Open Workbench By Wilmer Arellano Spring 2008

Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Embed Size (px)

Citation preview

Page 1: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Open Workbench

By Wilmer Arellano

Spring 2008

Page 2: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Statement Of Work (SOW)

• A statement of work (SOW) is a document used in the Project Development Life Cycle. Certain areas that need to be addressed are as follows:– Scope of Work, Describes the work to be done in detail

and specifies the hardware and software involved and the exact nature of the work to be done.

– Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work.

– Period of Performance, This specifies the allowable time for projects, such as start and finish times.

– Deliverables Schedule, This part list the specific deliverables, describing what and when it is due.

– Who is responsible for what.

Page 3: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Work Breakdown Structure (WBS)

• The WBS is the hierarchical list of the project's phases, tasks and milestones – Phase: A group of related tasks that completes a major step in a

project.– Task: An activity that has a beginning and an end. Project plans

are made up of tasks.– Milestone: A reference point marking a major event in a project

and used to monitor the project's progress. • Scope: The combination of all project goals and tasks, and

the work required to accomplish them.– The scope translates into the timeline and budget.

• Budget: The estimated cost of a project.• http://office.microsoft.com/en-us/assistance/

HA011361531033.aspx#Step%201

Page 4: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Work Breakdown Structure (WBS)

• This is what we want Deliverables based WBS• http://en.wikipedia.org/wiki/

Work_breakdown_structure#Example_of_a_work_breakdown_structure

Page 5: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Example

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%

Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%

1.3 Power Amplifier Design

Page 6: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle
Page 7: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

This is just an example, you can customize as you like.

Page 8: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

In Favorites Gantt Charts, double-click the little square and enter:

• A new Phases with:

•Name

•Category

•And ID

Make sure to select phase

Page 9: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

The first phase has been created

Page 10: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

In Favorites Gantt Charts, double-click the little square and enter:

•The Tasks with:

•Names

•Category

•And ID

•Duration

Make sure to select task

Page 11: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

The first task has been entered

Page 12: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

This is how it would look after all tasks for the first phase have been entered

Page 13: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

To indicate task’s dependencies drag from the end of one task to the beginning of the next one

Page 14: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Click here to auto-schedule

Page 15: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

This is how it would look like

Red Color indicates the Critical Path

Page 16: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%

1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%

1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%

Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%

1.3 Power Amplifier Design

Page 17: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Project with two phases included

It is a coincidence that the two phases have same duration

Page 18: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Click to see the PERT

The zoom commands were used to fit the chart in the window

Page 19: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

On planning, Resource assignment, double click the little square to enter the resources and their costs

Page 20: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Do the same for non labor resources

Use Equipment for Space

Page 21: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

You can add the cost of components as “material”

Page 22: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Right click on the tasks and select assignment to assign resources to the tasks

Page 23: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Right click on the tasks and select assignment to assign resources to the tasks.

Enter estimated hours in Estimate

Page 24: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

As components were entered with a rate of $100, 1.5 will represent $150

Page 25: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed

If you need to add a new task or phase in between tasks or phases, right click the square and select insert task

Page 26: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

There will be a problem if you click schedule again

Page 27: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential.

You would need to add more resources to keep the tasks in parallel

The zoom commands were used to fit the chart in the window

Page 28: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

•Another Low Frequency Engineer was included

•Two more Lab Spaces were included

•It was not necessary increase the project duration

Page 29: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Click on controlling and then Revise Schedule to see the budget

Page 30: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Set The base Line

Updating The Project Status

Page 31: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Updating The Project Status

Page 32: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Updating The Project Status

Page 33: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Updating The Project Status

The task bar changes color to reflect status (Red / Blue – Not Started)(Purple – Started)(Grey – Progress completed)The task name changes color to reflect status (Red – Not Started)(Purple – Started)(Green – Completed)

Page 34: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Updating The Project Status

If the task is completed enter 0 in Estimate

Page 35: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Updating The Project Status

We reduced 20 hours but because of the weekend it appears to be a longer time

Page 36: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Milestones

Page 37: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Milestones

Drag the milestone to the desired location

Page 38: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Milestones

Page 39: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Copy and Paste

Table cells can be copied and pasted into excel

By the way, this is a representation of the WBS

Page 40: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

Phase 1.1 Antenna Design HardwareTask 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction HardwareTask 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring HardwarePhase 1.2 Modulator Design HardareTask 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module HardwareTask 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware

Task 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction Hardware

Phase 1.1 Antenna Design Hardware Task 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring Hardware

Task 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module Hardware

Phase 1.2 Modulator Design Hardare Task 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware

Page 41: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle
Page 42: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

The Budget

JohnSmith 15 $225.00

Circuits Lab 10 $70.00JohnSmith 10 $150.00

Circuits Lab 2 24 $24.00Mary Morrison 20 $300.00Circuits Lab 32 $224.00John Martinez 32 $480.00Comp Mod $150.00John Martinez 40 $600.00Lab Circuits 3 40 $280.00

$2,503.00

Even the Components are included here

Page 43: Open Workbench By Wilmer Arellano Spring 2008. Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle

&&QuestionsQuestions