Onshore Oil & Gas rig move logistics MTLNextGen software

Embed Size (px)

DESCRIPTION

MTL NextGen software is the complete customized IT software and solution to cater to Onshore Oil & Gas rig move logistics planning, execution and performance reviews to help reduce non-productive time (NPT) and improve resource utilization

Citation preview

  • MTL NextGen Value Pack Page 1

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

    MTL NextGen - The IT System for Rig Move Operations

    A click away from Information

  • MTL NextGen Value Pack Page

    Rig Move Criticality

    Moving oil rigs is complex logistical activity. It requires strict yet flexible planning between various stakeholdersto move the Rigs efficiently and safely to reduce non-value time and increase oil productivity

    There are on an average 500 Rig moves per year

    More than 1 Million km driven per year related to rig moves.

    The exorbitant cost of Rigs even in non productive conditions signifies that the need of Rig move timeoptimization is inevitable.

    2

    Facts

    85% cost paid to Drilling contractor although rig is standing and not drilling

    Approx 750 USD per hour for rig in standby mode

    Opportunity cost of oil drilled during the same time as the rig is non-productive

    Logistics waiting time saved (String days) will be direct cost saving and contribution to Drilling.

    10 string month saved will equate 1 extra Rig for drilling annually.

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    Customer challenges - Conceptualization

    Customer / User Challenges

    Frequent changes to business processes.

    New performance evaluation business models

    New User requirements

    Increased demand for operational & HSE visibility

    Planning scenarios comparison and forecast Models

    Tactical planning for assets & activities to meet demand surge

    Dynamic reporting and information demands from stakeholders

    End-to-end automation and interfaces to remove manual work

    New technology absorption and solution models as best practices

    3

    IT Solution Design Challenges

    The challenge for us was to encapsulate all business ideas, process changes and create a workable IT model for each business concept

    Set the new IT model as the process benchmark for reference - best practice approach imbibed in the system for users to follow

    Biggest challenge was to not only plan the rig moves at strategic/tactical/execution level but also to accommodate the last minute amends to the system-defined plan

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Key Highlights

    4

    Covering the End-to-End process automation with logic and functionality

    Adding the planning and forecasting and reporting intelligence to the current execution only solution

    Strong review mechanisms and approval workflows for decision support and audit

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Solution at a glance

    ATM look & feel a familiar, easy-to-use technology for everyone

    5

    ATM Card style login

    Fuzzy TV for news and user messages

    Message board for rotating displays

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Solution at a glance

    6

    Self Explanatory Buttons

    Sliding Bars for

    Transaction &

    Report menu bar

    General

    News1 click rig board by region

    Gate Way to Performance

    Reports

    ATM look & feel One click buttons for information & functionality

    Buttons with User personalized data

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Solution at a glance

    7

    Performance Reporting with

    FusionChart modelling

    One Click Reporting ATM style performance and reporting dashboard

    Dynamic Reports for user defined

    templates & data points

    Financial reports on Menu bar

    with privilege control

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    Strategic Rig Move plan from SAP drilling sequence - Rig move plan in MTL NextGen to be

    forecasted automatically from the PDO SAP drilling Sequence. A new forecast is generated every

    week for the next rolling 52 week period.

    Strategic Plan by Rig / Assets

    Scenario comparison- Utilization with different asset levels

    Task Utilization Vs Asset Utilization

    MTL NextGen Strategic Plan & Forecast

    8

    Current Asset Level

    Increase / DecreaseAsset Level to

    Compare Asset & Task Utilization

    scenarios

    Task utilization

    SAP MTL NextGen

    Drilling

    SequenceForecasting Engine

    Rig Move

    Forecast

    Every week new

    sequence is fed

    to generate new

    forecast

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Rig Move on Paper

    9

    Rig move on Paper is the concept of process improvement where you plan the Rigmove before the actual event with and without constraints (time /resource)

    Rig move on Paper also serves as a reference for comparing Plan Vs Actual

    The key highlights are Scenario Comparison Max / Average / MinActual delivery performance E2E Performance breakdown by Activity

    Total E2E 21.78 hrs

    Scenario Comparison - Achievements

    MD UD WOD RM UD RURM UD

    12:00 PM 10:56 AM

    Max

    Average

    MD WOD RM UD RURM UDMin

    12:00 PM 06:48 AM

    03/04/201102/04/201101/04/2011Q4Q2 Q3Q1 Q4Q2 Q3Q1 Q4Q2 Q3Q1

    12:00 PM

    MD MD RM UD WOD RM UD RU

    06:27 AM

    Total E2E 39.95 hrs

    Release Time: 12:00 PM

    Total E2E 28.45 hrs

    Rig 01- 20 KM move

    359.5RU

    5.56.758.5RM

    0.22.848.15MD

    MinAverageMaxActivity

    359.5RU

    5.56.758.5RM

    0.22.848.15MD

    MinAverageMaxActivity

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    MTL NextGen Rig Move Performance Incentive

    Rig Move Incentive Scheme and its logic for different performances shortest possible time is rewarded and extra time taken above maximum limit is penalized

    Class D Move total rig move time is above the Maximum limit set, invokes a penalty, triggers an After Action Review to ascertain root cause

    Class C Move - total rig move time is between Average and Maximum, performance is accepted, no incentive

    Class B Move total rig move time is between Minimum and Average, incentive payment for good performance

    Class A Move total rig move time is below Minimum time limits, justification required for incentive payment

    10

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    7.00

    8.00

    9.00

    Sum of 1 Sum of 2 Sum of 3 Sum of 4 Sum of 5 Sum of 6 Sum of 7 Sum of 8 Sum of 9 Sum of 10

    Targ

    et T

    ime

    Distance

    Rig 1 Distance 1-10km

    Min of Net Rig Move2

    Average of Net Rig Move2

    Max of Net Rig Move

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    Customer Benefits Business / IT / Operation

    11

    A variety of components with key functionality Key Benefits

    Business Key Benefits

    Other Key Benefits

    Operational Key Benefits Planning at Strategic / Tactical / Operational Levels Scenario comparison based on Rig release time Optimum Equipment Level Planning & 3PL suggestion for Rig

    move based on Distance, Cost and historical performance

    Scenario Planning with drilling sequence Efficient and cost effective asset distribution Automated scorecard for KPI reporting End to end automation with logic and functionality

    Optimization of Asset planning & utilization Reduce resource Count Reduction in operating cost Reduce non productive time Introduced control mechanism for Rig move Visibility on Plan Vs Actual Rig move cost and cost savings Automated workflow and approval process

    Increased HSE visibility in Rig moves Screen personalization and user layout for ease navigation Dynamic Report engine for user defined data points reporting Increased communication across 4PL community The whole solution is a click away from Rig move information

    Rig Issues & Improvements

    Dashboard

    Notifications

    Report Engine Rig move plan

    ATM Look

    DesignDemand

    Planning

    Compliance-HSE

    Asset PlanningDynamic Report

    KPI Dashboard

    Performance

    ManagementRig Forecast

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    What to Sell As Is Solution

    12

    Rig Issues & Improvements

    Dashboard

    Notifications

    Report Engine Rig move plan

    ATM Look

    DesignDemand

    Planning

    Compliance

    - HS E

    Asset PlanningDynamic Report

    KPI Dashboard

    Performance

    ManagementRig Forecast

    MTL NextGen Saleable Components

    Situa

    tion

    Concept

    Solu

    tion

    Bene

    fits

    Conclu

    de

  • MTL NextGen Value Pack Page

    THANK YOU FOR

    YOUR ATTENTION

    13