1
O P 4 O P 275 O P 33 O P 13 O P 185 O P 45 O P 120 O P 132 O P 26 O P 24 O P 128 O P 104 O P 88 O P 113 O P 16 O P 99 O P 160 £ ¤ 50 § ¨ ¦ 780 § ¨ ¦ 205 § ¨ ¦ 505 § ¨ ¦ 80 § ¨ ¦ 5 Clarksburg Hood Thornton Byron Ryde Benicia Brentwood Elk Grove Isleton Oakley Rio Vista Lodi Tracy Courtland Fairfield Freeport Locke Suisun City Antioch Bethel Island French Camp Knightsen Lathrop Lincoln Village Manteca Sacramento Pittsburg Stockton Terminous Walnut Grove West Sacramento Discovery Bay Bay Point Country Club Mountain House Sources: Plan Area, ICF 2012; Area of Additional Analysis, ICF 2012;Transmission Lines, ICF 2011; ROA, SAIC 2010; Constructability (Rev 10), DHCCP DWR 2012; Constructability (Rev 3b), DHCCP DWR 2012; Constructability (Rev 5a), DHCCP DWR 2015 Legend Plan Area Areas of Additional Analysis Restoration Opportunity Area Transmission Line Conveyance Construction Footprint Modified Pipeline/Tunnel Alignment Pipeline/Tunnel Alignment East Alignment West Alignment Through Delta/Separate Corridors 0 9.5 4.75 Miles ´ Figure 24-6 Electrical Transmission Lines K:\Projects_1\DWR\00726_11_BDCP\mapdoc\_Recirc\Ch24\Fig24_6_Electrical Transmission Facilities_20150326.mxd

OP 45 - California State Water Resources Control Board · PDF fileOP 45 OP120 OP 132 OP26 OP24 OP 128 OP ... 80 §¨¦ 5 Clarksburg Hood Thornton Byron Ryde Benicia Brentwood Elk Grove

Embed Size (px)

Citation preview

Page 1: OP 45 - California State Water Resources Control Board · PDF fileOP 45 OP120 OP 132 OP26 OP24 OP 128 OP ... 80 §¨¦ 5 Clarksburg Hood Thornton Byron Ryde Benicia Brentwood Elk Grove

OP4

OP238

OP275

OP33OP112

OP13

OP185

OP92

OP45

OP120

OP132

OP26

OP24

OP128

OP104

OP88

OP113

OP16

OP99

OP160

£¤50

§̈¦238

§̈¦780

§̈¦205

§̈¦880

§̈¦505

§̈¦680

§̈¦80

§̈¦5

Clarksburg

Hood

Thornton

Byron

Ryde

Benicia

Brentwood

ElkGrove

Isleton

Oakley

RioVista Lodi

Tracy

Courtland

Fairfield

Freeport

LockeSuisunCity

AntiochBethelIsland

FrenchCamp

Knightsen

Lathrop

LincolnVillage

Manteca

Sacramento

Pittsburg

Stockton

Terminous

WalnutGrove

WestSacramento

DiscoveryBay

BayPoint

CountryClub

MountainHouse

Sources: Plan Area, ICF 2012; Area of Additional Analysis, ICF 2012;Transmission Lines, ICF 2011; ROA, SAIC 2010;Constructability (Rev 10), DHCCP DWR 2012; Constructability (Rev 3b), DHCCP DWR 2012;Constructability (Rev 5a), DHCCP DWR 2015

LegendPlan AreaAreas of Additional AnalysisRestoration Opportunity AreaTransmission Line

Conveyance Construction FootprintModified Pipeline/Tunnel AlignmentPipeline/Tunnel AlignmentEast AlignmentWest AlignmentThrough Delta/Separate Corridors

0 9.54.75Miles

´

Figure 24-6

Electrical Transmission Lines

K:\Pr

ojects

_1\D

WR\00

726_

11_B

DCP\m

apdo

c\_Re

circ\C

h24\F

ig24_

6_Ele

ctrica

l Tran

smiss

ion Fa

cilitie

s_20

1503

26.m

xd