4 OPERATING DATA REPORT DOCKETNO ._ DiTE (- CO31PLETED BY > _ TELEFliONE : -~ __ OPERATING STATUS i 1. Unir Nsme: Hatch 2 Notes 2. Reporting Period: January 1980 3. Licensed Thermal Power (NIWt): 2436 MWt - - -4. Nameplate Rating (Gross NIWe): - 817.0 Gross MWe , 5. Design Electrical Rating (Net 31We): 784.0 flet MWe , 6. 51aximum Dependable Capacity (Gross 51We): 805.7 Gross MWe Slaximum Dependable Capacity (Net 51We): 772.7 fiet MWe , ~ _ _ S. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons: ch,ncad flat M0r from 740 to 772.7 to reflect new utility --- '_ . 9. Power Level To hhich Restricted. If Any (Net S!We): 10. Reasons For Restrictions,if Any: * _ This 51onth Yr..t o.Da t e Cumum:. I1. Hours In Reporting Period 744 744 357- 12. Number Of Hours Reactor Was Criticai 684.1 684.1 33a7 n 13. Reactor Reserve Shutdown Hours 0.0 0.0 '- 14. Hours Generator on-Line 661.2 661.2 30; ' 15. Unit Resene Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (51WH) 1471890 1471890 696595: 17. Gross Electrical Energy Generated ('.1WH) 49.9_79._0_ _ _, 499790 233575G - IS. Net Electrieal Energy Generated (.'.tWH) 478796 478796 22359 " 19. Unit Senice Factor 88.9 88.9 . .. . . n . 20. Unit Availability Factor 88.9 88.9 0 _ 21. Unit Capacity Factor (Using SIDC Net) 83.3 83.3 i 22. Unit Capacity Factor (Using DER Net) 82.I 82.1 7: - 23. Unit Forced Outage Rate 0.0 0.0 24. Shutdowns Scheduled Oser Next 6.\1onths (Type. Date,and Duration of Each): Vont Headpr naflector and Surveillanca Outage. March 1 to Aoril 13 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiewu INITIA L CRITICALITY INITl4 L ELECTRICITY Coil %1ERCI A L OPERATION - _ . 8002.I9Og

OPERATING DATA REPORT · 2019. 11. 6. · average daily unit power level docket no. y-unit "!_ d \te 2. c05tpleted by u-~~ '"telepflone 9ia -- 510ntil january day average daily power

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • 4

    OPERATING DATA REPORT

    DOCKETNO ._DiTE (-

    CO31PLETED BY >_

    TELEFliONE : -~ __

    OPERATING STATUSi

    1. Unir Nsme: Hatch 2 Notes

    2. Reporting Period: January 1980

    3. Licensed Thermal Power (NIWt): 2436 MWt- - -4. Nameplate Rating (Gross NIWe): - 817.0 Gross MWe ,

    5. Design Electrical Rating (Net 31We): 784.0 flet MWe ,6. 51aximum Dependable Capacity (Gross 51We): 805.7 Gross MWe

    Slaximum Dependable Capacity (Net 51We): 772.7 fiet MWe ,~

    _ _

    S. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:

    ch,ncad flat M0r from 740 to 772.7 to reflect new utility --- '_

    .

    9. Power Level To hhich Restricted. If Any (Net S!We):10. Reasons For Restrictions,if Any:

    *_

    This 51onth Yr..t o.Da t e Cumum:.

    I1. Hours In Reporting Period 744 744 357-12. Number Of Hours Reactor Was Criticai 684.1 684.1 33a7 n13. Reactor Reserve Shutdown Hours 0.0 0.0

    '-

    14. Hours Generator on-Line 661.2 661.2 30;'

    15. Unit Resene Shutdown Hours 0.0 0.016. Gross Thermal Energy Generated (51WH) 1471890 1471890 696595:17. Gross Electrical Energy Generated ('.1WH) 49.9_79._0_ _ _, 499790 233575G -IS. Net Electrieal Energy Generated (.'.tWH) 478796 478796 22359 "19. Unit Senice Factor 88.9 88.9 . .. . . n .20. Unit Availability Factor 88.9 88.9 0

    _

    21. Unit Capacity Factor (Using SIDC Net) 83.3 83.3 i22. Unit Capacity Factor (Using DER Net) 82.I 82.1 7: -23. Unit Forced Outage Rate 0.0 0.024. Shutdowns Scheduled Oser Next 6.\1onths (Type. Date,and Duration of Each):

    Vont Headpr naflector and Surveillanca Outage. March 1 to Aoril 13

    25. If Shut Down At End Of Report Period. Estimated Date of Startup:26. Units In Test Status (Prior to Commercial Operation): Forecast Achiewu

    INITIA L CRITICALITYINITl4 L ELECTRICITYCoil %1ERCI A L OPERATION

    - _ .

    8002.I9Og

  • . .

    AVERAGE DAILY UNIT POWER LEVEL

    DOCKET NO. Y-

    UNIT "!_ _.D \TE 2.

    C05tPLETED BY U-~~ '"

    TELEPflONE 9IA - -

    510NTil January

    DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEV:L(Niwe-Net) (51We-Net :

    1 800 17 792

    2 800 is 789

    3 801 662i9

    4 800 :o 786

    5 77a 21 . 796

    6 774 79622

    7 799 23 799

    8 795 24 801

    9 793 25 771

    10 796 26 15

    11 789 -727:: 440 -723i3 680 2929

    i4 787 2043o

    15 794 3 507

    16 795

    INSTRUCTIONS

    On this format,!ist the average daily unit power leselin NIWe Net for each day in the reporting month. Cthe nearest whole megawatt.

  • s

    .

    50-366UNIT S!!UIDOWNS AND POWER REDt!CllONS DOCKET NO.

    UNIT NAME liat cli 2DA TE 2-10-80

    COMPLE IED HY J. Lt. RodtnREPORT MON Ill January1 EkJPilONE 912-167-7781

    ''i _"o .3 h k 3Ct'n5CL* C 'F, E, CJu$c & Correttive

    No. 1)2tc g g g jgy Evciti a7 g7 Ati,on i,,$3 5 ~5j Report * NU h' Psesent Recurreine*

    - uQ

    .

    80-01 800111 S 0 li 4 flA ZZ C0flROD Reduction in power to perfonn turb-ine test and rod sequence exchange

    80-02 800126 S 81.4 0 1 flA SA ZZZZZZ Shutdown to perfonn primary contain-ment isolation modifications

    ,

    80-03 800129 S 01.4 B 4 flA ZZ TURBill Unit was brough off 1ine to performturbine over. testing

    Oo*

    do

    Ay, , , .

    F: I onced Reason: Method: INintur G InstinitionsS: Sulied uled A 1:iguipment Failure (laplain) 1. Manual fo 1 s ep.n .uion i, li o i

    Ital.iinteiunte on' fest J Ma n u il .';. i .n. . I niiy n!,, .:s i.o ,,i.-

    f-lkl u elt.y i A ni. i, .i: ' ' . I 1: , 6.r (I i r. I 1. e..( > :i 3ilo.r 15 i . . i i. . : i i,!-) : a is 'i

    t :i 4,4C; i i. .I. ,E i t ; ,, , ,'o , :- i.

  • - .

    NARRATIVE REPORTUNIT 2

    January 11th Reduction started for turbine test ''

    sequence exchange

    January 25th Shutdown started *or TMI connitmen . . . _ _ .Containment Isclation logic)

    January 26th Generator off line 03: 43 CST

    January 29th Generator on line 13:06 CSTGenerator off line 19:50 CST for turbine tertin:Generator on line 21:14

    January 30th Reduction due to PCIOMR, CMPF

    There was no single release of radioactivity or single -

    exoosure which accounts for more than 10% of the allowab'.values during January of 1Q80.

    .

    k6N

    D hb9

    So sh 5

  • . .

    HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTSTO BE REPORTED FOR OCTOBER 1979

    NUMBER DATE COMPLETED DESCRTPTION

    79-5c26 1 7-80 Reoaired stanr:- 'service water pum: -

    79-5478 1-24-80 Mounted and '' - "protection breaker na,- -

    79-5513 12-23 79 Performed PM on ?'" -

    79-5203 1-8-80 Repaired "A" RHR S' - '

    79-3423 1-8-80 Repaired reactor -n-"'control system

    79-5990 1-8-80 Repaired rod bico"B"

    79-5957 1-7-80 Replaced PSW 3+-guage

    79-5732 1-3-80 Tightened core s o .-, bolts

    79-4086 1-9-80 Adjusted recirc nhigh soeed stops

    79-6004 1-2-80 Replaced bolts on -PSW pumps

    79-5948 1-4-80 Replaced inverterdischarge flow india-

    79-5752 1-2-80 Repaired coupling anB.W. rec. tank tran e - --

    79-3044 12-3-79 Installed filter circumeson reactor manualrelays

    79-3338 1-28-80 Inspected RPS M-G s-- v' ~distribution panel . --w'for missing insulate.-

    80-271 1-29-80 Visually inspectedheld devices in dr"found all to be acca-

    g

  • 80-376 1-30-80 Repaired motor on . ---main steam line draic

    0'342 ''31.gg Nemov,4 then ' ' ' ~ *e*"Us ,g *

    00'371 ''28~80 Repy**ed t 0 :.c o n|*'o 1, ._** st y*

    .