32
52B11NE8ie3 63.6215 EVA LAKE 010 OPAP 1991 REPORT PROJECT NUMBER OP91-348

OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

52B11NE8ie3 63.6215 EVA LAKE 010

OPAP 1991 REPORTPROJECT NUMBER

OP91-348

Page 2: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

52B11NE8103 63.6245 EVA LAKE 010C

INDEX

SITE l PAGE

LOCATION AND ACCESS..............lREGIONAL GEOLOGY.................2MINERALIZATION...................3ASSAY RESULTS....................3

SITE 2

LOCATION AND ACCESS..............4REGIONAL GEOLOGY.................4MINERLIZATION....................4SUMMARY OF ASSAY RESULTS. . . . . . . . . 5

SITE 3

LOCATION AND ACCESS..............6REGIONAL GEOLOGY.................6MINERALIZATION............. . . . . . . 7SUMMARY OF ASSAY RESULTS.........8

SITE 4

LOCATION AND ACCESS.............10REGIONAL GEOLOGY................10MINERALIZATION..................10SUMMARY OF ASSAY RESULTS........11

SUMMARY AND RECOMMENDATIONS

SITE 1..........................12SITE 2..........................12SITE 3..........................12SITE 4..........................12

SUMMARY OF DAYS WORKED...............13

ASSAY CERTIFICATES

EXPENDITURES.........................16

Page 3: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE lSITE l ******

LOCATION AND ACCESS

SITE IS LOCATED ON CLAIMS 1011749,1010545,1011748, 975485 AND 1100117 APPROXIMATLY 50 KM. EAST OF ATIKOKAN, NORTH OF CROOKED PINE LAKE IN THE CENTRAL EASTERN SECTION OF WEAVER TWP. DISTRICT OF RAINY RIVER DISTRICT.

ACCESS IS AVAILABLE VIA HIGHWAY 11 TO HIGHWAY 633 TO KAWENE, TURNING EAST AT THE END AND PROCEED EAST BY BUSH ROAD FOR APPROXIMATLY 24 KM. PARALLEL TO THE SOUTH SHORE OF CROOKED PINE LAKE TO MARKER 25-A WHICH LEADS TO A SMALL UNNAMED LAKE, (see drawing number l )

Page 4: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 2

REGIONAL GEOLOGY

AS DESCRIBED BY J. PIRIE (1975) REPORT 179.

"The area is bisected by the major east-trending Quetico Fault that seperates a sequence of Early Precambrian turbidite metasediments of the Quetico Subprovince to the south from Early Precambrian metavolcanic and batholith rocks of the Wabigoon Subprovince to the north. The wacke-mudstone turbidite sequence contains primary north-facing sedimentary structures in the northern part, and has been progressively metamorphosed from lower greenshist facies assemblages in the north to upper amphibolite facies assemblages and accompanying quartz monzonite anatexite in the south. Before the metamorphic climax, a number of mafic to ultramafic hornblendic intrusions were emplaced in the sequence.

North of the Quetico Fault a narrow belt of metavolcanics was intruded by several mafic, intermediate and felsic stocks and dikes before low grade metamorphism and deformation. To the north, the metavolcanics merge into the main batholith across a narrow zone that contains an increase in the amount of batholithic phases. The oldest phases in the batholith are a group of trondhjemitic and layered hornblende gneiss and amphibolite intruded by foliated quartz diorite and diorite. These older phases suffered later pervasive introduction of leucotrondhjemite. A number of small late trondjemite, quartz diorite and quartz mononite to granodiorite stocks occur here and there in the batholith, some of which are cut by narrow diabase dikes metamorphosed under greenschist facies conditions. A few relatively fresh Middle to Late Precambrian diabase dikes cut the older rocks throughout the map-area.

Major transcurrent faulting along the Quetico, Elbow Lake and subsidiary faults continued beyond the major deformation and metamorphism. The site of the Quetico Fault was possibly a zone of weakness from the time of volcanic activity and turbidite sedimentation.

In the metavolcanic belt, gold mineralization occurs along shear zones and locally, minor chalcopyrite accompanies disseminated pyrite. South of Crooked Pine Lake, minor copper- nickel minerlization has been outlined within three small mafic to ultramafic bodies intruding the metasediments and minor uranium staining has been noted within a large sheet of muscovite graphic granite pegmatite."(see Drawing 1)

Page 5: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

V N

qv

^ — *—

z b

fi!u,asp

l x'

QUETICO FAULT

LEGEND

- QUETICO FAULT A SHOW ING

SHE A R24. lopilli tuffib t uff

y 4 quartz gabbrotb d iabase7aL q uartz monzonite?4 . leucotro ndhjemite

CROOKED PINE LAKE

ANDREWS-HICKSSCALE: x/

: 1320DATE:

DE C. 16 1991

APPROVED BY:

REVISED

WEAVER TWP. SITE l

OPAP PROJECT NUMBER OPS l-438DRAWING NUMBER

Page 6: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 3

MINERALIZATION

NO SAMPLES TAKEN

AFTER ESTABLISHING A GRID IT WAS OUR INTENION TO DO A MAG AND VLF SURVEY OVER THE ICE. THEN FROM THE SMALL ISLAND DRILL IN ORDER TO DETERMINE THE NATURE OF THE CONDUCTOR.

ON APRIL 2nd A GRID WITH CONTROLS WAS COMPLETED OVER THE LAKE IN ORDER TO LOCATED THE AIRBORNE CONDUCTOR WHICH HAD BEEN IDENTIFIED UNDER THE LAKE. ON THE FOLLOWING DAY HOWEVER THE WEATHER TURNED UNSEASONABLE WARM, MELTING THE ICE AND DESTROYING THE GRID.

SITE HAD TO BE ABANDONED. WILL ATTEMPT TO CONDUCT MAG AND VLF SURVEY NEXT WINTER.

ASSAY RESULTS

NO SAMPLES TAKEN.

Page 7: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 4

SITE 2 ******

LOCATION AND ACCESS

ACCESS TO THIS SITE MAY BEEN GAINED BY TRAVELLING 12 KM. FROM THE END OF HIGHWAY 633 ON A BUSH ROAD TO THE PUBLIC LANDING ON THE SOUTH SHORE OF CROOKED PINE LAKE THEN BY BOAT TRAVELLING EAST APPROXIMATELY 9 KM.TO THE SHOWING.

REGIONAL GEOLOGY

SEE SITE ONE DESCRIPTION.

MINERALIZATION

LOCATION NUMBER l

MINERALIZATION CONSIST OF FINELY BANDED PYRITIZED SCHIST APRROXIMATELY 8 INCHES IN WIDTH. PYRITE IS FINE GRAINED WITH SMALL QUARTZ KNOTS.

LOCATION NUMBER 2

HERE THE MINERALIZATION IS HOSTED BY QUARTZ AND ARSENOPYRITE VEINS APPROXIMATELY 6 INCHES IN WIDTH.

Page 8: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

LEGENDMERCUTIO LAKE

-—atTETICO FAULT ASHOWING

SHEAR X SAMPLE LOCATION

flowlopilli-tuff

3*. gradedwacke-mudstonequartz gabbro

t b d iabasequartz monzoniteleucotrondhiemite

AAu/ Ag,Cu,asp

CROOKED PINE LAKE

ANDREWS — HICKS

NORTH SHORE CROOKED PINE SITE 2

OPAP PROJECT NUMBER OP9I-438

Page 9: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 5

SUMMARY OF ASSAY RESULTSZZ?H!ZZ?M~H™ZEM™ — M!!ZMH !sz ss s sa m z si z

LOCATION NUMBER l

SAMPLE # Au

CP097-01 .008

CP097-02 .006

CP097-03 .010

CP097-04 .008

CP097-05 .046

CP097-06 .016

LOCATION NUMBER 2

098-1 .012

098-2 .010

SUMMARY OF ASSAY RESULTS

ALTHOUGH INITIAL ASSAY RESULTS (1990) LOOKED PROMISING SUBSEQUENT FOLLOW UP PROVED NEGATIVE, POSSIBLE FURTHER WORK NORTH OF THE MAIN FAULT MAY PROVE TO BE MORE REWARDING.

Page 10: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 6

SITE 3 ******

LOCATION AND ACCESS

THIS LOCATION CONSISTS OF 4 UNPATENT CLAIMS, BISECTED BY HWY 633 APPROXIMATELY 4.8 KM. FROM THE JUNCTION OF HIGH WAY 11 AND HIGHWAY 633, 15 MILES EAST OF ATIKOKAN, DISTRICT OF RAINY RIVER, NORTHWESTERN ONTARIO.

THE SHOWING IS LOCATED APPROXIMATELY 37 METRES WEST OF HIGHWAY 633 AND 100 METRES SOUTH OF THE PUBLIC LANDING FOR EVA LAKE, (see drawing # 3 )

REGIONAL GEOLOGY

as described in open file report 5539 page 379 (see drawing # 4 )

THE AREA LIES WITHIN THE QUETICO SUBPROVINCE IN A BELT OF METASEDIMENTS WHICH VARY FROM METAMORPHOSED WACKES TO QUARTZ-BIOTITE SCHIST. NEAR THE QUETICO FAULT THE METASEDIMENTS GRADE INTO SERICITE SCHISTS.

SMALL ULTRAMAFIC SILLS, DIKES, AND STOCKS, COMPOSED OF DOMINANTLY PYROXENITE AND HORNBLENDITE INTRUDE THE METASEDIMENTS.

THE METASEDIMENTS STRIKE NORTHEAST AND DIP FROM 50 DEGREES TO 65 DEGREES NORTHWEST.

LOCAL GEOLOGY

THE SHOWING CONSIST OF AN INTRUSIVE MASS OF PROXENITE 80 FT. WIDE AND UP TO 400 LONG TAPERING OFF GRADUALLY TO THE EAST. THE SURROUNDING ROCKS CONSIST OF METASEDIMENT WITH NO CLEARLY DEFINED STRIKE OR DIP.

Page 11: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

EVA LAKE

ANDREWS - HICKS

MAR l ON LAKEo

EVA LAKE S lTE 3

OPAP PROJECT NUMBER OPS 1-438

Page 12: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

LEGEND

3*. a/ffTT/LE-- P l**tot. iflte an A* r z

EVA LAKE

ANDREWS HICKSDUCK LAKE

EVA LAKE SITE 3OPAP PROJECT NUMBER OP9 1-438

Page 13: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 7

MINERALIZATION

THIS SHOWING CONSISTS OF AN INTRUSIVE MASS COMPOSED OF PYROXENITE, TONALITE, TALC, BIOTITE AND ACTINOLITE. CHALCO PYRITE VARIES FROM TRACE TO 30* AND PYRRHOTITE TRACE TO 5*. (SEE DRILL LOG).

ASSAY RESULTS

SAMPLE # Pt Pd Au Ag Cu Ni Rh ppb ppb ppb ppb ppb ppb ppb

192714 808 870 684 Ol192715 933 995 746 Ol192716 808 808 684 Ol192717 684 746 622 Ol192718 622 746 622 31192719 684 808 622 Ol192720 622 808 746 Ol192721 746 808 808 Ol192722 684 746 622 Ol192723 684 777 684 Ol192724 559 684 622 Ol192725 870 808 684 62192726 746 746 622 Ol192727 746 684 622 31192728 622 559 684 Ol192729 435 622 435 62192730 497 622 497 Ol192731 622 497 746 31192732 373 559 435 Ol192733 497 497 684 Ol192734 622 684 622 Ol192735 559 684 528 Ol192736 497 622 466 Ol192737 497 622 559 Ol192738 559 373 345 Ol192739 497 497 808 Ol192740 559 559 622 Ol192741 373 373 342 Ol192742 373 373 311 Ol192743 311 248 311 Ol192744 933 933 715 Ol

Page 14: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 8

EVL-1 368 463 328 5200 1000ELV-2 259 396 299 6300 1300ELV-3 215 433 332 5800 2000ELV-4 301 485 384 9000 2200ELV-5 478 478 396 7000 1400ELV-6 234 493 410 9300 1900ELV-7 328 522 437 10000 2100ELV-8 478 642 593 )*10000 3700

d.373%)ELV-9 348 672 593 ^0000 3800

d.197%)ELV-10 303 552 485 5400 1100ELV-11 77 1119 653 8900 1000

Page 15: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 9

SEE DRILL LOG FOR ADDITION ASSAY RESULTS

Page 16: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 10

SITE 4

LOCATION AND ACCESS

THE SHOWING IS LOCATED APPROXIMATELY .5 KM SOUTH OF PLATEAU LAKE, 10 KILOMETRES SOUTHEAST OF ATIKOKAN, SOUTH OF THE SCHWENGER-MCCAUL TOWNSHIP BOUNDARY. THE PROPERTY IS ACCESSABLE BY HIGHWAY 11, THEN BY FOOT TRAIL FOR l KILOMETRE WEST ALONG A POWER LINE WHICH CROSSES HIGHWAY 11 APPROXIMATELY 12 KILOMETRES WEST OF THE SAPAWE JUNCTION, (see drawing # 7)

REGIONAL GEOLOGYd s nz nr s sn ~ — ~ M

(as described in OFR 5539)

THE AREA LIES WITHIN THE QUETICO SUBPROVINCE IN A BELT OF METASEDIMENTS WHICH VARY FROM METAMORPHOSED WACK TO QUARTZ-BIOTITE SCHIST.

SMALL ULTRAMAFIC SILLS, DIKES, AND STOCKS, COMPOSED OF OF DOMINATELY PROXENITE AND HORNBLENDITE, INTRUDE THE METASEDIMENTS.

THE METASEDIMENTS STRIKE NORTHEAST AND DIP FROM 50 DEGREES TO 65 NORTHWEST.

NEAR THE MINERALIZATION SEVERAL EAST-TRENDING SHEAR ZONES UP TO 2 METRES WIDE WERE OBSERVED, STRIKING FROM 70 DEGREES TO 90 DEGREES AND DIPPING 75 DEGREES NORTH TO VERTICAL.

MINERALIZATION

THE BASE MINERALIZATION IS ASSOCIATED WITH A PYROXENITE PLUG, HOSTED BY EARLY PRECAMBRIAN METASEDIMENTS.

PYROXENITE CONTAINS COARSE-GRAINED SECTIONS WITH PYROXENITE CRYSTALS UP TP 2 CENTIMETRES IN SIZE. MINOR HORNBLENDE OCCURS IN THE IMMEDIATE VICINITY.

MINERALIZATION VARIES FROM DISSEMINATED TO NEAR MASSIVE SULPHIDES; PYRITE, PYRRHOTITE AND CHALCOPYRITE.

Page 17: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 11

ASSAY RESULTS

SAMPLE # Pt Pd Au Cu Ni Rh Ag Pb Zn PPB PPB PPB PPB PPB PPB PPB PPB PPB

192704192705192706192707192708192709192710192711192712192713

624351862482466226212431062

6237362Ol626262626262

62Ol939331435010118601

01OlOlOlOl0101Ol01Ol

Page 18: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

LEGEND

quarts-feldspar-biotitemetdsedtmentarv.. migmatite hornblendite

PLATEAU LAKE

ANDREWS

PLATEAU LAKE SITE 4

OPAP PROJECT NUMBER OP9I-438

Page 19: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 12

SUMMARY AND RECCOMENDATIONS ***************************

SITE l

A FURTHER ATTEMPT SHOULD BE MADE TO LOCATED THE EXACT LOCATION OF THE AIRBORNE CONDUCTOR, AND DRILLED TO IDENTIFY CAUSE.

SITE 2

INITIAL RESULTS (1990) APPEARED TO BE ENCOURAGING HOWEVER THIS YEARS WORK FAILED TO CONFIRM PREVIOUS WORK. THERE ARE MANY SHOWINGS TO THE NORTH AND EAST OF THIS LOCATION AND FURTHER WORK NORTH OF THE QUETICO FAULT ALONG THE SAME STRIKE MAY BE REWARDING.

SITE 3

THIS SITE SHOULD HAVE MORE WORK PERFORMED. THREE POSSIBLY 4 DEEP HOLES SHOULD BE DRILLED TO DETERMINE NATURE AND EXTENT OF MINERALIZATION. IT HAS BEEN SUGGESTED THE ORE ZONE MAY WIDEN A DEPTH. IF THIS IS PROVEN OR GRADE INCREASES ALTHOUGH NOT LARGE IT MAY BE MINED PROFITABLY.

SITE 4

FURTHER WORK SHOULD BE CONDUCTED AT THIS SITE. THE HIGH COPPER (2.1381O SHOULD BE FURTHER INVESTIGATED. MORE STRIPPING, MAG, VLF WORK SHOULD BE DONE TO DEFINE MINERALIZED ZONE WITH FOLLOW UP DRILLING.

Page 20: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 13

SUMMARY OF DAYS WORKED

DATE DDMM

01/04

02/04

03/04

04/04

05/04

06/04

07/04

18/05

19/05

20/05

11/08

ACTIVITY

PROSPECTED PLATEAU LAKE OCCURANCE (SITE # 4}

SETUP GRID LINE ON WEAVER TWP. SITE (SITE it 1)

TO THUNDER BAY TO PICK UP EXPLOSIVES fi SUPPLIES

CONTINUED WORK ON EVA LAKE SHOWING (STRIPPING)

BLASTED EVA LAKE SHOWING AND CONTINUED STRIPPING

CONTINUES STRIPPING SITE 3

RETURNED TO THUNDER BAY PREPARED S TAGGED SAMPLES

RETURNED TO EVA LAKE TO CONTINUE WORK

PROSPECTED EVA LAKE CLAIMS. NO NEW SHOWINGS FOUND.

PROSPECTED NORTH SHORE CROOKED PINE LAKE {SITE #2)

RETURNED TO EVA LAKE

12/08

13/08

14/08

PREPARED DRILL SITE WITH SKIDDER

CONTINUED PREPARING SITE, WASHED OUTCROP AT DRILL SITE

PREPARED DRILL PLATFORM, SETUP DRILL, STARTED DRILLING

Page 21: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 14

15/08

16/08

19/08

20/08

21/08

22/08

23/08

24/08

25/08

26/08

27/08

28/08

29/08

CONTINUED DRILLING, PUMP CEASED, REPAIRED, RESUMED DRILLING, 20 FEET OF CORE

TO THUNDER BAY TO PICK UP SUPPLIES

CONTINUED DRILLING, MORE PUMP AND DRILL PROBLEMS, 25 FEET CORE RECOVERED

CONTINUED DRILLING, 35 FEET CORE RECOVERED

CONTINUED DRILLING REACHED SOUTH WALL CONTACT

DEMOBILIZED EQUIPMENT, CHECKED WATER LEVELS AT SITE ffi, EXAMINED ABWIN INTRUSIVE (SIMULAR EVA LAKE BUT SMALLER)

REGIONAL RECONNAISSANCE EASTERN EXTENSION OF QUETICO FAULT (RECENT LOGGING IN AREA)

PROSPECTED WESTERN PORTION OF WEAVER TWP. (SITE # 1)

PROSPECTED PLATEAU LAKE INTRUSIVE (SIMULAR TO EVA LAKE BUT LARGER)

PROSPECTED WEAVER TWP. SOUTHERN CLAIMS SITE #1 CLAIMS 1064288-89 FEW OUTCROPS LOTS OF DEADFALL

SKETCHED MAIN SHOWING AT EVA LAKE, MAPPED AND MEASURED DRILL HOLE LOCATION see drawings 5 and 6.

VISITED BY MAU LAVIGNE MNR REGIONAL GEOLOGIST SHOWED HIM DRILL SITE, MAIN TRENCH AND DRILL CORE

DEMOBILIZED ALL EQUIPMENT, REPAIRED WERE NECESSARY, LABELLED AND PACKED SAMPLES

Page 22: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

PAGE 15

18/11

19/11

22/11

02/01/92

03/01/92

07/01/92

10/01/91

STARTED DRAFTING REPORT

CONTINUED REPORT (MAPS)

CONTINUED REPORT (TEXT)

CONTINUED REPORT (OPAP FORMS)

CONTINUED REPORT (MAPS)

CONTINUED REPORT (EXPENSES)

COMPLETED REPORT

Page 23: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

Chemex Labs Ltd,Analytical Chemists * Geochemists' Registered Auayers 5175Timbertea Blvd., Mississauga, Ontario, Canada UW2S3 PHONE: 416-624-2806

To: ANDREWS, MIKE

390 LAKESHORE DR. THUNDER BAY, ONTARIO P7B5E4

Project:Comments: ATTN: M. ANDREWS

Page Number : 1 Total Pages :2 Certificate Date: 19-APR-91 Invoice No. : 19113499 P.O. Number :

CERTIFICATE OF ANALYSIS A91 13499

SAMPLE DESCRIPTION

192704 A A-f^P^ 192705 l/t^V " 192706 \ j \ S 1) 192707 fS[\\Kt)'^ 192708 Q^

192709 192710 { Q 192711 X 192712 192713

192714 . 192715 ' 192716 192717 192718 r192719 192720 192721 S . 192722 d/,} ft. 192723 X/"*

192724 192725 192726 192727 192728

192729 192730 j 192731 192732 \ 192733 U

t

i192734 " 192735 192736 192737 192738

192739 192740 192741 192742 192743

A

PREP CODE

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

208 208 208 208 208

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

294 294 294 294 294

Pt OZ/t

< 0.002 0.014oroinr0.008 0.008

0.020 < 0.002

0.004 0.010

< 0.002

O.P26 01030! OL026I 0 L 022 i 0^02 4 J

0.022 0.020 0.024 0 .022 0.022

0.018 0.028 0.024 0.024 0.020

0.014 0.016 0.020 0.012 0.016

0.020 0.018 0.016 0.016 0.018

0.016 0.018 0.012 0.012 0.010

PdOZ/t

< 0 .002 0.012 0.002

< 0.001 0.002

< 0.002 < 0.002 < 0.002

0.002 < 0.002

0.028 0.032 0.026 0.024 0.024

0.026 0.026 0.026 0.024 0.025

0.022 0.026 0.024 0.022 0.018

0.020 0.020 0.016 0.018 0.016

0.022 0.022 0.020 0.020 0.012

0.016 0.018 0.012 0.012 0.008

Au OZ/t

0.002 < 0.001 < 0.004 < 0.004

0.001

a. 014< 0.001 < 0.001

0.006 < 0.001

0.022 0.024 0.022 0.020 0.020

0.022 0.024 0.026 0.020 0.022

0.020 0.022 0.020 0.020 0.022

0.014 0.016 0.024 0.014 0.022

0.020 0.017 0.015 0.018 0.011

0.026 0.020 0.011 0.010 0.010

Rh OZ/t

< 0 .001 < 0 .001 < 0.001 < 0.001 < 0.001

< 0 .001 < 0 .001 < 0.001 < 0.001 < 0.001

< 0.001 < 0.001 < 0.001 < 0 .001

0.001

< 0.001 < 0.001 < 0 .001 < 0.001 < 0.001

< 0.001 0.002

< 0 .001 0.001

< 0.001

0.002 < 0 .001

0.001 < 0.001 < 0.001

< 0.001 < 0.001 < 0.001 X 0.001 X 0.001

< 0 .001 < 0 .001 < 0 .001 < 0 .001 < 0 .001 1

CERTIFICATION

Page 24: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

Chemex Labs Ltd,Analytical Chemists' Geochemlsts * Registered Assayere5175Timberlea Blvd., Mississauga, Ontario, Canada L4W2S3 PHONE: 416-624-2806

To: ANDREWS. MIKE390 LAKESHORE DR. THUNDER BAY, ONTARIO P7B5E4

Project:Comments: ATTN: M.ANDREWS

Page Number :2Total Pages :2 Certificate Date: 19-APR-91 Invoice No. : 19113499 P.O. Number :

CERTIFICATE OF ANALYSIS A9113499

SAMPLE DESCRIPTION

192744

.

PREP CODE

208 294

Pt OZ/t

0.030

PdOZ/t

0.030

AuOZ/t

0.023

RhOZ/t

< 0.001

CERTIFICATION:

Page 25: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M .SC., PH. o., c. Chem (Ont.i, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

43699 Certificate of RncilysisMr. M. Andrews Andrews Exploration 390 Lakeshore Dr. Thunder Bay, Ontario P7B-5E4

SAMPLE NUMBERS ^ccurassay Ci

.44164 S44165 .44166 544167 )44168

170544171544172544173544173544174544175544176544177544176544179544180544181544181

Page:

May 28 91

Work Order Project

T910263

tower

206851206852206853206854206855206856206857206858206859206860206860206861206862206863206864206865206866206867206868206868

Goldppb

8(5(5(5(51855(5(55

891237915271

288279133129

GoldOz/T

(0.001(0.001^.001^.001(0.0010.001(0 .O01(0.001(0.001(0.001(0.0010.0030.0040.0020.004O.O020.0080.0080.0040.004

Check

Check

Lf-30

ORIGINAL

Page 26: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., PH. D., c. Chem lorn.), c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

43700 Certificate of AnalysisMr. M. Andrews Andrews Exploration 39O Lakeshore Or. Thunder Bay, Ontario P7B-5E4

SAMPLE NUMBERS Silver *ccurassay Customer ppm

Page:

May 29

Work Order # Project

91

T910263

Copper ppm

Nickel ppm

Lead ppm

Zinc ppm

544171544172544173

206851206852206853206854206855206856206857206858206859206860

l l l l12 l l l l

45412928342532232729

72936238519660726140

141412119

217

10157

2134161410501420189

LF-30

ORIGINAL

Page 27: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. o., c. chsm ionu, c. Chem (U.K.I, M.C.I.c., M.R.S.C., A.R.C.S.T.

41741 Certificate of AnalysisPage:

Mr . M . Andrews Andrews Exploration 390 Lakeshore Or. Thunder Bay, Ontario P7B-5E4

September 12

SAMPLE NUMBERS Accurassay Ci

550697 ! 50698

506995070050701 .0702 )703

?0704507055070650706507075070850709507105071150712507135071450715507155071650717 .50718 50719507205072150722507235072450724

Work Order tt : T910664 Project :

tomer

EVL-1EVL-2EVL-3EVL-4EVL-5EVL-6EVL-7EVL-8EVL-9

EVL-10EVL-10EVL-11CHP-02PHN-01ABIW1N206871206872206873206874206875206875206876206877206878206879206880206881206882206883206884206884

Goldppb

3282993323843964104375935933734856532667189

121027978

128492

1801394634404449

GoldOz/T

0.0100.0090.0100.0110.0120.0120.0130.0170.0170.0110.0140.0190.0010.0020.001(0.001(0.001(0.0010.001(0.001(0,001(0.001(0.0010.0020.0030.0050.0040.0130 .0130.0010 .001

Platinumppb

36825921530147823432847834830430377(1512262a5U5(15U5(15(15(15(158910419066

141699583

Palladiumppb

463396433485478493522642672440552

111911

128103(10(10(10(10(10(10(10(1041538463

388605549

91

LF-30Per:

Check

Check

Check

•Xj-rf—* \s/v ,v-.^n^*

ORIGINAL

Page 28: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. chem lom.i, c, Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

41742 Certificate of AnalysisMr . M. Andrews Andrews Exploration 390 Lakeshore Dr. Thunder Bay, Ontario P7B-5E4

SAMPLE NUMBERS Accurassay Customer

550725550726550727550728550728

206885206886206887206888206888

Gold ppb

101144485065

Page:

September 12

Work Order Project

: T910664

GoldOz/T

0.0030.0040.0010.0010.002

Platinum Palladium ppb ppb

115147

93131

97

91

90 261 1516374 Check

LF-30

ORIGINAL

Page 29: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D,, c. chem (om.i, c. chem (U.K.), M.C.I.C., M.R.s.c., A.R.C.S.T.

41743 Certificate of AnalysisPage:

Mr . M . Andrews Andrews Exploration 390 Lakeshore Dr. Thunder Bay, Ontario P7B-5E4

September 12 91

SAMPLE NUMBERS Accurassay Customer

550697550698550699550700550701550702

;703 704550705550706550707550708

Wtt550711550712550713550714550715550716550717550718550719550720550721550722550723550724550725550726550727

EVL-1EVL-2EVL-3EVL-4EVL-5EVL-6EVL-7EVL-8EVL-9

EVL-10EVL-11CHP-02PHN-01 ABIW1N206871206872206873206874206875206876206877206878206879206880206881206882206883206884206885206886206887

Copper ppm

52006300580090007000930010000 ^ 275

Work Order Project

Nickel ppm

1000130020002200140019002100

: T910664

) 1 0, 000 A 27 3700

54008900

750) 10, 000 A

920017057

150140

773373

14001700

)io,ooo/*;3800

5100510082004800

490

11001000210

Ift0lo 1 90 270100110190110

82483888

xv7~*3700 3^300/3fi^600

3100210330130160

LF-30

ORIGINAL

Page 30: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., PH. D., c. Chem (Om.i, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

41744 Certificate of AnalysisMr . M. Andrews Andrews Exploration 390 Lakeshore Dr. Thunder Bay, Ontario P7B-5E4

SAMPLE NUMBERS Accurassay Customer

550728 206888

Copper ppm

7200

Page:

September 12 91

Work Order Project

Nickel ppm

3400

: T910664

LF-30p.,. Vi

ORIGINAL

Page 31: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

MNR OPAP GRANT EXPENSES 1991 PAGE 16

LOCATIONS:

GRANT $10,000

WEAVER TWP.EVA LAKENORTH SHORE CROOKED PINEPLATEAU LAKE

RECEIVED 5000.00

DATE DESCRIPTION OF EXPENSES**** ***********************MAY 31 ASSAYING CHEMEXSEPT 25 ASSAYING ACCURASSAYSEPT 9 ASSAYING ACCURASSAY

APR-OCT MISC HARDWARE " DRILL SUPPLIES " MNR " EXPLOSIVES " FOOD S MEALS M PLUGGER RENTAL

IIH

II

PAID OUT ********

1070.00636.86281.41

SSBBBBBSS

1988.27

38.58128.7054.05

179.40265.70362.25

SSSBBSSSB

1028.68

DAYS WORKED 3627 2700.00REPORT PREPARATION 4 DAY 400.00MILEAGE 2200 KM @ .30 per 660.00

BBSBSSSSB

3760.00

TOTAL EXPENDITURES 6776.95

BALANCE *******

3930.003293.143011.73

2973.152844.452790.402611.002345.301983.05

-716.95-1116.95-1776.95

PERCENT *******15.79* 9.40* 4.15%

SSBBBB

29.34%

.57* 1.90*.80*

2.65* 3.92* 5.35*BSSBB

15.18*

39.84* 5.90* 9.74*

55.48*

100.00*

Page 32: OPAP 1991 REPORT PROJECT NUMBER OP91-348 - Ontario · 2017-01-17 · OPAP 1991 REPORT PROJECT NUMBER OP91-348. 52B11NE8103 63.6245 EVA LAKE 010C INDEX SITE l PAGE LOCATION AND ACCESS

S2BMNE8103 63.6845 EVA LAKE900

63.

This submtttal consisted of various reports, some of which have been culled from this file. The culled material had been previously submitted under the following record series (the documents can be . viewed In these series):

D/; 11PD

9340, ooo^ G