25
OPEN meter Open Public Extended Network metering 7 TH FRAMEWORK PROGRAMME Author: Nicolas Arcauz [email protected] Date: December 8th, 2010 Venue: Stanislaw Staszic Palace, Varsaw OPEN meter Open Public Extended Network metering OPEN meter Project

OPERA Project Powerpoint Template · 2012-10-12 · TECHNOLOGY GAPS WP4 TESTING WP5 SPECIFICATION & PROPOSAL OF A STANDARD WP3 PRE-NORMATIVE RESEARCH ACTIVITIES WP 6 DI SS EMI N A

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

OPEN meterOpen Public Extended Network metering 7TH FRAMEWORK PROGRAMME

Author: Nicolas Arcauz [email protected]: December 8th, 2010Venue: Stanislaw Staszic Palace, Varsaw

OPEN meterOpen Public Extended Network metering

OPEN meter Project

Project coordinated by

OPEN meterOpen Public Extended Network metering

ENERGY 2008.7.1.1

Official Journalof the European Union

The OPEN meter project is an official initiative by the European Commission

OJ Reference: OJ C288 of 30 November 2007

Identifier: FP7-ENERGY-2008-1

Topic called: Open Access Standard for Smart Multi-Metering Services

2

Project coordinated by

OPEN meterOpen Public Extended Network metering ENERGY 2008.7.1.1

The driver, as seen by the European Commission:

The large scale adoption of smart metering is today hampered by

the lack of widely accepted open standards capable of

guaranteeing interoperability of systems and devices produced

by different manufacturers

3

Project coordinated by

OPEN meterOpen Public Extended Network metering ENERGY 2008.7.1.1

The OPEN meter project proposal was defined and selected by the Commission, among all other applicants, to meet these ambitious objectives

Expected impact by the Commission

after pre-normative research, adoption of these standards will open up the metering market, enabling active customer participation to

energy markets, and at the same time allowing EU-industry to take world leadership

Other information facilitated by the Commission

the typical consortium should be a well balanced partnership between network industries, equipment suppliers, research centres

and regulatory and standardisation bodies. A maximum of one project will be funded under this topic

4

Project coordinated by

OPEN meterOpen Public Extended Network metering

55

• Smart Meter Manufacturers

• Telecommunications industry

• Silicon design & manufacturing

• Meter operators

• Network operators

• DNO associations

• R&D labs

• Testing & quality assurance

• Academia

• Normalization

• Standardization

Consortium

A well balanced consortium of 19 partners

Project coordinated by

OPEN meterOpen Public Extended Network metering Factsheet

European collaborative project7th Framework Programme– Topic Energy.2008.7.1.1– Project Number 226369

Estimated project duration 30 months: Jan 2009 - June 2011Project budget: € 4,2 MM, EC funding: € 2,4 MMConsortium with 19 participantsTotal effort committed: 339 person-monthsProject co-ordinator:Project Technical co-ordinator:Official website is http://www.openmeter.com

6

Project coordinated by

OPEN meterOpen Public Extended Network metering

OPEN meter working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

what do we need ?

what is thereto be used ?

define & develop what is not there

test new developments & use cases

towards a set of standard specs

OPEN meter

WORKSHOP

8 July 2009

A holistic approach from requirements to standardisation

7

Project coordinated by

OPEN meterOpen Public Extended Network metering Architecture

Electricity Meter / Communication

hub

Local O & M device

Concentrator

Central System

Legacy systems

(Supplier / Grid

Company )

Local O &M device

MI 1

MI 3

MI4MI 2

CI 3

CI1 CI 2

CI4

SI2

SI1

SI3

System components and interfaces

Multi -utility meter

External devices

End Customer devices

MI5

Local O &M device

MUMI 1

MUMI 2

OPEN meter focus on access

technologies

8

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

completed

2nd OPEN meter

WORKSHOP

February 4th, 2010

completed

on-going tasks

1st OPEN meter

WORKSHOP

July 8th, 2009

9

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

07/12/2010 10

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

D1.1: AMI requirements

D1.2: Regulatory requirements

D2.1: Assessment of technologies

D2.2: State of the art of technologies & protocols

D2.3 : Research needs

D3.1: Design of system Architecture

D3.2: OSI layers

Specifications

D4.1: Testing procedures

All deliverables can be downloaded at official project website www.openmeter.com

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

11

Project coordinated by

OPEN meterOpen Public Extended Network metering WP1-Requeriments & regulation

12

Examples of overall system functions and communication requirements

- Meter Registration- Remote Tariff Programming- Meter reading (On demand)- Meter reading (for billing)- Remote Disconnection and Reconnection- Power Control- Clock Synchronization- Remote Firmware Update- Alarm and event Management- Interruption information- Fraud Detection- Remote Concentrator access- Load Profile Management

- Automatic adaptation to grid changes- Meter Availability Control

-Energy Balances-Load Shedding Management-Costumer device management-Power Quality Management-Prepayment

ADVANCED

OPTIONAL

MINIMUM

- PLC or Wireless Interface- At least 3.000 end point addresses per

concentrator- The minimum speed for PLC: 2.4 kbps- Automatic meter detection and adaptation

to topology changes- Phase-detection- Repeater functionality- Coexistence

- Bidirectional connection to other multi-utility meters

- Posibility of a faster PLC interface- Use of PLC modem of a meter device to

communicate with other nearby meters- Self-healing and auto-configured repeating

mechanism for wireless- One-directional interface to the end customer

ADVANCED

OPTIONAL

MINIMUM

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

13

Project coordinated by

OPEN meterOpen Public Extended Network metering WP2-Identification of gaps

Example of technology assessment

14

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

15

Project coordinated by

OPEN meterOpen Public Extended Network metering WP3 – Research activities

Local O&M device

Local O&M device

Multi-utility meter

Electricity meter /

Comms. hubLocal O&M

device

End-customer device

Central system

Legacy system

(Supplier / grid company)

Concentrator

External devices

MI1

CI1

MI2

CI2

MI4

MUMI1

MI5

MI3

SI2

SI1

SI3

CI3

CI4

MUMI2

OPEN meter focus on access

technologies

DLMS/COSEM over S-FSK

DLMS/COSEM over PRIME

DLMS/COSEM over G3

Meters&Moreover B-PSK PLC

1607/12/2010

Project coordinated by

OPEN meterOpen Public Extended Network metering DLMS / COSEM over SFSK

17

Project coordinated by

OPEN meterOpen Public Extended Network metering DLMS / COSEM over PRIME

18

Project coordinated by

OPEN meterOpen Public Extended Network metering DLMS / COSEM over G3

19

Project coordinated by

OPEN meterOpen Public Extended Network metering Meters & More

20

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

21

Project coordinated by

OPEN meterOpen Public Extended Network metering

WP4- Testing & Compliance tests

To be able to test prototypes of the implementations of proposedOPEN meter system in an early phase.

To get insight in the compliance of products to the WP1 requirements and specifications/standards that are defined/selected in WP3.To get insight in the interoperability of modules of the OPEN meter Advanced Metering Infrastructure.

Objective

Deliverables

WP Status

WP4 will be delivering the following:

• D4.1: Report on test approach and test procedures ( what will be tested and how the tests should be done).

• D4.2: delivering a set of prototypes of different meters & modules.

• D4.3: setting-up physical test facilities and providing a detailed report on those facilities.

• D4.4: providing recommendations for improvement of standards and test procedures (input for WP5)

D4.1 is already published. Tasks are progressing well

22

Project coordinated by

OPEN meterOpen Public Extended Network metering Working packages

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

WP1 FUNCTIONAL

REQUIREMENTS &REGULATORY ISSUES

WP2IDENTIFICATION OF

KNOWLEDGE & TECHNOLOGY GAPS

WP4TESTING

WP5SPECIFICATION & PROPOSAL OF A STANDARD

WP3PRE-NORMATIVE RESEARCH ACTIVITIES

WP6

DIS

SEM

INA

TIO

N

WP7

CO

OR

DIN

ATI

ON

23

Project coordinated by

OPEN meterOpen Public Extended Network metering

WP5Proposal of Standard

To Create a formal OPEN meter system specification

Prepare and promote the specification for standardisation

Initiate and support the standardisation process with European and International standardisation organisations

Objective

WP Status

Deliverables

&

Work plan

2424

Project coordinated by

OPEN meterOpen Public Extended Network metering Summary

The OPEN meter project is an official initiative by the European Commission

Objectives and timelines are very much aligned with those established in M/441

Partners have the technicalexpertise needed for success

The Panel of Users & Stakeholders will provide the project with valuable input and feedback

The OPEN meter project is committed to offer an active participation in the M/441 coordination group and other international initiatives by

manufacturersresearchers

CENELECutilities

25