10
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements

OOMC and Local RPRS Settlement Alignment

Embed Size (px)

DESCRIPTION

OOMC and Local RPRS Settlement Alignment. January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements. Objectives. Align Settlement of Local RPRS Deployments with that of OOMC. Reasons for Proposal. Potomac Economics Recommendation Both Services Utilized to Solve Local Constraints - PowerPoint PPT Presentation

Citation preview

Page 1: OOMC and Local RPRS Settlement Alignment

OOMC and Local RPRSSettlement Alignment

January 2007WMS Meeting

Ino Gonzalez

ERCOT Settlements

Page 2: OOMC and Local RPRS Settlement Alignment

Objectives

• Align Settlement of Local RPRS Deployments with that of OOMC

Page 3: OOMC and Local RPRS Settlement Alignment

Reasons for Proposal

• Potomac Economics Recommendation– Both Services Utilized to Solve Local Constraints– Consistent Settlement Methodology– Include Start-Up Claw-Back– Include Claw-Back Three Hours After End of Deployment

• WMS Request for PRR proposal

Page 4: OOMC and Local RPRS Settlement Alignment

Reasons for OOMCDeployments

6.5.10 Out of Merit Capacity and Out of Merit Energy Services

ERCOT will use OOMC and OOME Services to procure additional capacity and energy required to provide reliable ERCOT System operation, or to effectively manage Local Congestion as determined by ERCOT.

Page 5: OOMC and Local RPRS Settlement Alignment

Reasons for Local RPRS Deployments

6.8.1.11 Local Congestion Replacement Reserve Payment to QSE

The QSE for a Resource selected to provide RPRS to resolve Local Congestion that actually reconnects to the ERCOT Transmission Grid and starts the unit in order to provide RPRS will be paid both the Resource Category Generic Startup Cost for starting the unit and the Resource Category Generic Minimum Energy Cost less the MCPE for operating at the Low Sustainable Limit (LSL) as set forth in the Resource Plan for that unit during the instructed interval (s). If the MCPE during the intervals of an hour in which ERCOT deploys a Resource for RPRS provides revenue in excess of the hourly cost to start and operates the unit at LSL, the QSE representing the Resource may retain any such excess revenue.

Page 6: OOMC and Local RPRS Settlement Alignment

Settlement of OOMC Deployments

If RPRS Bid Price exists,Then:

PCOOM = (-1)*Min [(BPRP * COOMRP), (PS + PO)]Else:

PCOOM = -1 * (PS + PO)

Where:PCOOM = OOMC Payments ($)BPRP = Bid Price for Replacement Reserve ($/MW)COOMRP = OOMC Awarded Capacity (MW)PS = Start Up Price PO = Operating Price

Page 7: OOMC and Local RPRS Settlement Alignment

Settlement of OOMC DeploymentsIf the unit is deemed to be on-line,

Then:PS = 0

PO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ]

Else:

PS = Max [ 0, ( RCGSC – { ∑ (MCPE * MR) }) ] / # of instructed hours

PO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ]

Where:RCGMEC = Resource Category Generic Minimum Energy Cost RCGSC = Resource Category Generic Startup Cost LSL = Resource Low Sustainable LimitMCPE = Balancing Energy Market Clearing MR = Actual Metered Output of the Resource

Clawback

Page 8: OOMC and Local RPRS Settlement Alignment

Settlement of OOMC DeploymentsIf resource continues to remain online after the instructed intervals

Then:CRCGSC = ∑ (MCPE – RCGFC) * MR

If CRCGSC > 0 & Total PS>0

PS = Max(0,[ RCGSC – ∑ (MCPE * MR) - CRCGSC ]) / # hours

Else

PS = Max(0,[ RCGSC – ∑ (MCPE * MR) ]) / # hours

Where: CRCGSC = Charge Against the Resource Category Generic

Startup Cost

Clawback Clawback

Clawback

Page 9: OOMC and Local RPRS Settlement Alignment

Settlement of Local RPRS Deployments

Current Methodology

LPC = -1 * Max(0, LPS + LPO)

If unit is deemed to be Off-line,

Then: LPS = RCGSC / N LPO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ]

Proposed Methodology

PS (LPS)= [ RCGSC – ∑ (MCPE * MR) - CRCGSC ] / # hours

PO (LPO) = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ]

Where:LPC = PCOOM = Local RPRS Payments ($)LPS = PS = Price for starting the resourceLPO = PO = Price for operating the resourceN = Number of hours of procurement

Clawback

Page 10: OOMC and Local RPRS Settlement Alignment

Conclusion and Recommendation

1. No significant difference between OOMC and Local RPRS Settlements

2. Elimination of significant manual process to identify multiple startup payments for same resource.

3. Align Settlements of OOMC and Local RPRS