Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
OPERATION OFFICE / WORKSHOP:PT 12510 (A-13),Kawasan Perusahaan Chacar,23100 Dungun,Terengganu Darul Iman,MALAYSIATel : +609 - 827 7200 / 0201Fax : +609 - 827 0185Website : www.d-petro.com
SECTION 1.0 INTRODUCTION
Brief Summary Of CompanyCompany Mission StatementCorporate InformationCorporate Registration
SECTION 2.0 ORGANISATION
DiPETRO Organization Chart Profile Of Key Personnel
SECTION 3.0 MANPOWER REPORT
SECTION 4.0 COMPANY CAPABILITIES
Plant Maintenance ServicesPlant Turnaround ServicesBlasting, Painting And Fire Proofing WorksEpcc/Construction/Fabrication WorksScaffolding Supply, Delivery Erection & Dismantling ServicesHot & Cold Insulation Manpower Supply
SECTION 5.0 ON GOING PROJECT FLIERSPlant Maintenance/ Construction Division
SECTION 6.0 COMPANY FACILITIES & PAST PROJECT FLIERSWorkshop / Fabrication YardPast Project & Fliers
DiPETRO SYNERGY ENG SDN BHD (hereinafter referred to as DiPETRO) is 100% Bumiputera,company both in equity and as well as management control. The Company was formelyknown as HP Engineering Enterprise was incorporated in February 2009. Beginning with sub contarcting work from Main Contractor, HP Engineering Enterprise emerged forwardand expand its business to become Main Contractor with the inception of newly SendirianBerhad Company. In coping with the new business challenge, The newly formed Company(DiPETRO) was then incorporated on 8th April 2011.
DiPETRO management staff and key projects supervisory personnel have vast experience in oil, gas and petrochemical industry. In addition to indirect manpower (key personnel)above, DiPETRO has been proven to be able to deploy huge amount of direct manpowerof multi-discipline crews (profesional and labours forces) for its plant maintenance,construction.With technical support from both in-house and DiPETRO subcontractors, DiPETRO possesstechnical know-how project management experience and local knowledge to manage and engage in Plant Construction, Maintenance and Turnaround works. DiPETRO and its associates have successfully completed projects for the following work:
� Mechanical, Plant Civil & Steel Fabrication Works� Plant Maintenance Services & Turnaround Works� Statutory Tank Maintenance� Scaffolding Erection, Dismantle & Rental Services� Blasting & Painting Works� Hot & Cold Insulation Works� Manpower Supply
DiPETRO is committed to maximize its business potential and is confident to render qualityservices to our clients as we have in-place Quality and Safety Programs which are adheredto during execution of our works.
To be the leading company for the provision of :
� Experienced, qualified and competent manpower in their own field of expertise to our clients in the oil, gas and petrochemical industry.
� Uncompromised quality, safety and timely execution of Engineering Services including Mechanical & Civil Works.
GENERAL
Company Name : DiPETRO SYNERGY ENG SDN BHD(Formely known as HP Engineering Enterprise)
Registration No. : 939710-U
Date of Incorporation : 8th April 2011
Registered Address : A1-02-02, Hata Square, Jalan Mewah 1/3, Pandan Mewah, 68000 Ampang, Selangor
Head Office : PT 12510 (A-13), Kawasan Perusahaan Chacar,Mukim Kuala Paka,23100 Dungun Terengganu Darul Iman
Contact No : (609)827 7200 / 0201 Fax No : (609)827 0185E-mail : [email protected]
Web Address : www.d-petro.com
Company Secretary : MOHD FAIRUZ BIN A RAZAK
& Auditor A1-02-02, Hata Square, Jalan Mewah 1/3,Pandan Mewah, 68000 Ampang, Selangor
Contact No : Tel : (03) 4296 9694; Fax No : (603) 4296 9692
Equity Structure : 100% Bumiputera
CAPITAL STRUCTURE
Authorised Capital : RM 1,000,000.00Paid Up Capital : RM 1,000,000.00Working Capital : RM 1,000,000.00
SHAREHOLDERS
Ahmad Fikeri Bin Mohamad : ShareholderMohd Hanafiah Bin Darmadan : Shareholder
BOARD OF DIRECTORS
Ahmad Fikeri Bin Mohamad : Managing DirectorMohd Hanafiah Bin Darmadan : Executive/Operation Director
BANKER
Name of Bank : Bumiputra Commerce Berhad (CIMB)Address : Dungun, Terengganu.Current Account. No. : 8601785563
BANKING FACILITIES
1. Name of Bank : RHB BANKOD : RM 1,000,000.00Term Loan : RM 72,000.00BA : RM 250,000.00BG : RM 1,500,000.00
Total RM 2,822,000.00
2. Name of Bank : PUBLIC BANK (BG Facilities)Total RM 500,000.00
3. Name of Bank : SME BANKOD / Trade Line : RM 1,000,000.00BG : RM 2,500,000.00
Total RM 3,500,000.00
GRAND TOTAL OF FACILITIES : RM 6,822,000.00
1) United Kingdom Accreditation Services (UKAS)
2) Kementerian Kewangan Malaysia (MOF)
3) Construction Industri Development Board (CIDB)
4) Petroleum Nasional Berhad (PETRONAS)
5) Dewan Perniagaan Melayu Malaysia
6) Akta Kumpulan Wang Simpanan Pekerja (KWSP)
7) Others
1) United Kingdom Accreditation Service (UKAS)ISO 9001 - 2008, Quality Management System - Requirement
Provision of Mechanical & Civil Services
2) KEMENTERIAN KEWANGAN MALAYSIA140100 BAHAN BINAAN 220111 PERALATAN KAWALAN KESELAMATAN
140200 PERALATAN KESELAMATAN JALAN JAYA 220112 SAND BLASTING & MENGECAT UNTUK KAPAL
180100 MESIN DAN KELENGKAPAN BENGKEL 220501 KONTRAK BURUH
180200 PERALATAN PERINDUSTRIAN MINYAK 220802 BANGUNAN
180300 MESIN DAN KELENGKAPAN KHUSUS 221404 MEMBAIKPULIH : BARANG LOGAM
200200 STESYEN JANAKUASA LETRIK DAN PERALATAN 200300 KABEL, AKSESORI DAN KONDUKTOR
GENERATOR/ ALAT GANTI
TARIKH LUPUT : 12/08/2017
3) LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (CIDB)G7 B PEMBINAAN BANGUNAN B04 KERJA BANGUNAN AM
G7 CE PEMBINAAN KEJURUTERAAN AWAM CE21 KERJA-KERJA KEJURUTERAAN AWAM
G7 ME MEKANIKAL DAN ELEKTRIKAL M15 KELENGKAPAN AM PELBAGAI
TARIKH LUPUT : 28/05/2018
5) PETROLIAM NASIONAL BERHAD (PETRONAS)
SM2 MANPOWER SUPPLY 03 Specialist Manpower 11 Lecturing & Training Personnel
SM5 01 Floating Roof Storage Tank
SM5 02 Fixed Roof Storage Tank
SM5 03 Cryrogenic Storage Tank
SM5
SM5 04 Heat Exchanger, Condensors & Cooler
SM5 07 Pressure & Unpressurized Vessel
SM5 01 Mechanical Valve
SM5 01 Metallic Structural/Piping
SM5 03 Lined Pipe
SQ1 03 Painting & Coating
SM5 01 Hot Insulation
SM5 02 Cold Insulation
SO2 02 Onshore Fabrication 01 Minor Onshore Fabrication - Civil Work
SO2 02 Major Fabrication 03 Onshore Facilities
SO2 02 Onshore Fabrication
SP1 03 Pipeline Coating
SC2
SM 5090100
SM 5090300
SQ 1060100
SM 5120100
SM 5120200
SM 5010103
SM 5010300
SM 5010400
SM 5010700
SM 5030100
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
03 Columns, stripper & Corrugated Plate Interceptor
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
MECHANICAL ENGINEERING & MAINTENANCE 03 Valve Repair & Maintenance
MECHANICAL ENGINEERING & MAINTENANCE
09 Structural & Piping Fabrication/ Welding Services
MECHANICAL ENGINEERING & MAINTENANCE
Code Services/ Specialist
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
MECHANICAL ENGINEERING & MAINTENANCE
01 Stationary Equipment Repair & Maintenance
SM 2031100
SM 5010101
SM 5010102
09 Structural & Piping Fabrication/ Welding Services
PIPELINE & ASSOCIATED SERVICES
02 Pipeline Construction (Fabrication & Installation)
MECHANICAL ENGINEERING & MAINTENANCE 11 Coating Services
MECHANICAL ENGINEERING & MAINTENANCE 12 Insulation Work
MECHANICAL ENGINEERING & MAINTENANCE 12 Insulation Work
03 Minor Onshore Fabrication - Mechanical
OFFSHORE FACILITIES CONS-
OFFSHORE FACILITIES CONSTRUCTIONOFFSHORE FACILITIES CONSTRUCTION
SC 2080000 CIVIL STRUCTURAL & BUILDING MAINTENANCE SERVICES 08 Scaffolding Services & Inspection
SO 2020201
SO 2020102
SO 2020203
SP 1020300
Management Structure:
The company is led by a strong and experienced team which includes representative drawn
from various professional fields, i.e. business, engineering, maintenance, fabrication and
construction in the oil, gas and petrochemical industries. This bring depth and diversity in
expertise and perspectives towards leadership of the company. As of today, the key
management team of DiPetro Synergy Eng Sdn Bhd (DiPETRO), consist of the following individuals:-
i) Ahmad Fikeri Bin Mohamad Managing Director
ii) Mohd Hanafiah Darmadan Executive/Operation Director
Aged 46, is the Managing Director of the company. He has a Degree in
Mechanical Engineering from California State University. He has joined
DiPETRO in April 2011 as Managing Director and in-charge of the overall
admin, financials and operations of the company. For project purposes
he acts as Project Advisor/ Manager monitoring all operation and
technical matters including planning, execution, safety, quality control
and procedures, etc.
Prior to his appointment in DiPETRO, he had served Hse Resources Sdn Bhd
as Technical Director (from May 2005 - March 2011), Technotest Sdn Bhd
as a General Manager (Jan 2004 - April 2005) as well as a Director in
its subsidiary EN-ES Technologies Sdn Bhd, Asaga Corporation Sdn Bhd
as a General Manager and same time as Managing Director in its subsidiary Asaga Engineering &
Construction Sdn Bhd (June 2003 - Dec 2003), Mushtari Maintenance Services Sdn Bhd as
Operation Manager (March 1997 - May 2003) and as Project Engineer (July 1995 - Feb 1997) and
Perusaahan Otomobil Nasional Sdn Bhd (PROTON) as Technical Executive (July 1990 - July 1992).
His professional qualification includes as a PTS Protective Coating & Lining CORAL Committee,
Institute Material of Malaysia (IMM) Qualified Blasting & Painting Inspector, Welding Inspector
(CSWIP), and Qualified Project/ Turnaround Manager. Apart from that he is also member of the
Board of Engineers and Institution of Engineers of Malaysia.
Managing Director
Ahmad Fikeri Mohamad
As a highly responsible management, he had undergone various Safety Courses both onshore
and offshore. Among the courses that he had attended were conducted by Terengganu Safety
Training Centre Sdn Bhd (TATI) namely onshore Safety Orientation, Safety for Line Supervisor,
and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely
Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational
Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and
NIOSH Petronas Safety Passport (NPSP)
In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in
the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a
multidicipline manager which specialization is in mechanical field. During the course of his work,
he has been handling various disciplines namely mechanical and maintenance work (construction
including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,
Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.
Aged 46, is the Executive cum Operation Director of the Company.
He has a Diploma In Electrical Engineering from Universiti Teknologi
MARA (UiTM). He has joined DiPETRO in April 2011 as Executive as well
as Operation Director and in-charge of the overall technical and
operations of the company. For the project purposes, he acts as
Project Advisor/ Manager monitoring all operation and technical;
matters including planning, scheduling, execution, safety of the
projects and procedures, etc.
Executive/Operation Director
Prior to his appointment in DiPETRO, he had served HSE Resouces Sdn Bhd
as Operation Director (from May 2005 - March 2011), Technotest Sdn Bhd
as a Deputy General Manager (August 2003 - April 2005) as well as a
Director in its subsidiary EN-ES Technologies Sdn Bhd, Mushtari
Maintenance Services Sdn Bhd as Turnaroud Manager (August 1999 - June 2003) and as
Superintendent (Jan 1995 - July 1999) and Warga Hikmat Kejuruteraan Sdn Bhd as Site Supervisor
(Feb 1990 - Dec 1994).
Mohd Hanafiah Darmadan
His profesional qualification includes as a qualified Turnaround/ Shutdown Manager, Institute
Material of Malaysia (IMM) Qualified Blasting & Painting Technician and Safety Supervisor.
As a highly responsible management, he had undergone various Safety Courses both onshore
and offshore. Among the courses that he had attended were conducted by Terengganu Safety
Training Centre Sdn Bhd (TATI) namely Onshore Safety Orientation, Safety for Line Supervisor,
and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely
Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational
Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and
NIOSH Petronas Safety Passport (NPSP)
In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in
the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a
multidicipline manager which specialization is in mechanical field. During the course of his work,
he has been handling various disciplines namely mechanical and maintenance work (construction
including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,
Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.
1) PERMANENT STAFF
As to date, DiPetro Synergy Eng Sdn Bhd (DiPETRO) maintained 18 numbers of
permanent staff.
The detailed breakdown is as follows:
DIVISION PERMANENT EMPLOYEE
a) MECHANICAL DIVISION 12 Pax
b) CIVIL / SCAFFOLDING / INSULATION DIVISION 3 Pax
c) ADMIN, PROCUREMENT & FINANCE 3 Pax
2) CONTRACT STAFF
DiPetro Synergy Eng Sdn Bhd employs multi-discipline staff on contract basis depending
on the prevailing workload. As to date, DiPETRO maintained 30 numbers of
contract staff.
The detailed breakdown is as follows:
DIVISION CONTRACT EMPLOYEE
a) CIVIL / SCAFFOLDING / INSULATION DIVISION > 10 Pax (Long Term Contract)
b) MECHANICAL DIVISION > 20 Pax (Long Term Contract)
3) DIRECT HIRE STAFF/SUB-CONTRACT
DiPetro Synergy Eng Sdn Bhd engages direct hire professional and labour forces to carry out
committed projects with the client. Most of these direct hired staff are taken to compliment
permanent and contract staff manning level in order to meet the peak manpower requirement
of the company.
This is typically required during plant turnaround and major EPCC projects.To-date, DiPETRO
had proven itself to be able to mobilize some 500 direct hire staff (professional and labour
forces) for its plant turnaround and EPCC during the respective projects peak construction
periods. Depending on the nature and size of the project, at one time Direct Hires professionals
and labours can reach as high as 1,000 person especially for turnaround work.
The detailed breakdown is as follows:
DIVISION DIRECT HIRE STAFF
a. CIVIL / SCAFFOLDING / INSULATION DIVISION > 50 Pax (Short Term Contract)
b. MECHANICAL DIVISION > 500 to 1,000 Pax (Short Term Contract)
1 IntroductionDiPETRO has been active in this field since March 2009. In general, the Companyprovides resources of tehcnical know-how in the form of manpower, equipment, toolsmaterials and consumables to perform the construction and maintenance servicesfor the oil, gas and petrochemical industries.
To-date a total of about RM 88.4 million worth of orders were executed by the Company.This equates to some 1,794,600 manhours being exposed and performed on orders and requisitions from the various clients.
2 Plant Maintenance and Turnaround ServicesFrom the modest beginning of providing minor plant maintenance repairs and services in2009, the Company has since developed into renowned force in providing a more complexand integrated services, including plant turnaround works.The Company involved in the turnaround works of various plantnamely, Processing Plant like Export Terminal and CompressorCompressor Stations & Gas Processing Plant i.e. GPP 1,2,3,4,5,6Refineries (Petronas Penapisan Terengganu Sdn Bhd andPetronas Penapisan Melaka Sdn Bhd and Petrochemical Plant(MTBE, Ethylene & Optimal), etc.
3 Maintenance and Construction Works for Blasting, Painting and Fire Proofing WorksThe Plant Maintenance Division obtained necessary supports for the above works from in-house Construction and Minor EPCC group as well as from network of contractors whoare proficient in this field. The Company has good reputation and contacts with established paint manufacturers for competitive material offers to the clients. To date the company has completed sizeable blasting & painting work for various type ofplant equipment namely Storage Tanks, vessels, pipings and structures.
The following are the core scope of work that we offer for our Industrial Coating Services as follows:-- corrosion protection, - waterproofing, insulation, - concrete repair, - fire protection and surface preparation
4 EPCC/Construction/Fabrication WorksThe Company undertakes contracts from clients to carryout fabrication of piping works and structural steel for oil, gas and petrochemical plants in the area. The fabrication works is carryout in our fabrication yards located in Paka, Terengganu. The Company has been handling many projects which involved multi disciplinesi.e. mechanical, civil, electrical & instrumentation works.
Examples of project undertaken by the Company includes the EPCC Of The New Filter Water Seperator (FWS) at PDB Fuel & & Aviation Storage Terminal which involved blasting/painting, fabrication and installation of 5,000 dia-inch piping c/wstructure as well as the Installation of Process Stipper Feed PumpUpgrading Project which involved fabrication and installation of suctionand discharge piping c/w new Pump. These projects involved multi discipline i.e. mechanical, civil, electrical & instrumentation works.
5 Scaffolding Supply, Delivery Erection & Dismantling ServicesDiPETRO have involved in scaffolding works in construction, plant maintenance as wellas plant major turnaround services in various oil & gas & petrochemical plants.
DiPETRO capable of providing Conventional tube & fitting and quick erect, modular systems incompliance to BS 1139 with capacity of 30,000m3 of scaffolding materials.
5.1 Significant Performances :
a) Subcontractor to HSE Resources Sdn Bhd : i) 15,000 m3 Scaffolding Erection for 2010 Plant Mini-Turnaround at KR-2, PPTSB.ii) 20,000 m3 of Scaffolding Erection at Optimal Chemical for 2011 Plant Turnaround works.
6 Statutory Tank Maintenance
6.1 Above Ground Storage Tank� Crude Oil Tank� Product Terminals � Refineries � Petrochemical & Power Plants
� Tank Inspection - API 653 Inspection , DOSH, NDE, etc.� Tank Maintenance & Repair� Tank Products� Tank Fabrication� Tank Engineering & Design� Tank Coating and Lining� Tank Cleaning� Tank Calibration� New Tank Construction� Safe and efficient removal of tank bottom sludge� Turnkey Projects, etc
Choosing the right contractor for any project is important, but when the project is cleaning a large above ground storage tank, selecting the right vendor is essential.
Our on-site supervisors are experienced veterans who know how to keep a tank cleaning project on track and avoid time consuming and costly mistakes. Our crews consist of full-time personnel trained to do their work safely and efficiently. Type of Tank Services provided are:-
7 Hot & Cold Insulation Since mid of 2009, DiPETRO has diversified its business activities into insulationServices. Our latest Insulation activities / contract are as follows:-
i) Hot & Cold Insulation Contract for the Turnaroundwork at MTBE Malaysia
8 Manpower SupplyDiPETRO has managed and successfully supplied experienced and qualified manpower to various CLIENTs either directly to PETRONAS or to Main Contractors.DiPETRO has the capability of providing the following range of manpower requirements:
8.1 PROFESSIONAL/ TECHNICAL� Project/Turnaround Manager� Project/Turnaround Engineer� Safety Officer/ Supervisor
� Scaffolding Inspector/ Supervisor � Material Controller
� QA/ QC Engineer and Inspector� Planner & Scheduler
8.2 SKILLED & UN-SKILLED WORKERS � Mechanical and Civil Supervisor � Pipe Fitter � Electrician � Foreman � Scaffolding Erector
� Tig Welder � Scaffolding Supervisors� 6G Welder � Rigger
� Blaster � Semi Skill/ General Workers� Painter� Insulator
DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:
No Name of Project/ contract and location Description Of Work Performed Date Client
Total Estimated/ Value of Contract
(RM)
Estimated Total manhours
Name of Referees for each Project
1Engineering, Procurement, Construction and Commissioning (EPCC) of Water Cooled Heat Exchangers Installation at GPP2, GPP3 & GPP4, Gas Processing Kertih (GPK), Terengganu
Shutdown July 15 - Jan 17 PETRONAS Gas Berhad 25,000,000.00 241,000 Murad Jaafar (03-2331 1329)
2 Heat Exchanger - E-1604 - Bottom Channel Shell Repair Shutdown Oct 15 - Dec 15
FPG Oleochemicals Sdn Bhd 150,000.00 1,200 Arumugam Balakrishnan
(09-5852233)
25,150,000.00 242,200 Total Services Rendered =
A. EPCC/ PCC FOR MECHANICAL, PIPING & CIVILDiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:
No Name of Project/ contract and location Description Of Work Performed Date Client Total Value of
Contract (RM)Estimated Total
ManhoursReferees for each
Project
1 Soap Water and Waste Water Treatment Project March 2009HRSB/Petronas
Dagangan Berhad 35,000.00 1,800 En Mohd Darail
2 Modify HPRT Control System (Mechanical Tie-in work)Project/ Shutdown
workMarch -
April 2009TKE/ Petronas Gas
Berhad 520,000.00 29,000 En Harmaini - PGB Senior Engineer
3 PN660019 Refurbishment of Sand Filter ProjectMarch -
April 2009HRSB/Petronas
Penapisan Melaka 50,000.00 2,900 En Mohd Zainuddin Bin Awang Ahmad - Persiaran Penapisan,
76300 Sg Udang, Melaka
4 Manpower supply for blinding/ loading unloading ProjectSept - Oct
2009HRSB/Ethylene
Malaysia 96,550.00 5,500 A Mutalib Shafiai/ En Yusof Bin Ahmad - 09-829 2530
5Term Contract for Plant Civil & Structure Repair at Polyethlene Malaysia Term Contract
Sept 09 - Aug 2010
HRSB/Ethylene Malaysia 176,000.00 8,000 Roskarno Ismail - 09-829
2530
6Recommissioning Sludge Dryer Vessels (Include Mechanical Tie-in works) Project Dec 2009
HRSB/Petronas Gas Berhad 86,500.00 2,900
En M Sallehin Bin Kassim/ En Shuhaime Bin Hashim - 09-
831 2345
7 Installation of Drum Rotator at PP Plant Project Jan 2010HRSB /
Polypropylene Malaysia
78,000.00 2,800 Abd Rahim Mohamed
8 Metallic structural Piping (Include Mechanical Tie-in works)Project / Shutdown
workFeb 2010 - March 2010
HRSB/Petronas Gas Berhad 549,571.00 17,000 Azhar Bin Abdullah - Tel 09-
831 2369
9 Fire Water Line Upgrading Project at PPTSB ProjectFeb 2010 - May 2010
HRSB/Petronas Penapisan (T) Sdn
Bhd680,000.00 18,800 Izwan Nazim
10The Price Agreement for the Supply, Fabrication, Galvanising, Maintenance and Delivery of 50kg LPG Cylinder Steel Pallet for PDB
ProjectMar 2010 - Oct 2010
HRSB/Petronas Dagangan Berhad 138,000.00 12,800
Abdul Majeed K. Kunheen - General Manager - Finance
Division
11 Replace & rectify 12LBB45 Alloy Pipe inclusive PWHT ProjectMarch 2010 -May 2010
Panglima Power Sdn Bhd 61,573.86 6,200 06 351 3048
12 Repair Floating Suction Pipe Tank T-202 Project May 2010HRSB/Petronas
Dagangan Berhad 95,000.00 8,900 A Mutalib Shafiai/ En M
Shariff Hj Ibrahim (Procurement)
13Delivery, Installation & comm of Process Stripper Feed Pump Upgrading at EMSB Project
May - June 2010
HRSB/Ethylene (M) Sdn Bhd 385,000.00 10,800
A Mutalib Shafiai/ En M Shariff Hj Ibrahim
(Procurement)
14Metallic Structural/ Piping (Cooling Water Piping Replacement)(Include Mechanical Tie-in works)
Project / Shutdown work
Oct 2010 - Nov 2010
HRSB/Petronas Gas Berhad 422,000.00 16,900 Muhammad Bin Idris
(Procurement)
15Price Agreement (PA) for the Repair Work of LPG Pallet for Petronas Dagangan Berhad at Melaka LPG Terminal Project
Dec 2010- Mar 2011
HRSB/Petronas Dagangan Berhad 276,000.00 9,800 M Ruslan Asari - Manager,
Supply Chain Mgt
16The EPCC of the New Filter Water Separator (FWS) at PDB Fuel and Aviation Storage Terminals EPCC
Dec 2010 - Aug 2011
HRSB/Petronas Dagangan Berhad 4,900,000.00 68,000 En Rozaini Bin Mohd Sani -
General Manager
17Mechanical Piping UCON-26-LS Configuration Project Petronas Chemical Derivatives Sdn Bhd Project
Dec 2012 - Jan 2013
Petronas Chemical Derivatives Sdn Bhd 2,941,200.00 93,000 En Shamsulisam
18 Fabrication and Installation of Pipe Bridge at Kaneka ProjectSept 2012 - Feb 2013 Kaneka (M) Sdn Bhd 4,500,000.00 25,000 En Saiful Adlee -
609-583 7000
19 GPP 4 Tie In Works at Petronas Gas Berhad Complex A Project / ShutdownOct 2012 - Feb 2013 PGB / Shinryo 350,000.00 18,800 En Harmaini / En Azhar
20 Mechanical and Piping GPP1 Boot Level Controller Modification Project / ShutdownFeb - March
2013 Petronas Gas Berhad 641,000.00 29,000 En Harmaini
21Engineering, Design Serv-Mechanical & Piping GPP2 Boot Level Modification EPCC
Feb - Mar 2013 Petronas Gas Berhad 354,200.00 10,000 Hasanul Arifin Che Jawias
22EPCC Of 2-PSV-1101, 2-PSV-1102, 2-PSV-1103, And 2-PSV-1104 Discharge Headers To GPP-1 Project
Sept - Oct 2013 Petronas Gas Berhad 650,000.00 13,000 Harmainie Yahaya
23EPCC of Fire Wall for Hydrogen Skid for Argon Plant at ASU2, CUF Kertih, Terengganu Darul Iman EPCC
April - July 2013
Petronas Gas Berhad (CUF) 488,900.00 28,000 En. M Madzhir Bin Ibrahim
09 867 3677
24 Pressure Vessel Servicing Job Turnaround June 13 - July 13
KANEKA 93,000.00 5,000 Muhamad Tirmizi 09 582 6000
25 EPCC For Installation And Integration Of Owners Supplied Skids For Advanced C02 Pilot at GPP3
EPCC June 13 - April 14
PETRONAS Technical Services Sdn Bhd
4,982,200.00 43,900 Azmil Azim
26 New Line Of Underground Firewater and OWS for GPPA & GPPB ProjectJune 13 - April 14
PETRONAS Gas Berhad 2,050,000.00 44,800 Mohd Asmadi
03 2144 8966
27 Installation Of Fire Walls Between Transformer and Cable Celler ProjectDec 14 - Feb 15
PETRONAS Chemicals
Derivatives Sdn Bhd380,900.00 8,700 Nur Syazwani Amira Bt M
Munir
28Engineering, Procurement, Construction And Commissioning (EPCC) Services For Resak Line Upgrading (RLU) Project At Gas Processing Plant (GPP)
Project / EPCC8 July 14 -
Apr 15PETRONAS Gas
Berhad 10,656,136.00 117,600 Harmaini Yahya 03 2051 5000
B. TANK CLEANING/ INSPECTION WORK
No Name of Project/ contract and location Description Of Work Performed Date Client Total Value of
Contract (RM)Estimated Total
ManhoursName of two Referees
for each Project
1 Repair & Refurbish Floating Suction Pipe for T-205 Project April 2009 - May 2009
HRSB/Petronas Dagangan Berhad
96,000.00 5,800 En Roslan Omar/ 03-2331 6325
2 Repair & Refurbish Floating Suction Pipe for T-202 ProjectOct 2009 - Nov 2009
HRSB/Petronas Dagangan Berhad 95,000.00 5,800 En Roslan Omar/ 03-2331
6325
3 T901- BD Ball Tank for DOSH Inspection ProjectJuly -
August 2010 Kaneka (M) Sdn Bhd 78,000.00 5,900 En Saiful Adlee - 609-583 7000
4 Tank Cleaning & Dosh Inspection on T-0003 Spherical TankTank Cleaning &
OverhaulJan - March
2012Kaneka Paste
Polymers Sdn Bhd 100,000.00 7,000 En Saiful Adlee - 609-583 7000
5 Repair Leaking Roof ACR Building ProjectOct - Nov
2012Kerteh terminal Sdn
Bhd 23,520.00 4,000 En Ahmad Fakri Mohd 09 830 5886/5788
6 Maintenance Repair of Portable Access Platform Project Dec 2012Kerteh terminal Sdn
Bhd 4,900.00 5,800 En Ahmad Fakri Mohd 09 830 5886/5788
7 Tank Internal Cleaning and DOSH Inspection on BT-0003B at Kaneka Port Storage
Project Nov 2012 - Feb 2013
Kaneka Paste Polymers Sdn. Bhd.
106,330.00 5,000 En Muhamad Tirmizi / En Saiful Adli (09 582 6000)
8 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-901)
Project June 2013 Kaneka (Malaysia) Sdn. Bhd.
86,000.00 9,830 MK Hafiz
9 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-902)
Project Feb - March 2014
Kaneka (Malaysia) Sdn. Bhd.
86,000.00 1,280 En Hafiz (09 582 6000)
10 To Repair Nozzle On BD Spherical Tank (T-902) Shutdown Feb-14 Kaneka (M) Sdn Bhd 25,000.00 5,000 MK Hafiz
The above summary of experiences provides indicative measure concerning DSESB future potentials and direction. The management of DSESB is committed to providing its client best-value-for-money project deliveries.
C. TURNAROUND / SHUTDOWN
No Project Title / Description Type Of Work Date Client Total Value of Contract (RM)
Estimated Total Manhours
Name of two Referees for each Project
12009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu Turnaround
Sept 2008 - June 2009
Optimal Chemical (M) Sdn Bhd 467,000.00 48,700
En Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan
Kuantan-Kuala Terengganu,Terengganu
2The Dismantling & installation of Four(4) Nos of E 2005 AFC Bundle and its Auxiliaries During PDH shutdown October 2009
Project/Shutdown Works
Aug 2009 - Oct 2009
MTBE Malaysia Sdn Bhd 187,000.00 17,900 Tuan Suzira Bt Tuan Mat
3 Main Mechanical Contractor for KR2 Shutdown 2010 Project/Shutdown Works
March 2010 -April 2010
Petronas Penapisan (T) Sdn Bhd
420,000.00 35,600 En Ramniza Mat Rani
4Provision of 2011 Plant Turnaround Work for Derivatives and Utilities Package
Project/Turnaround Works
Oct 2010 - Feb 2011
Optimal Chemical (M) Sdn Bhd 558,000.00 46,000 Mansor bin Ahmad -
Maintenance Dept
5 Integrated Planning for Heat Exchanger Overhaul Works for MMSB Plant Shutdown Aprill 2011
Project/Shutdown Works
April 2011 HRSB/MTBE 785,000.00 35,000 Hj Sufian Ayob
6 MBS Plant Shutdown At Kaneka Malaysia Shutdown May-11 Kaneka 45,000.00 7,600 En Saiful Adlee - 609-583 7000
7 Polyplastic Shutdown December 2011 Shutdown Nov - Dec 2011
Polyplastic 200,000.00 28,000 En Razali & En Azlizi 09 585 8363
8 Kertih Terminal Shutdown January 2012 Shutdown January 2012
Kerteh Terminal Sdn Bhd
280,000.00 30,300 En Amir - 09 826 6463
9 CUF Defect Works Project January 2012
Kaneka/PGB/CUF/PDH
40,000.00 2,800 En Saiful Adlee - 609-583 7000
10 To Perform of Mechanical Shutdown work during Optimal Turnaround 2012 for Package B
Turnaround /Shutdown Jan - May 2012
Optimal Chemical (M) Sdn Bhd
12,980,000.00 211,000 En M Reza Shawal - 609-830 7613
11 Flexsys Chemical Annual Shutdown Shutdown Oct 2012 - Jan 2013
Flexsys Chemical (M) Sdn Bhd
600,000.00 40,000 En Shahrizan
12 GPP 4 Tie-In Works at Petronas Gas Berhad Complex A Project Sept - Jan 2013
PGB/Shinryo 350,000.00 18,000 En Harmaini / En Azhar
13 To Perform Service At Chilled Water Tower Distributor At PGB-CUF Kerteh
Turnaround June - Sept 2013
Petronas Gas Berhad (CUF)
220,000.00 22,700 Rostam Abd Ghani
14 9 Unit BOG Equipment Servicing & Inspection For DOSH Project May 2014 Kertih Terminals Sdn Bhd
98,000.00 9,400 Anuar Ali
15Provision of Labour, Tool, Equipment and Consumable in Order To Perform 2014 Plant Turnaround Mechanical Work Package For Static Equipment
Turnaround 15 May 14 - 31 May 14
Flexsys Chemical Sdn Bhd
327,000.00 28,600 Mat Noor Salleh 09-585 6296
16 Construction Work For Boiler Noise @ F24101 Project Dec 14 - Jan 15
PETRONAS Penapisan
(Terengganu) Sdn Bhd
210,000.00 5,600 Zakiah Bt Mat Daud
17 To Supply Manpower, Tools, Equipment and Consumable For 2015 Turnaround For DOSH Registered Equipment at KTSB
Turnaround Dec 14 - Feb 15
Kertih Terminals Sdn Bhd
240,000.00 15,200 Surizan Khalil 09 830 5788
18 FPG 2015 Plant Turnaround Works Turnaround May 15 - June 15
FPG Oleochemicals Sdn. Bhd.
6,400,000.00 120,000 Azhari / Arumugam
19 DOSH CF Renewal For Five (5) Exchangers E120, E122, E126, E131, E225 During Mini Shutdown 2015
Shutdown June 15 - Aug 15
PETRONAS Chemicals Ethylene
Sdn. Bhd.185,000.00 4,500 Azila C Omar (09-8272040)
20 DOSH Inspection - 9 Unit BOG Equipment for CF Renewal Shutdown Sept 2015 Kerteh Terminal Sdn. Bhd
98,500.00 2,500 Anuar Bin Ali (09-8305095)
D. SCAFFOLDING
No Project Title / Description Type Of Work Date Client Total Value of Contract (RM)
Estimated Total Manhours
Name of two Referees for each Project
1 Scaffolding Services & Inspection ProjectNov - Dec
2009Ethylene (M) Sdn
Bhd 47,000.00 5,400 En Nadzir Bin Ismail - Tel 09-829 2512
2 Scaffolding Services & Inspection Term ContractDec 2009 - April 2010
Optimal Chemical (M) Sdn Bhd 135,000.00 16,760 Mansor bin Ahmad -
Maintenance Dept
3 Scaffolding Services & Inspection Project/TAOct 2010 - Feb 2011
Optimal Chemical (M) Sdn Bhd 215,000.00 19,400 Mansor bin Ahmad -
Maintenance Dept
4 Scaffolding Services & Inspection TurnaroundApril 2015 - July 2015
FPG Oleochemicals Sdn. Bhd. 500,000.00 35,000 Azhari/Arumugam
E. BLASTING & PAINTING WORK
No Project Title / Description Type Of Work Date Client Project Value (RM)
Estimated Total Manhours
Name of two Referees for each Project
1Term Contract Blasting and Painting 2+1 at Petronas Fertilizer Kedah Sdn Bhd Term Contract
Feb 2007 - Feb 2009
Petronas Fertilizer Kedah Sdn Bhd 156,800.00 9,830
En Zenol Arifin Mohd Sidek, KM 3, Jalan Jeniangm P.O. Box 22,
08300 Gurun, Kedah
2Additional Work during 2009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu
Turnaround Feb 2009 - June 2009
Optimal Chemical (M) Sdn Bhd
96,000.00 8,900
Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan
Kuantan-Kuala Terengganu,Terengganu
3 External Painting Work for Fire Water Tank At MBS Plant Project July - Aug 2011
Kaneka (M) Sdn Bhd 30,000.00 3,400 En Saiful Adlee - 609 583 7000
4 Maintenance Painting Work of Pipe Rack at KEPS Plant ProjectJuly - Aug
2011 Kaneka (M) Sdn Bhd 118,000.00 8,700 En Saiful Adlee - 609 583 7000
5 External Painting Work for VCM Tank ProjectSept - Nov
2012 Kaneka (M) Sdn Bhd 95,000.00 8,000 En Saiful Adlee - 609 583 7000
63,420,780.86 1,553,600.00
25,150,000.00 242,200.00
88,570,780.86 1,795,800.00
Total Services Rendered =
Total On Going Services =
Grand Total Service Rendered =
WORKSHOP / FABRICATION YARD
24 meters
35 meters