OP Transport 2007 – 2013and JASPERS
Ministry of Transport
Managing Authority: Ministry of Transport
Allocation: 5 759,08 mil. EUR
Cohesion Fund: 4 603,64 mil. EUR
ERDF: 1 155,44 mil. EUR
OP Transport
Priority 1 -Upgrading the TEN-T Railway Network
Priority 4 -Upgrading 1st Class Roads outside the TEN-T
Upgrading and Development of the Motorway and Road TEN-T Network
Priority 2 -Construction and Upgrading of the Motorway and Road TEN-T Network
Upgrading and Development of the Railway Network outside of TEN-T
Reconstruction and Upgrading of 1st Class Roads outside of TEN-T
Development and Upgrading of Inland Waterways in and outside of the TEN-T Network, Upgrading River Vessels in order to Reduce the Adverse Environmental Impact of Transport
Upgrading and Development of Railway Lines in the TEN-T Network
Priority 3 -Upgrading Railway Networks outside the TEN-T
Priority 6 – Support of Multimodal Transport and Network and Construction and Upgrading of Inland Waterways
Development of the Underground Network in Prague
Introduction of Road Traffic Management and Regulation Systems in Prague
Support for Multimodal Freight Transport,
The Development of Intelligent Transport Systems in Road Transport, and of Systems Improving Road Traffic Safety and Flow
Priority 7 Technical Assistance - CF
Priority 8 Technical Assistance -
ERDF
Priority 5 - Upgrading and Development of the Prague Underground and Systems for the Management of
Road Transport in the City of Prague
Ensuring Interoperability on Existing Railway Lines, Ensuring Compliance with Technical Specifications for Interoperability (TSI), and the Development of Telematic Systems
OP Transport – priority axes
33%
29%
2%
36%
TEN-T road
TEN - T railways
TEN-T waterways
Other
Allocations – TEN-T/other
Fund Allocation
Priority 1 (rail TEN-T) CF 1 610,18
Priority 2 (road TEN-T) CF 1 855,92
Priority 3 (rail non TEN-T) CF 749,26
Priority 4 (road non TEN-T) ERDF 860,98
Priority 5 (Prague metro) CF 300,20
Priority 6 (multimodal tr. and waterways) ERDF 270,68
Priority 7 (TA) CF 88,14
Priority 8 (TA) ERDF 23,78
Total CF + ERDF 5 759,08
Allocations (mil. EUR)
• Cohesion Fund
• Upgrading and Development of Railway Lines in the TEN-T Network
• Ensuring Interoperability on Existing Railway Lines, Ensuring Compliance with Technical Specifications for Interoperability (TSI), and the Development of Telematic Systems
Priority 1 – Modernisation of railways TEN-T
Priority 1 – Modernisation of railways TEN-T
• Cohesion Fund
• Upgrading and Development of the Motorway and Road TEN-T Network
• Development of Intelligent Transport Systems in Road Transport, and of Systems Improving Road Traffic Safety and Flow
Priority 2 - Construction and Upgrading of the Motorway and Road
TEN-T Network
Priority 2 - Construction and Upgrading of the Motorway and Road TEN-T Network
• Cohesion Fund
• Upgrading and Development of the Railway Network outside of TEN-T
Priority 3 - Modernisation of railway outside the TEN-T
• ERDF
• Reconstruction and Upgrading of 1st Class Roads outside of TEN-T
Priority 4 – Upgrading 1st Class Roads outside the TEN-T
• Cohesion Fund
• Development of the Underground Network in Prague
• Introduction of Road Traffic Management and Regulation Systems in Prague
Priority 5 – Upgrading and Development of the Prague Underground and Systems for the Management of Road Transport in
the City of Prague
• ERDF (Czech Republic excluding Prague)
• Support for Multimodal Freight Transport
• Development and Upgrading of Inland Waterways in and outside of the TEN-T Network, Upgrading River Vessels in order to Reduce the Adverse Environmental Impact of Transport
Priority 6 – Support of Multimodal Transport and Construction and Upgrading of Inland Waterways
Priority 6 – Support of Multimodal Transport and Construction and Upgrading of Inland
Waterways
JASPERS - TOP PRIORITIES
• The control of completeness and correctness of Feasibility Study for the Third Transit Railway Corridor. Afterwards the control of completeness and correctness of Cohesion Fund project Application and control of draft conditions for the tender for project located in this corridor - Planá u Mariánských Lázní – Cheb. – AP 2006, Priority Axis 1 OPT
• The control of completeness and correctness of Feasibility Study for the Fourth Transit Railway Corridor. Afterwards the control of completeness and correctness of Cohesion Fund project Application and control of draft conditions for the tender for project located in this corridor – Benešov – Stránčice (AP 2006), Priority Axis 1 OPT
• Construction of Radio Digital Network (GSM – R) Kolín – Břeclav –State border, Priority Axis 1 OPT
Need of coordination
• Project applications already under preparation• EC approval of OP Transport expected in second
quarter 2007• Formal submission of applications - end of 1st q.
2007
=> We have to establish reasonable time schedule to provide RIA time for proper preparation of final applications