Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
")
")
")
")")
")
")
")")
")")
")
")
")
")
")
")
")
")
")
")
")
Modified Route DSubstation Alternative
D-1
D-0
SVO-2
SVO-3
I8-73 I8-72
I8-71
I8-70I8-69 I8-68
I8-67
MRD-36
MRD-35
MRD-36.3
SVO-1
SVO-0MRD-34
MRD-33
I8-74I8-75I8-76 §̈¦8
§̈¦8
OP79
Japatul
February 2007 Administrative Draft EIR/EIS
ROJECT ESCRIPTIONP DB.
N
ÆFigure Ap.LU E.1-9
0 3,000Feet
Land Use:Interstate 8 Alternative
SAN
DIEG
O CO
UNTY
IMPE
RIAL
COU
NTYFigure
Extent
Sunrise Powerlink Project
Draft EIR/EISJanuary 2008
Environmental Planning Inc.
Public Facilities and Utilities
Interstate 8 Alternative, Overhead Portion AgricultureAgriculture/ResidentialInterstate 8 Alternative, Underground Portion
Route D AlternativeModified Route D Alternative
Modified Route D Alternative:Star Valley Option, Underground Portion
Modified Route D Alternative:Star Valley Option, Overhead Portion Substation
") Mileposts
Major Road
Commercial and Office
IndustrialResidentialTribalWaterSensitive Use
Proposed ProjectSycamore Canyon-Elliot ReconductorAlternative Routes
Parks and Recreation, Federal Land, or Undeveloped Private Land
Sunrise Powerlink ProjectE.1 INTERSTATE 8 ALTERNATIVE