Open Forum WebEx
1
Reliability Standards Update
July 20, 2015Charlotte, NC
David Greene P.E.SERC Senior Reliability Engineer
Open Forum WebEx
Agenda
• Recently Filed/Approved /Standards/NOPRs• 2015 Standards Enforcement Timetable• Recent NERC Standards Development Activity• NERC Standards Tools and Information• SERC Regional Criteria Development Activity• SERC Technical Committee Document Activity• SERC Standards Tools and Information
2
Open Forum WebEx
Reliability Standards Recently Filed and Pending FERC Approval
3
Standard Number Title Filing Date
CIP-014-2 Physical Security 5/15/2015
PRC-004-5
PRC-010-2Definition
Protection System Misoperation Identification and Correction,Undervoltage Load Shedding,Remedial Action Scheme (RAS)
6/8/2015
Open Forum WebEx
Reliability Standards Recently Approved by FERC
Standard(s) Title FERC Approved
Future Enforceable
Date
PRC-001-1.1 (ii)PRC-004-2.1(i)
PRC-004-4
PRC-005-2(i)PRC-005-3(i)
System Protection Coordination, Analysis and Mitigation of Transmission and Generation Protection System Misoperations,Protection System Misoperation Identification and Correction, Protection System Maintenance, Protection System and Automatic Reclosing Maintenance,
5/29/2015 5/29/20155/29/2015
7/1/2016
5/29/2015
4
Open Forum WebEx
Reliability Standards Recently Approved by FERC
Standard(s) Title FERC Approved
Future Enforceable
Date
PRC-019-2
PRC-024-2
VAR-002-4
Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection,Generator Frequency and Voltage Protective Relay SettingsGenerator Operation for Maintaining Network Voltage Schedules.
5/29/2015 7/1/2016
7/1/2016
5/29/2015
5
Open Forum WebEx
Reliability Standards Recently Approved by FERC
Standard(s) Title FERC Approved
Future Enforceable
Date
CIP-014-1CIP-014-2
Physical Security 11/20/20147/14/2015
10/1/2015
PRC-006-2 Automatic Underfrequency Load Shedding
3/4/2015 10/1/2015
COM-001-2 Communications, 4/16/2015 10/1/2015
FAC-001-2 FAC-002-2
Facility Interconnection Requirements,Facility Interconnection Studies
11/6/2014 1/1/2016
6
Open Forum WebEx
Reliability Standards Recently Approved by FERC
Standard(s) Title FERC Approved
Future Enforceable
Date
NUC-001-3 Nuclear Plant Interface Coordination
11/4/2014 1/1/2016
PRC-005-3 Protection System Maintenance and Automatic Reclosing Maintenance
1/22/2015 4/1/2016
PRC-004-3PRC-004-4
Protection System Misoperation Identification and Correction
5/3/2015,5/29/2015
7/1/2016
7
Open Forum WebEx
Reliability Standards Recently Approved by FERC
Standard(s) Title FERC Approved Future Enforceable
Date
COM-002-4 Operating Personnel Communications Protocols
4/16/2015 7/1/2016
MOD-031-1 Demand and Energy Data 2/19/2015 7/1/2016
PER-005-2 Operations Personnel Training
6/19/2014 7/1/2016
BAL-001-2 Real Power Balancing Control Performance
4/16/2015 7/1/2016
8
Open Forum WebEx
Reliability Standards Notice of Proposed Rulings (NOPR) issued by
FERCStandard(s) Title FERC
Issued NOPR
Future Enforceable
Date
PRC-002-2 Disturbance Monitoring and Reporting Requirements
4/16/2015 Earliest 6 months
PRC-005-4 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
4/16/2015 Earliest 36 months
TPL-007-1 Transmission System Planned Performance for Geomagnetic Disturbance Events
5/14/2015 Earliest 6 months
9
Open Forum WebEx
Reliability Standards NOPRs issued by FERC
Standard(s) Title FERC Issued NOPR
Future Enforceable
Date
EOP-011-1 Emergency Operations 6/8/2015 12 months
PRC-010-1 PRC-010-2
Undervoltage Load Shedding 6/8/2015 12 months
Associated with PRC-012-2
Definition of Remedial Action Scheme
6/8/2015 12 months
10
Open Forum WebEx
Reliability Standards NOPRs issued by FERC
Standard(s) Title FERC Issued NOPR
Future Enforceable
Date
TOP-001-3TOP-002-4 TOP-003-3IRO-001-4 IRO-002-4
IRO-008-2
Transmission Operations Operations Planning Operational Reliability Data Reliability Coordination - Responsibilities and Authorities Reliability Coordination — Analysis Tools Reliability Coordinator Operational Analyses and Real-time Assessments
6/18/2015
Earliest 9 months for TOP-003-3.
12 months for others
11
Open Forum WebEx
Reliability Standards NOPRs issued by FERC
Standard(s) Title FERC Issued NOPR
Future Enforceable
Date
IRO-010-2
IRO-014-3
IRO-017-1
Reliability Coordinator Data Specification and Collection Coordination Among Reliability Coordinators Outage Coordination
6/18/2015
Earliest 9 months for IRO-010-2.
12 months for others
12
Open Forum WebEx
Reliability Standards NOPRs issued by FERC
Standard(s) Title FERC Issued NOPR
Future Enforceable
Date
CIP-003-6, CIP-004-6, CIP-006-6, CIP-007-6, CIP-009-6,
CIP-010-2,
CIP-011-2
Security Management Controls, Personnel and Training, Physical Security of BES Cyber Systems, Systems Security Management, Recovery Plans for BES Cyber Systems, Configuration Change Management and Vulnerability Assessments,Information Protection
7/18/20154/1/2016
13
Open Forum WebEx
2015 Standards Enforcement Timetable
Standard Requirements Enforcement Date
MOD-032-1: Data for Power System Modeling and Analysis
R1 7/1/2015
PRC-005-2: Protection System Maintenance R3,R4 (R1, R2, R5 already enforceable)
10/1/2015
COM-001-2 Communications All 10/1/2015
CIP-014-1, -2: Physical Security R1-R6 10/1/2015
14
Open Forum WebEx
2015 Standards Enforcement Timetable
Standard Requirements Enforcement Date
PRC-006-SERC-01: Automatic Underfrequency Load Shedding
R4-R6 10/1/2015
PRC-006-2 Automatic Underfrequency Load Shedding
All 10/1/2015
FAC-001-2 Facility Interconnection Requirements,FAC-002-2 Facility Interconnection Studies
All 1/1/2016
NUC-001-3— Nuclear Plant Interface Coordination
All 1/1/2016
15
Open Forum WebEx
2016 Standards Enforcement TimetableStandard Requirements Enforcement
Date
PRC-005-3(i) — Protection System and Automatic Reclosing Maintenance (Disbursed Generation Resources, DGR)
All 4/1/2016
CIP V5 Standards All, except CIP-003-5 R2
4/1/20164/1/2017
BAL-001-2 – Real Power Balancing Control Performance
All 7/1/2016
COM-002-4 – Operating Personnel Communications Protocols
All 7/1/2016
16
Open Forum WebEx
2016 Standards Enforcement TimetableStandard Requirements Enforcement
Date
MOD-025-2 — Verification and Data Reporting of Generator Real and ReactivePower Capability and Synchronous Condenser Reactive Power Capability
All – See Implementation Plan for 5 year phase in.
7/1/2016
MOD-031-1 — Demand and Energy Data All 7/1/2016
PER-005-2 — Operations Personnel Training All 7/1/2016
PRC-004-4 — Protection System Misoperation Identification and Correction (Dispersed Generation Resources)
All 7/1/2016
17
Open Forum WebEx
2016-2017 Standards Enforcement TimetableStandard Requirements Enforcement
Date
PRC-019-1, -2 — Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection (Version 2 adds DGR)
All – See Implementation Plan for 5 year phase in.
7/1/2016
PRC-024-1, -2 — Generator Frequency and Voltage Protective Relay Settings (Version 2 adds DGR)
All – See Implementation Plan for 5 year phase in.
7/1/2016
MOD-032-1: Data for Power System Modeling and Analysis
R2-R4 7/1/2016
MOD-033-1 — Steady-State and Dynamic System Model Validation
All 7/1/2017
18
Open Forum WebEx
NERC Standards Development Activity
• Project 2015-04: Alignment of Terms - NERC Glossary of Terms and Rules of Procedure– Comments due July 27, 2015– Initial Ballot July 17-27, 2015
• Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-002-2)– Comments due August 20, 2015– Additional Ballot August 11-20, 2015
• Project 2015-08 Emergency Operations – NERC Standards Committee approved SAR posting to revise EOP-
004-2, EOP-005-2, EOP-006-2 and EOP-008-1 per periodic review.
19
Open Forum WebEx
NERC Standards Development Activity• Project 2015-07 Internal Communications Capabilities
– Modify COM-001-2 to address FERC directive from Order 808.– NERC Standards Committee appointed drafting team.
• Project 2010-07.1 Vegetation Management – Revision to FAC-003 to update Minimum Vegetation Clearance
Distance (MVCD) Table 2 per test results – NERC Advisory.
• Project 2009-02 Real-time Reliability Monitoring and Analysis Capabilities – NERC Standards Committee approved SAR posting.
• Project 2007-06 System Protection Coordination– Phase 1 PRC-027-1 handles PRC-001-1.1(ii) R3, R4– Phase 2 proposes retirement of PRC-001-1.1(ii) R2, R5 and R6
(covered in other TOP/IRO standards). R1 move to new TOP-009.
20
Open Forum WebEx
NERC Standards Tools and Information• NERC Standards Page
– http://www.nerc.com/pa/Stand/Pages/default.aspx
– U.S. Enforcement Dates– U.S. Enforcement Status/
Functional Applicability
spreadsheet– Project Tracking Spreadsheet– Projected Posting Schedule
21
Open Forum WebEx
SERC Regional Criteria Development Activity
MOD-025-2 Replaces SERC Regional Criteria: Verification of Generator Real and Reactive Power Capability.
PRC-002-2 Memorializes SERC Disturbance Monitoring Equipment and Reporting Regional Criteria. Follow PRC-002-2 once approved. Regional Criteria will be retired with PRC-018-1 (6 year implementation).
BAL-003-1 Frequency Response and Frequency Bias Setting Data Now Submitted to NERC.
PRC-004-3 Adds New Requirements to Protection System Misoperations Processing. Requirements (R1-R6) and Data Submittals Are TWO Separate Activities!
22
Open Forum WebEx
SERC Procedure Development ActivityPRC-004-4: Protection
System
Misoperation
Identification
and
Correction:
Now = Data
Reporting Plus
Requirements
23
Open Forum WebEx
SERC Regional Technical Committee Document Activity
Document Name SERC Committee
Action Current Status
Actual and Forecast Demands
Reliability Review
Subcommittee
Proposed retirement
given approval of MOD-31-1
To be presented for retirement at the 2015
fall Engineering Committee (EC)
meeting
Verification of Generator Real and Reactive
Capability
Generation Subcommittee,
Dynamics Review
Subcommittee
Proposed retirement
given approval of MOD-025-2
To be presented for retirement at the 2015
fall EC meeting
24
Open Forum WebEx
SERC Regional Technical Committee Document Activity
Document Name SERC Committee
Action Current Status
Short Circuit Model Building
Short Circuit Data Working
Group (SCDWG)
New Regional Criteria
SCDWG will present for approval at the 2015 fall
EC meeting
SERC Conservative Operations Guideline
Reliability Risk Team - OC
New Guideline
Approved by OC at 2015 summer meeting
SERC Guideline Facility Connection
Requirements
SERC Planning Standards
Subcommittee (PSS)
Revision
PSS has addressed comments and will
present for approval at the 2015 fall EC
meeting
25
Open Forum WebEx
SERC Regional Technical Committee Document Activity
Document Name SERC Committee
Action Current Status
Disturbance Monitoring Equipment (DME)
Installation and Reporting Requirements
Protection and Controls
Subcommittee (PCS)
Memorialize
Regional Criteria will remain as is until
PRC-018-1 is retired by PRC-002-2
Special Protection System / Remedial
Action Scheme (SPS/RAS)
Misoperations
Protection and Controls
SubcommitteeRevision
PCS will present for approval at the fall EC
meeting
26
Open Forum WebEx
SERC Standards Tools and Information
• SERC Standards and Regional Criteria Page– Regional Standards and Criteria news– Standards Committee Links– Biweekly Standards Report– SERC Regional Criteria and Guidelines Page
27