Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013

Embed Size (px)

Citation preview

  • Slide 1

Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013 Slide 2 Outline of Presentation Permanent Stormwater Controls that Require O&M Verification Inspections O&M Requirements in the Municipal Regional Stormwater Permit The O&M Verification Inspection Plan Tools for Conducting, Tracking and Reporting O&M Inspections For more information Slide 3 Permanent Facilities that Require O&M Inspections Provision C.3.h of the MRP requires agencies to conduct inspections to verify operation & maintenance (O&M) of: Stormwater treatment measures, and Hydromodification management measures Slide 4 Stormwater Treatment Measures Low impact development (LID) treatment systems (biotreatment, infiltration, rainwater harvesting systems) Bioretention Area (biotreatment) Slide 5 Stormwater Treatment Measures Vault-based systems (hydrodynamic separators, media filters, proprietary tree well filters) Media Filter Cartridge Hydrodynamic Separator Slide 6 Hydromodification Management (HM) Facilities Basin, tank, pipe, or vault with specially designed outlet to slowly release water. Detention basin with outlet structure Slide 7 O&M Requirements (Provision C.3.h) Agencies subject to the MRP must: Require facility owners to conduct ongoing maintenance (e.g., maintenance agreement). Prepare and implement plan for annual O&M verification inspections, including new installations. Conduct O&M verification inspections; provide enforcement as needed. Track and report on inspections. Slide 8 Model Maintenance Agreement Requires property owner to assure ongoing operation and maintenance Slide 9 What about Municipality- owned Facilities? O&M inspection requirements do not distiguish between municipal and non- municipal facilities. Inspect, track and report on facilities that your municipality is responsible for maintaining. Slide 10 O&M Verification Inspection Plan Each fiscal year, inspect: All newly installed stormwater treatment and HM controls within 45 days of installation 20% of the total number of installed stormwater treatment and HM controls (when rounding, round up!) 20% of all installed vault-based systems (round up) All installed treatment and HM facilities must be inspected at least once every 5 years. Slide 11 Lessons Learned from NOVs Round up when calculating 20 % of treatment/HM facilities per year, AND when calculating 20 % of vault systems. If your agency has fewer than 5 facilities, be sure to inspect at least one per year. Annual Reporting year July 1 - June 30th Now is a good time to verify you have your inspections completed Slide 12 Mosquito Abatement District Coordination List of newly-installed facilities submitted each year: To Mosquito Abatement District (MAD) Also to Regional Water Board Submitted before October 1 Countywide Program makes the MAD submittal based on info in your Annual Report Slide 13 Tools for Inspecting, Tracking & Reporting O&M Verification Inspection Checklist Annual Report O&M Inspection Table Each agency should have an internal tracking table NOT submitted with Annual Report Can be requested by Regional Board at any time Slide 14 O&M Verification Checklist Slide 15 Annual Report Form C.3.h Reporting Table Slide 16 Annual Report Form Name of facility/site inspected Address If newly installed Party responsible for maintenance Date of inspection Type of inspection (initial, annual, follow-up, spot) Type of stormwater treatment/HM control Inspection findings/results Enforcement actions taken Comments/Follow-up Slide 17 Data Tracking Similar to AR Data Except Name of facility/site inspected Address specific description of location of treatment/HM controls If newly installed date of installation Party responsible for maintenance Date of inspection Type of inspection (initial, annual, follow-up, spot) Type of stormwater treatment/HM control type and size Inspection findings/results Enforcement actions taken Comments/Follow-up corrective actions Slide 18 For More Information Countywide Program Password Protected ND page www.flowstobay.org (click on Municipalities, then ND)www.flowstobay.org O&M Verification Inspection Plan Template O&M Verification Inspection Checklist Model maintenance agreement Municipal Regional Stormwater Permit www.flowstobay.org (click on Municipalities, then scroll to Municipal Stormwater Permit) www.flowstobay.org Slide 19 Common Issues in Inspections of Newly-Installed Treatment Measures Purpose of inspection When to inspect What to look for during inspection Common issues Checklist for 45-day inspection Slide 20 Purpose of Inspection Verify treatment measures and/or hydromodification management controls are installed per approved plans. At a minimum, inspect those components that are visible in the finished condition. If possible, also inspect below grade components during construction. Slide 21 When to Inspect Within 45 days of installation May conduct as part of overall final inspection of constructed project May conduct during different construction phases (e.g. inspect underground elements, i.e. underdrain, while visible) Slide 22 Prepare for the Inspection Review project plans to identify: The number of treatment measures and/or HM systems to be installed on the site. The locations of treatment measures and/or HM systems. The dimensions of treatment measures and/or HM systems. Slide 23 Prepare for the Inspection Review project plans to identify: How high flows will be managed/diverted Locations of underdrains and cleanouts Type and extent of plant cover Type of approved irrigation system In this system, high flows will enter raised inlet. Slide 24 During the Inspection Confirm that installation matches approved plans regarding: Total number and type(s) of facilities Location of facilities on the site Components and dimensions of facilities Request confirmation from site superintendent that biotreatment soil is per MRP specifications Slide 25 During the Inspection Confirm that installation matches approved plans regarding: Type and extent of plant cover Functional irrigation system (if provided) High-flow bypass or overflow path Overflow drain designed to keep out trash and debris. Slide 26 Common Issues Is there exposed soil? Exposed soil should be covered with 2 of mulch, except for area immediately surrounding tree trunks (roots need air). Will vegetation block inlets to the treatment measure when mature? Turf is blocking inlet; insufficient drop between pavement and top of grade in planting area. Slide 27 Common Issues Is there positive drainage to the treatment measures? Is there permanent erosion control at points of concentrated flow? Cobbles reduce erosion at entrance to bioretention area. Slide 28 Common Issues Are plants healthy? Is there accumulation of sediment from construction activity? Accumulated sediment must be removed. Slide 29 O&M Verification Checklist May be used for 45-Day inspections; will have to use Comments section Slide 30 Questions? Jill Bicknell, P.E. 408-720-8811 x1 [email protected] Kristin Kerr, P.E., QSD 510.832.2852 x 122 [email protected]