI)on weed control activities
Draft Operational Plan 2019/2020Operational Plan 2019/2020 9
CSP Strategy EN2
Adopt environmental sustainability practices
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION – EN2.1
Implement Council’s Environmental Sustainability Policy across all Council operations
EN2.1.1 Continue to implement projects and activities identified in the action plan under the Environmental Sustainability policy
DELIVERY PROGRAM ACTION – EN2.2
Improve water efficiency of Council operations
EN2.2.1 Ensure new or refurbished buildings and facility designs incorporate water efficiency measures
DELIVERY PROGRAM ACTION – EN2.3
Conduct Engagement Programs that encourage positive behaviour change in the community
EN2.3.1 Coordinate Clean Up Australia Day activities including organising rubbish pickup at approved sites, advertising and assisting volunteer groups.
EN2.3.2 Publish #SustainabilitySunday on Council’s social media platform
WE WILL MEASURE PROGRESS BY:
The completion of projects identified in the Action Plan
WE WILL MEASURE PROGRESS BY:
Ensuring water efficiency measures are incorporated into new facilities and refurbishment of current facilities
WE WILL MEASURE PROGRESS BY:
Increased community participation in the Clean Up Australia Day event
Weekly social media posts being published
Draft Operational Plan 2019/2020Operational Plan 2019/2020 10
CSP Strategy EN2
Adopt environmental sustainability practices
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EN2.4
Work with schools to increase awareness of caring for the local environment
EN2.4.1 Continue to coordinate delivery of EnviroMentors workshops in local primary schools as part of the Hands On for Less Waste Project
DELIVERY PROGRAM ACTION – EN2.5
Consider water sensitive urban design principles in development assessment
EN2.5.1 Major Development Applications reviewed with Water Sensitive Urban Design principles considered
WE WILL MEASURE PROGRESS BY:
The number of children participating in workshops
WE WILL MEASURE PROGRESS BY:
The consideration of Water Sensitive Urban Design principles in the assessment of major developments
Draft Operational Plan 2019/2020Operational Plan 2019/2020 11
CSP Strategy EN3
Protect and rehabilitate waterways and catchments
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION - EN3.1
Engage with the community and external agencies to deliver programs which improve the health of the Yass River and tributaries
EN3.1.1 Continue to contribute to regional water quality data by participating in the Waterwatch program, submitting monthly data for two sites on the Yass River.
DELIVERY PROGRAM ACTION – EN3.2
Increase community awareness of the importance of stormwater health and quality
EN3.2.1 Participate in the H2OK Stormwater Education Project, run by the ACT Government for the ACT and surrounding region.
DELIVERY PROGRAM ACTION – EN3.3
Deliver Plan of Management for the Yass Gorge
EN3.3.1 Undertake Council's responsibilities under the Yass Gorge Plan of Management
WE WILL MEASURE PROGRESS BY:
The number of reports submitted on time
WE WILL MEASURE PROGRESS BY:
The number of community engagement activities (such as drain stencilling and media items)
WE WILL MEASURE PROGRESS BY:
The number of activities in the Plan of Management completed
Draft Operational Plan 2019/2020Operational Plan 2019/2020 12
CSP Strategy EN4
Maintain a balance between growth, development and environmental protection through sensible planning
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EN4.1
Ensure Council's statutory planning instruments are up to date and reflective of community needs
EN4.1.1 Undertake ongoing strategic land use planning and reviews of existing instruments
DELIVERY PROGRAM ACTION – EN4.2
Ensure development application assessment is thorough and efficient
EN4.2.1 Review the development process and implement changes aligning with the NSW governments best practice guidelines
WE WILL MEASURE PROGRESS BY:
Finalising the Yass Valley Comprehensive Development Control PlanFinalising Murrumbateman, Bookham, Bowning & Binalong Flood StudiesContinuing the Murrumbateman Land Investigation
WE WILL MEASURE PROGRESS BY:
Improvement on development application assessment timeframes when compared to the previous year
Draft Operational Plan 2019/2020Operational Plan 2019/2020 13
CSP Strategy EN5
To investigate and implement approaches to reduce our carbon footprint
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION – EN5.1
Reduce rubbish to landfill through effective waste management and recycling
EN5.1.1 Finalise strategy to reduce waste going to landfill. EN5.1.2 Actively participate in the various Canberra Region Joint Organisation waste
reduction programs including Household Chemical collection, Garage Sale Trail event and green waste study.
DELIVERY PROGRAM ACTION – EN5.2
Work with local businesses to encourage recycling
EN5.2.1 Undertake survey of businesses in Yass and Murrumbateman to establish what waste types is generated and could be separated for recycling.
DELIVERY PROGRAM ACTION – EN5.3
Promote initiatives in the community such as Eat/Shop Local, Love your Leftovers and being efficient with electricity
EN5.3.1 Continue weekly #SustainabilitySunday posts on Facebook. EN5.3.2 Launch media program showcasing the sustainability efforts made by local
businesses. EN5.3.3 Continue community workshops under the "Hands On for Less Waste" project.
WE WILL MEASURE PROGRESS BY:
Finalising the Strategy and adoption by Council Reducing the per capital percentage of waste going to
landfill by 20% based on the benchmark from 2017/18 over the 10 year period to 2026/27
Participation in Canberra Region Joint Organisation programs (100%)
WE WILL MEASURE PROGRESS BY: Completion of survey and report presented to Council
WE WILL MEASURE PROGRESS BY:
The number of social media posts The launch of promotional programs The number of workshops held
Draft Operational Plan 2019/2020Operational Plan 2019/2020 14
CSP Strategy EN5
To investigate and implement approaches to reduce our carbon footprint
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION – EN5.4
Investigate low carbon technologies when Council assets are developed or due for replacement
EN5.4.1 Reviewing assets that are being developed or due for replacement in the next 12 months, and explore options which utilise low carbon best practice
DELIVERY PROGRAM ACTION – EN5.5
Encourage efficient use of renewable energy by Yass Valley households
EN5.5.1 Include posts about energy in #SustainabilitySunday weekly posts.
WE WILL MEASURE PROGRESS BY:
Investigating funding opportunities for alternate energy use for Council, including use of solar energy for Council buildings and facilities
Ensuring carbon emissions are considered as part of the procurement process when replacing plant items
WE WILL MEASURE PROGRESS BY:
The number of social media posts encouraging energy efficiency
Draft Operational Plan 2019/2020Operational Plan 2019/2020 15
Our Economy
CSP Strategy EC1
Capitalise on the region's close proximity to Canberra and its position as a convenient hub to South East Australia to
attract industry and investment
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION - EC1.1
Facilitate business excellence, innovation and collaboration in the Yass Valley LGA to build stronger business networks and support structures identified through the Economic Development Committee and relevant government agencies and community organisations
EC1.1.1 Support and encourage participation in relevant business excellence award programs
EC1.1.2 Collaborate with regional innovation networks to facilitate innovation and entrepreneurship
DELIVERY PROGRAM ACTION - EC1.2
Enhance and promote the Yass Valley brand to drive positive economic activity
EC1.2.1 Implement relevant early stage actions identified in the Southern Tablelands Regional Economic Development Strategy (REDS) - Liveability and visitor economy
Evaluating outcomes from workshops
Reporting against business enquiries to conversion
WE WILL MEASURE PROGRESS BY:
The number of local businesses successful in achieving finalist status or better
Demonstrating positive outcomes from collaboration
WE WILL MEASURE PROGRESS BY:
Demonstrating positive outcomes from plan implementation
Draft Operational Plan 2019/2020Operational Plan 2019/2020 16
DELIVERY PROGRAM ACTION – EC2.2
Collaborate with regional tourism stakeholders
EC2.2.1 Investigate the feasibility of delivering collaborative tourism services with the Tablelands local government areas (LGA's)
EC2.2.2 Work collaboratively with LGA's within the Destination Southern NSW (DSNSW) and Canberra Region Joint Organisation (CRJO) to deliver tourism outcomes identified within the DSNSW Destination Management Plan and priority projects
EC2.2.3 Facilitate the development of the Murrumbateman Winery Trail
EC2.2.4 Implement activities that develop export ready tourism businesses
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EC2.1
Enhance and promote the Yass Valley brand to drive positive tourism outcomes
EC2.1.1 Implement Yass Valley tourism action plan
CSP Strategy EC2
Jointly develop appropriate tourism opportunities and promote the region as a destination
WE WILL MEASURE PROGRESS BY:
Reporting against trends identified via Tablelands Tourism Monitor
Reporting against trends from data reported through Tourism Research Australia
Reporting against activities and trends via Council’s Tourism Plan and monitor
WE WILL MEASURE PROGRESS BY:
The outcome of feasibility reported to Council The achievement of plan goals The number of funding applications lodged Reviewing and including the Murrumbateman Winery Trail
in Council’s Pedestrian and Mobility Plan (PAMP) The number of export ready tourism businesses
Draft Operational Plan 2019/2020Operational Plan 2019/2020 17
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EC3.1
Identify and participate in initiatives that assist small business
EC3.1.1 Participate in activities under the NSW Government's Office of Small Business - Small Business Month and Easy to Do Business (ETDB) programs
EC3.1.2 Collaborate with Yass Valley Business Chamber, State and Federal agencies to deliver skills development workshops and networking events for small business
CSP Strategy EC3
Support and foster conditions that enable local and small/home-based businesses to grow
WE WILL MEASURE PROGRESS BY:
Demonstrating positive outcomes of activities The number of referrals through ETDB program Demonstrating positive outcomes from workshops and
networking events
Draft Operational Plan 2019/2020Operational Plan 2019/2020 18
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EC4.1
Protect rural lands for agricultural purposes
EC4.1.1 Ensure agricultural use of the land is considered in all rural development applications
DELIVERY PROGRAM ACTION – EC4.2
Identify opportunities and barriers for the agricultural industry in Yass Valley
EC4.2.1 Implement relevant early stage actions identified in Southern Tablelands Regional Economic Development Strategy (REDS) - Agriculture
CSP Strategy EC4
Foster and develop a diverse, adaptive and innovative agricultural industry
WE WILL MEASURE PROGRESS BY:
The number of development applications which have considered rural agricultural use in their assessment
WE WILL MEASURE PROGRESS BY:
Demonstrating positive outcomes from plan implementation
Draft Operational Plan 2019/2020Operational Plan 2019/2020 19
CSP Strategy EC5
Encourage collaboration between businesses, government and training providers to develop
employment and training opportunities for young people in the region
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – EC5.1
Facilitate networking and collaboration amongst stakeholders
EC5.1.1 Support training and employment initiatives for young people
WE WILL MEASURE PROGRESS BY:
Reporting against trends in the youth unemployment rate Demonstrating positive outcomes from supporting training
and employment initiatives for young people eport against trends in the unemployment rate
Draft Operational Plan 2019/2020Operational Plan 2019/2020 20
Our Community
CSP Strategy CO1 Facilitate and encourage equitable access to community
infrastructure and services such as health care, education and transport
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager/Director of Planning
DELIVERY PROGRAM ACTION - CO1.1
Provide an accessible library service to all of the community
CO1.1.1 Providing a library service that enables equitable access to information and programs
DELIVERY PROGRAM ACTION - CO1.2
Advocate to the State Government and relevant agencies to ensure that transport, health and educational services are delivered equitably to all residents
CO1.2.1 Advocate to the State Government and relevant agencies to ensure equitable access to community, health and education services and funding to support infrastructure growth
CO1.2.2 Advocate to Transport NSW to undertake a community and public transport audit
WE WILL MEASURE PROGRESS BY:
Survey residents’ level of satisfaction
WE WILL MEASURE PROGRESS BY:
Survey residents’ level of satisfaction Ensuring a transport audit has been undertaken Demonstrating progress under the Memorandum of
Understanding between Council and the Department of Education
Draft Operational Plan 2019/2020Operational Plan 2019/2020 21
CSP Strategy CO1 Facilitate and encourage equitable access to community
infrastructure and services such as health care, education and transport
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION - CO1.3
Ensure plans are in place for accessible community facilities and services in consultation with the Access Committee
CO1.3.1 Ensure infrastructure and service improvement programs are in place to provide the appropriate accessible community facilities and services
WE WILL MEASURE PROGRESS BY:
Ensuring projects identified within the Yass Valley Pedestrian Access and Mobility Plan (PAMP) are completed and consistent with budget allocations
Ensuring actions completed within the Disability Inclusion Action Plan are consistent with budget allocations
Draft Operational Plan 2019/2020Operational Plan 2019/2020 22
CSP Strategy CO2 Encourage and facilitate active and creative participation
in community life
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION – CO2.1
Deliver robust and diverse community engagement opportunities
CO2.1.1 Implement Council’s Community Engagement Strategy
DELIVERY PROGRAM ACTION – CO2.2
Ensure the community is well informed about its projects, policies and programs
CO2.2.1 Undertake community engagement activities
WE WILL MEASURE PROGRESS BY:
The survey results measuring the number of people who feel they can have a say on important issues
The number of residents who participated in community engagement activities in the last 12 months period
WE WILL MEASURE PROGRESS BY:
The survey results measuring the number of people who feel they can have a say on important issues
The number of residents who participated in community engagement activities in the last 12 months period
Draft Operational Plan 2019/2020Operational Plan 2019/2020 23
CSP Strategy CO2
Encourage and facilitate active and creative participation in community life
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – CO2.3
Develop and implement a Public Art Strategy that includes specific actions for the development of creative pursuits
CO2.3.1 Develop a Public Art Strategy
DELIVERY PROGRAM ACTION – CO2.4
Provide a library service that facilitates creative participation in community life
CO2.4.1 Deliver a range of community-focused library programs.
DELIVERY PROGRAM ACTION – CO2.5
Support the growth of a diverse range of community events
CO2.5.1 Provide access to financial support for development of community events through Council's Community Grants Program
CO2.5.2 Encourage cooperative marketing of major events through Seasonal Major Event Marketing Program
C02.5.3 Publicise upcoming community events on Council's website and via Yass Valley Views
WE WILL MEASURE PROGRESS BY: The completion and adoption of a Public Art Strategy
WE WILL MEASURE PROGRESS BY:
The number and type of community-focused library programs conducted
The number of participants in library programs
WE WILL MEASURE PROGRESS BY:
The number and value of Community Grants allocated to given for community events.
The number of events participating in the Seasonal Major Event Marketing Program
The number of events provided publicity
- - The number
Draft Operational Plan 2019/2020Operational Plan 2019/2020 24
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Finance & Corporate Services
DELIVERY PROGRAM ACTION – CO3.1
Encourage and support existing and new interagency groups
CO3.1.1 Participate in relevant interagency groups
DELIVERY PROGRAM ACTION – CO3.2
Connecting the community to Yass Valley Council through a range of Advisory Committees
CO3.1.2 Support the operations of Council's Advisory Committees. Monitor and advise on the need for and effectiveness of Council's Advisory Committees
DELIVERY PROGRAM ACTION – CO3.3
Support the growth and development of volunteering
CO3.2.1 Continue to engage volunteers in providing Council’s Home Living Support and Library Services
CSP Strategy CO3 Foster and encourage positive social behaviours to
maintain our safe, healthy and connected community
WE WILL MEASURE PROGRESS BY:
The number and type of interagencies Council officials participated in
Number and type of interagencies Council officia
WE WILL MEASURE PROGRESS BY:
The number and type of completed projects
Number and type of interagencies C
WE WILL MEASURE PROGRESS BY:
The number of volunteers involved in providing Council’s Home Living Support and Library services
The number and type of interagencies Council officials participated in
tNumber and type
Draft Operational Plan 2019/2020Operational Plan 2019/2020 25
CSP Strategy CO3 Foster and encourage positive social behaviours to
maintain our safe, healthy and connected community
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION – CO3.3
Develop a Crime Prevention Plan
CO3.3.1 Review crime statistics to determine the need for a Crime Prevention Plan
DELIVERY PROGRAM ACTION – CO3.4
Foster Road Safety Awareness
CO3.4.1 Monitor and implement programs for road safety improvements and awareness
WE WILL MEASURE PROGRESS BY:
The number of programs and community engagement activities identified and undertaken in the road safety education budget
The number of funding and grants received for and expended on road safety upgrades and improvements
OP - Programs and community en
WE WILL MEASURE PROGRESS BY:
The completion of a Review
Number and type of interagencies Council officia
Draft Operational Plan 2019/2020Operational Plan 2019/2020 26
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – CO4.1 Ensure appropriate controls are in place to conserve heritage value of our built environment
CO4.1.1 Review and update the Heritage Schedule within the Local Environmental Plan (LEP) to incorporate heritage guidelines for development
CO4.1.2 Finalise the Yass Valley Comprehensive Development Control Plan
DELIVERY PROGRAM ACTION – CO4.2
Continue the Heritage Advisory Service
CO4.2.1 Continue to secure co-funding for the Local Heritage Grants Program and advisory service from the Office of Environment & Heritage
WE WILL MEASURE PROGRESS BY:
Submitting applications for funding to the Office of Environment & Heritage and completion of acquittals
Securing annual funding from the NSW Office of Environment & Heritage
Securing annual funding
CSP Strategy CO4
Recognise and celebrate our diverse cultural identities and protect and maintain our community's natural and
built environment
WE WILL MEASURE PROGRESS BY:
The completion of the Yass Valley Comprehensive Development Control Plan
The inclusion of an up to date heritage schedule within the LEP
er and type of interagencies Council offi
Draft Operational Plan 2019/2020Operational Plan 2019/2020 27
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – CO4.3
Continue the Local Heritage Grants Program
CO4.3.1 Encourage owners of local heritage properties to seek funding for small conservation projects
DELIVERY PROGRAM ACTION – CO4.4
Implement the Yass Valley Aboriginal Reconciliation Action Plan (RAP) in conjunction with the Aboriginal Consultative Committee CO4.4.1 Completion of the actions identified in the RAP CO4.4.2 Assist in conducting The National Aboriginal Islander Day Observance Committee
(NAIDOC) Week and Reconciliation Week events as provided for in the RAP
CSP Strategy CO4
Recognise and celebrate our diverse cultural identities and protect and maintain our community's natural and
built environment
WE WILL MEASURE PROGRESS BY:
The allocation of Heritage Grants budget to suitable applicants
Securing annual funding from the NSW Office of
WE WILL MEASURE PROGRESS BY:
The actions identified in the RAP which are completed
The nature of assistance provided in conducting NAIDOC Week and Reconciliation Week events
The actions identified i
Draft Operational Plan 2019/2020Operational Plan 2019/2020 28
CSP Strategy CO5
Maintain our rural lifestyle
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning
DELIVERY PROGRAM ACTION – CO5.1
Ensure the community is attractive and vibrant while maintaining our village atmosphere
CO5.1.1 Develop and maintain CBD streetscapes and village community spaces
WE WILL MEASURE PROGRESS BY:
Completing annual maintenance programs associated with streetscapes
Identifying and programming improvement projects associated with streetscapes
- Response data relating to service requests
Draft Operational Plan 2019/2020Operational Plan 2019/2020 29
CSP Strategy IN1
Develop high speed rail links between the region, Canberra, Sydney and Melbourne
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager
DELIVERY PROGRAM ACTION – IN1.1
Assess the advantages and disadvantages for Yass Valley of any high speed rail proposal
IN1.1.1 Assess advantages and disadvantages on any high speed rail proposals for Yass Valley
Our Infrastructure
WE WILL MEASURE PROGRESS BY:
Assessing the advantages and disadvantages determined on any proposals for high speed rail for Yass Valley
Assessing the advantages and disadvant
Draft Operational Plan 2019/2020Operational Plan 2019/2020 30
CSP Strategy IN2
Improve public transport links to connect towns within the region and increase access to major centres
WE WILL MEASURE PROGRESS BY:
Funding commitments for upgrade work on the Barton Highway in place
Continued participation in Cross-border and interagency meetings to further the business case and design of the Barton Highway duplication
Funding commitments for upgrade work on
OPERATIONAL PLAN ACTIVITIES
Responsibility of General Manager
DELIVERY PROGRAM ACTION – IN2.1
Lobby the Federal and State Governments to upgrade the Barton Highway
IN2.1.1 Continue advocating on behalf of the Yass Valley for the Federal and State Governments to fund further duplication of the Barton Highway
IN2.1.2 Participate in cross-border and interagency meetings to further the business case and design of the Barton Highway duplication
DELIVERY PROGRAM ACTION – IN2.2
Advocate for public transport links or improved services where there is a demonstrated community need
IN2.2.1 Advocate for public transport links or improved services where there is a demonstrated community need
DELIVERY PROGRAM ACTION – IN2.3
Seek funding opportunities to deliver upgrade works on regional roads
IN2.3.1 Seek funding opportunities to deliver upgrade works on regional roads
WE WILL MEASURE PROGRESS BY:
Continued advocacy for the maintenance and expansion of public transport links
Continued advocacy for t
WE WILL MEASURE PROGRESS BY:
The length of upgrade work delivered on regional roads
The value of grants obtained to upgrade regional roads
Length of u
Draft Operational Plan 2019/2020Operational Plan 2019/2020 31
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION - IN3.1
Deliver transport asset infrastructure, maintenance, renewal and enhancement programs for urban, rural and regional roads to maintain or improve overall condition
IN3.1.1 Develop and deliver annual programs for road renewal and construction, including bridges and stormwater
WE WILL MEASURE PROGRESS BY:
Annual Capital Work programs being completed
The value of grants received and expended for road upgrades and improvements
The timber bridge replacement program implemented for 11 bridges.
The completion of Annual Capita
CSP Strategy IN3
Maintain and improve road infrastructure and connectivity
Draft Operational Plan 2019/2020Operational Plan 2019/2020 32
CSP Strategy IN3
Maintain and improve road infrastructure and connectivity
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION - IN3.1 cont’d
Deliver transport asset infrastructure, maintenance, renewal and enhancement programs for urban, rural and regional roads to maintain or improve overall condition
IN3.1.2 Develop and deliver annual maintenance programs for urban, rural and regional roads based on priority and in accordance with allocated budgets
IN3.1.3 Implement sound asset management practices in accordance with industry
standards
WE WILL MEASURE PROGRESS BY:
Ensuring roads are inspected in line with the annual program
Gravel roads in the annual maintenance program graded in line with road hierarchy for unsealed roads
The completion of the annual sealed roads maintenance program
The completion of Annual Capital
WE WILL MEASURE PROGRESS BY:
An assessment of the condition undertaken on 1/3 of the road network
Programming for transport asset renewal and upgrading implemented
Ensuring the Asset Management plan review is completed
The comple
Draft Operational Plan 2019/2020Operational Plan 2019/2020 33
CSP Strategy IN3
Maintain and improve road infrastructure and connectivity
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN3.2
Deliver Roads & Maritime Services (RMS) state road maintenance and renewal programs in accordance with the Road Maintenance Council Contract
IN3.2.1 Deliver Roads & Maritime Services (RMS) state road maintenance and renewal programs in accordance with the Road Maintenance Council Contract
WE WILL MEASURE PROGRESS BY:
Completion of annual heavy patching and reseal programs
Routine network inspections undertaken in accordance with the Road Maintenance Council Contract (RMCC)
Completion of the routine maintenance program
'Acceptable' or better performance rating from the RMS achieved
RMS Contracts undertaken at no cost to Council
The completion of Annual Capital W
Draft Operational Plan 2019/2020Operational Plan 2019/2020 34
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN4.1
Develop and maintain new and existing recreational and community assets to address our communities needs in a sustainable manner
IN4.1.1 Develop and maintain sports grounds and associated facilities to a standard that enables use by a variety of users
IN4.1.2 Develop and maintain parks, playgrounds and other open spaces to a standard that enables use by a variety of users
IN4.1.3 Maintain and operate Council’s commercial assets including swimming pools and Yass Caravan Park
CSP Strategy IN4 Maintain and update existing community facilities and
support the development of new community infrastructure as needed
WE WILL MEASURE PROGRESS BY:
The completion of the annual maintenance program associated with sportsgrounds
Identifying and programming improvement projects associated with sportsgrounds
The completion of Annual Capital Work pr
WE WILL MEASURE PROGRESS BY:
Completion of the annual maintenance program associated with parks and open spaces
Identifying and programming improvement projects associated with parks and open spaces
OP - Expending the parks and re
WE WILL MEASURE PROGRESS BY:
Completion of annual maintenance program associated with commercial assets
Identifying and programming improvement projects associated with commercial assets
Providing learn to swim and water safety programs at Council’s swimming pools
Undertaking reviews of services at Caravan Park to maintain or achieve a 'very good' online rating for the caravan park.
Reviewing the ongoing commercial operation of the Yass Caravan Park
The comple
Draft Operational Plan 2019/2020Operational Plan 2019/2020 35
CSP Strategy IN4 Maintain and update existing community facilities and
support the development of new community infrastructure as needed
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN4.1 – Cont’d
Develop and maintain new and existing recreational and community assets to address our communities needs in a sustainable manner
IN4.1.4 Manage Council’s properties and buildings
IN4.1.5 Develop Plans of Management for Community land and Crown land devolved to Council
WE WILL MEASURE PROGRESS BY:
The number of plans of Management for Community and Crown Lands completed
OP - Buildings Asset Manage
WE WILL MEASURE PROGRESS BY:
Buildings Asset management Plan for Council buildings and facilities completed
Maintain operating cost of Council’s buildings and facilities within allocated budgets
OP - Buildings Asset Management Plan for C
Draft Operational Plan 2019/2020Operational Plan 2019/2020 36
CSP Strategy IN4 Maintain and update existing community facilities and
support the development of new community infrastructure as needed
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN4.1 – cont’d
Develop and maintain new and existing recreational and community assets to address our communities needs in a sustainable manner
IN4.1.8 Develop and operate Council's cemeteries.
IN4.1.9 Provision of a pedestrian and cycleway network
WE WILL MEASURE PROGRESS BY:
Requests for burial plot or internment actioned on the day
of enquiry
Completion of annual maintenance program associated with
cemeteries
Finalising and implementing the Strategic Plan for Yass Lawn Cemetery
The completion of Annual Capital Wor
WE WILL MEASURE PROGRESS BY:
Completion of annual maintenance program associated with pedestrian and cycleway networks
Identifying and programming improvement projects associated with pedestrian and cycleway networks
OP - Pedestrian and c
Draft Operational Plan 2019/2020Operational Plan 2019/2020 37
CSP Strategy IN4 Maintain and update existing community facilities and
support the development of new community infrastructure as needed
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN4.2
Ensure sufficient land is appropriately located for future Council facilities and emergency services
IN4.2.1 Ensure that as settlement grows locations are appropriately earmarked for Council facilities and emergency services
WE WILL MEASURE PROGRESS BY:
Ensuring locations for future Council facilities and emergency services are identified to support settlement growth
Locations for future Council facilities a
Draft Operational Plan 2019/2020Operational Plan 2019/2020 38
CSP Strategy IN5 Ensure high quality water supply options for the towns in
the region
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN5.1
Council to supply quality water, cater for growth and quality enhancements that addresses the community needs
IN5.1.1 Council to supply quality water, cater for growth and quality enhancements that address the community needs
WE WILL MEASURE PROGRESS BY:
Reliability in line with average Department of Primary Industries water outage rate
Compliance with Health Department measures that ensure safe drinking water
Implementation of corrective actions on water quality measures within one month
Benchmarking of water supply costs per capita/household with like Councils undertaken
Participation in the development of a Regional water strategy
Undertaking business case and final design for the upgrade to the Yass Water Treatment Plant
Completion of annual operational and maintenance programs associated with the water supply network
Reviewing and implement the Integrated Water Cycle Management Plan
OP - Reliability in
Draft Operational Plan 2019/2020Operational Plan 2019/2020 39
CSP Strategy IN6 Implement safe, accessible and efficient waste
management and recycling options for general and green waste and sewage
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN6.1
Provide and operate a quality sewer network. Cater for growth and quality enhancements that address the community needs
IN6.1.1 Operate an efficient sewerage management network
DELIVERY PROGRAM ACTION – IN6.2
Provide an efficient and sustainable waste service
IN6.2.1 Operation of domestic and commercial waste collection
IN6.2.2 Decommissioning of Murrumbateman Landfill in accordance with Landfill Closure Plan and relevant Environmental Protection Authority (EPA) guidelines
WE WILL MEASURE PROGRESS BY:
Reliability in line with average Department of Primary Industries sewer blockages rate
Compliance with EPA Licence on sewer treatment plant discharge
Benchmarking of sewerage costs per capita/household with like Councils undertaken
Completion of annual operational and maintenance programs associated with the sewer network
Reviewing and implement the Integrated Water Cycle Management Plan
OP - Reliability in line with aver
WE WILL MEASURE PROGRESS BY:
Reducing the number of complaints for non- collection of domestic kerbside bins
Developing Waste Strategy taking into account current Canberra Region Joint Organisation direction in waste management and Council’s resolution on reducing waste to landfill
Closing the Murrumbateman landfill
OP - Number
Draft Operational Plan 2019/2020Operational Plan 2019/2020 40
CSP Strategy IN7 Secure improvements for and future proof
telecommunications infrastructure
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Engineering
DELIVERY PROGRAM ACTION – IN7.1
Advocate for servicing of mobile telephone blackspot areas
IN7.1.1 Advocating for the continued installation of mobile telephone towers and related infrastructure to be prioritised in blackspot (no coverage) areas.
DELIVERY PROGRAM ACTION – IN7.2
Advocate for a more stable communication network
IN7.2.1 Liaise with communication providers that operate in our region, to achieve a more stable communication network for fixed line mobile and internet communication systems
WE WILL MEASURE PROGRESS BY:
A reduction in mobile telephone blackspot areas in Yass Valley
Annual survey to determine the extent of ‘bla
WE WILL MEASURE PROGRESS BY:
Surveying the community on satisfaction with the telecommunication network
Surveying the community o
Draft Operational Plan 2019/2020Operational Plan 2019/2020 41
CSP Strategy IN8 Improve accessibility to and support the development of
health and medical facilities in the region
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager
DELIVERY PROGRAM ACTION – IN8.1
Continue to advocate on behalf of the community for health and medical facilities in the region.
IN8.1.1 Continue to advocate on behalf of the community for health and medical facilities in the region.
WE WILL MEASURE PROGRESS BY:
Surveying the community to determine adequacy of health and medical facilities
Surveying the community on satisfaction wit
Draft Operational Plan 2019/2020Operational Plan 2019/2020 42
CSP Strategy IN9 Improve accessibility to and support the development of
education and training facilities in the region
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager
DELIVERY PROGRAM ACTION – IN9.1
Continue to advocate on behalf of the community for education and training activities to serve our residents
IN9.1.1 Continue to advocate on behalf of the community for education and training activities to serve our residents
WE WILL MEASURE PROGRESS BY:
Identifying a suitable site for a school at Murrumbateman
Surveying the community to determine adequacy of education and training facilities
Reporting on progress of the joint use Memorandum of Understanding (MoU) between Council and the NSW Department of Education.
Reporting on progress of the Joint U
Draft Operational Plan 2019/2020Operational Plan 2019/2020 43
Our Civic Leadership
CSP Strategy CL1
Effect resourceful and respectful leadership and attentive representation of the community
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION - CL1.1
Ensure activities carried out in Yass Valley are in a safe manner and meet legislative requirements
CL.1.1.1 Monitor and respond to compliance issues relating to illegal dumping, abandoned vehicles, OSSM systems, food and other regulated premises, companion animals, livestock and parking
CL1.1.2 Provide education programs on Onsite Sewage Management (OSSM) systems, food safety awareness and companion animals.
WE WILL MEASURE PROGRESS BY:
Carrying out OSSM audits in accordance with the OSSM strategy (target 100%)
Inspecting registered food and other regulated premises (target 100%) Returning or re-homing registered companion animals (target > 75%) The number of livestock issues attended The number of abandoned vehicles impounded The number of illegal dumping reports to Evironment Protection
Authority ( EPA ) for inclusion in (Report Illegal Dumping) RID ONLINE The number of cross border illegal waste dumping meetings attended The number of companion animals education activities undertaken The number of food safety awareness activities undertaken The number of OSSM awareness activities undertaken
Draft Operational Plan 2019/2020Operational Plan 2019/2020 44
CSP Strategy CL1
Effect resourceful and respectful leadership and attentive representation of the community
OPERATIONAL PLAN ACTIVITIES Responsibility of Director of Planning/Director of Engineering
DELIVERY PROGRAM ACTION - CL1.1 – cont’d
Ensure activities carried out in Yass Valley are in a safe manner and meet legislative requirements
CL.1.1.3 Provide a fleet of adequately maintained vehicle and plant, updated in accordance with renewal schedules
CL.1.1.4 Provide an effective and efficient role in emergency management and the development of associated plans
CL.1.1.5 Undertake Work Health & Safety improvement actions
WE WILL MEASURE PROGRESS BY:
Reviewing plant renewal schedules to ensure that plant and equipment meets future operational needs.
Plant and equipment serviced in line with manufacturers recommendations (>95%)
Major plant and equipment utilised for operational purposes (>60%)
WE WILL MEASURE PROGRESS BY:
Carryin
WE WILL MEASURE PROGRESS BY:
Reviewing and update the Emergency Management Plan (EMPLAN) as required
Review and update the EMPLAN as
WE WILL MEASURE PROGRESS BY:
Acquittal of actions undertaken to Council’s insurer
WE WILL MEASURE PR
Draft Operational Plan 2019/2020Operational Plan 2019/2020 45
CSP Strategy CL1
Effect resourceful and respectful leadership and attentive representation of the community
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager/Director of Finance & Corporate Services
DELIVERY PROGRAM ACTION - CL1.2
Address the community’s needs in a sustainable manner
CL1.2.1 Continue to align with Office of Local Government (OLG) financial ratio benchmarks
CL1.2.2 Continue to align with SRV determination
DELIVERY PROGRAM ACTION - CL1.3
Meet its objectives through improving the effectiveness of risk management, controls and governance processes
CL1.3.1 Provide independent, objective assurance and consulting activity to add value and improve Council’s obligations
CL1.3.2 Manage Council’s risks
WE WILL MEASURE PROGRESS BY:
Meeting or exceeding OLG benchmarks for financial ratios by 2026
Reporting of SRV projects in line with approval
Meeting or exceeding OLG benchmarks for fin
WE WILL MEASURE PROGRESS BY:
Completing planned internal audits
Presenting Annual Financial report to Audit, Risk and Improvement Committee and Council
Achieving acceptable insurer audit results
Maintaining lost time injuries at or below the State average
- Completing plan
Draft Operational Plan 2019/2020Operational Plan 2019/2020 46
CSP Strategy CL1
Effect resourceful and respectful leadership and attentive representation of the community
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager/Director of Finance & Corporate Services
DELIVERY PROGRAM ACTION - CL1.4
Be compliant, more efficient and effective
CL1.4.1 Implement Internal Audit Plan
CL1.4.2 All regulated compliance is adhered to
DELIVERY PROGRAM ACTION - CL1.5
Improve Council’s operating performance (operating performance ratio)
CL1.5.1 Implement SRV by increasing rates by 8.5% pa (inclusive of the annual rate peg) for 4 years from 2016/17
CL1.5.2 Undertake a program of service reviews to ensure that services are delivered in the most cost effective and efficient manner
WE WILL MEASURE PROGRESS BY:
Updating and adopting a Strategic 4 year Internal Audit Workplan annually
Adhering to the Office of Local Government Calendar of Compliance and Reporting Requirements
Adhering to Council’s Compliance register
Updating and adopting a Strategic 4 yea
WE WILL MEASURE PROGRESS BY:
Increasing rates in accordance with the awarded Special Rates Variation (SRV) and rate-peg
Programming and delivering service reviews
Increasing rates i
Draft Operational Plan 2019/2020Operational Plan 2019/2020 47
CSP Strategy CL1
Effect resourceful and respectful leadership and attentive representation of the community
OPERATIONAL PLAN ACTIVITIES Responsibility of all Executive
DELIVERY PROGRAM ACTION - CL1.6
Maximise Council’s ability to generate income
CL1.6.1 Implement SRV by increasing rates by 8.5% pa (inclusive of the annual rate peg) for 4 years from 2016/17
CL1.6.2 Review fees and charges to ensure user pay principles are adopted where possible
CL1.6.3 Review commercial activities to ensure Council is maximising returns
WE WILL MEASURE PROGRESS BY:
Increasing rates in accordance with the awarded SRV and rate-peg
Including user pays principles where possible in fees and charges
Maximising returns on commercial activities
Increasing rates in accordance with the
DELIVERY PROGRAM ACTION - CL1.7
Ensure that Council assets are being renewed faster than they are deteriorating
CL1.7.1 Review service priorities to ensure sufficient revenue is provided for asset renewal
CL1.7.2 Undertake a strategic review of Council’s land holdings to determine the best option for each
CL1.7.3 Develop asset management plans for transport and buildings asset classes
WE WILL MEASURE PROGRESS BY:
Reviewing asset renewal revenue service priorities
Reviewing the best options for Council’s land holdings
Implementing strategies and improving processes to provide additional funds for asset renewal
Adoption of the Asset Management Plans
Developing and adopting an Asset Management Strategy
Increasin
Draft Operational Plan 2019/2020Operational Plan 2019/2020 48
CSP Strategy CL2
Encourage and facilitate open and respectful communication between the community, the private
sector, Council and other government agencies
OPERATIONAL PLAN ACTIVITIES Responsibility of All Executive
DELIVERY PROGRAM ACTION – CL2.1
Make doing business with Council easier
CL2.1.1 Continued development of Council’s online presence that improves customer experiences
WE WILL MEASURE PROGRESS BY:
Surveying community sentiment on ease of doing business with Council
Surveying community sentiment on ease of doing b
DELIVERY PROGRAM ACTION – CL2.2
Inform and engage with the community on all actions of Council
CL2.2.1 Deliver communications campaigns which clearly inform the community of Council’s actions
CL2.2.2 Implement Council’s Communication with the Media & Social Media Policies to ensure open and honest communication
CL2.2.3 Implement Council’s Community Engagement Strategy
CL2.2.4 Develop project specific communication Plans to ensure Council adheres to its Community Engagement Strategy
WE WILL MEASURE PROGRESS BY:
Surveying community sentiment on Council’s engagement with the community
Complying with legislation for advertising
Distributing Valley Views triannually
Surveying community sen
DELIVERY PROGRAM ACTION – CL2.3
Undertake community engagement to ensure the community is involved in Council’s decision making process
CL2.3.1 Implement Council’s Community Engagement Strategy for all major projects
WE WILL MEASURE PROGRESS BY:
Surveying results measuring the number of people who feel they can have a say on important issues
Surveying
Draft Operational Plan 2019/2020Operational Plan 2019/2020 49
CSP Strategy CL3
Collaborate and cooperate as a group of councils to achieve efficiencies and a greater voice in regional
decision-making and encourage similar cooperation across other sectors and community groups
OPERATIONAL PLAN ACTIVITIES Responsibility of General Manager
DELIVERY PROGRAM ACTION – CL3.1
Actively participate in the Canberra Region Joint Organisation
CL3.1.1 Actively participate in the Regional Joint Organisation of Councils
WE WILL MEASURE PROGRESS BY:
Evidence of collaborating and facilitating networking in the region to share ideas
Communicating the number of funding opportunities to our community
Communicating the number of networking opportunities arranged
Presenting delegates report to Council following Joint Organisation Board meetings
Surveying community sentiment on e
Draft Operational Plan 2019/2020Operational Plan 2019/2020 50
CSP Strategy CL4
Actively investigate and communicate funding sources and collaboration opportunities that can strengthen the
region
OPERATIONAL PLAN ACTIVITIES Responsibility of All Executive
DELIVERY PROGRAM ACTION – CL4.1
Monitor and distribute information from government agencies relating to funding opportunities
CL4.1.1 Provide information to community organisations on funding opportunities
CL4.1.2 Provide information to community organisations on training in writing grant applications
DELIVERY PROGRAM ACTION – CL4.2
Facilitate networking in the region to share ideas
CL4.2.1 Attend and actively contribute to regional interagency and cross-border meetings
WE WILL MEASURE PROGRESS BY:
The number of funding opportunities advised
The number of organisations provided with information on training in application writing
The number of successful grant applications
The number of collaborative funding op
WE WILL MEASURE PROGRESS BY:
Communicating the number of regional interagency and cross-border meetings attended
Evidence of collaboration through interagency and cross-border meetings
The number of collabo
Draft Operational Plan 2019/2020Operational Plan 2019/2020 51
Charging Philosophy
In accordance with S.404 (1) of the Local Government Act 1993, Council provides the following details of its revenue policy that also incorporates the basis upon which the rates and charges will be made.
Rates and charges represent the process whereby Council recovers the cost of providing its services for within the boundaries of the local government area. In general, Council follows a user-pays philosophy towards the provision of services. In the case of water, sewer and garbage services, price increases reflect the cost of providing these services. With ordinary land rates, the rate increases must not be above the limits set by the Minister for Local Government, unless the Minister approves a special variation to general income.
The rates and charges levied by the Council are a debt that is applied to the land and this debt becomes the responsibility of the current owner of the land. Any arrears that may not have been discharged by previous owners become the responsibility of the current owner.
The rates and charges set out in this revenue policy are designed to provide the net source of funds after allowing for loans, contributions and government grants for the programs and initiatives identified in the operational plan. The detailed outline of the income and expenditure of the Council is set out in the 2019/2020 budget which is contained in this plan.
Goods and Services Tax (GST)
Ordinary rates, special rates, water charges, sewerage charges, stormwater charges and domestic management charges are exempt from GST because of a determination by the federal treasurer. The majority of Council fees as advertised in the schedule of fees accompanying the operational plan are subject to GST and accordingly the charges reflect a 10% GST component.
Ordinary Rates
Ordinary Rates
Ordinary rates are applied to properties based on independent valuations supplied to the Council on all rateable properties within the LGA boundaries by the Valuer-General. The valuations used in the 2019/20 rating period have a base date of 1 July 2016.
For 2019/2020 Council has adopted a Special Rate Variation of 8.5% (including the 2.7% rate pegging) as awarded by the Minister for Local Government.
Statement of Revenue Policy
Draft Operational Plan 2019/2020Operational Plan 2019/2020 52
Statement of Revenue Policy – cont’d
The total estimated income yield in 2019/20 from ordinary rates is $10,881,745 as detailed in the following table.
CATEGORY SUB - CATEGORY AD
VALOREM MINIMUM
CHARGE BASE
CHARGE TOTAL YIELD
AVE UNIMPROVED LAND VALUE
PER ASSESSMENT
AVE RATES PER ASSESSMENT
Farmland 0.0029098 $650.00 $4,218,559 $773,712 $2,901
Residential Non Urban 0.0024825 $435.50 $3,333,708 $363,234 $1,337
Residential Yass 0.0043982 $664.00 $1,792,969 $157,537 $762
Residential Binalong 0.0038028 $664.00 $129,107 $74,560 $670
Residential Bowning 0.0038028 $664.00 $74,059 $107,831 $672
Residential Wee Jasper 0.0038028 $664.00 $29,880 $61,416 $664
Residential Bookham 0.0038028 $664.00 $10,624 $37,575 $664
Residential Murrumbateman 0.0026622 $664.00 $175,336 $313,696 $839
Residential Gundaroo 0.0018783 $360.00 $175,846 $314,389 $951
Residential Sutton 0.0023606 $360.00 $81,256 $377,062 $1,250
Business Sutton & Gundaroo 0.0024825 $435.50 $18,123 $311,247 $1,208
Business Yass 0.0104278 $664.00 $712,660 $287,916 $3,072
Business Bowning 0.0104278 $664.00 $6,559 $104,833 $1,093
Business Binalong 0.0104278 $664.00 $8,569 $67,400 $779
Business Murrumbateman 0.0104278 $664.00 $114,490 $577,853 $6,026
ESTIMATED YIELD $10,881,745
Structure of the Ordinary Rate
The rating provisions of the Local Government Act 1993 allow Councils to base their ordinary rates either on a system of minimum rates and base rates.
Yass Valley Council has chosen to employ the system of both the base rates and minimum rates as a means of levying rates on all properties throughout the LGA. The scenarios outlined above use these provisions. In accordance with Section 497 of the Local Government Act 1993 the structure of the Ordinary Rate must comprise:
• a base amount (i.e. fixed charge required by
statute to be no more than 50% of the total amount of the rate)
• a minimum amount (i.e. the maximum of the minimum rate is fixed by statute annually)
• an ad valorem component (i.e. a rate levied on the unimproved land value).
Ordinary Base Rate
Council has chosen to apply a system of base amounts in an attempt to overcome community concerns over the inequity of the rate burden of a rate levied solely on land values. The uniform base charge reflects that some of the benefits derived by ratepayers from the provision of Council works and services are shared equally by the community, regardless of property valuation.
The philosophy behind the base charges is that the base amount should apply to all properties and the total income from the charge should approximate the general administration costs of the Council together with the cost of common services available to each property within the Council area.
Ordinary Minimum Rate
The minimum rate is applied to residential and business properties, to ensure there is an equitable contribution for services where properties have a relatively low land valuation.
Ad Valorem Rate
Council has adopted a system of ad valorem rates that will apply to each property valuation to develop a variable charge on each rate notice. The ad valorem charge is multiplied by the land valuation supplied by the Valuer-General to determine the ad valorem charge. The ad valorem amount of the rate is to be levied on the unimproved land value of all rateable land within each rating category on the rates notice.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 53
Statement of Revenue Policy cont’d
Rateable Land Categories
Categorisation of all rateable land in the council area has been undertaken in accordance with the requirements of chapter15 of the Local Government Act 1993. Council has used the following categories of rateable land:
Farmland - this is land used genuinely for primary production. The dominant use of the land must be for the business or industry of grazing, and the growing of crops etc. The activities must have a significant and commercial purpose or character and be engaged in for the purpose of profit on a continuous or repetitive basis. Rural residential land will not be categorised as farmland.
Residential - the Local Government Act 1993 identifies this land as property used for residential accommodation, or in the case of vacant land, property zoned for residential use under an environmental planning instrument (hotels, motels, guesthouses, boarding houses or nursing homes) are specifically excluded from this category. This category also includes rural residential land.
Business - the Local Government Act 1993 identifies property within this category as land, which cannot be categorised in any of the other categories of farmland or residential.
Valuations
Council will be using valuations with a base date of 1 July 2016 for rating purposes in 2019/20. All property owners in the Council area will have been provided with a valuation of their property from the Valuer General in January 2017. The valuations are based upon the land value only of the property and do not include any structures or other improvements.
Any appeal against the property valuation should be lodged with Valuation Services – Property NSW, PO Box 745 Bathurst NSW 2795 or by phone on 1800 110 038 to request a review kit to be posted or emailed to you. Online objection lodgement is also available at www.valuergeneral.nsw.gov.au/land_values/requ est_a_review/how_to_lodge_an_objection
Pension Rebates
In accordance with Section 575(3)(a) of the Local Government Act 1993 Council provides a rate reduction of 50% of the amount of the rate levy, provided the maximum rebate for combined general rate and domestic waste management charges does not exceed $250 to eligible pensioners. Of this rate reduction, the NSW Government reimburses 55%.
The estimated pension rebate in 2019/20 is
$56,000 for land rates and $28,000 for Domestic Waste Management.
Interest on Overdue Rates and Charges
In accordance with Section 566 of the Local Government Act 1993 Council charges interest on all rates and charges that remain unpaid after they become due and payable. Rates and charges become payable one month after the date of service of the rates notice unless a person elects to pay the rates and charges by instalments.
Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local Government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local Government. Council will adopt the maximum rate.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 54
Statement of Revenue Policy cont’d
Exemptions
The Local Government Act 1993 – Sections 555 to 558 state that the following exemptions from all land rates and where indicated water and sewer access charges must be applied:
1. Crown Land (general rates, water and sewer access charges) - Crown Land that is not being land held under a lease for private purposes.
2. National Parks (general rates, water and sewer access charges) - Land within a national park, historic site, nature reserve state game reserve or conservation reserve whether or not the land Is affected by a lease, licence, occupancy or use.
3. Conservation Agreements (general rates only) – Land that is a subject of a conservationagreement, any rate levies on that whole parcel of land is to be reduced by the percentage of the land in which the conservation agreement covers.
4. Churches or places of public worship (general rates only) - Land that belongs to a religious body and is occupied and used as a church, a minister of religions residence, a place for religious teaching or training or the residence of the official head or assistant head of any religious body in the State or any diocese within the State.
5. Schools (general rates only) - Land that belongs to and is occupied and used in connection with a school, school playground or residence occupied by a teacher, employee or caretaker of the school, as defined by the Education Reform Act 1990
6. Government Departments, Council or Emergency Service (general rates only) - Land that belongs to and is occupied and used in connection with an emergency service or Government department, Council or an emergency service or Government department or Council office or residence provided that it is not commercially leased. This includes Police Stations and residences, Ambulances Stations and residences, Fire Stations and Government offices.
7. Aboriginal Land (general rates only) – Land that is vested in an NSW Aboriginal Land Council or a Local Aboriginal Land Council under Division 5 of Part 2 of the Aboriginal Land Rights Act 1983 exempts Local
Aboriginal Land Councils from the payment of rates and charges to Local Government Authorities on certain types of lands. This includes land included in Schedule 1 of the Aboriginal Land Rights Regulation 2002, vacant land and declared land that is of spiritual or cultural significance to Aboriginal people.
8. Public places (general rates only) - Land that is a public place.
9. Public Reserve or Common (general rates only) – Land used for a public reserve or common and vested in the Crown, a public body or trustees.
10. Public cemetery (general rates only) - Land used for a public cemetery and vested in the Crown, a public body or trustees.
11. Public library (general rates only) - Land used solely for a free public library and vested in the Crown, a public body or trustees.
12. Public hospital (general rates only) - Land that belongs to a public hospital.
13. Area Health Service (general rates only) - Land that is vested in an area health service.
14. Benevolent or Public Charity (general rates only) – Land that belongs to a public benevolent institution or public charity and is used or occupied by the institution or charity for the purposes of the institution or charity.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 55
Statement of Revenue Policy cont’d
Annual Charges
In accordance with Section 501(1) of the Local Government Act 1993 Council proposes to make and levy an annual charge for the following services:
• Water Supply Services • Sewerage Services • Waste Management Services • Liquid Trade Waste • Stormwater Management Services • On Site Sewage Management Services
WATER SUPPLY SERVICES
Water Availability Charge
The availability charge is based on the size of the meter connection and is shown on the annual rates notice. The charge is related to the cost of providing access to a 20-32mm water connection and has been set at $480 for those properties that are connected to the Yass water supply and $360 for those properties that are connected to the Murrumbateman water supply. Availability charges for larger water connections are based on the size of the water meter connection.
Water availability charges in Yass and Murrumbateman are planned to align in 2020/21 following the construction of the Yass to Murrumbateman pipeline.
The availability charge is designed to cover some of the costs incurred by Council in providing and maintaining infrastructure such as reservoirs, pump stations and reticulation systems. Because of the fixed nature of the costs incurred by Council in operating the infrastructure, the availability charge applies to all properties able to connect to the system regardless of whether or not a connection is in place.
All properties falling within the defined water supply boundaries are subject to compulsory water availability charges. For details on land that is exempt from water access charges, see the section under ordinary rates.
The total estimated income yield in 2019/20 from the Water Availability Charge is$1,730,000
Discounts – (Water Availability Charge) A 50% reduction to applicable to all churches in the Yass Valley LGA. Water Usage Charges
The water usage charge for 2019/20 is set at $3.40 per kilolitre for the first 5 kilolitres per day. Water usage in excess of this is charged at $4.50 per kilolitre. The consumption charge is invoiced three times annually, with the usage calculation per day averaged over this period. The water consumption charges are designed to meet the fixed and variable operating costs related to the provision of water supply. Details of the water charges for the 2019/20 financial year are set out in the Fees and Charges section o. f the document.
The total estimated income yield in 2019/20 from water Usage Charges is $1,980,000.
Discounts (Water Usage Charges)
Churches, nursing homes, Apex Homes and St Vincent de Paul receive a 35% discount on usage charges. Council playing fields, Yass Pool, The Men’s Shed the Yass Community Garden and Yass Golf Course (non-building infrastructure) receive a 55% discount on usage charges and Binalong Pool receives a 90% discount.
Pension Rebate
In accordance with Section 575(3)(b) of the Local
Government Act 1993 Council provides a reduction of
50% of water availability charges levied up to a
maximum of $87.50 for each property. Of this
reduction, the NSW Government reimburses 55%.
The estimated pension rebate in 2019/20 is $22,000.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 56
Statement of Revenue Policy cont’d
Interest on Overdue Water Charges
In accordance with Section 566 of the Local Government Act 1993 Council charges interest on all water supply service charges which remain unpaid after they become due and payable. Water supply charges become payable one month after the date of service of the rate notice unless a person elects to pay the charges by instalments.
Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local government. Council will adopt the maximum rate.
SEWERAGE SERVICES
Residential Charges
The residential sewerage charge is based on a flat charge for all residential properties connected to Council’s sewerage service network and for 2019/20 is $700. Residential sewerage charges reflect the cost of providing and maintaining the required infrastructure as well as operating costs for pumpstations and the sewage treatment plant.
Non Residential Charges
Charges for non-residential sewer usage are based on water consumption for all businesses properties connected to Council’s sewerage service network. For 2019/20 the charge is $3.00 per kilolitre with a minimum charge of $700. Charges are based on the previous year’s water consumption. These fees are designed to distribute the cost of providing non-residential services equitably on a user-pay basis
Total Income
The total estimated income yield in 2019/20 from sewer charges is $2,230,000.
Discounts (Sewerage Services Charges)
A 50% reduction is applicable to all churches in theYass Valley LGA.
Pension Rebate
In accordance with Section 575(3)(b) of the Local Government Act 1993 Council provides a reduction of 50% of residential sewerage charges levied up to a maximum of $87.50 for each individual property. Of this reduction, the NSW Government reimburses55%.
The estimated amount of the pension rebate in 2019/20 is $18,000.
Interest on Overdue Sewer Charges
In accordance with Section 566 of the Local Government Act 1993, Council charges interest on all sewer supply service charges which remain unpaid after they become due payable. Sewer supply charges become payable one month after the date of service of the rates notice unless a person elects to pay the charges by instalments. Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local Government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local government. Council will adopt the maximum rate.
Liquid Trade Waste
This charge recovers the additional cost of transporting and treating liquid waste from liquid waste dischargers. It is calculated by multiplying the total water consumption from water meter readings by a sewerage discharge factor and liquid trade waste discharge factor by a charge of $2.10 per kilolitre for those with appropriate pre-treatment, or $17.00 per kilolitre for those without pre-treatment.
The sewerage discharge factor and trade waste
discharge factor are based on Appendix G of the Liquid
Trade Waste Management Guidelines 2009 as
published by the NSW Office of Water. These factors
are intended to represent the proportion of waste
water being discharged into the sewer that is
considered to be trade waste. The formula provides a
system for charging on a user pays basis.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 57
Statement of Revenue Policy cont’d
The total estimated income yield in 2019/20 from trade waste charges is $63,000.
WASTE MANAGEMENT SERVICES
Domestic Waste Management Charges
Sections 496 and 504 the Local Government Act 1993 provide that the domestic waste management services of the Council must be financed by specific annual charges made and levied for that purpose alone. The Act prevents Council from applying ordinary rate income towards meeting the cost of domestic waste management services, nor can it use waste charge income for non-waste related functions.
The term ‘domestic waste management service’ relates to the services that comprise the periodic collection of waste, generated on domestic premises, from individual parcels of rateable land and the services associated with recycling activities provided to these properties.
The functions of domestic waste management services carried out by Council include, but are not limited, to the following:
• collection of domestic waste • disposal and treatment of domestic waste • recycling and waste minimisation activities
associated with domestic waste collection and disposal
Kerb-Side Collection Charge
This is an annual waste collection charge of $397 that meets the costs of:
1. the weekly 140 litre bin domestic waste collection service and the associated waste disposal or treatment
2. the fortnightly 240 litre bin domestic recycling collection service
It is applicable to each occupied residential property and each residential unit in a multi-unit complex for which the service is available.
Additionally, each residential property or unit in a multi complex that already has a kerb side collection may request an additional domestic garbage or recycling service. An annual charge of $264.00 for an additional garbage service and $133.00 for an additional recycling service is applicable.
Collections will only be conducted from the Council supplied mobile garbage bins on the specified collection days.
Vacant Properties
A charge is levied against all vacant properties, where a garbage collection service is offered. The charge in 2019/20 is $30 per property.
Total Income
The estimated total income from domestic waste management charges for 2019/20 is $1,620,000.
Pension Rebate
In accordance with Section 575(3) (a) of the Local Government Act 1993 Council provides a reduction of 50% of the domestic waste management charge provided the maximum rebate for combined rate and domestic waste management services does not exceed $250.
The estimated pension rebate in 2019/20 is $28,000.
Business Waste Management Charges
The business waste management charges are designed to meet the costs of providing waste management services for commercial premises throughout the Council area. The income and expenditure associated with the business waste collection and disposal service is expressly separated from the domestic waste management charges in conformity with the provision of the Local Government Act 1993.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 58
Statement of Revenue Policy cont’d
There is an annual kerbside waste collection charge of $397 that meets the costs of:
1. the weekly 140 litre bin waste collection
2. service and the associated waste disposal or treatment
3. the fortnightly 240 litre bin recycling collection service
The estimated total rate income for business waste management charges in 2019/20 is $35,000.
Waste Management Environmental Charge
This charge of $120.00 applies to all rateable properties and goes towards the provision of transfer stations and the management of environmental waste matters throughout the LGA. This charge contributes towards the provision of additional infrastructure and improvements to accommodate waste disposal at all transfer stations throughout the LGA. Funds also go towards the purchase, maintenance and upgrading of waste and recycling bins and infrastructure at all facilities. Funds also provide for long term financial planning of improvements to all facilities.
Farmland property owners with more than one property in the same name, without a house, may claim a credit upon completion of a Statutory Declaration.
The estimated total rate income for the waste management environmental charge in 2019/20 is $880,000.
Interest on Overdue Waste Charges
In accordance with Section 566 of the Local Government Act 1993 Council charges interest on all waste service charges which remain unpaid after they become due and payable. Waste charges become payable one month after the date of service of the rate notice unless a person elects to pay the charges by instalments.
Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local Government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local Government. Council will adopt the maximum rate.
STORMWATER MANAGEMENT SERVICES
Stormwater Management Charge
The stormwater management charge of $25 is levied under Section 496A of the Local Government Act 1993 on all occupied residential or business properties within the Yass Township. This charge reflects the cost of the provision and maintenance of the stormwater infrastructure within Yass.
The total estimated income yield in 2019/20 from the stormwater management charge is $57,000.
Interest on Overdue Stormwater Management Charges
In accordance with Section 566 of the Local Government Act 1993 Council charges interest on all stormwater management charges that remain unpaid after they become due and payable. Stormwater management charges become payable one month after the date of service of the rates notice unless a person elects to pay the rates and charges by instalments.
Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local Government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local Government. Council will adopt the maximum rate.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 59
ON SITE SEWAGE MANAGEMENT SERVICES
On Site Sewage Management Charge
The on-site sewage management charge of $33 is levied in accordance with Section 68 of the Local Government Act 1993 on all properties (rateable or non-rateable) that operate an on-site sewage management system.
The charge makes the land owner compliant under the legislation as it constitutes an ‘approval to operate’ by council. This charge reflects the cost to council to effectively manage and administer all on-site sewage management systems operating within Yass Valley Council.
The total estimated yield in 2019/20 from the on-site sewage management charge is $125,000.
Interest on Overdue On-Site Sewage Management Charges
In accordance with Section 566 of the Local Government Act 1993 Council charges interest on all on-site sewage management charges that remain unpaid after they become due and payable. On Site Sewage Management charges become payable one month after the date of service of the rates notice unless a person elects to pay the rates and charges by instalments.
Where a person elects to pay by instalments, rates and charges become payable on the due date of the instalment. Interest will be calculated on a daily basis using the simple interest method. The rate of interest must not exceed the maximum rate specified by the Minister for Local Government for overdue General Rates, which is currently 7.5% but may change in accordance with advice from the Minister for Local Government. Council will adopt the maximum rate.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 60
Statement of Revenue Policy cont’d
Statement of Borrowings
Under the Local Government Act, Council is required to include details of proposed borrowings in the
financial period covered by this revenue policy. Council is proposing to make new borrowings for
projects in 2019/20.
Council’s amount of borrowings on 1 July 2019 is expected to be as follows:
NOTE
LOAN PRINCIPAL ON 1
JULY 2019 ANNUAL COST
General Fund General Infrastructure 1 $1,152,437 $699,025 Water Fund NSW Treasury Loan-Raising the Dam Wall 2 $750,000 $750,000 Raising the Dam Wall 3 $9,130,741 $877,559 Yass to Murrumbateman Water Supply 4 $2,218,290 $291,585 Water Main Ford to Demestre 5 $846,152 $111,223
Sewer Fund Sewer Infrastructure 6 $4,122,354 $363,737
Sewer pump station upgrade 7 $365,903 $48,097
Note 1 - Council’s General Fund loan is at a fixed rate of 5.91%, it will be fully paid out in 2020-
2021 and is funded by rates revenue.
Note 2 - To ensure Yass Valley Council is able to maintain an adequate water supply to meet both current and future needs, Council undertook the project of raising the Yass Dam Wall. This project was funded by two separate loans, serviced from the water rates and charges. NSW Treasury Loan is an interest free loan payable over a period of 10 years. This loan will be fully repaid in 2019-20.
Note 3 - As stated above a further $10,000,000 loan for the dam wall project was taken out in 2011-12, and was fully drawn down by 7 September 2012. During the drawdown period, the interest rate is variable, with a fixed interest rate of 6.96% applying from the 7 September 2012, for a period of 10 years. The total loan is over a 30 year period, to be renegotiated after 10 years.
Note 4 – To ensure adequate and sustainable cash flows in Water and S64 Reserves, Yass Valley Council was required to take out a loan to fund the following projects in 2018/19. Pressure Pump System at Murrumbateman $175k. Yass to Murrumbateman WS Design and Easement $1.2m. Yass to Murrumbateman WS Construction $1,050k. Which is a total of $2.425m. This loan has an indicative fixed interest rate of 3.5% over 10 years.
Note 5 – To ensure adequate and sustainable cash flows in the Water S64 Reserves, Yass Valley Council was required to take out a loan to fund the 300mm Water main Ford to Demestre Street $925k. This loan has an indicative fixed rate of 3.5% over 10 years.
Note 6 – To ensure Yass Valley Council is able to meet future requirements, construction of a sewerage scheme has been undertaken for Murrumbateman village. The project was funded through loan (60%), grant (26%) and Sewer Fund reserves (14%). The loan will be serviced from the sewer rates and charges. This loan has a 20 year term. Interest rate is 4.82% pa fixed.
Note 7 – To ensure adequate and sustainable cash flows in the Sewer Reserves, Yass Valley
Council was required to take out loans to fund the following projects in 2018/19. Riverbank Park
SPS Generator installation $200k. Laidlaw St SPS upgrade $75k. Ford St SPS Generator design
$125k. This loan has an indicative fixed interest rate of 3.5% over 10 years.
Draft Operational Plan 2019/2020Operational Plan 2019/2020 61
2019/2020Fees and Charges
Draft Operational Plan 2019/2020Operational Plan 2019/2020 62
TYPE OF SERVICE BASIS FOR FEE
1. Public Good - Service provides a broad community benefit. Inconceivable or impractical to
charge for service on a user basis.
Zero Cost
Recovery
2. Practical Constraint - Service is a minor part of the overall operation of Council, or the
potential for revenue collection is so minor as to be outweighed by the costs of collection
Zero Cost
Recovery
3. Shared Benefits - Benefits from the provision of the service accrue to the community as a
whole as well as individual users (Community Service Obligation).
Partial Cost Recovery
4. Stimulus - A stimulus to the demand for the service is required. In the short term only part of
the cost of the service is to be recovered.
Partial Cost Recovery
5. Evasion - Charging prices to recover full cost may result in widespread evasion. Partial Cost Recovery
6. Equity - The service is targeted to low income users. Partial Cost Recovery
7. Economic - Service promotes or encourages local economic activity. Full Cost Recovery
8. Private Good - Service benefits particular users making a contribution to their individual
income, welfare or profits without any broader benefits to the community.
Full Cost Recovery
9. Monopoly - Council has a monopoly over the provision of the service and there are no
community service or equity obligations.
Full Cost Recovery
10. Developmental - Fee set will enable Council to develop and maintain a service Full Cost Recovery
11. Contribution - Charges levied to compensate community for an increase in demand for service
or facilities as a consequence of a development proposal.
Full Cost Recovery
12. Regulatory - Non-Fixed - Fee charged to cover cost incurred by legislative requirements where
no community service obligation exists.
Full Cost Recovery
13. Regulatory - Fixed - Fee fixed by legislation.
(Note: Prices are subject to change in accordance with advice from the relevant Minister)
Regulatory
14. Market - Service provided is in competition with that provided by another Council or agency
(private or public) and there is pressure to set a price which will attract adequate usage of the
service.
Reference Pricing
15. In-House - Service provided predominantly for Council use but sale to external markets will
defray costs.
Reference Pricing
16. Entrepreneurial - The service is a profit making activity and the price paid by users. Pricing
should recover an amount greater than the full cost of providing that service.
Rate of Return
17. Penalty - Fee charged is greater than the cost of the service so as to act as a Pricing
dis-incentive
Rate of Return
18. Annual Charges - Sections 496, 501 or 502 of the Act Regulatory
Pricing of Policy Code
INDEX
2582 Bus ....................................................................................... 19 Additional Marketing Opportunities............................................. 20 All Hire Facilities ........................................................................... 14 Amendment of an Approval to Carry Out an Activity ..................... 2 Animal Carcases and Offal ............................................................ 13 Animal Control .............................................................................. 10 Annual Non Residential Sewerage Charge (Minimum) ................. 12 Annual Residential Sewerage charge ............................................ 12 Annual Trade Waste Fee............................................................... 12 Application under Section 68 - Water Supply, Sewerage and
Stormwater Drainage Work – PART B ........................................ 1 Application under Section 68 - Community Land – PART D ............ 2 Application under Section 68 - Management of Waste – PART C .. 1 Application under Section 68 - Public Roads – PART E ................... 2 Application under Section 68 - Structures/Places of Public
Entertainment – PART A ............................................................ 1 Application under Section 68 Local Government Act 1993 ............ 1 Binalong Pool ................................................................................ 17 Building Certificate ......................................................................... 8 Building Classification ..................................................................... 8 Building Construction Certificates .................................................. 5 Building Inspections ........................................................................ 6 Building Occupation Certificate ...................................................... 6 Building Re-Inspection Fee ............................................................. 6 Business Waste Account Charge ................................................... 12 Business Waste Charge ................................................................. 13 Caravan Park ................................................................................. 16 Cemeteries ................................................................................... 11 Certificate Lodgement – Part 4A..................................................... 6 Community Event Charges ........................................................... 14 Complying Development Certificate ............................................... 3 Complying Development Registration ............................................ 3 Contaminated Recycling Bin Collection Fees ................................ 14 Council Documents ......................................................................... 1 Council Records Search .................................................................. 1 Designated Development ............................................................... 4 Development Application Notification / Advertising Fees .............. 4 Development Applications ............................................................. 4 Development Applications (Land-use and building) ....................... 4 Development Contributions ........................................................... 7 Development that requires Concurrence ....................................... 4 Dishonoured Debits ........................................................................ 1 Engineering Compliance Inspections (General) .............................. 6 Engineering Compliance Inspections (Subdivision) ........................ 6 Engineering Construction Certificate .............................................. 6 Exemption from Water Restrictions ............................................. 12 Fencing Inspection .......................................................................... 6 Food Premises ................................................................................ 3 Footpath Construction Costs ........................................................ 14 Government Information Public Access Act (GIPAA) ...................... 1 Gravel Royalties ............................................................................ 14 Hoarding Erection ........................................................................... 2 Home Maintenance (aged) ........................................................... 19 Home Modification ....................................................................... 19 Household Waste ......................................................................... 13 Impounded Articles ...................................................................... 11 Integrated Development ................................................................ 4 Interest Charge ............................................................................... 1 Kerb and Gutter Construction Costs ............................................. 14 Kerb Side Collection Domestic & Business ................................... 12 Map/Plan Sales ............................................................................. 10 Memorial Hall ............................................................................... 14 Mixed Waste ................................................................................. 13 Modification of a Development Consent ........................................ 5 Mortuary ........................................................................................ 3 Movie Screen ................................................................................ 15 Murrumbateman Equestrian Grounds ......................................... 15 Murrumbateman Recreation Reserve Grounds ........................... 15 National Disability Insurance Scheme (NDIS) Services ................. 19
Non Residential Sewer Usage Charge ........................................... 12 On-site Sewage Management System ........................................... 3 Other Charges ................................................................................. 9 Paper/Cardboard/Glass Collection................................................ 13 Parking Permits ............................................................................. 11 PART F – Other Activities ................................................................ 2 Plan Copying ................................................................................. 10 Planning Certificate ......................................................................... 8 Planning Proposals .......................................................................... 9 Plumbing and Drainage Diagrams ................................................... 2 Plumbing/Drainage ......................................................................... 3 Printing, Photocopying .................................................................... 1 Private Works ................................................................................ 14 Public & Environmental Health Compliance ................................... 3 Ranger Services ............................................................................. 10 Refund Requests ............................................................................. 1 Relocation of Second-hand Buildings .............................................. 8 Replacement Bins ......................................................................... 13 Request for Bonding of Subdivision Works ..................................... 7 Returned cheques ........................................................................... 1 Review of Decision to Reject an Application ................................... 5 Review of Determination ................................................................ 4 Review of Modification Application ................................................ 5 Road Closure Application ................................................................ 6 Road Closure Application – Council Roads ...................................... 7 Road Leases .................................................................................. 14 Road Opening Permit ...................................................................... 9 Road Restoration Fee .................................................................... 14 Road Works Permit (S138) ............................................................ 14 Rural Addressing Number ............................................................... 1 Sales .............................................................................................. 13 Section 603 Certificate .................................................................... 1 Separated Materials (Clean) ......................................................... 13 Septic Tanks, Effluent Disposal ..................................................... 12 Service Marketing Partner Benefits Package Fee .......................... 20 Sewerage Charges ......................................................................... 12 Sewerage Headworks.................................................................... 12 Sewerage Re-inspection Fee ......................................................... 12 Site Compatibility Certificate – Infrastructure .............................. 10 Site Compatibility Certificate – Seniors Housing ........................... 10 Skin Penetration Premises .............................................................. 3 Social Support & Respite ............................................................... 19 Sporting Fields and Ovals .............................................................. 17 Stadium ......................................................................................... 18 Stock Impounding ......................................................................... 10 Stormwater Improvement Charge ................................................ 12 Subdivision Certificate for Linen Registration ................................. 7 Sutton Hall .................................................................................... 15 Swimming Pools .............................................................................. 3 Temporary Accommodation ........................................................... 3 Tourism Guide Advertising ............................................................ 20 Trade Waste Usage Charge ........................................................... 12 Traffic Count ................................................................................. 14 Transport Fees (HLSS) ................................................................... 18 Tree Removal .................................................................................. 3 Tyres.............................................................................................. 13 Unoccupied Land Charge .............................................................. 12 Waste Management Environmental Charge ................................. 14 Water Availability Charge ............................................................. 11 Water Headworks Charges ........................................................... 11 Water Sales ................................................................................... 12 Water Supply ................................................................................ 11 Water Usage Charge ..................................................................... 11 Wee Jasper Hall ............................................................................. 15 Weed Management ........................................................................ 3 Yass and Murrumbateman Libraries ............................................. 18 Yass Community Centre ................................................................ 14 Yass Olympic Pool ......................................................................... 16 Yass Street Stall ............................................................................. 15
Working Together for our Community Page 1
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Section 603 Certificate Section 603 Certificate each N 13 $85.00
Returned cheques Fee for returned and disallowed cheques each N 9 $12.00
Dishonoured Debits Fee for direct debits disallowed where a manual reference is required by the bank.
each N 7 $12.00
Refund Requests Fee for refunding credit balances or overpayments on rates or water accounts
each N 17 $12.00
Interest Charge Interest rate payable on overdue rates and charges Percent (%) N 12 7.5%
Printing, Photocopying
B & W & Colour Photocopying, internet & computer printing (Paper quality to be approved by Council)
A4 Page per page Y
17
$0.50
A4 page (double sided) per page Y $0.80
A3 page per page Y $1.00
A3 page (double sided) per page Y $1.20
Government Information Public Access Act (GIPAA)
Formal Access Request each N
13
Set by IPC/GIPA
Processing Charge per hour N Set by IPC/GIPA
Council Documents Annual Report each Y
8
$60.00
Delivery Program & Operational Plan each Y $60.00
Community Strategic Plan each Y $60.00
Council Records Search Enquiries requiring a written reply or search of Council’s records
per hour or part thereof (minimum 1
hour)
N 8 $110.00
Administration Non-online processing admin fee for bookings per hour or part thereof (minimum 1
hour)
Y 17 $36.00
Rural Addressing Number Rural Addressing Number (new or replacement number)
per new lot created
Y 8 $120.00
Application under Section 68 Local Government Act 1993 PART A – Structures/Places of Public Entertainment
Approval to install a manufactured home, moveable dwelling or associated structure on land.
_
12
Refer Development Application Fees
PART B – Water Supply, Sewerage and Stormwater Drainage Work
Approval to carry out sewerage work. each N
12
$156.00
Approval to carry out stormwater drainage work. each N $156.00
Approval to carry out water supply work. each N $156.00
Approval to draw water from a Council water supply or a standpipe or sell water so drawn.
each N
$156.00
Approval to alter, disconnect or remove a meter connected to a service pipe. Separate fee shall apply for alter, disconnect or removal of meter.
each N $156.00
Approval to connect a private drain or sewer with a public drain or sewer under the control of Council or with a drain or sewer which connects with such a public drain or sewer. Connection expenses shall apply separately.
each N $156.00
PART C – Management of Waste
For fee or reward, transport waste over or under a public place.
each N
12
$156.00
Approval to place waste in a public place. each N $156.00
Approval to place a waste storage container in a public place
each N $156.00
Approval to dispose of waste into a sewer of the Council
each N $156.00
Trade Waste Application Processing Fee for Concurrence:
Classification A each N $260.00
Classification B each N $400.00
Classification C each N $600.00
Classification S Each N $260.00
Approval to install, construct or alter a waste treatment device, human waste storage facility or a drain connected to any such device or facility.
plus inspection fee
N $156.00
Working Together for our Community Page 2
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
PART D – Community Land Approval to engage in trade or business on community land.
per application N
12
$156.00
Approval to direct or procure a theatrical, musical or other entertainment for the public on community land.
per application N $156.00
Approval to construct a temporary enclosure for the purpose of entertainment on community land.
per application N $156.00
Approval to play a musical instrument or sing for a fee or reward on community land.
per application N $156.00
Approval to set up, operate or use a loudspeaker or a sound-amplifying device on community land.
per application N $156.00
Approval to deliver a public address or hold a religious service or public meeting on community land.
per application N $156.00
Approval to operate a public car park. per application N $156.00
Approval to operate a caravan park or camping ground.
per application/
per site (caravan
park)/ per site (camping ground)
N Refer Development Application Fees for new parts or $15.50/site (caravan park) $10.50/site (camping ground)
Approval to operate a Manufactured Home Estate. per application/
per site
N Refer Development Application Fees for new estates or $15.50/site (existing estates)
PART E – Public Roads Approval to swing or hoist goods across or over any part of a public road by means of a lift, hoist or tackle projecting over the footway
per application N
12
$156.00
Approval to expose or allow to be exposed (whether for sale or otherwise) any article in or on or so as to overhang any part of the road or outside a shop window or doorway abutting the road, or hang an article beneath an awning over the road
per application N $156.00
If part of an existing application or approval $0.00
PART F – Other Activities
Approval to install a domestic oil or solid fuel-heating appliance (other than a portable appliance).
plus inspection fee
N
12
$156.00
Approval to install or operate amusement devices. plus inspection fee
N $156.00
Approval to use a standing vehicle or any article for the purpose of selling any article in a public place.
per application N $156.00
Approval to carry out an activity prescribed by the regulations or an activity of a class or description prescribed by the regulations.
per application N $156.00
Approval to operate a public car park. per application N $156.00
Approval to operate a caravan park or camping ground.
per application/
per site (caravan
park)/ per site (camping ground)
N Refer Development Application Fees for new parts or $15.50/site (caravan park) $10.50/site (camping ground)
Approval to operate a Manufactured Home Estate. per application/
per site (existing estates)
N Refer Development Application Fees for new estates or $15.50/site (existing estates)
Amendment of an Approval to Carry Out an Activity
Fee for the amendment of an approval under Section 68 Local Government Act 1993.
each N 12 $78.00
Hoarding Erection Approval for hoardings per application N
12
$156.00
If part of an existing application or approval $0.00
Plumbing and Drainage Diagrams
Sewer Main Diagram per application N
12
$55.00
Sewer Service Diagram per hour or part thereof (minimum 1
hour)
N $110.00
Working Together for our Community Page 3
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Food Premises Inspection
Small Premises (1-5 FTE food handlers) per inspection N
12
$136.00
Medium Premises (6-10 FTE food handlers) per inspection N $209.00
Large Premises (11+ FTE food handlers) per inspection N $272.00
Pre –purchase Inspection/Advice per inspection N $136.00
Mobile Food Vendor (New) per inspection N $74.00
Mobile Food Vendor (Annual Inspection) per inspection N $74.00
Temporary Food Stalls (community events) per inspection N $41.00
Re-inspection per inspection N $74.00
Improvement Notice (infringement as per Act) Set by legislation. Price is subject to change
each N 13 $330.00
Skin Penetration Premises Inspection Set by legislation. Price is subject to change
per inspection N 13 $100.00
Weed Management Weed Certificate per certificate N
12
$154.00
Subdivision Inspections Per inspection/
per lot
Y $51.00
Public & Environmental Health Compliance
Inspection per inspection N 12 $136.00
Tree Removal Tree Removal application and inspection per application N 12 $113.00
On-site Sewage Management System
Approval to Operate (included in Rates Notice) per application N
12
$33.00
Inspection fees – to be applied only when improvement notices are issued for a poorly maintained system
per inspection N $146.00
Plumbing/Drainage Inspections where a Construction Certificate or Complying Development Certificate have not been issued by Council or a Private Certifier
per inspection N
12
$195.00
Permit per application N $156.00
Swimming Pools Inspection per inspection N 13
$150.00
Re-inspection per inspection N $100.00
Resuscitation Sign each N 12 $30.50
Mortuary Inspection per inspection N 12 $308.00
Temporary Accommodation Permit each N 12 $156.00
Complying Development Registration
Administration Fee each N 13 $36.00 Set by legislation. Price is subject to change.
Complying Development Certificate
Development up to $5,000 per certificate Y
12
$330.00
Development with a value between $5,001 to $100,000
per certificate Y $330.00 plus $0.60 per $100 in excess of $5,000
Development with a value between $100,001 to $250,000
per certificate Y $900 plus $0.50 per $100 in excess of $100,000
Development with a value between $250,001 and $500,000
per certificate Y $1,650 plus $0.41 per $100 in excess of $250,000
Development with a value of more than $500,000 per certificate Y $2,675 plus $0.60 per $100 in excess of $500,000
Complying Development Certificates for development which is outside of Council staff's category of accreditation under the provisions of the Building Professionals Act 2005
per certificate Y
Pass on all costs associated with engaging a suitably accredited certifier plus an facilitation fee of $120 per hour or part thereof
Modification application – Minor Internal layout changes only
per certificate Y
12
$71.00
Modification application – Minor internal/external/set out charges
per certificate Y 50% of the original CDC fee
Modification application – Major change per certificate Fee as per new complying development certificate application above
Working Together for our Community Page 4
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Development Applications (Land-use and building)
Dwelling houses with an estimated construction cost up to $100,000.00
per application N
13
$455.00
Development not involving building work, demolition or subdivision
per application N $285.00
Development applications for Advertisements per application N $285 plus $93 per advertisement in excess of 1
Development up to $5,000 per application
N $110.00
Development with a value between $5,001 and $50,000
per application N $170 plus $3 for each $1,000 (or part thereof) of the estimated cost
Development with a value between $50,001 and $250,000
per application N $352 plus $3.64 for each $1,000 (or part thereof) by which the estimated cost exceeds $50,000
Development with a value between $250,001 and $500,000
per application N $1,160 plus $2.34 for each $1,000 (or part thereof) by which the estimated cost exceeds $250,000
Development with a value between $500,001 and $1,000,000
per application N $1,745 plus $1.64 for each $1,000 (or part thereof) by which the estimated cost exceeds $500,000
Development with a value between $1,000,001 and $10,000,000
per application N $2,615 plus $1.44 for each $1,000 (or part thereof) by which the estimated cost exceeds $1,000,000
Development with a value more than $10,000,000 per application N $15,875 plus $1.19 for each $1,000 (or part thereof) by which the estimated costs exceeds $10,000,000
Development Applications (Subdivisions)
Subdivision of land (including boundary adjustment) involving the opening of a public road.
per application N
13
$665 plus $65 per additional allotment to be created
Subdivision of land (including boundary adjustment) not requiring the opening of a public road
per application N $330 plus $53 per additional allotment to be created
Strata Subdivision per application N $330 plus $65 per additional
allotment to be created
Designated Development Designated development as defined by the Environmental Planning and Assessment Act 1979
each N
13
Normal DA Fee plus $920
Integrated Development Integrated Development as defined by the Environmental Planning and Assessment Act 1979
each N Normal DA Fee plus $140, and $320 for each approval body
Development that requires Concurrence
Development which requires the concurrence of a Government Authority
per application N 13 Normal DA Fee plus $140, and $320 for each concurring authority
Development Application Notification / Advertising Fees
Neighbour Notification (mail out only) per application N
12
$61.50
Neighbour Notification (newspaper notice and mail out)
per application N $315.00
Development for which an environmental planning instrument or development control plan requires notice to be given
per application N
13
$1,105.00
Advertised Development per application N $1,105.00
Prohibited Development per application N $1,105.00
Designated Development per application N $2,220.00
Review of Determination Fee for request for a review of determination under Section 8.2 of the Environmental Planning and Assessment Act 1979:
Development up to $5,000 per application N
13
$55.00
Development not involving the erection of a building, the carrying out of work or demolition of a building
per application N 50% of the original DA Fee
Development that involves the erection of a dwelling house with a cost of construction less than $100,000
per application N $190.00
Development with a value between $5,001 and $250,000
per application N $85 plus $1.50 for each $1,000 (or part thereof) of the estimated cost
Working Together for our Community Page 5
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Development with a value between $250,001 and $500,000
per application N $500 plus $0.85 for each $1,000 (or part thereof) by which the estimated cost exceeds $250,000
Development with a value between $500,001 and $1,000,000
per application N $712 plus $0.50 for each $1,000 (or part thereof) by which the estimated cost exceeds $500,000
Development with a value between $1,000,001 and $10,000,000
per application N $987 plus $0.40 for each $1,000 (or part thereof) by which the estimated cost exceeds $1,000,000
Development with a value more than $10,000,000 per application N 13 $4,737, plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000.00
Review of Decision to Reject an Application
Estimated cost of development less than $100,000 N
13
$55.00
Estimated cost of development $100,000 or more and less than or equal to $1,000,000
N $150.00
Estimated cost of development more than $1,000,000
N $250.00
Modification of a Development Consent
Fee for the Modification of a Consent or Local Development or State Significant Development under Section 4.55(1) Environmental Planning and Assessment Act 1979 (Mistake or minor error)
N
13
$71.00
Fee for a modification of development consent under Section 4.55(1A) Environmental Planning and Assessment Act 1979. (Minimal Environmental Impact)
N $645 or 50% of the original fee, whichever is lesser
Fee for a modification of development consent under Section 4.55(2) Environmental Planning and Assessment Act 1979. (Other)
N
(a) if the fee for the original application was less than $100
50% of the fee for the original application applies
(b) if the fee for the original application was $100 or more:
and development does not involve building work, demolition or subdivision
N 50% of the fee for the original application applies
and development involves dwelling houses with an estimated construction cost up to $100,000 – a fee of $190 applies
per application N $190.00
and in the case of any other development application as per the following:
Development up to $5,000 per application N $55.00
Development with a value between $5,001 and $250,000
per application N $85 plus $1.50 for each $1,000 (or part thereof) of the estimated cost
Development with a value between $250,001 and $500,000
per application N $500 plus $0.85 for each $1,000 (or part thereof) by which the estimated cost exceeds $250,000
Development with a value between $500,001 and $1,000,000
per application N $712 plus $0.50 for each $1,000 (or part thereof) by which the estimated cost exceeds $500,000
Development with a value between $1,000,001 and $10,000,000
per application N $987 plus $0.40 for each $1,000 (or part thereof) by which the estimated cost exceeds $1,000,000
Development with a value more than $10,000,000
per application N $4,737 plus $0.27 for each $1,000 (or part thereof) by which the estimated costs exceeds $10,000,000
Review of Modification Application
Review of modification application under section 8.2(1)(b)
per application N 13 50% of the modification fee
Building Construction Certificates
Stating that work completed in accordance with specified plans and specifications will comply with the regulations to the EP&A Act in relation to building work:
12
Development up to $5,000 per certificate N $280.00
Working Together for our Community Page 6
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Development with a value between $5,001 and $100,000
per certificate N $280 plus $0.60 per $100 in excess of $5,000
Development with a value between $100,001 and $250,00
per certificate N $850 plus $0.50 per $100 in excess of $100,000
Development with a value between $250,001 and $500,000
per certificate N $1,600 plus $0.41 per $100 in excess of $250,000
Development with a value of more than $500,000 per certificate N $2,625 plus $0.60 per $100 in excess of $500,000
Construction Certificates for development which is outside of Council staffs category of accreditation under the provisions of the Building Professionals Act 2005
per certificate N Pass on all costs associated with engaging a suitably accredited certifier plus an facilitation fee of $120 per hour or part thereof
Modification application – Minor internal layout changes only
per certificate Y 12 $71.00
Modification application – Minor internal/external/set out changes
per certificate Y 12 50% of the original CC fee
Modification application – major change per certificate Y 12 Fee as per new construction
certificate application above
Building Inspections Building inspections required by Clause 162A of the EP&A Reg 2000 where Council issues a Construction Certificate or Complying Development Certificate.
per inspection Y
12
$195.00
Inspections where Council does not issue a Construction Certificate or Complying Development Certificate
per inspection Y $195.00
Same Day Inspection where 48 hours notice is not given for inspection
per inspection Y $345.00
Building Occupation Certificate
Interim Occupation Certificate per certificate Y
12
$150.00
Final Occupation Certificate authorising the occupation and use of part of a new building.
per certificate Y $150.00
Building Re-Inspection Fee Where re-inspection of work is required due to the work being incomplete or severely defective.
per inspection Y 17 $195.00
Fencing Inspection Fencing inspection per inspection Y 12 $275.00
PART 4A - Certificate Lodgement
Lodgement of
Complying Development Certificate;
each
N
13
$36.00
Construction Certificate; N $36.00
Occupation Certificate; or N $36.00
Subdivision Certificate (by Private Certifier) N $36.00
Engineering Construction Certificate
Stating that work completed in accordance with specified plans and specifications will comply with the regulations, the EP&A Act and Ausspec #1 in relation to public engineering work:
Development up to $5,000 per certificate N
12
$280.00
Development with a value between $5,001 and $100,000
per certificate N $280 plus $0.60 per $100 in excess of $5,000
Development with a value between $100,001 and $250,000
per certificate N $850 plus $0.50 per $100 in excess of $100,000
Development with a value between $250,001 and $500,000
per certificate N $1,600 plus $0.41 per $100 in excess of $250,000
Development with a value more than $500,000 per certificate N $2,625 plus $0.60 per $100 in excess of $500,000
Engineering Compliance Inspections (General)
Stating specified engineering work has been completed (Inspections)
per inspection N
12
$140.00
Where on behalf of the Crown
Engineering Compliance Inspections (Subdivision)
Stating specified subdivision work has been completed: where subject of a development consent or Complying Development Certificate
per inspection N 12 $240.00
Road Closure Application – Crown Roads
Request for Council to support by resolution an application for road closure of a Crown Road and forward related forms to the NSW Dept. of Trade and Investments (Crown Land)
per application N 12 $230.00
Working Together for our Community Page 7
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Road Closure Application – Council Roads
Request to Council to support by resolution an application for road closure of a Council Road and forward related forms to the NSW Dept. of Trade and Investment (Crown Lands). Fee includes fully, status report, public notification, review of submissions and objection, Council resolution, payment of Crown Land fees, detailed status report for Crown Land, survey plans, registration of plans with LPI etc
per application N 12 $5,500.00
Request for Bonding of Subdivision Works
Request for bonding of subdivision works – Administration Fee
per application N 12 $380.00
Subdivision Certificate for Linen Registration
Authorising the registration of a plan of subdivision for:
2-5 lots of land per certificate N
12
$530.00
more than 5 lots of land per certificate N $875.00
Draft Development Contributions
Proposed cost of development:
11
Up to and including $100,000 per application N Nil
More than $100,000 and up to and including $200,000
per application N
0.5 % of development cost
More than $200,000 per application N 1% of development cost
Draft Development Contributions – Heavy Haulage
Development generating heavy vehicle traffic on: per application
11
4.5c per tonne payload per kilometre
Sealed roads N
Unsealed roads per application N
11.25c per tonne payload per kilometre
Development Contributions Yass Town
Open Space each N
11
$2,707.00
Community Facilities each N $2,104.00
Traffic Management each N $1,926.00
Administration each N $748.00
Stormwater and Land Acquisition N Refer to Plan
Car Parking each N $10,531.00
Rural Roads each N $9,524.00
Gundaroo/Sutton
Open Space each N $2,707.00
Community Facilities each N $2,980.00
Traffic Management, Stormwater and Land Acquisition
N Refer to Plan
Administration each N $748.00
Murrumbateman (Village and Residential)
Open Space each N $2,712.00
Community Facilities each N $3,297.00
Traffic Management each N $887.00
Stormwater and Land Acquisition N Refer to Plan
Administration each N $742.00
Binalong
Open Space each N $1,877.00
Community Facilities each N $2,011.00
Traffic Management each N $2,135.00
Administration each N $742.00
Stormwater and Land Acquisition each N Refer to Plan
Bowning
Open Space each N
11
$1,877.00
Community Facilities each N $2,011.00
Traffic Management each N $2,168.00
Administration each N $742.00
Stormwater and Land Acquisition each Refer to Plan
Bookham & Wee Jasper
Open space each N $1,877.00
Community Facilities each N $2,011.00
Working Together for our Community Page 8
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Administration each N $742.00
Stormwater and Land Acquisition each Refer to Plan
Rural Areas and Rural Residential (excl. village and Small Lot Zones)
Murrumbateman
Rural Roads each N $19,899.00
Community Facilities each N $1,516.00
Administration each N $732.00
Gundaroo, Sutton and Wallaroo
Rural Roads N Refer to Plan
Community Facilities each N $1,516.00
Administration each N $732.00
Coolalie, Good Hope, Binalong, Bowning, Wee Jasper, Precincts
Rural Roads each N $9,523.00
Community Facilities each N $1,516.00
Administration each N $732.00
Building Certificate Class 1 building (together with any Class 10 buildings on the site) or a Class 10 building
N
13
$250 for each dwelling contained in the building or in any other building on the lot. Where any additional inspection is required prior to the issue of the building certificate an additional fee of $90 applies
Additional fee for an application for a building certificate
N The maximum fee applicable to the lodgement of a combined Development Consent & Construction Certificate application or a Complying Development Certificate application immediately prior to the lodgement of the building certificate application
Where a development consent, complying developing certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained
13
Additional fee for an application for a building certificate for other classes of building:
Not exceeding 200 m2 N $250.00
Exceeding 200 m2 but not exceeding 2,000 m2 N $250 plus an additional $0.50 per m2 over 200m2
Exceeding 2,000 m2 N $1,165 plus an additional $0.075 per m2 over 2,000m2
Copy of Building Certificate N $13.00
Building Classification Stating a building has a specified (BCA) classification.
N
12
$110.00
Stating a proposed building has a specified (BCA) classification.
N $110.00
Planning Certificate Planning Certificate issued under section 10.7(2) of the EP&A Act 1979
N
13
$53.00
Certificate issued under section 10.7(5) of the EP&A Act 1979
N $133.00
Relocation of Second-hand Buildings
Inspection fee (Fee applicable unless Building Inspection Report is provided).
N
12
$195+ $120/ hour if outside LGA boundary
Bond
N $10,000.00
Working Together for our Community Page 9
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Planning Proposals
Mapping or instrument errors or updates to property description
N
12
Nil
Application /Request for Council consideration of Planning Proposal
N $2,040.00
Post Gateway processing Minor Planning Proposal (e.g. low impact, site specific amendment, minimal assessment required)
N $8,160.00
Post Gateway processing Major Planning Proposal
(e.g. more detailed assessment and agency
consultation required)
N $18,360.00
Post Gateway processing Complex Planning
Proposal
(e.g. urban release areas with complex servicing
arrangements, significant consultation with
agencies or stakeholders)
N 8 $38,000.00
Planning Proposals under Division 3.5 of the EP&A
Act
Y 8 Normal DA Fee plus Planning Proposal Fee *No separate notification/ advertising fee payable
Additional costs incurred by Council in undertaking
studies, peer reviews, public hearings, obtaining
legal advice or drafting agreements for a Planning
Proposal
Y 8 By quotation after assessment
Road Opening Permit Road Opening Permit and Inspection Fee N 12 $195.00
Other Charges Fee for a certified copy of a document, map or plan held by the Council in accordance with Clause 150 (2) of the Act
N 13 $55.00
Variation of Restriction – “as to User” N
12
$167* plus Development Application notification fee
Outstanding Notices Letter N $89.00
Stamping of an additional plan and specification for each copy after four
N $41.00
Provision of any written information in relation to a town planning, building, environmental health or engineering enquiry including existing holding and dwelling entitlement searches
N $341.00
Plan First Levy N 13 For each development
application lodged with a consent authority for development referred to in clause 246(1) having an estimated cost exceeding $50,000, an amount calculated as follows is to be set aside for payment to the Director General for the services referred to in clause 245AA(2)(g), (h) and (i):
P=
--5 where:
13
P represents the amount to be set aside, expressed in dollars rounded down to the nearest dollar, and
E represents the estimated cost of the development, expressed in dollars rounded up to the nearest thousand dollars.
Working Together for our Community Page 10
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Map/Plan Sales Includes: Printed Data
LEP Maps A0 each N
9
$185.00
Aerial Photography A1 each N $164.00
Contour Maps A2 each N $154.00
Topographic Maps A3 Each N 14 $123.00
Deposited Plans A4 each N
9
$108.00
Digital Data each N $118.00
LGA Road Maps
A0 each N $154.00
A2 each N $144.00
Other Data and Graphic Requests N $110 per hour or part thereof. Min 1 hour
Plan Copying A2 each N
14
$21.00
A1 each N $31.00
Larger than A1 each N $41.00
Site Compatibility Certificate – Infrastructure
Application to Secretary of Department of Planning & Environment for Site Compatibility Certificate
N 13 $265 plus $265 per hectare or part thereof. Note: Max fee is not to exceed $5,000
Site Compatibility Certificate – Seniors Housing
Application to Secretary of Department of Planning & Environment for Site Compatibility Certificate
N 13 $265 plus $42 per bed (residential care facility) or $42 per dwelling (any other case). Note: Max. fee not to exceed $5,000
Animal Control Enitre Animal Lifetime registration (over 6 months) – not desexed each N
13
*Set by Legislation and are subject to change $210.00*
Pensioners - Desexed Animal (lifetime fee) each N $25.00*
Desexed Animal (lifetime fee) each N $58.00*
Young Animal (puppy up to 6 months) (kitten up to 4 months) each N $58.00*
Additional fee for animal not desexed by required aged each N $152.00*
Animal belonging to registered Breeders per Animal (lifetime fee)
each N $58.00*
Desexed purchased from RSPCA/Council pound each N $29.00*
Late fee if registration not paid 28 days after the date which the animal is required to be registered
each N
$16.00*
Release Fee/dog – Not Dangerous or Restricted (No release on weekends)
12
First Day N $36.00
Second day N $26.00
Everyday thereafter N $21.00
Dangerous Dog Collar each Y As per cost
Microchip Dog Fee each Y As per veterinary fee
Surrender of dog each N $62.00
Compliance Certificate–Dangerous/Restricted Dog Enclosure
Each N 13
$150.00*
Ranger Services Call Out Fee per hour or part thereof min 1 hour
N
12
$125.00
Stock Impounding Collection Fees N As charged by collector
Ranger attendance – sustenance and welfare per hour of part thereof min 1 hour
Y $52.00
Sheep per head N $30 for first animal and $3 per head thereafter and collection fee
Sustenance Fee
Horse & Cattle per head/per day
N $35.00
Sheep per head/per day
N $12.00
Pig per head/per day
N $12.00
Working Together for our Community Page 11
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Goat per head/per day
N $12.00
Pound Fees- For each advertisement per advert N Actual cost
Parking Permits Special Vehicle Permit
per space/per day
N 12 $35.00
Impounded Articles Impounded Vehicles per vehicle N
12
$343.00
Impounded Vehicles storage fee per day N $31.00
Vehicle recovery per vehicle N Actual collection cost
Impounded Articles per article N $ 41.00
Cemeteries Reservation Fee/Plot, perpetual maintenance (ROB)
each Y
14
$1,335.00
Grave Digging/reopen ROB issued prior to 1/7/2018*
each Y $1,975.00
Grave Digging/reopen where ROB issued post 1/7/2018*
each Y $1,255.00
Grave digging - children (up to 5 years of age) * each N $410.00
Double depth digging each Y $195.00
A/H burials by arrangement each Y $595.00
* Additional fee for A/H burials (as above)
Monument Erection Lodgement Fee (where applicable & non refundable)
each Y $52.00
Cemeteries where applicable Columbarium/Memorial Gardens Plot/ Reservation each Y 14 $210.00
Water Availability Charge Yass Water Supply
Yass/Bowning/Binalong & rural lands connected to water main
each N
18
$480.00
20 mm to 32 mm water meter
40 mm each N $750.00
50 mm each N $1,170.00
80 mm each N $2,997.00
100 mm each N $4,682.00
150 mm each N $10,534.00
Churches (20 mm – 32 mm) each N $240.00
Murrumbateman – 20 – 32 mm diameter water meter
each N $360.00
Note: All other Murrumbateman availability charges will be at 75% of Yass Water Supply charges
Water Usage Charge Usage charge per KL (where availability charge is levied)
Tariff 1 per kilolitre N
18
$3.40
Tariff 2 - trigger - over 5 kilolitres per day
(averaged on each billing cycle) per kilolitre N $4.50
Water Headworks Charges Yass Town Water Supply per ET each N
11
$14,035.00
Hamilton Rise Sub Division per ET each N $22,005.00
Rural Water Supply N
Yass, Bowning and Binalong per ET each N $14,035.00
Murrumbateman per ET each N $22,370.00
Water Supply Special Reading each N
8
$80.00
Water Connection Fee (if water main is available in front of property - excludes water meter)
(a) Short water services (19 mm diameter) (no road crossing)
each N $2,000.00
(b) Long water service (25 mm diameter) (across the road)
each N $2,970.00
Water Connection Fee (no water main in front of property)
N Full cost
Water Meter Reading Checking each N $80.00
Water Meter Testing each N $200.00
Hydrant Pressure Measurement and Flow Analysis
each $330.00
Working Together for our Community Page 12
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
New Water Meter (requested by customer)
(a) 20 mm diameter each N $245.00
(b) 25 mm diameter each N $340.00
Installation and removal of flow restrictors each N
12
$200.00
Disconnection or reconnection of water supply (Separate fee shall apply for approvals.
each N $340.00
Water Sales Draw water from a Council water supply or a stand pipe
per kilolitre N
8
$4.20
Water stand pipe Avdata Key each N $70.00
Locating Water and Sewer Services per hour or part thereof min 1 hour
N $154.00
Exemption from Water Restrictions
Application for exemption from water restrictions
each N 8 $50.00
Septic Tanks, Effluent Disposal Septic Waste Dumping
Business Hours per kilolitre N
8
$6.00
Minimum Charge each N $120.00
After hours & weekends per kilolitre N $12.00
Minimum Charge each N $240.00
Sewerage Charges Connect a private drain or sewer with a public drain or sewer
N 12 At Cost
Sewerage Headworks Yass per ET each N
11
$6,502.00
Hamilton Rise Sub Division per ET each N $9,677.00
Murrumbateman per ET each N $16,531.00
Sewerage Re-inspection Fee Re-Inspection Note: Where re-inspection of work is required due to it being incomplete or defective a re-inspection fee will apply over and above the fees quoted for the work.
each N 17 $195.00
Annual Residential Sewerage charge
per year N 18 $700.00
Annual Non Residential Sewerage Charge (Minimum)
Charge - higher charges shall apply for larger water service connection. (Minimum charge)
per year N
18
$700.00
Churches per year N $350.00
Non Residential Sewer Usage Charge
Non Residential Sewer Usage Charge per kilolitre N 18 $3.00
Annual Liquid Trade Waste Fee
Annual Liquid Trade Waste Fee (water usage <1000 kL)
per year N
18
$100.00
Annual Liquid Trade Waste Fee (water usage 1001- 2000 kL)
per year N $187. 00
Annual Liquid Trade Waste Fee (water usage 2001 - 3000 kL)
per year N $312.00
Annual Liquid Trade Waste Fee (water usage 3001 - 4000 kL)
per year N $436.00
Annual Liquid Trade Waste Fee (water usage 4001 - 5000 kL l)
per year N
$561.00
Annual Liquid Trade Waste Fee (water usage > 5000 kL)
per year N $780.00
Trade Waste Usage Charge With appropriate pre treatment per kilolitre N 18
$2.10
Without pre treatment per kilolitre N $17.00
Stormwater Improvement Charge
Yass - occupied residential and business land each N 18 $25.00
Kerb Side Collection Domestic & Business
140Lt grey garbage bin – weekly collection 240Lt green recycling bun - fortnightly collection
per year N
18
$397.00
Additional service to above
140Lt grey garbage bin – weekly collection per year N 264.00
240Lt green recycling – fortnightly collection per year N 133.00
Unoccupied Land Charge Domestic Waste Management unoccupied land charge
each N 18 $30.00
Account Charge Minimum charge for monthly business waste transfer Station accounts
each Y $21.00
Working Together for our Community Page 13
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Household Waste Wheelie Bin General Waste - <140 L each Y
8
$6.00
SMALL (up to sedan boot) each Y $13.00
MEDIUM (Small trailer, twin cab ute) each Y $21.00
LARGE (Ute & trailer max height 450mm each Y $37.00
Small Truck Side boards up to 300mm sideboard each Y $69.00
Small Truck Side boards up to 600mm sideboard each Y $138.00
Small Truck Side boards up to 900mm sideboard each Y $207.00
Mixed Waste Commercial/Industrial and Building Waste (non hazardous)
each m3 Y
8
$105.00
(Yass & M/bateman TS up to 4 m3, not accepted at Village TS)
Commercial Compacted tonne Y $167.00
Separated Materials (Clean) Green Organic/ natural Timber waste Utility/trailer (1/2 load)
each Y
5
$6.00
Utility/trailer (level load) each Y $12.00
Mattresses each Y
8
$27.00
Whitegoods/Electrical (microwaves, household ovens, washing machines)
each Y $7.00
Fridge/Freezer (de-gas cert) each Y $7.00
Fridge/Freezer (non de-gassed) each Y $27.00
Computers & TVs (Free Disposal) each Y
$0
Other E-waste each Y $10.00
Car Body each Y $27.00
Scrap Metal m3 Y $12.00
Sorted building Timber Waste, timber furniture, partial board
m3 Y $55.00
Tree branches > 300mm m3 Y $45.00
Tree Stumps m3 Y $65.00
Concrete/Brick/Tiles – No steel reo in small blocks (Separated)
m3 Y $80.00
Concrete – small blocks including steel reinforcement
m3 Y $105.00
Tyres Car each Y
8
$8.00
Light Truck each Y $9.00
Medium Truck each Y $14.00
Tractor each Y $40.00
Earth Moving Tyres each Y $125.00
Large Earth Moving Tyres each Y $235.00
Animal Carcases and Offal Small (Cat or Small Dog) each Y 8
$6.00
Medium (Sheep/alpaca/Dog) each Y $16.00
Sales Mulch m3 Y 4 $8.00
Paper/Cardboard/Glass Collection
Yass, Murrumbateman and Bowning including Public Holidays Collections
8
240 Litre Bin/Collection each Y $10.50
660 Litre Bin/Collection each Y $16.50
1100 Litre Bin/Collection each Y $23.50
Recyclable material at transfer station
Business Waste Charge Commercial Bins (1,100 litre bin) per collection Y
8
$36.00
Commercial Bins (660 litre bin) per collection Y $31.00
Business (240 litre bins) per collection Y $18.50
Y
Replacement Bins 240 litre bin – Recycling Bin each Y
8
$87.00
140 litre bin – Garbage Bin each Y $72.00
Working Together for our Community Page 14
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Community Event Charges Bin hire - Maximum 40x 240L bins available includes delivery, collection and waste disposal (1 service)
per bin Y
8
$10.50
Additional emptying of bins per hour or part thereof (min 1 hour)
Y $185.00
1100L skip bin per bin Y $36.00
Contaminated Recycling Bin Collection Fees
1st offence - Warning Notice
8
Warning Notice
2nd offence – if requested to empty contaminated bin
each Y $44.00
3rd offence – if requested to empty contaminated bin
each Y $100.00
Waste Management Environmental Charge
On all Rateable Properties each Y 18 $120.00
Road Restoration Fee Road Restoration Fee
8
Paved (bitumen or concrete) (min charge $500)
m2 N $360.00
Unpaved (gravel, earth, grass) (min charge $300)
m2 N $140.00
Road Works Permit (S138) Application to undertake works within the road reserve (excluding road openings) (Not applicable to public utility providers)
per application N 8 $180.00
Private Works Other Works
Undertake works on private property Associated with Special Events
N 14 Price on application
Traffic Count Undertake traffic count/classifying and provide data (requests from consultants to undertake specific traffic counts – providing existing data is covered by ‘Council Record Search’).
per traffic counter/
classifier per week including
associated reporting
N
8
$640.00
Road Leases <0.05 ha per annum Y
8
$110.00
0.05 to 0.5 ha per annum Y $200.00
0.5 ha to 4.5 ha per annum $335.00
>4.5 ha per annum Y $335.00 $335.00 plus $55.00 per Ha (pro rata) above 4-5 Ha
Gravel Royalties Gravel Royalties m3 Y 8 $3.30
Kerb and Gutter Construction Costs
Full Cost per metre N 8 $210.00
Half Cost (frontage) per metre N 3
$105.00
Quarter Cost (sideage) per metre N $52.50
Urban Gutter Crossing Construction (up to 5 m. long)
each N 8 $950.00
Footpath Construction Costs Concrete Footpath m2 N 8 $100.00
All Hire Facilities (Subject to waiver)
Bond per booking N
3
$1,000.00
Key and Cleaning Deposit per booking Y $250.00
Garbage Collection Deposit per booking Y $ 480.00
Yass Community Centre Per Hour or part thereof min 1 hour
Y
3
$13.00
Per day
per day Y $65.00
Memorial Hall Full Hire of Memorial hall – per day per day Y
3
$205.00
Yass Rotary Club - Rotary Markets per day Y 25% off full hall hire
Yass Music Club – set up and pack up chairs per event Y $30.00
Kitchen Annex and meeting room
Per hour per hour or part thereof (min 1 hour)
Y $21.00
Per day
per day Y $103.00
Working Together for our Community Page 15
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Upstairs Meeting Room
Per hour per hour or part thereof (min 1 hour)
Y $21.00
Per day per day Y $103.00
Schools exempt (for all locally organised events)
Movie Screen Indoor/Outdoor inflatable movie screen and speakers
per day Y 3 $200.00
Yass Street Stall Booking Fee per day Y 3 $7.00
Murrumbateman Recreation Hall
Main Hall including kitchen
3
Per hour (min of 1 hour or part thereof) per hour Y $17.00
Per day per day Y $85.00
Meeting Room
Per hour (min of 1 hour or part thereof) per hour Y $11.00
Per day per day Y $55.00
Whole Hall
Per hour (min of 1 hour or part thereof) per hour Y $27.00
Per day per day Y $135.00
Murrumbateman Markets (up to 26 uses of the village green and pavilion)
per year Y 8
$1050.00
Entire Complex
Major Events/Field Days per event Y 3
$3,180.00
Registered Charity or Not for Profit Group† per day Y $325.00
Commercial or Private Use per day Y 8 $1,000.00
Murrumbateman Equestrian Grounds
Equestrian Area
Ring 1
Hourly (unavailable)
per Hour
3
Unavailable
Morning (up until 12pm) per session $160.00
Afternoon (after 12pm) per session $160.00
Ring 2
Hourly (weekends on approval only)
per hour
3
$20.00
Morning (up until 12pm) per Session $100.00
Afternoon (after 12pm) Per session $100.00
Ring 3
Hourly (weekends on approval only)
per hour
3
$10.00
Morning (up until 12pm) per session $50.00
Afternoon (after 12pm) per session $50.00
Southern Sand Arena and/or adjoining Paddock Areas (Available for private use)
Hourly (min 1 hour) hourly Y $10.00
Daily daily y $50.00
Event hire per paddock Section 2 (see map) per day/per section
Y
8
$48.00
Event hire per paddock Section 3 (see map) per day/per section
Y $48.00
Event clean up maintenance fee applicable where arenas/grounds are not left in acceptable state
per hour or part thereof (min 1 hour)
Y $80.00
Sutton Hall Hire Ree
Per hour per hour or part thereof (min 1 hour)
Y
3
$12.00
Per day per day Y $135.00
Wee Jasper Hall (Administered by Wee Jasper Community Association)
Hire Fee
3
Not for profit per day Y $52.00
Local use of Hall donation per day Y $52.00
Private Function per day Y $210.00
Commercial Function per day Y 8
$315.00
Cleaning per day Y $165.00
Working Together for our Community Page 16
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Caravan Park Caravan Park Fees
Long Term Cabin - 1 person per week Y
14
$202.00
each additional person per week Y $23.00
Permanent Caravan Site two people per week Y $121.00
each additional person per week Y $23.00
Powered site (inc. two people ) per night Y $33.00
Pensioner Rate Weekly Rate 7th night no charge
per night Y $29.00
each additional person per person/ per night
Y $11.00
children under 16 yrs per person/
per night Y
$5.00
Greater than 8 days stay on powered site electricity Charge
per day Y $6.00
Unpowered site for Caravans (inc. two people ) - Pensioner Rate
per night
Y $29.00
Weekly Rate 7th night no charge Per night Y $24.00
- each additional person
per person /per night
Y $11.00
- children under 16 yrs per person/ per night
Y $5.00
Worker Cabin ensuite- Limit two people (inc. linen) per night weekly
Y $56.00
Weekly rate inc Linen & 1 service p/week per night weekly
Y $250.00
Worker Cabin no ensuite- 2 people (inc. linen) (cap 4 people)*
per night for 2 people
Y $46.00
Weekly rate inc Linen & 1 service p/week* weekly for 2 people
Y $205.00
Additional person per night Y $11.00
Includes linen and 1 clean per week
Ensuite Cabins – Tourist Cabin – two people (inc. linen) (cabin capacity 4 person)
per night Y $99.00
- Each additional person per night Y $11.00
- Children under 16 yrs per night Y $5.00
Ensuite Cabin – tourist cabin – two people (inc linen)
weekly for 2 people
Y $438.00
Front Loader Washing Machine per load Y $5.00
Dryers per cycle Y $4.00
Linen Hire per person/ per night
Y $16.00
Yass Olympic Pool Entrance to Yass & Binalong Pools
Entrance
Adults each Y
3
$5.00
Children each Y $4.00
Aged Pensioners each Y $4.00
Pre School children and onlookers admission each Y $1.00
School groups per student each Y $1.50
Disabled Pension Card holder & carer FREE
Season Tickets
Family per season Y $210.00
Adults per season Y $138.00
Children per season Y $108.00
Aged Pensioners per season Y $108.00
Pensioner Family per season Y $160.00
Replacement Card
each Y $6.00
Working Together for our Community Page 17
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Pool Lane Hire Commercial Lane Hire per lane/hour Y $11.00
Not For Profit Hire per person/ day
Y $0.50
YVC Swimming (Intermediate/stroke correction) 1st child consecutive
children Y
14
$143.00 $123.00
YVC Swimming (competitive training) per child Y $256.00
Swimming Lessons – 5 lessons (Yass & Binalong Pools)
each Y $72.00
Aqua Fitness
Season ticket holder
Pensioner including entry
Non-season ticket holder + entry fee
each Y $5.50 $5.50 $8.50
Binalong Pool Only Entrance
Adults each Y
3
$5.00
Children each Y $4.00
Aged Pensioners each Y $4.00
Pre School children and onlookers admission each Y $1.00
School groups per student each Y $1.50
Season Tickets
Family per season Y $123.00
Adults per season Y $77.00
Children per season Y $67.00
Aged Pensioners per season Y $67.00
Pensioner Family per season Y $113.00
Commercial Lane Hire per lane/hour Y $6.50
Not for Profit Hire per person/
day Y $0.50
Annual Hire Fees Sporting Fields and Ovals (Sports group conditions are as per usage agreements)
Sportsground Booking Fee - Casual Users (Schools exempt)
per event per day
Y 2 $145.00
Yass United Rugby League per year Y
3
$1,800.00
Australian Rules (Yass) per year Y $2,250.00
Australian Rules (Murrumbateman) Per year Y $800.00
Yass Rams Rugby Union (includes juniors) per year Y $2,610.00
Senior Cricket per year Y $2,440.00
Senior Netball per year Y $1,255.00
Touch Football per year Y $3,760.00 Yass Junior Rugby League per year Y $2,120.00
Binalong RLFC per year Y $550.00
Yass Little Athletics per year Y $330.00
Murrumbateman Little Athletics per year Y $320.00
Basketball per year Y $1900.00
Soccer per year Y $3,640.00
Murrumbateman Adult Riders annual fee per year $700.00
Murrumbateman Pony Club annual fee per year $800.00
Sutton Tennis Court - Commercial Hire (per court)
per hour or part thereof (min 1 hour)
Y $12.00
Casual power usage (per site) per site/ per 4 hours
Y
7
$5.00
Hire of open space (Banjo Paterson or Riverbank Park) for community events
Per day Y $60.00
Working Together for our Community Page 18
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Stadium Hire Fee
Per hour per hour or part thereof
(min 1 hour)
Y
3
$28.00
Per day per day Y $138.00
Yass and Murrumbateman Libraries
Temporary borrower N 5 $11.00
Replacement library card each N
8
$4.00
Inter Library Loans Min Charge (not refundable admin Charge)
non refundable
admin charge
Y $5.50
may also be charged by supplying institution
Y $16.50
Library Bags each Y $2.00
Overdue Books per week N $1.00
Maximum charge per item N $5.00
Lost/Damaged Books per item N *Replacement cost as listed on catalogue record of item + $5 admin fee
Book Club Membership per club Y $100.00
Programs and Activities- Mini Music, Lego Club etc Y Nominal donation to be
determined by Director
Laminating
-A4 sized document per page Y $3.00
-A3 sized document per page Y $5.00
Scanning
Scan to email (self-serve) per scan Y $1.00
Book Sale
-Hardcover books per item Y $5.00
-Paperbacks per item Y $3.00
-Children’s picture books per item Y $1.00
-DVDs & CDs per item Y $1.00
-Magazines Per item
pr 3 items Y $0.50
$1.00
Transport Fees (HLSS) Standard Fees
Up to 20km per trip N
3
$18.00
20 – 50km per trip N $20.00
50-80km per trip N $31.00
Over 80km per trip N $33.00
Over 100km per trip N $38.00
Part Pensioner Discounted Fees
Up to 20km per trip N
3
$16.00
20-50km per trip N $18.00
50-80km per trip N $29.00
Over 80km per trip N $31.00
Over 100km
per trip N $36.00
Full Pensioner Discount Fees
Up to 20km per trip N $14.00
20-50km per trip N $16.00
50-80km per trip N $26.00
Over 80km per trip N $29.00
Over 100km
per trip N $34.00
Working Together for our Community Page 19
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Series of appointments to Canberra, usually to undergo radiotherapy or chemotherapy
Fees negotiated
according to individual
circumstances
6
Transport contributions are
GST Free
NEHRT fees are set on a per
km basis and increase each
year by 2.5% or $1 per trip,
whichever is the higher –
see HLSS-OP-26 Fees.
Transport provided on a Full Cost Recovery basis per kilometre N 16
$0.78 plus $48.40 per hour or part thereof
2582 Bus Single trip – standard each N
6
$6.00
Single trip – pensioner each N $4.00
All day ticket – standard each N $10.00
All day ticket – pensioner each N $9.00
Social Support & Respite Standard – Individual per hour or part thereof (min 1 hour)
N 3
$17.50
Part Pensioner – Individual per hour or part thereof (min 1 hour)
N
$15.50
Pensioner – Individual per hour or part thereof (min 1 hour)
N $13.50
Standard – Group each N $17.50
Part Pensioner – Group each N $15.50
Pensioner – Group each N $13.50
Home Modification (aged) Home Modification (subsidised by contribution from Commonwealth Govt) Subject to funding.
N 3 35% of cost of services (labour, materials and travel
Home Maintenance (aged) Home Maintenance (subsidised by contribution from Commonwealth Govt) Subject to funding.
N 3 35% of cost of services (labour, materials and travel)
National Disability Insurance Scheme (NDIS) Services
NDIS Participants: HLSS provides a range of supports including, but not limited to, assisting with personal care, household tasks, community participation, developing life skills, group and personal activities.Support delivery is flexible and tailored to meet the needs of the Participant. Quotes provided on request.
N 16 https://www.ndis.gov.au/providers/price-guides-and-information
Community YVHLSS and Brokerage Services
Home Maintenance, Respite Care, Social Support, Domestic Assistance, Personal Care provided on a full cost recovery basis
8
Monday – Friday: 6am to 6pm per hour or
part thereof (min 1 hour)
Y $50.00
Monday – Friday: 6pm to 10pm per hour or
part thereof (min 1 hour)
Y $62.00
Monday – Thursday: Overnight service Y $136.00
Saturday: 6am to 6pm per hour or
part thereof (min 1 hour)
Y $62.00
Saturday: 6pm to 10pm per hour or
part thereof (min 1 hour)
Y $78.00
Friday – Saturday: Overnight service Y $147.00
Sunday: 6am to 6pm per hour or part thereof (min 1 hour)
Y $75.00
Sunday: 6pm to 10pm per hour or
part thereof (min 1 hour)
Y $93.00
Sunday: Overnight service Y $147.00
Public Holiday: 6am to 6pm per hour or
part thereof (min 1 hour)
Y $75.00
Working Together for our Community Page 20
ACTIVITY/FUNCTION DETAIL OF FEE/CHARGE Per GST PRICING
CODE 2019/20 FEE or CHARGE
(incl GST)
Public Holiday: 6pm to 10pm per hour or
part thereof (min 1 hour)
Y $93.00
Public Holiday: Overnight service Y $147.00
Compulsory WHS Assessment of a person unknown to YVHLSS
service Y $50.00 (once only fee)
Tourism Guide Advertising Based on A4 guide full colour
7
1/12 page each Y $480.00
Tourism Guide Advertising 1/6 page each Y $770.00
Tourism Guide Advertising 1/3 page each Y $1,320.00
Tourism Guide Advertising 1/2 page each Y $1,780.00
Tourism Guide Advertising 2/3 page each Y $2,195.00
Tourism Guide Advertising Full page each Y $2,975.00
Tourism Guide Advertising Cover page (inside front/back) each Y $3,485.00
Tourism Guide Advertising Cover page – outside back each Y $4,000.00
Fee for Service Marketing Partner Benefits Package
Tourism Partner (included with guide advertising) from Y
7
$480.00
Business Supporter each Y $155.00
Friends of Tourism each Y $80.00
Additional Marketing Opportunities
Website tile advertising per month Y
7
$155.00
E-News advertising and feature story per issue Y $155.00
Product display at VIC per month Y $155.00
VIC – Meeting room Hire (hr) per hour or part thereof (min 1 hour)
Y $25.00
VIC - Meeting Room Hire (½ day = 3 hours) each Y $55.00
VIC - Meeting Room Hire (day = 6 hours) per day Y $85.00
Event Marketing Campaign Package Per unit Y $500.00
(Note: Pricing Code 13 - Prices are subject to change in accordance with advice from the relevant Minister)
2019/2020
Annual Budget I
ncreasing rates in accordance wit
Draft Operational Plan 2019/2020Operational Plan 2019/2020 85
EXPENDITURE BY TYPE
SOURCES OF REVENUE
Rates & Annual Charges
43%
User Charges & Fees14%
Interest & investment revenue
1%
Other revenues2%
Grants & contributions for
operating purposes14%
Grants & contributions for capital purposes
26%
Employee benefits & costs
42%
Borrowing costs5%
Materials & contracts
19%
Depreciation & amortisation
21%
Impairment0%
Other expenses13%
Draft Operational Plan 2019/2020Operational Plan 2019/2020 86
$ '000 2020 2020 2020 2020 2020 2020
TOTAL
Proposed
Budget
Our
Environment
Proposed
Budget
Our Economy
Proposed
Budget
Our
Community
Proposed
Budget
Our
Infrastructure
Proposed
Budget
Our Civic
Leadership
Proposed
BudgetIncome from Continuing Operations
Revenue:
Rates & annual charges 17,355 130 - - 6,476 10,749
User charges & fees 5,713 190 913 355 4,186 67
Interest & investment revenue 583 20 - - 119 444
Other revenues 839 18 - 6 713 102
Grants & contributions for operating purposes 5,759 102 5 430 3,582 1,640
Grants & contributions for capital purposes 10,433 450 - - 9,983 -
Other Income:
Net gains from disposal of assets - - - - - -
Net share of interests in joint ventures - - - - - -
TOTAL INCOME FROM CONTINUING OPERATIONS 40,682 910 918 791 25,059 13,002
Expenses from Continuing Operations
Employee benefits & costs 11,773 1,183 1,225 582 6,051 2,732
Borrowing costs 1,329 - - - 1,275 54
Materials & contracts 5,324 240 196 98 4,271 517
Depreciation & amortisation 5,976 - - - 5,976 -
Impairment - - - - - -
Other expenses 3,526 272 224 921 873 1,236
Net losses from disposal of assets - - - - - -
TOTAL EXPENSES FROM CONTINUING OPERATIONS 27,928 1,695 1,645 1,601 18,446 4,539
OPERATING RESULT FOR THE YEAR 12,754 (785) (727) (810) 6,613 8,463
NET OPERATING RESULT FOR THE YEAR BEFORE GRANTS &
CONTRIBUTIONS FOR CAPITAL PURPOSES 2,321 (1,235) (727) (810) (3,370) 8,463
NET OPERATING RESULT FOR THE YEAR EXCLUDING
EXTRAORDINARY ITEMS BEFORE GRANTS & CONTRIBUTIONS
FOR CAPITAL PURPOSES 2,321 (1,235) (727) (810) (3,370) 8,463
Assumptions
Rate Increase (incl. 0.3% increase from growth) 8.50%
General Index 2.50%
Employee Cost Index 2.50%
Operational Grant Index 0.50%
Capital Grant (averaged over 5 years) 0.00%
Investment Interest rate 3.00%
Overdue rates interest rate 8.00%
Operational PlanINCOME STATEMENT
Draft Operational Plan 2019/2020Operational Plan 2019/2020 87
$ '000 2020 2020 2020
NotesProposed
Budget
Proposed
Budget
Proposed
Budget
Income from
Continuing
Operations
Expenses from
Continuing
Operations
Operating
Result from
Continuing
OperationsFunctions/Activities
Governance - 172 (172)
Administration 1 13,002 3,467 9,535
Public order and safety 390 917 (527)
Health 253 505 (252)
Environment 4,074 3,469 605
Community services and education 367 367 -
Housing and community amenities 1,518 2,142 (624)
Water supplies 10,071 3,662 6,409
Sewerage services 2,389 2,008 381
Recreation and culture 2,203 2,334 (131)
Transport and communication 5,764 7,823 (2,059)
Economic affairs 651 1,062 (411)
Total Functions & Activities 40,682 27,928 12,754
Operational PlanFunctional Area Allocation
1. Administration Income includes general rates and the general component of the Financial Assistance Grant
Administration Expenses include corporate support for all other functions, plant/fleet, finance, HR, IT
Draft Operational Plan 2019/2020Operational Plan 2019/2020 88
$ '000 2020
Proposed
Budget
Assets
Current Assets:
Cash & cash equivalents 17,057
Investments 2,088
Receivables 2,047
Inventories 545
Other 54
Non-current assets classified as 'held for sale' -
TOTAL CURRENT ASSETS 21,791
Non-Current Assets:
Investments -
Receivables -
Inventories -
Infrastructure, property, plant & equipment 392,517
Investments accounted for using the equity method -
Investment property 3,900
Intangible assets -
TOTAL NON-CURRENT ASSETS 396,417
TOTAL ASSETS 418,208
LiabilitiesCurrent Liabilities:
Payables 3,788
Borrowings 1,309
Provisions 3,047
TOTAL CURRENT LIABILITIES 8,143
Non-Current Liabilities:
Payables -
Borrowings 15,137
Provisions 1,428
TOTAL NON-CURRENT LIABILITIES 16,565
TOTAL LIABILITIES 24,708
NET ASSETS 393,499
Equity
Retained earnings 216,754
Revaluation reserves 176,745
Council equity interest 393,499
Non-controlling interest -
TOTAL EQUITY 393,499
Assumptions
General Index 2.50%
No impact from revaluation of assets
Operational PlanSTATEMENT OF FINANCIAL POSITION
Draft Operational Plan 2019/2020Operational Plan 2019/2020 89
$ '000 2020
Proposed
Budget
Cash Flows from Operating Activities
Receipts:
Rates & annual charges 17,355
User charges & fees 5,713
Investment & interest revenue received 593
Grants & contributions 16,192
Bonds, deposits & retention amounts received -
Other 839
Payments: -
Employee benefits & costs (11,773)
Materials & contracts (5,324)
Borrowing costs (1,329)
Bonds, deposits & retention amounts refunded -
Other (3,526)
NET CASH PROVIDED (OR USED IN) OPERATING ACTIVITIES 18,740
Cash Flows from Investing Activities
Receipts:
Sale of investment securities -
Sale of infrastructure, property, plant & equipment 450
Deferred debtors receipts -
Other investing activity receipts -
Payments: -
Purchase of investment securities -
Purchase of infrastructure, property, plant & equipment (17,724)
Deferred debtors & advances made -
NET CASH PROVIDED (OR USED IN) INVESTING ACTIVITIES (17,274)
Cash Flows from Financing Activities
Receipts:
Proceeds from borrowings & advances -
Payments:
Repayment of borrowings & advances (2,084)
NET CASH PROVIDED (OR USED IN) FINANCING ACTIVITIES (2,084)
NET INCREASE/(DECREASE) IN CASH & CASH EQUIVALENTS (618)
plus: CASH & CASH EQUIVALENTS - beginning of year 17,675
CASH & CASH EQUIVALENTS - end of year 17,057
Assumptions
Rates & charges recovery rate 100.00%
Debtor recovery rate 100.00%
General Index 2.50%
Investment Interest rate 3.00%
Overdue rates interest rate 8.00%
Operational PlanSTATEMENT OF CASH FLOWS
Draft Operational Plan 2019/2020Operational Plan 2019/2020 90
2020
Proposed
Budget
Operating Performance Ratio
This ratio measures Council's ability to contain operating expenditure within operating revenue 7.67%
Benchmark - Greater than 0%
(operating revenue excl. capital grants and contributions - operating expenses) / operating revenue excluding capital grants and contributions
Own Source Operating Revenue incl. FAGs
This ratio measures the level of Council's fiscal flexibility. It is the degree of reliance on external funding sources such as operating grants and contributions. Council's
financial flexibility improves the higher the level of its own source revenue 67.15%
Benchmark - Greater than 60%
operating revenue excl. grants and contributions (except FAGs) / operating revenue incl. all grants and contributions
Own Source Operating Revenue excl. FAGs
This ratio measures the level of Council's fiscal flexibility. It is the degree of reliance on external funding sources such as operating grants and contributions. Council's
financial flexibility improves the higher the level of its own source revenue 60.20%
Benchmark - Greater than 60%
operating revenue excl. all grants and contributions / operating revenue incl. all grants and contributions
Building and Asset Renewal Ratio
This ratio indicates the extent to which Council is forecasting to meet its consumption level on assets by renewing or replacing assets 100%
Benchmark - Greater than 100% - average over 3 years
asset renewals (building and infrastructure) / Depreciation, amortisation and impairment (building and infrastructure)
Infrastructure Backlog Ratio
This ratio shows what proportion the backlog is against total value of infrastructure 0%
Benchmark - Less than 2%
Estimated cost to bring to satisfactory condition / Total (WDV) of infrastructure, buildings and other structures
Asset Maintenance Ratio
This ratio shows whether assets are maintained to the current standard 98%
Benchmark - Greater than 100% - average over 3 years
Actual asset maintenance / Required asset maintenance
Debt Service Ratio
This ratio measures the ability to service debt including interest, principal, and lease payments 11%
Benchmark - Between 0% and 20%
Cost of debt service (interest expense & principal repayments) / Total continuing operating revenue (excl. capital grants & contributions)
Real Operating Expenditure
This ratio shows the operating expenditure per capita $1,606
Benchmark - Decrease over time
Operating expenditure / Population
Cash Expense Cover Ratio
This ratio indicates the number of months Council can continue paying for its immediate expenses without additional cash inflow 8.52
Benchmark - Greater than 3.0 months
(current year's cash and cash equivalents / (total expenses - depreciation - interest costs) * 12
Operational PlanFINANCIAL RATIOS
Draft Operational Plan 2019/2020Operational Plan 2019/2020 91
2019/2020
Identified Projects I
ncreasing rates in accordance wit
Draft Operational Plan 2019/2020Operational Plan 2019/2020 92
SRVGeneral
RevenueReserves
$18,708,000 $11,248,000 $2,130,000 $464,000 $4,866,000
Local Roads Sealed Roads Resealing Capital Renewal $610,000 $610,000
Sealed Roads Rehab Capital Renewal $400,000 $180,000 $220,000
Murrumbateman Winery Trail Capital New $950,000 $400,000 $550,000
Bridges Replacement of 11 timber bridges (year 2) Capital Renewal $3,010,000 $1,150,000 $1,860,000
Regional Roads Regional Roads Resealing Capital Renewal $280,000 $280,000
Regional Roads Heavy patching Capital Renewal $150,000 $150,000
Wee Jasper (Tumut Rd) - Gravel Resheeting Capital Renewal $50,000 $50,000
Burrinjuck Heavy Patching Capital Renewal $40,000 $40,000
Regional Roads Rehab Capital Renewal $460,000 $460,000
Water Developer Servicing Plan (DSP) Operational $40,000 $40,000
Telemetry System Upgrade Strategy Capital Upgrade $20,000 $20,000
Yass to Murrumbateman Pipeline -Design Capital New $75,000 $75,000
Yass to Murrumbateman Pipeline -Easements Capital New $200,000 $200,000
Yass to Murrumbateman Pipeline -Construction Capital New $5,000,000 $4,600,000 $400,000
Yass Dam – Load Test Operational $300,000 $300,000
Water Main Replacement Program Capital Renewal $200,000 $200,000
Water Quality Improvement Yass Capital Renewal $1,200,000 $1,200,000
New Water Connections Capital New $45,000 $45,000
Village Water Main Extentions Capital Upgrade $40,000 $40,000
WTP Improvements Capital Upgrade $50,000 $50,000
Sewer Sewer Main Renewal Program Capital Renewal $200,000 $200,000
Ford Street SPS Generator/SCA Design Capital New $280,000 $280,000
Yass STP Decantor Rubber Replacement Capital Renewal $25,000 $25,000
Buildings Asset management Plans Operational $100,000 $100,000
Gundaroo Hall Operational $5,000 $5,000
Sutton Hall Operational $5,000 $5,000
Transfer Stations Purchase Weighbridge Capital New $150,000 $150,000
Landfill Closure Capital Renewal $50,000 $25,000 $25,000
Closure Murrumbateman Landfill Capital Renewal $200,000 $200,000
Replacement Baler Capital Renewal $100,000 $100,000
Sports Grounds Yass Valley LGA Facilities Program Capital Renewal $1,110,000 $1,110,000
Victoria Park Amenities Upgrade (Stage 2) Capital Upgrade $160,000 $160,000
Walker Park Sporting Complex Improvements Capital Upgrade $568,000 $518,000 $50,000
Sports Field Oversowing Operational $6,000 $6,000
Sports Field Vertidraining Operational $9,000 $9,000
Jones Park Maintenance - Contribution to Lions Club Operational $3,000 $3,000
Gundaroo Oval Improvements Operational $6,000 $6,000
Recreational Grounds Remulch Playground Operational $6,000 $6,000
Playground Safety Rectification Operational $5,000 $5,000
Coronation Park Playground Replacement Capital Renewal $260,000 $130,000 $130,000
Caravan Park Caravan Park Amenities Upgrade Capital Upgrade $160,000 $160,000
Swimming Pools Shade Sail & New Vacuum Capital New $35,000 $35,000
Cemeteries New Toilet at Lawn Cemetery Capital New $40,000 $40,000
New Plinths at Yass lawn Cemetery Operational $10,000 $10,000
Additional Workshop Vehicle Hoist Capital New $11,000 $11,000
Plant Renewal Program Capital Renewal $1,350,000 $1,350,000
General Replacement of landscaping in RAB Comur St Capital Renewal $20,000 $20,000
Road Safety RSO and Active Transport program Operational $90,000 $45,000 $45,000
Forward Works 2019/20 Future Works Program Capital Renewal $50,000 $50,000
Stormwater 2019/20 Stormwater Program from Yass FRMPS Capital Renewal $150,000 $100,000 $50,000
Learning and Development Program Operational $229,000 $40,000 $189,000
Property File Scanning Operational $50,000 $50,000
Catchment Management Projects Operational $15,000 $15,000
Education Activities - Environmental Services Section Operational $5,000 $5,000
Ranger Services ' K9 Cube' safety enhancement Capital New $25,000 $25,000
Hawthorn Land Capability Studies Operational $100,000 $100,000
Waste
Recreation
Plant and Equipment
Engineering Services
Finance and Corporate
Planning
Roads
Water and Sewer
Property
Total Cost
2019/20
Internal Funding
External
Funding
Council
Yass Valley Council Projects 2019/20
Functional Area Asset Type Title Project TypeNew, upgrade
or Renewal
2019/20
Draft Operational Plan 2019/2020Operational Plan 2019/2020 93
Long Term
Financial Plan
Draft Operational Plan 2019/2020Operational Plan 2019/2020 94
$ '000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Notes Actual Actual Actual Budget Budget Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast
Income from Continuing Operations
Revenue: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 2.02
Rates & annual charges 12,555 13,686 14,958 16,036 17,355 17,754 18,163 18,580 19,008 19,445 19,892 20,350 20,818 21,296
User charges & fees 6,971 6,320 6,692 5,863 5,713 5,856 6,002 6,152 6,306 6,464 6,625 6,791 6,961 7,135
Interest & investment revenue 1,140 515 522 403 583 574 585 613 650 691 860 924 994 1,079
Other revenues 932 3,069 763 487 839 860 881 904 926 949 973 997 1,022 1,048
Grants & contributions for operating purposes 7,854 8,146 6,730 5,818 5,759 5,788 5,817 5,846 5,875 5,904 5,934 5,964 5,993 6,023
Grants & contributions for capital purposes 5,862 5,891 7,652 8,789 10,433 5,885 5,915 5,944 5,974 6,004 6,034 6,064 6,094 6,125
Other Income:
Net gains from disposal of assets 9 107 - - - - - - - - - - - -
Net share of interests in joint ventures - - - - - - - - - - - - - -
TOTAL INCOME FROM CONTINUING OPERATIONS 35,323 37,734 37,317 37,396 40,682 36,717 37,362 38,039 38,738 39,457 40,318 41,089 41,882 42,706
Expenses from Continuing Operations 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Employee benefits & costs 10,740 11,590 11,587 11,689 11,773 12,067 12,369 12,678 12,995 13,320 13,653 13,994 14,344 14,703
Borrowing costs 1,283 1,221 1,329 1,614 1,329 925 868 825 788 748 708 665 621 622
Materials & contracts 6,452 5,644 4,610 5,749 5,324 5,457 5,594 5,733 5,877 6,024 6,174 6,329 6,487 6,649
Depreciation & amortisation 6,482 6,174 5,942 5,977 5,976 6,082 6,160 6,238 6,316 6,394 6,472 6,550 6,628 6,706
Impairment - - - - - - - - - - - - - -
Other expenses 4,984 5,126 4,568 4,049 3,526 3,614 3,705 3,797 3,892 3,989 4,089 4,191 4,296 4,403
Net losses from disposal of assets - - 1,249 - - - - - - - - - - -
TOTAL EXPENSES FROM CONTINUING OPERATIONS 29,941 29,755 29,285 29,078 27,928 28,146 28,695 29,272 29,868 30,475 31,097 31,730 32,376 33,084
OPERATING RESULT FOR THE YEAR 5,382 7,979 8,032 8,318 12,754 8,571 8,667 8,767 8,870 8,982 9,222 9,360 9,505 9,622
NET OPERATING RESULT FOR THE YEAR BEFORE GRANTS &
CONTRIBUTIONS FOR CAPITAL PURPOSES (480) 2,088 380 (471) 2,321 2,686 2,752 2,823 2,896 2,978 3,188 3,296 3,411 3,497
NET OPERATING RESULT FOR THE YEAR BEFORE GRANTS &
CONTRIBUTIONS FOR CAPITAL PURPOSES and EXCLUDING
EXTRAORDINARY ITEMS (489) 1,981 380 (471) 2,321 2,686 2,752 2,823 2,896 2,978 3,188 3,296 3,411 3,497
Assumptions
Rate Increase (incl. 0.3% increase from growth) 8.50% 8.50% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30%
General Index 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
Employee Cost Index 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
Operational Grant Index 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50%
Capital Grant (averaged over 5 years) 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50%
Investment Interest rate 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.50% 3.50% 3.50% 3.50%
Overdue rates interest rate 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.50% 8.50% 8.50% 8.50% 8.50%
Efficiency gain on Materials, Contracts & Other Exp. 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
New Capital works (for depreciation) 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
Population Increase 1% 1% 1% 1% 2% 2% 2% 3% 3% 3% 3% 3% 3% 3%
Long Term Financial Plan - ALL FUNDSINCOME STATEMENT
9
Draft Operational Plan 2019/2020Operational Plan 2019/2020 95
$ '000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Notes Actual Actual Actual Budget Budget Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast
Assets
Current Assets:
Cash & cash equivalents 10,613 16,810 18,696 17,675 17,057 17,402 18,359 19,571 20,957 22,493 24,308 26,299 28,735 31,366
Investments 5,246 2,055 2,088 2,088 2,088 2,088 2,088 2,088 2,088 2,088 2,088 2,088 2,088 2,088
Receivables 3,487 1,902 2,527 2,299 2,047 1,867 1,565 1,643 1,311 1,143 985 819 657 437
Inventories 495 214 519 532 545 559 573 587 602 617 632 648 664 681
Other 138 89 51 52 54 55 56 58 59 61 62 64 65 67
Non-current assets classified as 'held for sale' - - - - - - - - - - - - - -
TOTAL CURRENT ASSETS 19,979 21,070 23,881 22,646 21,791 21,971 22,641 23,947 25,017 26,402 28,076 29,917 32,210 34,639
Non-Current Assets:
Investments - - - - - - - - - - - - - -
Receivables - - - - - - - - - - - - - -
Inventories - - - - - - - - - - - - - -
Infrastructure, property, plant & equipment 342,491 349,187 357,192 374,793 392,517 405,517 418,517 431,517 444,517 457,517 470,517 483,517 496,517 509,517
Investments accounted for using the equity method - - - - - - - - - - - - - -
Investment property 2,467 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,901
Intangible assets - - - - - - - - - - - - - -
TOTAL NON-CURRENT ASSETS 344,958 353,087 361,092 378,693 396,417 409,417 422,417 435,417 448,417 461,417 474,417 487,417 500,417 513,418
TOTAL ASSETS 364,937 374,157 384,973 401,339 418,208 431,388 445,058 459,364 473,434 487,819 502,493 517,334 532,627 548,057
Liabilities
Current Liabilities:
Payables 3,610 5,400 3,605 3,695 3,788 3,882 3,979 4,079 4,181 4,285 4,392 4,502 4,615 4,730
Borrowings 1,379 1,503 1,624 2,084 1,309 869 794 801 840 880 920 698 698 699
Provisions 2,742 2,649 2,900 2,973 3,047 3,123 3,201 3,281 3,363 3,447 3,533 3,622 3,712 3,805
TOTAL CURRENT LIABILITIES 7,731 9,552 8,129 8,752 8,143 7,874 7,974 8,161 8,384 8,612 8,846 8,822 9,025 9,234
Non-Current Liabilities:
Payables - - - - - - - - - - - - - -
Borrowings 18,256 16,750 15,127 16,446 15,137 14,331 13,505 12,704 11,858 9,337 8,417 7,719 7,021 6,322
Provisions 1,549 1,063 1,359 1,393 1,428 1,463 1,500 1,538 1,576 1,615 1,656 1,697 1,740 1,783
TOTAL NON-CURRENT LIABILITIES 19,805 17,813 16,486 17,839 16,565 15,794 15,005 14,242 13,434 10,952 10,073 9,416 8,761 8,105
TOTAL LIABILITIES 27,536 27,365 24,615 26,591 24,708 23,669 22,979 22,402 21,818 19,565 18,919 18,238 17,786 17,339
NET ASSETS 337,401 346,792 360,358 374,749 393,499 407,719 422,079 436,962 451,616 468,255 483,574 499,096 514,841 530,717
Equity
Retained earnings 202,927 209,488 218,938 215,728 216,754 217,974 219,334 221,217 222,871 226,510 228,829 231,351 234,096 236,972
Revaluation reserves 134,474 137,304 141,420 159,021 176,745 189,745 202,745 215,745 228,745 241,745 254,745 267,745 280,745 293,745
Council equity interest 337,401 346,792 360,358 374,749 393,499 407,719 422,079 436,962 451,616 468,255 483,574 499,096 514,841 530,717
Non-controlling interest - - - - - - - - - - - - - -
TOTAL EQUITY 337,401 346,792 360,358 374,749 393,499 407,719 422,079 436,962 451,616 468,255 483,574 499,096 514,841 530,717
Assumptions
General Index 0.00% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
No impact forecast from revaluation of assets
Long Term Financial Plan - ALL FUNDSSTATEMENT OF FINANCIAL POSITION
Draft Operational Plan 2019/2020Operational Plan 2019/2020 96
$ '000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Notes Actual Actual Actual Budget Budget Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast
Cash Flows from Operating Activities
Receipts:
Rates & annual charges 12,539 13,881 14,914 16,036 17,355 17,754 18,163 18,580 19,008 19,445 19,892 20,350 20,818 21,296
User charges & fees 7,024 7,567 6,639 5,863 5,713 5,856 6,002 6,152 6,306 6,464 6,625 6,791 6,961 7,135
Investment & interest revenue received 1,040 479 507 631 593 574 585 613 650 691 860 924 994 1,079
Grants & contributions 11,934 10,906 12,877 14,607 16,192 11,673 11,731 11,790 11,849 11,908 11,968 12,028 12,088 12,148
Bonds, deposits & retention amounts received 34 - 13 - - - - - - - - - - -
Other 2,792 5,000 1,938 487 839 860 881 904 926 949 973 997 1,022 1,048
Payments:
Employee benefits & costs (10,525) (11,683) (11,257) (11,689) (11,773) (12,067) (12,369) (12,678) (12,995) (13,320) (13,653) (13,994) (14,344) (14,703)
Materials & contracts (7,140) (5,496) (4,486) (5,749) (5,324) (5,457) (5,594) (5,733) (5,877) (6,024) (6,174) (6,329) (6,487) (6,649)
Borrowing costs (1,235) (1,251) (1,100) (1,614) (1,329) (925) (868) (825) (788) (748) (708) (665) (621) (622)
Bonds, deposits & retention amounts refunded - - - - - - - - - - - - - -
Other (7,305) (6,593) (7,049) (4,049) (3,526) (3,614) (3,705) (3,797) (3,892) (3,989) (4,089) (4,191) (4,296) (4,403)
NET CASH PROVIDED (OR USED IN) OPERATING ACTIVITIES 9,158 12,810 12,996 14,523 18,740 14,654 14,826 15,006 15,187 15,376 15,694 15,911 16,135 16,329
Cash Flows from Investing Activities
Receipts:
Sale of investment securities - 3,231 - - - - - - - - - - - -
Sale of infrastructure, property, plant & equipment 11 835 284 250 450 - - - - - - - - -
Deferred debtors receipts - - - - - - - - - - - - -
Other investing activity receipts - - - - - - - - - - - - -
Payments:
Purchase of investment securities/property 1,007 - (33) - - - -
Purchase of infrastructure, property, plant & equipment (15,318) (9,297) (9,859) (17,601) (17,724) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000)
Deferred debtors & advances made - - - - - - - - - - - - -
NET CASH PROVIDED (OR USED IN) INVESTING ACTIVITIES (14,300) (5,231) (9,608) (17,351) (17,274) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000) (13,000)
Cash Flows from Financing Activities
Receipts:
Proceeds from borrowings & advances 4,650 - - 3,750 - - - - - - - - - -
Payments:
Repayment of borrowings & advances (2,009) (1,382) (1,502) (1,943) (2,084) (1,309) (869) (794) (801) (840) (880) (920) (698) (698)
Repayment of finance lease liabilities - - - - - - - - - - - - - -
NET CASH PROVIDED (OR USED IN) FINANCING ACTIVITIES 2,641 (1,382) (1,502) 1,807 (2,084) (1,309) (869) (794) (801) (840) (880) (920) (698) (698)
NET INCREASE/(DECREASE) IN CASH & CASH EQUIVALENTS (2,501) 6,197 1,886 (1,021) (618) 345 957 1,212 1,386 1,536 1,814 1,991 2,437 2,631
plus: CASH & CASH EQUIVALENTS - beginning of year 13,114 10,613 16,810 18,696 17,675 17,057 17,402 18,359 19,571 20,957 22,493 24,308 26,299 28,735
CASH & CASH EQUIVALENTS - end of year 10,613 16,810 18,696 17,675 17,057 17,402 18,359 19,571 20,957 22,493 24,308 26,299 28,735 31,366
Assumptions
Rates & charges recovery rate 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Debtor recovery rate 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
General Index 0.00% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
Investment Interest rate 0.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.50% 3.50% 3.50% 3.50%
Overdue rates interest rate 0.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.50% 8.50% 8.50% 8.50% 8.50%
Long Term Financial Plan - ALL FUNDSSTATEMENT OF CASH FLOWS
Draft Operational Plan 2019/2020Operational Plan 2019/2020 97
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Actual Actual Actual Budget Budget Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast
Operating Performance RatioThis ratio measures Council's ability to contain operating expenditure
within operating revenue 0.00% -1.63% 6.56% 1.28% -1.65% 7.67% 8.71% 8.75% 8.80% 8.84% 8.90% 9.30% 9.41% 9.53% 9.56%
Benchmark - Greater than 0%
(operating revenue excl. capital grants and contributions - operating
expenses) / operating revenue excluding capital grants and
contributions
Own Source Operating Revenue incl. FAGs 2829 4171 2941 2827 2827 2827 2827 2827 2827 2827 2827 2827 2827 2828
This ratio measures the level of Council's fiscal flexibility. It is the degree
of reliance on external funding sources such as operating grants and
contributions. Council's financial flexibility improves the higher the level of
its own source revenue 60% 69.18% 73.85% 69.34% 68.50% 67.15% 75.91% 76.17% 76.44% 76.71% 76.98% 77.33% 77.61% 77.89% 78.18%
Benchmark - Greater than 60%
operating revenue excl. grants and contributions (except FAGs) /
operating revenue incl. all grants and contributions
Own Source Operating Revenue excl. FAGs 0 0 0 0 0 0 0 0 0 0 0 0 0 1
This ratio measures the level of Council's fiscal flexibility. It is the degree
of reliance on external funding sources such as operating grants and
contributions. Council's financial flexibility improves the higher the level of
its own source revenue 60% 61.17% 62.80% 61.46% 60.94% 60.20% 68.21% 68.60% 69.01% 69.41% 69.82% 70.32% 70.73% 71.14% 71.56%
Benchmark - Greater than 60%
operating revenue excl. all grants and contributions / operating revenue
incl. all grants and contributions
Building and Asset Renewal Ratio 4684.35 7902.45 8380.15 5,977 5,976 6,082 6,160 6,238 6,316 6,394 6,472 6,550 6,628 6,706
This ratio indicates the extent to which Council is forecasting to meet its
consumption level on assets by renewing or replacing assets 1.00 72% 128% 141% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Benchmark - Greater than 100% - average over 3 years
asset renewals (building and infrastructure) / Depreciation, amortisation
and impairment (building and infrastructure)
183,254 177,080 171,138 165,161 159,185 153,103 146,942 140,704 134,388 127,993 121,521 114,971 108,342 101,636
Infrastructure Backlog Ratio $8,123.00 $6,742.19 $3,013.61 $2,013.61 $1,013.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.02 $0.00This ratio shows what proportion the backlog is against total value of
infrastructure 0.02 5% 4% 2% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Benchmark - Less than 2%
Estimated cost to bring to satisfactory condition / Total (WDV) of
infrastructure, buildings and other structures
Asset Maintenance Ratio
This ratio shows whether assets are maintained to the current standard 1.00 98% 98% 98% 98% 98% 98% 98% 98% 100% 102% 102% 102% 102% 102%
Benchmark - Greater than 100% - average over 3 years
Actual asset maintenance / Required asset maintenance
Debt Service RatioThis ratio measures the ability to service debt including interest, principal,
and lease payments -1% 11% 8% 10% 12% 11% 7% 6% 5% 5% 5% 5% 5% 4% 4%
Benchmark - Between 0% and 20%
Cost of debt service (interest expense & principal repayments) / Total
continuing operating revenue (excl. capital grants & contributions)
Real Operating Expenditure 16564 16730 16931 17134 17391 17652 18005 18365 18916 19483 20067 20669 21289 21928
This ratio shows the operating expenditure per capita #### $1,808 $1,779 $1,730 $1,697 $1,606 $1,594 $1,594 $1,594 $1,579 $1,564 $1,550 $1,535 $1,521 $1,509
Benchmark - Decrease over time
Operating expenditure / Population
Cash Expense Cover Ratio
This ratio indicates the number of months Council can continue paying
for its immediate expenses without additional cash inflow 3.00 4.51 7.64 8.83 8.47 8.52 8.93 9.41 9.86 10.33 10.83 11.44 12.09 13.04 13.90
Benchmark - Greater than 3.0 months
(current year's cash and cash equivalents / (total expenses -
depreciation - interest costs) * 12
Long Term Financial Plan - ALL FUNDSFINANCIAL RATIOS
Draft Operational Plan 2019/2020 97