13
ENVIRONMENTAL MEASUREMENT SAMPLING LABORATORY EQUIPMENT EX- COMPONENTS Rev. 1 ORI Abwassertechnik GmbH & Co. KG Bollacken 2 D-32479 Hille Germany Tel.: +49 57 03 / 51010 Fax: 0 57 03 / 510151 e-mail: [email protected] Internet: http://www.origmbh.de Operating Manual for Ex traffic light system for Dräger X-zone Switch Off/On Item No. 8322301 ATEX II 2G IIC T3 X

Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

ENVIRONMENTAL MEASUREMENT SAMPLING LABORATORY EQUIPMENT EX-COMPONENTS

Rev 1 ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 57 03 51010 Fax 0 57 03 510151

e-mail Infoorigmbhde Internet httpwwworigmbhde

Operating Manualfor

Ex traffic light system for Draumlger X-zone Switch OffOn

Item No 8322301

ATEX II 2G IIC T3 X

Operating Manual Ex traffic light2

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Revision directoryRevision Date Author Revision1 20120213 SS 1st draft11 20120214 SS Amendments new item numbers12 20120215 SS Larger drawings +2 revisions p 5

Contents

1 Safety information 311 Intended use 312 Safety signs and symbols 313 Installation initial start-up operation 4131 Special operating instructions 5

2 Technical data 63 Setup 74 connection 85 Traffic light function displays 116 Installation 127 Inspectionservicecleaning 12

Operating Manual Ex traffic light3

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

1 Safety information

11 Intended use

The explosion zone traffic light system is used for signalling and regulation of traffic within explosion-hazardous areas in Zones 1 and 2 The explosion traffic light is used for closing(red traffic light) and releasing (green traffic light) explosion-hazardous areas in combina-tion with the Draumlger Switch OffOn boxes and the Draumlger X-zone 5000 through display of the appropriate traffic lightsThe traffic light is designed for mobile use and is easy to transport using its wheels It can be operated indoors and outdoors

12 Safety signs and symbols

Problem-free and reliable operation of this device is only guaranteed if the safety informa-tion contained in this operating manual is observed precisely The safety information con-tained in this operating manual is labelled with the following symbols

WarningWarning points out activities or processes which (if they are not carried out properly) could lead to personnel injuries or to a safety risk Observe the work instructions precisely and proceed with the utmost care

CautionCaution points out activities all processes which (if they are not carried out properly) could lead to incorrect operation or destruction of the equipment Observe the instructions precisely

NoteNote points out activities or processes which (if they are not carried out properly) could cause indirect influences on operation or unforeseen equip-ment actions

Operating Manual Ex traffic light4

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

13 Installation initial start-up operation

The installation electrical connection initial start-up operation and maintenance of the explosion zone traffic light system may only be carried out by trained spe-cialist personnel who have been authorised to do so by the equipment owner

Specialist personnel must be familiar with this operating manual and follow the instructions contained therein Before connecting the traffic light system ensure that the supply voltage complies with the value specified on the nameplate The explosion zone traffic light system has been prepared at the works for connection to a Draumlger Switch Off switchbox A Draumlger Switch ON Box can be connected as an alternative However this requires re-cabling of the traffic light terminal box Before switching the system on check all connections for cor-rect cabling again Ensure that the traffic light displays the correct signal colour for the cor-responding condition of the switchbox connected If not check the connections in the re-lay

Before installationinitial start-upRead the operating manual You must also observe the operating manual for the explosion-proof traffic signal 60912 made by STAHLInstallation and operating personnel must be sufficiently trained Ensure that the contents of the operating manual has been completely understood by the responsible personnel The national installation and assembly regulations (eg IECEN 60079-14) also apply

Before operating the traffic light you must ensure that

the traffic light has been properly installed the connection has been made properly the operating and nominal voltage have been observed the traffic light is not damaged

When operating the equipmentKeep the operating manual available at the location of useObserve the safety information Observe the national safety and accident prevention regulationsOnly operate the equipment in accordance with the performance dataMaintenance or repair work which is not described in the operating manual may not be carried out without previous agreement with the manufacturerDamage may cancel out the explosion protection Modifications and alterations to the equipment which could affect the explosion protection are not permitted Only operate the device and undamaged and clean condition

In cases of uncertaintycontact the manufacturer

Operating Manual Ex traffic light5

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

The traffic light may only be operated in explosion-hazardous areas in accordance with this operating manual

Summary of special warning notices

- If the housing is damaged or if the housing components (eg the connecting plug) are damaged the device must be taken out of operation immediately and secured against unintentional operation

- Free cable ends must be connected professionally (eg explosion-proof ter-minal boxes explosion-proof plugs)

- The traffic light must be powered down before the housing is opened - The traffic light lenses may only be cleaned using a moist cloth (danger of

static charging) - Do not use cleaning agents containing alcohol for cleaning - Equipotential bonding must be made via the housing earthing screw This

must be made using a spade terminal and the connecting cable of min 4 mm2

- If the X-zone Switch OffOn box is used the traffic light may only be operated with 400V 3Phasen+N 50Hz inputs

- The device must be set up securely on a level floor Tensioning of the supply and connecting cables must be avoided

- The traffic light must be made more stable using additional weights (eg sandbags) if necessary and must also be suitably secured to ensure stable standing even at high wind speeds

- Only consumers which do not exceed the following maximum values may be connected 400V 50Hz CEE 32A 3P+N+PE

131 Special operating instructions

The explosion-proof traffic light has been fitted with an explosion-proof power socket The X-zone Switch Off or On device is connected here

Only plugs of type 857112 and 857812 made by R STAHL may be used in connection with this power socket

The wall power socket can only be switched on when the plug has been plugged in If the plug has been withdrawn lock the hinged cover with the bayonet ring

Technical progressThe manufacturer reserves the right to modify technical data to match technical process without specific notice You can obtain information about activities and possible amend-ments to this operating manual from ORI ABWASSERTECHNIK GMBH amp CO

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 2: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light2

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Revision directoryRevision Date Author Revision1 20120213 SS 1st draft11 20120214 SS Amendments new item numbers12 20120215 SS Larger drawings +2 revisions p 5

Contents

1 Safety information 311 Intended use 312 Safety signs and symbols 313 Installation initial start-up operation 4131 Special operating instructions 5

2 Technical data 63 Setup 74 connection 85 Traffic light function displays 116 Installation 127 Inspectionservicecleaning 12

Operating Manual Ex traffic light3

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

1 Safety information

11 Intended use

The explosion zone traffic light system is used for signalling and regulation of traffic within explosion-hazardous areas in Zones 1 and 2 The explosion traffic light is used for closing(red traffic light) and releasing (green traffic light) explosion-hazardous areas in combina-tion with the Draumlger Switch OffOn boxes and the Draumlger X-zone 5000 through display of the appropriate traffic lightsThe traffic light is designed for mobile use and is easy to transport using its wheels It can be operated indoors and outdoors

12 Safety signs and symbols

Problem-free and reliable operation of this device is only guaranteed if the safety informa-tion contained in this operating manual is observed precisely The safety information con-tained in this operating manual is labelled with the following symbols

WarningWarning points out activities or processes which (if they are not carried out properly) could lead to personnel injuries or to a safety risk Observe the work instructions precisely and proceed with the utmost care

CautionCaution points out activities all processes which (if they are not carried out properly) could lead to incorrect operation or destruction of the equipment Observe the instructions precisely

NoteNote points out activities or processes which (if they are not carried out properly) could cause indirect influences on operation or unforeseen equip-ment actions

Operating Manual Ex traffic light4

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

13 Installation initial start-up operation

The installation electrical connection initial start-up operation and maintenance of the explosion zone traffic light system may only be carried out by trained spe-cialist personnel who have been authorised to do so by the equipment owner

Specialist personnel must be familiar with this operating manual and follow the instructions contained therein Before connecting the traffic light system ensure that the supply voltage complies with the value specified on the nameplate The explosion zone traffic light system has been prepared at the works for connection to a Draumlger Switch Off switchbox A Draumlger Switch ON Box can be connected as an alternative However this requires re-cabling of the traffic light terminal box Before switching the system on check all connections for cor-rect cabling again Ensure that the traffic light displays the correct signal colour for the cor-responding condition of the switchbox connected If not check the connections in the re-lay

Before installationinitial start-upRead the operating manual You must also observe the operating manual for the explosion-proof traffic signal 60912 made by STAHLInstallation and operating personnel must be sufficiently trained Ensure that the contents of the operating manual has been completely understood by the responsible personnel The national installation and assembly regulations (eg IECEN 60079-14) also apply

Before operating the traffic light you must ensure that

the traffic light has been properly installed the connection has been made properly the operating and nominal voltage have been observed the traffic light is not damaged

When operating the equipmentKeep the operating manual available at the location of useObserve the safety information Observe the national safety and accident prevention regulationsOnly operate the equipment in accordance with the performance dataMaintenance or repair work which is not described in the operating manual may not be carried out without previous agreement with the manufacturerDamage may cancel out the explosion protection Modifications and alterations to the equipment which could affect the explosion protection are not permitted Only operate the device and undamaged and clean condition

In cases of uncertaintycontact the manufacturer

Operating Manual Ex traffic light5

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

The traffic light may only be operated in explosion-hazardous areas in accordance with this operating manual

Summary of special warning notices

- If the housing is damaged or if the housing components (eg the connecting plug) are damaged the device must be taken out of operation immediately and secured against unintentional operation

- Free cable ends must be connected professionally (eg explosion-proof ter-minal boxes explosion-proof plugs)

- The traffic light must be powered down before the housing is opened - The traffic light lenses may only be cleaned using a moist cloth (danger of

static charging) - Do not use cleaning agents containing alcohol for cleaning - Equipotential bonding must be made via the housing earthing screw This

must be made using a spade terminal and the connecting cable of min 4 mm2

- If the X-zone Switch OffOn box is used the traffic light may only be operated with 400V 3Phasen+N 50Hz inputs

- The device must be set up securely on a level floor Tensioning of the supply and connecting cables must be avoided

- The traffic light must be made more stable using additional weights (eg sandbags) if necessary and must also be suitably secured to ensure stable standing even at high wind speeds

- Only consumers which do not exceed the following maximum values may be connected 400V 50Hz CEE 32A 3P+N+PE

131 Special operating instructions

The explosion-proof traffic light has been fitted with an explosion-proof power socket The X-zone Switch Off or On device is connected here

Only plugs of type 857112 and 857812 made by R STAHL may be used in connection with this power socket

The wall power socket can only be switched on when the plug has been plugged in If the plug has been withdrawn lock the hinged cover with the bayonet ring

Technical progressThe manufacturer reserves the right to modify technical data to match technical process without specific notice You can obtain information about activities and possible amend-ments to this operating manual from ORI ABWASSERTECHNIK GMBH amp CO

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 3: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light3

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

1 Safety information

11 Intended use

The explosion zone traffic light system is used for signalling and regulation of traffic within explosion-hazardous areas in Zones 1 and 2 The explosion traffic light is used for closing(red traffic light) and releasing (green traffic light) explosion-hazardous areas in combina-tion with the Draumlger Switch OffOn boxes and the Draumlger X-zone 5000 through display of the appropriate traffic lightsThe traffic light is designed for mobile use and is easy to transport using its wheels It can be operated indoors and outdoors

12 Safety signs and symbols

Problem-free and reliable operation of this device is only guaranteed if the safety informa-tion contained in this operating manual is observed precisely The safety information con-tained in this operating manual is labelled with the following symbols

WarningWarning points out activities or processes which (if they are not carried out properly) could lead to personnel injuries or to a safety risk Observe the work instructions precisely and proceed with the utmost care

CautionCaution points out activities all processes which (if they are not carried out properly) could lead to incorrect operation or destruction of the equipment Observe the instructions precisely

NoteNote points out activities or processes which (if they are not carried out properly) could cause indirect influences on operation or unforeseen equip-ment actions

Operating Manual Ex traffic light4

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

13 Installation initial start-up operation

The installation electrical connection initial start-up operation and maintenance of the explosion zone traffic light system may only be carried out by trained spe-cialist personnel who have been authorised to do so by the equipment owner

Specialist personnel must be familiar with this operating manual and follow the instructions contained therein Before connecting the traffic light system ensure that the supply voltage complies with the value specified on the nameplate The explosion zone traffic light system has been prepared at the works for connection to a Draumlger Switch Off switchbox A Draumlger Switch ON Box can be connected as an alternative However this requires re-cabling of the traffic light terminal box Before switching the system on check all connections for cor-rect cabling again Ensure that the traffic light displays the correct signal colour for the cor-responding condition of the switchbox connected If not check the connections in the re-lay

Before installationinitial start-upRead the operating manual You must also observe the operating manual for the explosion-proof traffic signal 60912 made by STAHLInstallation and operating personnel must be sufficiently trained Ensure that the contents of the operating manual has been completely understood by the responsible personnel The national installation and assembly regulations (eg IECEN 60079-14) also apply

Before operating the traffic light you must ensure that

the traffic light has been properly installed the connection has been made properly the operating and nominal voltage have been observed the traffic light is not damaged

When operating the equipmentKeep the operating manual available at the location of useObserve the safety information Observe the national safety and accident prevention regulationsOnly operate the equipment in accordance with the performance dataMaintenance or repair work which is not described in the operating manual may not be carried out without previous agreement with the manufacturerDamage may cancel out the explosion protection Modifications and alterations to the equipment which could affect the explosion protection are not permitted Only operate the device and undamaged and clean condition

In cases of uncertaintycontact the manufacturer

Operating Manual Ex traffic light5

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

The traffic light may only be operated in explosion-hazardous areas in accordance with this operating manual

Summary of special warning notices

- If the housing is damaged or if the housing components (eg the connecting plug) are damaged the device must be taken out of operation immediately and secured against unintentional operation

- Free cable ends must be connected professionally (eg explosion-proof ter-minal boxes explosion-proof plugs)

- The traffic light must be powered down before the housing is opened - The traffic light lenses may only be cleaned using a moist cloth (danger of

static charging) - Do not use cleaning agents containing alcohol for cleaning - Equipotential bonding must be made via the housing earthing screw This

must be made using a spade terminal and the connecting cable of min 4 mm2

- If the X-zone Switch OffOn box is used the traffic light may only be operated with 400V 3Phasen+N 50Hz inputs

- The device must be set up securely on a level floor Tensioning of the supply and connecting cables must be avoided

- The traffic light must be made more stable using additional weights (eg sandbags) if necessary and must also be suitably secured to ensure stable standing even at high wind speeds

- Only consumers which do not exceed the following maximum values may be connected 400V 50Hz CEE 32A 3P+N+PE

131 Special operating instructions

The explosion-proof traffic light has been fitted with an explosion-proof power socket The X-zone Switch Off or On device is connected here

Only plugs of type 857112 and 857812 made by R STAHL may be used in connection with this power socket

The wall power socket can only be switched on when the plug has been plugged in If the plug has been withdrawn lock the hinged cover with the bayonet ring

Technical progressThe manufacturer reserves the right to modify technical data to match technical process without specific notice You can obtain information about activities and possible amend-ments to this operating manual from ORI ABWASSERTECHNIK GMBH amp CO

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 4: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light4

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

13 Installation initial start-up operation

The installation electrical connection initial start-up operation and maintenance of the explosion zone traffic light system may only be carried out by trained spe-cialist personnel who have been authorised to do so by the equipment owner

Specialist personnel must be familiar with this operating manual and follow the instructions contained therein Before connecting the traffic light system ensure that the supply voltage complies with the value specified on the nameplate The explosion zone traffic light system has been prepared at the works for connection to a Draumlger Switch Off switchbox A Draumlger Switch ON Box can be connected as an alternative However this requires re-cabling of the traffic light terminal box Before switching the system on check all connections for cor-rect cabling again Ensure that the traffic light displays the correct signal colour for the cor-responding condition of the switchbox connected If not check the connections in the re-lay

Before installationinitial start-upRead the operating manual You must also observe the operating manual for the explosion-proof traffic signal 60912 made by STAHLInstallation and operating personnel must be sufficiently trained Ensure that the contents of the operating manual has been completely understood by the responsible personnel The national installation and assembly regulations (eg IECEN 60079-14) also apply

Before operating the traffic light you must ensure that

the traffic light has been properly installed the connection has been made properly the operating and nominal voltage have been observed the traffic light is not damaged

When operating the equipmentKeep the operating manual available at the location of useObserve the safety information Observe the national safety and accident prevention regulationsOnly operate the equipment in accordance with the performance dataMaintenance or repair work which is not described in the operating manual may not be carried out without previous agreement with the manufacturerDamage may cancel out the explosion protection Modifications and alterations to the equipment which could affect the explosion protection are not permitted Only operate the device and undamaged and clean condition

In cases of uncertaintycontact the manufacturer

Operating Manual Ex traffic light5

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

The traffic light may only be operated in explosion-hazardous areas in accordance with this operating manual

Summary of special warning notices

- If the housing is damaged or if the housing components (eg the connecting plug) are damaged the device must be taken out of operation immediately and secured against unintentional operation

- Free cable ends must be connected professionally (eg explosion-proof ter-minal boxes explosion-proof plugs)

- The traffic light must be powered down before the housing is opened - The traffic light lenses may only be cleaned using a moist cloth (danger of

static charging) - Do not use cleaning agents containing alcohol for cleaning - Equipotential bonding must be made via the housing earthing screw This

must be made using a spade terminal and the connecting cable of min 4 mm2

- If the X-zone Switch OffOn box is used the traffic light may only be operated with 400V 3Phasen+N 50Hz inputs

- The device must be set up securely on a level floor Tensioning of the supply and connecting cables must be avoided

- The traffic light must be made more stable using additional weights (eg sandbags) if necessary and must also be suitably secured to ensure stable standing even at high wind speeds

- Only consumers which do not exceed the following maximum values may be connected 400V 50Hz CEE 32A 3P+N+PE

131 Special operating instructions

The explosion-proof traffic light has been fitted with an explosion-proof power socket The X-zone Switch Off or On device is connected here

Only plugs of type 857112 and 857812 made by R STAHL may be used in connection with this power socket

The wall power socket can only be switched on when the plug has been plugged in If the plug has been withdrawn lock the hinged cover with the bayonet ring

Technical progressThe manufacturer reserves the right to modify technical data to match technical process without specific notice You can obtain information about activities and possible amend-ments to this operating manual from ORI ABWASSERTECHNIK GMBH amp CO

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 5: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light5

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

The traffic light may only be operated in explosion-hazardous areas in accordance with this operating manual

Summary of special warning notices

- If the housing is damaged or if the housing components (eg the connecting plug) are damaged the device must be taken out of operation immediately and secured against unintentional operation

- Free cable ends must be connected professionally (eg explosion-proof ter-minal boxes explosion-proof plugs)

- The traffic light must be powered down before the housing is opened - The traffic light lenses may only be cleaned using a moist cloth (danger of

static charging) - Do not use cleaning agents containing alcohol for cleaning - Equipotential bonding must be made via the housing earthing screw This

must be made using a spade terminal and the connecting cable of min 4 mm2

- If the X-zone Switch OffOn box is used the traffic light may only be operated with 400V 3Phasen+N 50Hz inputs

- The device must be set up securely on a level floor Tensioning of the supply and connecting cables must be avoided

- The traffic light must be made more stable using additional weights (eg sandbags) if necessary and must also be suitably secured to ensure stable standing even at high wind speeds

- Only consumers which do not exceed the following maximum values may be connected 400V 50Hz CEE 32A 3P+N+PE

131 Special operating instructions

The explosion-proof traffic light has been fitted with an explosion-proof power socket The X-zone Switch Off or On device is connected here

Only plugs of type 857112 and 857812 made by R STAHL may be used in connection with this power socket

The wall power socket can only be switched on when the plug has been plugged in If the plug has been withdrawn lock the hinged cover with the bayonet ring

Technical progressThe manufacturer reserves the right to modify technical data to match technical process without specific notice You can obtain information about activities and possible amend-ments to this operating manual from ORI ABWASSERTECHNIK GMBH amp CO

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 6: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light6

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

2 Technical data

Dimensions (W x D x H mm) 795 x 71 x 2150

Weight 44 kg with OFFON switch 72kg

Environmental conditionsduring operation and storage -20degC to 40degC

Protection class IP 54

Power consumption 230V 50Hz 65W

Rated input voltage 400V 50Hz CEE 32A 3P+N+PE

Output voltage 400V 50Hz CEE 32A 3P+N+PE

CE mark CE

Approvals ATEX II 2G IIC T3 X

Materials

Support frame stainless steel 14301Power sockets polyamide GF 30Controller housing polyester

Traffic lighthousing polycarbonate blacklight fields polycarbonate d= 200mmcolours red green signal yellowSeal neoprene blackReflector copper chromium-platedSunshade polyamide

Illuminant

bulb 25W60WMounting E27Voltage 230VCapacity max 60 WTemperature Class (T) T3Max surface temperature [TOmax] T90degC

Device designation

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 7: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light7

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

3 Setup

Mechanical fixings for X-zone Switch OffOnAn X-zone Switch OffOn can be fixed to the traffic light foot area To do this unscrew the four star grip nuts from the threaded rods Remove the supporting plate and place the X-zone Switch OffOn on the traffic light foot area with the display elements facing forwards When doing so place the rear Switch OffOn panel between the threaded rods After this place the supporting plate over it and tighten the star grip nuts

Bracket for Draumlger OnOff Switch

Traffic light

Ex e terminal box

Connectionequipotential bonding

Connecting cable(Power input)

power socket for Draumlger Switch OnOff power input Connector for

Draumlger SwitchOnOff output

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 8: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light8

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

4 connection

Equipotential bonding

The traffic light is provided with an equipotential bonding connection This must be connected to the local equipotential bonding using an equipotential bonding cable gt= 4 mm2 An X-zone Switch OffOn unit must also be connected as above

Overall view of connection

Supply cableL1 black (control phase)L2 brownL3 greyN light bluePE greenyellow

Connect all 5 cores with 400 V~ power connection Only connect L1 N and PE with 230 V~ power connection

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 9: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light9

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Switch OffOn electrical connection to Ex traffic light

You must observe the operating manuals provided for the X-zone Switch OffOn and the X-zone 5000

It may be necessary to re-cable the relay depending on the Off or On version used See next page

Plug the 32A CEE Ex plug from the Switch OffOn into the 32A CEE Ex traffic light power socket

Plug the 32A CEE Ex connector plug from the traffic light into the 32A CEE Ex po-wer socket on the Switch OffOn

Connect the X-Zone 5000 via the black plug on the Switch OffOn Connect the power supply cable to the 400V mains supply Switch on the switch at the 32A CEE Ex power socket on the traffic light Switch on the switch at the 32A CEE Ex power socket on the Switch OffOn Operate the X-Zone 5000 in accordance with the operating manual

Traffic light with X-zone Switch Off and X-zone 5000

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 10: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light10

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Connection at relayThe relay in the terminal box has been cabled as delivered so that a Draumlger Switch Off switchbox can be connected

Switch Off versionConnect the black cable core (green traffic light) at the top to terminal 14 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 22 on the relay

The following cabling must be carried out by appropriate specialists to adapt to a X-zone Switch On Version

Switch On VersionConnect the black cable core (green traffic light) at the top to terminal 12 on the relayConnect the brown cable core (red traffic light) at the bottom to terminal 24 on the relay

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 11: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light11

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Traffic light controller circuit diagram

5 Traffic light function displays

The traffic light either illuminates red green or not at all The yellow lamp is not used in the standard delivery condition

If there is no voltage available the traffic light will not illuminate

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 12: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light12

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Operation with X-zone Switch OffRelay cabling for X-zone Switch Off If a X-zone Switch Off is connected the traffic light illuminates green if the X-zone Switch Off green indicator lamp also illuminates (no explo-sion atmosphere) If the X-zone Switch Off green indicator lamp is off the red traffic light will illuminate

Operation with X-zone Switch OnRelay cabling for X-zone Switch On If a X-zone Switch On is connected the traffic light illuminates green if the X-zone Switch Off red indicator lamp does not illuminate (no explo-sion atmosphere) If the X-zone Switch On red indicator lamp illuminates the red traffic light will illuminate

Note If when operating with a X-zone Switch OffOn Box the lamps do not illuminate as per the above description this may be due to a non-matching relay cabling (please refer to S10)

Operation without X-zone Off On Switch The red traffic light will illuminate if the cabling is for the X-zone Switch Off If the satellite has been cabled for operation with the X-zone Switch On the green traffic light will illumi-nate

6 Installation

The explosion-proof traffic light must be placed on firm ground with the X-zone Switch OffOn Box fixed to it and secured against tipping over as necessary Avoid tension in the connecting cables

7 Inspectionservicecleaning

Refer to the appropriate national regulations (eg IECEN 60079-17) for information on the type and extent of tests

Set out the maintenance intervals so that all expected defects occurring to the device can be determined in good time

Unplug the connector plug at regular intervals to avoid contact corrosion

Do not open the housing when powered up

Repair and maintenance work on the traffic light may only be carried out by appropriately-trained personnel who are authorised to do such work The device must be powered down before commencing any such work

Observe the applicable national provisions in the country of use

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations

Page 13: Operating Manual for Ex traffic light system for Dräger X ...tion with the Dräger Switch Off/On boxes and the Dräger X-zone 5000 through display of the appropriate traffic lights

Operating Manual Ex traffic light13

ORI Abwassertechnik GmbH amp Co KG Bollacken 2 D-32479 Hille GermanyTel +49 (0) 57 03 51 01 0 Fax +49(0) 57 03 51 01 51Email Infoorigmbhde Internet httpwwworigmbhde

Replacing the bulbsOpen the light field segment front door by undoing the two M5 cylinder head screws the front door is hinged Replace the bulb and then firmly close the door again

Service

The following points must be checked during maintenance work Damage or cracks to housing or light fields Connecting cable in perfect condition Reflectors in good condition Undamaged seals Housingfront doors firmly closed Installation condition acceptable

The following must be checked during service work Cables firmly held Housing for visible damage Observance of permissible temperatures in acc w EN 60079-0Bushings for soiling Seals for damage Function according to intended purpose The connecting plug pin surfaces may not be damaged

Cleaning

Traffic lightOnly clean housing and light fields using a moist cloth in order to prevent static charging We recommend using water with a light detergent for cleaning

Frame Cleaning using cloth brush vacuum cleaner etc If cleaning moist use water or mild non-abrasive non-scratching cleansing agent

Never use aggressive cleansing agents or solvents Avoid penetration of water and cleansing agent into contact bushings

AccessoriesOnly ever use original accessories or original spare parts

DisposalObserve national waste disposal regulations