48
Operation Research II Johan Oscar Ong, ST, MT Johan Oscar Ong, ST, MT

Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Operation Research II

Johan Oscar Ong, ST, MTJohan Oscar Ong, ST, MT

Page 2: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Grading� Requirements:

� Min 80% Present in Class� Having Good Attitude

� Score/Grade :

� Quiz and Assignment : 30%� Quiz and Assignment : 30%� Mid test (UTS) : 35%� Final Test (UAS) : 35%

� No additional assignment to increase your score

� Assignment should be submitted on time

Page 3: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

outlineMeeting Topics

1 Goal Programming (1)

2 Goal Programming (2) Quiz 1

3 Integer linear Programming (part 1) Quiz 2

4 Integer linear Programming (part 2) Quiz 3

5 Deterministic dynamic programming (part 1) Quiz 4

6 Review and Quiz

7 Midterm Test

8 Deterministic dynamic programming (part 2) Quiz 5

9 Decision analysis Quiz 6

10 Games Theory Quiz 7

11 Queuing System (part 1)

12 Queuing System (part 2) Quiz 8

13 Deterministic Inventory model Quiz 9

Page 4: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal ProgrammingGoal Programming

Page 5: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

What is Goal Programming?

� Mathematical model similar to Linear Programming, however it allows for multiple goals to be satisfied at the same time.

� Allows for the multiple goals to be prioritized � Allows for the multiple goals to be prioritized and weighted to account for the DM’s utility for meeting the various goals.

Page 6: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Assumptions

� Similar to LP:� Non-negative variables� Conditions of certainty� Variables are independent� Variables are independent� Limited resources� Deterministic

Page 7: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Components

� Economic Constraints� Physical� Concerned with resources� Cannot be violated� Cannot be violated� Example: # of production hours each week

Page 8: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Components

� Goal Constraints� Variable� Concerned with target values� Can be changed/modified� Can be changed/modified� Example: Desire to achieve a certain level of profit

Page 9: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Components

� Objective Function� Minimizes the sum of the weighted deviations

from the target values – this is ALWAYS the objective for Goal Programmingobjective for Goal Programming

� Not the same as LP (which was maximize revenue/minimize costs)

Page 10: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Steps

� Define decision variables� Define Deviational Variable for each goal� Formulate Constraint Equations

Economic constraints� Economic constraints� Goal constraints

� Formulate Objective Function

Page 11: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Terms

� Decision Variables are the same as those in LP formulations (represent products, hours worked)

� Deviational Variables represent overachieving � Deviational Variables represent overachieving or underachieving the desired level of each goal� d+ Represents overachieving level of the goal � d- Represents underachieving level of the goal

Page 12: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Economic Constraints� Stated as <=, >=, or = � Linear (stated in terms of decision variables)� Example: 3x + 2y <= 50 hours

Goal Programming Constraints

� Example: 3x + 2y <= 50 hours

� Goal Constraints � General form of goal constraint:

- d+ + d- =Decision Variables

Desired Goal Level

Page 13: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Microcom is a growth oriented firm which establishes monthly performance goals for its sales force

� Microcom determines that the sales force has � Microcom determines that the sales force has a maximum available hours per month for visits of 640 hours

� Further, it is estimated that each visit to a potential new client requires 3 hours and each visit to a current client requires 2 hours

Page 14: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Microcom establishes two goals for the coming month:� Contact at least 200 current clients� Contact at least 120 new clients� Contact at least 120 new clients

� Overachieving either goal will not be penalized

Page 15: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Steps Required:1. Define the decision variables2. Define the goals and deviational variables3. Formulate the GP Model’s Parameters:3. Formulate the GP Model’s Parameters:

� Economic Constraints� Goal Constraints� Objective Function

4. Solve the GP using the graphical approach

Page 16: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Step 1: Define the decision variables:� X1 = the number of current clients visited� X2 = the number of new clients visited

� Step 2: Define the goals:� Goal 1 – Contact 200 current clients� Goal 2 – Contact 120 new clients

Page 17: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Step 3: Define the deviational variables� d1+ = the number of current clients visited in

excess of the goal of 200� d1- = the number of current clients visited less � d1- = the number of current clients visited less

than the goal of 200� d2+ = the number of new clients visited in excess

of the goal of 120� d2- = the number of new clients visited less than

the goal of 120

Page 18: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Formulate the GP Model:� Economic Constraints:

� 2X1 + 3X2 <= 640 (note: can be <, =, >)X1, X2 => 0� X1, X2 => 0

� d1+, d1-, d2+, d2- => 0

� Goal Constraints:� Current Clients: X1 + d1- - d1+ = 200� New Clients: X2 + d2- - d2+ = 120

Must be =

Page 19: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� WebNet establishes two goals for the coming month:� Contact at least 200 current clients� Contact at least 120 new clients� Contact at least 120 new clients

� Overachieving either goal will not be penalized

Page 20: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Objective Function:� Minimize Weighted Deviations� Minimize Z = d1- + d2-

Page 21: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Complete formulation:� Minimize Z = d1- + d2-

� Subject to:� 2X1 + 3X2 <= 640� 2X1 + 3X2 <= 640� X1 + d1- - d1+ = 200� X2 + d2- - d2+ = 120� X1, X2 => 0� d1+, d1-, d2+, d2- => 0

Page 22: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Graph constraint:� 2X1 + 3X2 = 640

� If X1 = 0, X2 = 213If X2 = 0, X1 = 320� If X2 = 0, X1 = 320

� Plot points (0, 213) and (320, 0)

Page 23: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Graphical Solution

150150

200200

XX22

(0,213)(0,213)

00 5050 100100 150150 200200

5050

100100

150150

250250 300300 350350

(320,0)(320,0)XX11

Page 24: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

� Graph deviation lines� X1 + d1- - d1+ = 200 (Goal 1)� X2 + d2- - d2+ = 120 (Goal 2)

� Plot lines for X1 = 200, X2 = 120

Page 25: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Example

150150

200200

XX22 Goal 1Goal 1

dd11--

dd11++

(0,213)(0,213)

00 5050 100100 150150 200200

5050

100100

150150

XX11

Goal 2Goal 2Goal 2Goal 2dd22

++dd22++

dd22--dd22--(140,120)(140,120)

(200,80)(200,80)

250250 300300 350350

(320,0)(320,0)

Page 26: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Solving Graphical Goal Programming

� Want to Minimize d1- + d2-

� So we evaluate each of the candidate solution points:

Optimal Point

For point (140, 120)d1- = 60 and d2- = 0

Z = 60 + 0 = 60

For point (200, 80)d1- = 0 and d2- = 40

Z = 0 + 40 = 40

Contact at least 200 current clientsContact at least 120 new clients

Page 27: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Goal Programming Solution

� X1 = 200 Goal 1 achieved� X2 = 80 Goal 2 not achieved� d1+ = 0 d2+ = 0� d1- = 0 d2- = 40

� Z = 40

Page 28: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400
Page 29: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Goals are prioritized in some sense, and their level of aspiration is stated.

� An optimal solution is attained when all the goals are reached as close as possible to their aspiration level, while

13.5 Goal Programming

reached as close as possible to their aspiration level, while satisfying a set of constraints.

� There are two types of goal programming models:� Nonpreemtive goal programming - no goal is pre-determined to

dominate any other goal.� Preemtive goal programming - goals are assigned different priority

levels. Level 1 goal dominates level 2 goal, and so on.

Page 30: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� A company is considering three forms of advertising.

NONPREEMTIVE GOAL PROGRAMMINGAn Advertisement Example

Cost per Ad Customers

Television 3000 1000

� Goals� Goal 1: Spend no more $25,000 on advertising.� Goal 2: Reach at least 30,000 new potential

customers.� Goal 3: Run at least 10 television spots.

Television 3000 1000

Newspaper 250 200

Page 31: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� If these were constraints rather than goals we would have:3000X1 + 800X2 + 250X3 ≤ 25,000

An Advertisement Example

1000X1 + 500X2 + 200X3 ≥ 30,000X1 ≥ 10

� No feasible solution exists that satisfies all the constraints.

� When these constraints are simply goals they are to be reached as close as possible.

Page 32: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Detrimental variablesUi = the amount by which the left hand side

falls short of (under) its right had side value.

An Advertisement Example

value.Ei = the amount by which the left side

exceeds its right had side value.

� The goal equations3000X1 + 800X2 + 250X3 + U1 – E1 = 25,0001000X1 + 500X2 + 200X3 + U2 – E2 = 30,000

X1 + U3 – E3 = 10

Page 33: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� The objective is to minimize the penalty of not meeting the goals, represented by the detrimental variables

An Advertisement Example

detrimental variables E1, U2, U3.

≤ 25,000 ≥ 30,000 ≥ 10

Page 34: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� The penalties are estimated to be as follows:

� Each extra dollar spent on advertisement above $25,000 cost the company $1.

An Advertisement Example

$25,000 cost the company $1.

� There is a loss of $5 to the company for each customer not being reached, below the goal of 30,000.

� Each television spot below 10 is worth 100 times each dollar over budget.

Page 35: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� It is assumed that no advantage is gained by overachieving a goal.

Minimize 1E + 5U + 100U

An Advertisement Example –The goal programming model

Minimize 1E1 + 5U2 + 100U3s.t.3000X1 + 800X2 + 250X3 + U1 – E1 = 25,0001000X1 + 500X2 + 200X3 + U2 – E2 = 30,000

X1 + U3 – E3 = 10All variables are non-negative.

Page 36: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� The NECC is planning next month production of its two bicycles B2 and S10.

� Data

PREEMTIVE GOAL PROGRAMMING -New England Cycle Company

� Both models use the same seats and tires.� 2000 seats are available; 2400 tires are available. � 1000 gear assembly are available (used only in

the S10 model).� Production time per unit: 2 hours for B2; 3 hours

for S10.� Profit: $40 for each B2; 10$ for each S10.

Page 37: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Priority 1 : Fulfill a contract for 400 B2 bicycles to be delivered next month.

NECC – Prioritized Goals

Priority 4: � At least 200 tires left

over at the end of the month.At least 100 gear � Priority 2: Produce at � At least 100 gear assemblies left over at the end of the month.

� Priority 2: Produce at least 1000 total bicycles during the month.

� Priority 3: � Achieve at least

$100,000 profit for the month.

� Use no more than 1600 labor-hours during the month.

Page 38: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

Management wants to determine the production schedule that best meets its

New England Cycle Company Example

production schedule that best meets its prioritized schedule.

Page 39: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

NECC - SOLUTION

� Decision variablesX1 = The number of B2s to be produced next monthX2 = The number of S10s to be produced next month

� Functional / nonnegativity constraints

0X,X

Tires2400X2X2

assembliesGear1000X

Seats2000XX2

21

21

2

21

≥≤+≤≤+

Page 40: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Goal constraintsPriority 1 (goal 1): Production of at least 400 B2sPriority 1 (goal 1): Production of at least 400 B2s

XX11 + U+ U11 -- EE11 = 400= 400

Priority 2 (goal 2): Production of at least 1000 total cyclesPriority 2 (goal 2): Production of at least 1000 total cycles

NECC - SOLUTION

Priority 2 (goal 2): Production of at least 1000 total cyclesPriority 2 (goal 2): Production of at least 1000 total cyclesXX11 + X+ X22 + U+ U22 -- EE22 = 1000= 1000

Priority 3 (goal 3) Profit of at least $100,000Priority 3 (goal 3) Profit of at least $100,000.04X.04X11 + .10X+ .10X22 + U+ U33 -- EE33 = 100 (in $1000)= 100 (in $1000)

Priority 3 (goal 4) Use a maximum of 1600 labor hoursPriority 3 (goal 4) Use a maximum of 1600 labor hours2X2X11 + 3X+ 3X22 + U+ U44 -- EE44 = 1600= 1600

Priority 4 (goal 5) At least 200 leftover tiresPriority 4 (goal 5) At least 200 leftover tires2X2X11 + 2X+ 2X22 + U+ U55 -- EE55 = 2200= 2200

Priority 4 (goal 6) At least 100 leftover gear assemblyPriority 4 (goal 6) At least 100 leftover gear assemblyXX22 + U+ U66 -- EE66 = 900 = 900

Page 41: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Priority level objectives

Priority 1: Underachieving a production of 400 B2s:Minimize U 1

NECC - SOLUTION

Minimize U 1

Priority 2: Underachieving a total production of 1000: Minimize U 2

Page 42: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Priority level objectives � Priority 3: Underachieving a $100,000 profit

Using more than 1600 labor-hoursMinimize 30U + E

NECC - SOLUTION

Minimize 30U 3 + E4

Each $1,000 short of the $100,000 goal is considered 30 times as important as utilizing an extra labor-hour.

Page 43: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Priority level objectives Priority 4: Using more than 2200 tires

Using more than 900 gear assemblies

NECC - SOLUTION

Minimize E 5 + 2E6

Each leftover gear assembly is deemed twice as important as leftover tire.

Page 44: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Solve the linear goal programming for priority 1 objective, under the set of regular constraints and goal constraint as shown below

NECC - The solution procedure

constraint as shown below

Minimize U 1ST

X1 + U1 - E1 = 400

Tires2400X2X2

Gear1000X

Seats2000XX2

21

2

21

≤+≤≤+X1 = 400, thus

U1 = 0, and priority 1 goal is fully achieved.

Page 45: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Solve the linear goal programming for priority 2 level objective, under the set of original constraints plus the constraint X1 ≥≥≥≥ 400 (maintain the level of achievement of the priority 1 goal).

Minimize U 2

NECC - The solution procedure

Minimize U 2

STEvery point that satisfies X1 + X2 ≥≥≥≥1000 yields U2 = 0, and therefore, priority 2 goal is fully achieved.

Tires2400X2X2

Gear1000X

Seats2000XX2

21

2

21

≤+≤≤+

X1 ≥≥≥≥ 400X1 + X2 + U2 - E2 = 1000

Page 46: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Solve the linear goal programming for priority 3 level objective, under the set of original constraints plus the constraint X1 ≥≥≥≥ 400 (maintain the level of achievement of the

NECC - The solution procedure

(maintain the level of achievement of the priority 1 goal), plus the constraint X1 + X2 ≥≥≥≥1000 (maintain the level of achievement of the priority 2 goal).

� Every point in the range X1 = 400 and 600 ≤≤≤≤ X2 ≤≤≤≤800 is optimal for this model; 30U3 + E4 = 1720 is the level of achievement for the priority 3 goal.

Page 47: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� Solve the linear goal programming for priority 4 level objective, and notice that after the previous step the feasible region is reduced to a segment of a straight line between the points

NECC - The solution procedure

a segment of a straight line between the points (400,600) and (400,800).

� X1 =400; 600 ≤≤≤≤ X2 ≤≤≤≤ 700 and E5 + 2E6 = 0

Page 48: Operation Research II - WordPress.com...2013/02/01  · PREEMTIVE GOAL PROGRAMMING - New England Cycle Company Both models use the same seats and tires. 2000 seats are available; 2400

� In summary NECC should produce� 400 B2 model

Between 600 and 700 S10 model

NECC - Solution Summary