ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential document and should only be retained by the intended recipient. If you are not the intended recipient or have received this by accident, you are kindly requested to destroy this document. The unauthorized copying or transfer of this document or any part of its content is prohibited. Developing and building an Offshore Wind Farm from scratch ONP Project Experiences 5th Asia Offshore Wind Day - Tokyo

ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 1 21.01.2019

ONPManagement

DevelopmentEngineeringValue

This is a confidential document and should only be retained by the intended recipient. If you are not the intended recipient or have received this by accident, you are kindly requested to destroy this document. 

The unauthorized copying or transfer of this document or any part of its content is prohibited.

Developing and building an Offshore Wind Farm from scratchONP Project Experiences

5th Asia Offshore Wind Day - Tokyo

Page 2: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 2 21.01.2019

Speaker and introduction to ONP

Michael BergesArea Manager Asia-PacificBranch Manager Taiwan

[email protected]

ONP Management GmbH • Founded 2014

• TW-Branch est. 2018

• Employees: 28

• Technical advisory office focusing

on offshore wind

• Headquarter: Hamburg (Germany)

Our success stories

• Owner's Engineer for 600 MW Haixia OWF (TW)

• FEED-Study for BoE-Selection report of Haixia OWF (TW)

• Technical assessment and evaluation of Chu Feng OWF (TW)

• Project Management for 396 MW Merkur OWF (GER)

• Facilitating Financial Close (EUR 1.6b) for Merkur OWF

(GER)

• Preparing Arcadis Ost 1 OWF for 1st German auction

• Talanx Asset Management chose ONP as Lender's Technical

Advisor for two German OWFs

Page 3: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 3 21.01.2019

ONP Portfolio

Page 4: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 4 21.01.2019

Flawed design impacting the assets' lifetimeFOU-Package – Incorrect Design specifications

Page 5: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 5 21.01.2019

Flawed design impacting the assets' lifetimeFOU-Package – Incorrect Design specifications

Impairment of the functionality and durability of the

bolted flange connection between monopile and

transition piece as well as difficulties during the

installation

Issue Type of Contract:Multi-Contracting

Page 6: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 6 21.01.2019

Impact

Flawed design impacting the assets' lifetimeFOU-Package – Incorrect Design specifications

Repair work offshore, costly maintenance during the

operating phase and possibly reducing the durability

of the connection

Type of Contract:Multi-Contracting

Page 7: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 7 21.01.2019

Flawed design impacting the assets' lifetimeFOU-Package – Incorrect Design specifications

Incorrect design specifications (e.g., location of the

flange connection), insufficient manufacturing

requirements (e.g. bolt specification, tolerances) and

insufficient interface management

Root Cause Type of Contract:Multi-Contracting

Page 8: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 8 21.01.2019

Flawed design impacting the assets' lifetimeFOU-Package – Incorrect Design specifications

Choice of a robust design (e.g. flange connection to be

located under controlled environmental conditions);

clear description of the design, manufacturing and

installation requirements as well as the interfaces;

functioning interface management during all project

phases; check whether all requirements from

operation, production and installation have been

implemented in the design; check whether the design

is implemented in the fabrication and installation

methodology

Best Practice Type of Contract:Multi-Contracting

Page 9: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 9 21.01.2019

Positioning of SwitchgearTransition Piece vs. Tower

Page 10: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 10 21.01.2019

TitleInterfacemanagement – Interacting Contracts

Re-positioning of switchgear from tower base to

transition piece during detailed design of support

structure.

Issue Type of Contract:Type of Contract:BoP-EPCI, TSA-EPCI

Page 11: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 11 21.01.2019

Impact

TitleInterfacemanagement – Interacting Contracts

During detailed design of the support structure (TP) a

complete new platform arrangement was required

with interactions to different work packages

(Foundation, Inner Array Cable, WTG‘s). Scope of

work and interfaces had to be re-assessed and

negotiated in a short time period to met project

schedule. Delivery schedule of switchgear had to be

aligend with TP manufacturing process.

Type of Contract:BoP-EPCI, TSA-EPCI

Page 12: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 12 21.01.2019

TitleInterfacemanagement – Interacting Contracts

During the detailed design phase of the support

structure, the installation and final commissioning of

inner array cables with diameters of up to 630mm²

with planned junction boxes were questioned.

Root Cause Type of Contract:Type of Contract:BoP-EPCI, TSA-EPCI

Page 13: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 13 21.01.2019

TitleInterfacemanagement – Interacting Contracts

Make sure that all project details are aligend between

the Contractors and wind farm commissioning

strategy is established prior to start of detailed

design.

Best Practice Type of Contract:Type of Contract:BoP-EPCI, TSA-EPCI

DESIGNDESIGN

Access ladders

Fabrication

Welding requirements

Installation

Steel grades

Monitoring

Primary structure

LogisticsLoad-Area

Servicec-Cane

Mounting devices

Ventilation

Cable guiding

HSE

Coating

Secondarystructure

O&M

Collision beaviour

Grouted connection

Geotechnics

Corrosion protection system

Earthing Seamarking

Sonartransponder

Page 14: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 14 21.01.2019

Delays during construction of the windfarmFOU-Package – manufacturing delays

Page 15: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 15 21.01.2019

Delays during construction of the windfarmFOU-Package – manufacturing delays

Manufacturing process of one part of the foundation

system was massively delayed with additional quality

issues

Type of Contract:EPCIIssue

Page 16: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 16 21.01.2019

Delays during construction of the windfarmFOU-Package – manufacturing delays

Project schedule had to be adjusted; installation

during winter season necessary; time and cost overrun

in FOU-Package of EPCI-Contractor; Project had to

invest additional money in order to secure the

continuation of manufacturing process

Type of Contract:EPCIImpact

Page 17: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 17 21.01.2019

Delays during construction of the windfarmFOU-Package – manufacturing delays

Manufacturing surveillance incl. QA/QC not dilligent

enough; Manufacturer was not sufficiently familar

with the contractually agreed codes and standards;

only one manufacturer chosen without backup-option

Type of Contract:EPCIRoot Cause

Page 18: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 18 21.01.2019

Delays during construction of the windfarmFOU-Package – manufacturing delays

Contractual obligation for manufacturing surveillance

is enforceable; key components are sourced from at

least two manufacturers; Employer's Requirements

need to be as functional as possible and as stringent

as necessary; "instructions" are a valid tool to ensure

progress and quality

Type of Contract:EPCIBest Practice

Page 19: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 19 21.01.2019

Leading Edge ErosionWTG-Package – Additional Maintenance Costs

Page 20: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 20 21.01.2019

Leading Edge ErosionWTG-Package – Additional Maintenance Costs

Rain, hail, ice, UV and other weather conditions erode

the leading edge on the turbine blade especially at the

tip of the blade, were speeds up to 330km/h are being

achieved and raindrops or hailstones create multiple

shock wave impacts on the blade surface.

Issue Type of Contract:SMA, TSA

Page 21: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 21 21.01.2019

Impact

Leading Edge ErosionWTG-Package – Additional Maintenance Costs

The WTG manufacturer applies a protection foil with

defined design lifetime of 5 years. At the current state

of the art typical market costs for leading edge erosion

campaigns are approx. 80k€ per WTG. Such campaign

need to be driven reactively several time during the

WTG design lifetime depending on the blade condition.

Such costs were not expected and are born by the

project company.

Type of Contract:SMA, TSA

Page 22: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 22 21.01.2019

Leading Edge ErosionWTG-Package – Additional Maintenance Costs

The WTG SMA contract is not clearly defined in terms of

leading edge erosion, wear and tear is specifically excluded in

the SMA.

Root Cause Type of Contract:SMA, TSA

Page 23: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 23 21.01.2019

Leading Edge ErosionWTG-Package – Additional Maintenance Costs

Define explicitly in the SMA, that any costs caused by

leading edge erosion are included in the SMA fee.

Better define explicitly in the TSA that the turbine

supplier is responsible for any leading edge erosion

damage during the total design lifetime of the turbine.

Best Practice Type of Contract:SMA, TSA

Page 24: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 24 21.01.2019

Commissioning of WTGs without Grid ConnectionOperation & Maintenance – Mini-Grid-Solution

Page 25: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 25 21.01.2019

Commissioning of WTGs without Grid ConnectionOperation & Maintenance – Mini-Grid-Solution

"Hot" Commissioning of wind farm only possible after

(external) grid connection available

Issue Type of Contract:EPCI

Page 26: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 26 21.01.2019

Impact

Commissioning of WTGs without Grid ConnectionOperation & Maintenance – Mini-Grid-Solution

Delays in commissioning process and start of

operation; revenue losses

Type of Contract:EPCI

Page 27: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 27 21.01.2019

Commissioning of WTGs without Grid ConnectionOperation & Maintenance – Mini-Grid-Solution

Commissioning concept did not include measures for

establishing a wind-farm internal grid

Root Cause Type of Contract:EPCI

Page 28: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 28 21.01.2019

Commissioning of WTGs without Grid ConnectionOperation & Maintenance – Mini-Grid-Solution

Make allowance for string-wise-commissioning by

applying a mini-grid-solution

Best Practice Type of Contract:EPCI

Page 29: ONP Development Engineering Value Management · 2019. 2. 8. · ONP Management ONP Project Experiences 1 21.01.2019 ONP Management Development Engineering Value This is a confidential

ONPManagement ONP Project Experiences 29 21.01.2019

ONP Management GmbH | Member of Zech Group | Veritaskai 3 | 21079 Hamburg | Germanywww.onp-management.com

Michael Berges Area Manager Asia-PacificBranch Manager Taiwancph +49 172 513 [email protected]

TURNING VISION INTO POWER

ONP Management GmbH