    BATTERY SWAP SurveyReport

    TP-HUAWEI

    Site ID:

    Location:

    Site ID/Location

    Site Address:

    Scene: (Urban/ rural/mountain)

    BTS Type: (Indoor/Outdoor)

    Site type:(Sharing or independentif sharing, with which operator)

    RT(Building storeys )

    Site Area (L*W*H):

    Site Height (from GL):

    Nearest Landmark:

    Date :

    Telenor Representative:

    Huawei Representative:

    - 1 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    2/16

    Site Access

    Item (Y/N) Remarks

    Owner issue

    Access Issue at Night

    Society Issues

    Keys Required

    Guard Available (if yes mention

    Contact No.)Existing Site is below road

    level(M)Existing Site within 25 feet radius

    of road Level(Distance)

    Level of Pad from Gravel top(mm)

    Access Issue For EquipmentDelivery(Any obstacle)

    (i) Narrow Street

    (ii) Crane usage (RT)

    (iii) Stairs usage (RT)

    (iv) Narrow Stairs Case orWide(RT)

    (v) Equipment Can Easilypass through(RT)

    (vi) High Power TransmissionLines (RT)

    (vii) Any additional ToolsRequired for access andequipment entrance (e.g.

    - 2 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    3/16

    ladder/emergency lights)

    Equipment Detail

    Items Detail Remarks

    DG Capacity (Rating)

    DG Brand

    DG Condition(working/faulty)Transformer Capacity

    (Complete Detail)Number of Power Cabinets

    on Site (Rectifier)Brand & Rating Power

    System

    (Rectifier)

    Model of Power system

    (Rectifier)

    Numbers of RectifiermodulesOver All Site Load

    (Distribution Current)Number of Working

    Rectifier ModulesNumber of Faulty Rectifier

    ModulesSpace Available for Extra

    Rectifier ModulesExisting Battery Capacity

    (Ah)

    Number of Battery Banks

    Battery Banks Model

    Number of cells in each

    battery bank

    - 3 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    4/16

    Availability of battery

    temperature sensorGEM Installed

    Battery circuit breakers/ fuses information on Rectifier

    Fuse1 Fuse 2 Fuse 3 Fuse 4

    Make of breaker/fuse

    Model

    Breaker/fuse

    Capacity in Amp(A)

    In use/Not in use

    Total Battery MCB

    Installed in Cabinet

    (Brand & Rating)

    MCB Installed in

    Rectifier or With

    Battery Shelve in

    Cabinet

    AC breakers information in ACDB

    No of spare single phase

    AC breaker in ACDB

    Make of single phase AC

    breaker in ACDB

    single phase AC breaker

    Capacity in Amp(A)

    Wapda three phase Voltage

    R-Y (Phase-Phase)

    Y-B (Phase-Phase)

    B-R (Phase-Phase)

    R (Phase-Neutral)

    - 4 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    5/16

    Y (Phase-Neutral)

    B (Phase-Neutral)

    Required Material Detail

    Items Detail Remarks(Details)

    Power Cable Length From

    Meter To MCCB(Wapda)Mark and measure the AC

    cable route length from

    existing ACDB to new

    Battery Cabinet1 Dia PVC for AC cable

    (Make cable routing in

    layout)Mark and measure the DC

    cable route length from

    Rectifier to new Battery

    CabinetRequirement of New

    Duct(DC & PGND)New Cable Duct for Dc

    Cables(RT & GF OPTION-1 &

    6)New Cable Ladder for DC

    Cable for GF site (Make

    cable routing in layout)

    Vertical

    Horizontal

    Check the existing Earthing

    bus bar on equipment PadQuantity of spare holesCheck the existing Earthing

    bus bar on DG Pad

    Quantity of spare holesEarthing cable length (As

    Per Requirement)

    - 5 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    6/16

    Earthing Cable from Pit to

    Busbar (If Required)Earthing Cable from Busbar

    to new Equipment bar (If

    Required)Requirement of New Bus

    Bar

    Earthing Value()

    Important Observations

    Critical Issues Impact On SwapProposedSolution

    - 6 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    7/16

    - 7 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    8/16

    Civil Work Part

    Space for new Battery Cabinet: Battery rack size (W*D*H) 905mm*1125mm*2155mmOn existingequipmentPad

    On DGPAD

    Need toextendexistingpad

    New PADrequired(L*W)2mx 1.5m

    Acquisitionrequired fornew PAD

    UndertheTower

    OnExistingEmptyPad

    Option-1 Option-2 Option-3 Option-4 Option-5 Option-6 Option-7

    In case of any options selected above, please fill accordingly below:

    Option-1Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site

    (Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes

    (Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to newcabinet. (M)

    And form new bus bar to new cabinet. (M)

    - 8 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    9/16

    Special Remark

    Option-2

    Mention the position of new Battery Cabinet in Layout YES NOMark and measure the AC cable route length from

    existing ACDB to new Battery Cabinet (M)1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)

    Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)

    Earthing cable length

    Special Remark

    - 9 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    10/16

    Option-3

    Mention the position of new Battery Cabinet in Layout YES NO

    How much area need to be extend( On Existing Pad) (M^2)

    Extended PAD size M x M

    Sun shed is needed to extend or not YES NO

    Mark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment Pad

    Quantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)

    Earthing cable length from existing bar to new bar

    Earthing cable from new bar to sun shed

    Earthing cable from new bar to New Equipment

    Mark the North Direction

    Special Remark

    - 10 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    11/16

    Option-4

    Space available for new PAD (1.5mx2m) YES NO

    Mention the position of new Battery Cabinet in Layout YES NO

    New sun shed is required for new PAD YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)

    Earthing cable length from existing bar to new bar

    Earthing cable from new bar to sun shed

    Earthing cable from new bar to New Equipment

    North direction

    Special Remark

    - 11 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    12/16

    Option-5

    Check the possibilities of space for acquiring Available

    Not Available

    Mention the position of new Battery Cabinet in Layout YES NO

    New sun shed is required for new PAD YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)

    Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)

    Earthing cable length from existing bar to new bar

    Earthing cable from new bar to sun shed

    Earthing cable from new bar to New Equipment

    Special Remark

    - 12 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    13/16

    Option-6Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)

    New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes

    (Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to new

    cabinet. (M)

    And form new bus bar to new cabinet. (M)

    Special Remark

    - 13 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    14/16

    Option-7Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)

    1 Dia PVC for AC cable(Make cable routing in layout) (M)

    Mark and measure the DC cable route length from

    Rectifier to new Battery Cabinet (M)New Cable Ladder for DC Cable for GF site(Make cable routing in layout)

    Vertical

    (M)

    Horizontal

    (M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes

    (Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)

    If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to newcabinet. (M)

    And form new bus bar to new cabinet. (M)

    Special Remark

    - 14 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    15/16

    Site Snaps(obligatory)

    1. Complete site view from main entrance (2 to 3 snaps) from differentangles.

    2. Complete site view from tower 6 m height.

    3. Site level from road level

    4. Narrow Street (For Crain usage)

    5. Stairs usage (RT)

    6. Proposed Equipment space covering the surroundings (marked all four

    directions).

    7. Existing DG PAD.

    8. Existing Battery Bank.

    9. Battery Bank Brand/Rating

    10. Existing BTS & PAD snaps from appropriate distance (cover whole

    scenario of pad).

    11.Transformer Snap

    12.ACDB/ATS.

    13.Rectifier with open door from front.

    - 15 -

    TP

    Confidential BTS Site Battery Swap Survey Report

  • 8/3/2019 Onsite Survey Templt Tp-final(3)

    16/16

    14.1 Rectifier modules rating snaps.

    15. Equipment & DG pad earthing bus bar snaps.

    16. . Earthing Value Snaps.

    17. . Earhting pit snap.

    18. Wapda Voltage (P/P-01) & (P/N-03)

    - 16 -

    TP

    Confidential BTS Site Battery Swap Survey Report