31D16NWea82 63.6133 MONMOUTH 010
Physical Work Report for the Harper Deposit. Mining Claim SO 1078884, South Half, Lot 9, Concession XI,
Monmouth Township (Claim Map G-1298), Haliburton County, Southern Ontario Mining Division for the Period March 7, 1992 to December 18, 1992
Scott Harper, Hon. B.Sc.Box 820STNP704 Spadina AveToronto, OntarioMSS 2Z1December 18, 1992
March 7, 1992Personnel: J. Bryce, D. Roughley, S. Harper S450.00Equipment Rental:
Pionjar 120 80.00 Stihl Quikcut 40.00 Husquvarna 262 40.00
Transportation:Gasoline 48.50
Supplies:Chainsaw Oil 6.89
March 8, 1992Personnel: J. Bryce, D. Roughley, S. Harper 450.00Transportation:
Gasoline 21.00 April 4, 1992
Personnel: M. Harper, S. Harper 300.00Transportation:
Bus Ticket (Toronto-Peterborough) 17.12 Taxi 7.00 Gas 17.80
Supplies:Tree Wedge 5.74 Tree Wedge 6.89 WD 40 Lubricant 2.56
Equipment Rental:Husquvarna 262 40.00
May 5, 1992Personnel: O. Bolton, S. Harper (1/2 day X 2 X 150) 150.00Transportation:
Bus Tickets (Toronto-Peterborough) 34.24 Taxi 6.00
May 7, 1992Personnel: O. Bolton, J. Harper, S. Harper (1/2 X 3 X 150) 225.00Transportation:
Gas 19.00 May 8, 1992
Personnel: O. Bolton, L. Landsborough, S. Harper 450.00Equipment Rental:
Husquvarna 262 40.00Food 40.80
May 9, 1992Personnel: O. Bolton, L. Landsborough, S. Harper 450.00Equipment Rental:
Husquvarna 262 40.00Transportation
Gas 19.00 May 10, 1992
Personnel: O. Bolton, L. Landsborough, S. Harper 450.00Food 19.21
June 26, 1992Personnel: O. Bolton, S. Harper (1/2 X 2 X 150) 150.00Transportation:
Bus Tickets (Toronto-Peterborough-Toronto) 61.64 Taxi 7.00
Food 9.61 June 27, 1992
Supplies:6 rolls flagging tape 13.74 gasoline 13.00
June 28, 1992Personnel: O. Bolton, M. Harper, S. Harper 450.00 Equipment Rental:
Pionjar 120 80.00 Transportation:
Gasoline 15.75 Food 3.40
June 29, 1992Personnel: O. Bolton, M. Harper, S. Harper 450.00 Equipment Rental:
Husquvarna 262 40.00 Supplies:
2 Compasses 137.98Photocopies 0,92l Mining Claim Map 1.15
Food 9.36June 30, 1992
Personnel: O. Bolton, M. Harper, S. Harper 450.00 Equipment Rental:
Pionjar 120 80.00 Food 2.29 Transportation:
Gas 24.00 June 31, 1992
Personnel: O. Bolton, S. Harper (1/2 X 2 X 150) 150.00 August 13, 1992
Personnel: O. Bolton, S. Harper, D. Gratton (1/2 day),J. Harper (1/2 day) 450.00
Transportation:Bus shipping receipt (equipment fromMississauga-Peterborough) 9.10
August 14, 1992Personnel: D. Redlich, D. Cassell, O. Bolton, S. Harper 600.00 Equipment Rental:
Husquvarna 262 40.00 August 15, 1992
Personnel: O. Bolton, S. Harper 300.00 Equipment Rental
Stihl Quikcut 40.00 August 16, 1992
Personnel: O. Bolton, S. Harper 300.00 August 17, 1992
Personnel: O. Bolton, S. Harper, J. Harper (1/2 day),C. Twining (1/2 day) 450.00
Equipment Rental:Husquvarna 262 40.00
August 18, 1992
Personnel: O, Bolton, S. Harper 300.00 Food 5.04
August 19, 1992Personnel: S. D'Ambra, J. Vonderhey, O. Bolton, S. Harper 600.00
August 20, 1992Personnel: S. D'Ambra, J. Vonderhey, O. Bolton, S. Harper 600.00
August 21, 1992Personnel: S. D'Ambra, J. Vonderhey, O. Bolton, S. Harper 600.00
August 22, 1992Personnel: S. D'Ambra, J. Vonderhey, O. Bolton, S. Harper,
C. Twining (1/2 day), J. Harper (1/2 day), E. Spooner, G. Vrdoljak, K. Pavlic 1200.00
Equipment Rental:Husquvarna 262 40.00
August 23, 1992Personnel: S. D'Ambra (1/2 day), J. Vonderhey (1/2 day),
G. Vrdoljak (1/2 day), K. Pavlic (1/2 day), O. Bolton, S. Harper 600.00
August 24, 1992Personnel: O. Bolton, S. Harper 300.00
August 25, 1992Personnel: O. Bolton, S. Harper, J. Harper (1/2 day) 375.00 Supplies:
2 pkgs latern mantles 6.19 flashlight batteries, l roll 200 ASA film 13.90
Food 6.63 August 26, 1992
Personnel: O. Bolton, S. Harper 300.00 August 27, 1992
Personnel: O. Bolton, S. Harper 300.00 August 28, 1992
Personnel: O. Bolton, S. Harper 300.00 Equipment Rental:
Husquvarna 262 40.00 Pionjar 120 80.00
August 29, 1992Personnel: O. Bolton, J. Harper, S. Harper, D, Core (1/2 day),
F. Rentzel (1/2 day) 600.00 Equipment Rental:
Pionjar 120 80.00 September l, 1992
Personnel: C. Twining (1/2 day), J. Harper (1/2 day) 150.00 September 3, 1992
Personnel: O. Bolton, S. Harper, J. Harper (1/2 day) 375.00 September 4, 1992
Personnel: O. Bolton, S. Harper 300.00 September 6, 1992
Personnel: O. Bolton, S. Harper 300.00 September 7, 1992
Personnel: O. Bolton, S. Harper, J. Harper (1/2 day) 375,00 September 17, 1992
Personnel: C. Twining (1/2 day), S. Harper (1/2 day) 150.00 October 19, 1992
Personnel: J. Bryce (1/2 day), J. Landsborough (1/2 day),
S. Harper (1/2 day) 225.00 Transportation:
Gas 30.00 October 20, 1992
Personnel: J. Bryce, J. Landsborough, S. Harper 450.00 October 21, 1992
Personnel: J. Bryce, J. Landsborough, S. Harper 450.00 Transportation:
Gas 30.00 December 17, 1992
Personnel: S. Harper (1/2 X 150) 75.00
Brief Physical Work Description:
Overburden stripping (removal of soil, overburden, trees, tree stumps), bedrock trenching and rock sampling was performed on Mining Claim SO 1078884, Monmouth Township (G-1298), Haliburton County, Southern Ontario Mining Division. Overburden stripping and bedrock trenching was done using picks, shovels, Husqvarna 262 chainsaw, axes, crowbars, Pionjar 120 rock drill/breaker ('jackhammer') and sledge hammers. Overburden stripping exposed calcite veins in feldspathic paragneiss. Several methods for mineral specimen and gemstone extraction from the calcite veins were evaluated. Much work was done to expose a large calcite vein and prepare the area for future mining. Several calcite veins parallel to the large calcite vein were exposed by overburden stripping. All work was done under the supervision of S. Harper (author). On average 12 hours were worked per person per day except where noted.
Personnel Addresses:
O. Bolton 3 Jean Street Toronto, ON M4W 3A6a
J. Bryce2746 Willowmore Way Mississauga, ON (416) 286-4052
D. Cassell#102-811 Brian DriveEnola, PA17025(717) 732-6718
D. Core204 Whipkey DriveGranville, Ohio43023(614) 587-3415
S. D'Ambra 2703 Latona Road
Baltimore, MD21217(301) 254-7070
D. Gratton 369 Sammon Ave Toronto, ON M4J 2A6 (416) 466-6496
J. Harper1195 Nuforest DriveR. R. #1Ennismore, OntarioKOL 1TO(705) 292-7732
M. Harper1195 Nuforest DriveR. R. #1Ennismore, OntarioKOL 1TO(705) 292-7732
S. HarperBox 720STNP704 Spadina AveToronto, OntarioMSS 2Z1(416) 961-5041
L. Landsborough R. R. #1 Terra Cotta LOP l NO (416) 877-3084
J. Landsborough R. R. #1 Terra Cotta LOP l NO
K. Pavlic366 Prince of Wales DriveWhitby, OntarioLIN 6M9
D. Redlich48 Kensington DriveCamp Hill, PA17011(717) 737-0312
F. Rentzel687 Beechwood RoadColumbus, Ohio43213
D. Roughley 163 St. George St. Toronto, Ontario M5R 2L9 (416) 929-3083
E. Spooner 22 Russell Street Toronto, Ontario MSS 3B1
C. Twining R. R. #1 Ennismore, ON KOL 1TO (705) 292-6117
J. VonderheyRD4Box 376ALake Ariel, PA18436(717) 689-3324
G. Vrdoljak366 Prince of Wales DriveWhitby, OntarioLIN 6M9
C o
rv L
65
5 'i
T?
m o
' r
i
.X o
*
.
o o
o o
—
—
—o
-C
00
00
l
U7
0
0O
-T
.
r* s 5 o—
uvj
CO
ON
-S
—
-C
C
O
NJ
P 5 J
VJJ r- e* a VA ^ cT V
/l
f
ft-
(
m
o -t O
B o s:
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number. ooo lo f
Personal Information collected on this form Is obtained under the authority of the N this collection should be directed to the Provincial Manager, Mining Lands, Min Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.
31D16NW8002 63.6133 MONMOUTH 900
instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
Recorded Holder(s) Client No.S
Address
0/I/MSS221Telephone No.
Mining Division Township/Area M or G Plan No. sDates Work Performed
From: I ~l 1 a c\ *-i 1 k f, l"" 2
To:
Work Performed (Check One Work Group Only)Work Group
X
Geotechnical SurveyPhysical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
QvVi/b^fcMn 5/V/W//V9 Sedvock- /"^^cM/Ko '
Total Assessment Work Claimed on the Attached Statement of Costs S
m'TAnirt nml OGIHAL RURVFY j
ONTARIO GEOLOGICAL SURVEY" GIS - ASSESSMFNT FI l FS
npn 9. l iQQ9l-JvJl- i
l TReCEIVED yNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
e?
(attach a schedule If necessary)
Certification of Beneficial interest * See Note No. 1 on reverse side1 certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.
Date Recorded Holder or Agent (Signature)
o^ie/i-2 *f.w^^w/
Certification of Work Reportl certify that 1 have a personal knowledge of the facts set forth In this Work report, having performed the work or witnessed same during and/or after Its completion and annexed report is true.
Name and Address of Person Certifying
^ f (id vflj? (s nf\QTelepone No.
t"y*titoKDate Certified By (Signature)
For Office Use Only /j ;Total Value Cr. Recorded
4n,nADate Recorded
^ML, i* KaDeemed Approval Date
MinjWg Recorder 1 J
TJl'fV^-i^feu,^Date Approved
l
Date Notice for Amendments Sent
He •wBfflW ONTARIO MINIM DIVISIONREGEJVED
Ui:'J j o J992AM M.
JiSi2i@i!!!lM:?i3,4,S,r'
Work Report Number for
Applying Reserve
*
Claim Number (see Note 2)
w Id-ezzy
iTotal Number
of Claims
Number of
Claim Units
l
0241 (03/91)
Value of Assessment Work Done
on this Claim
nm
l 7-1(2
Value Applied to this Claim
O
OTotal Value Work Total Value
Done Work Applied
Value Assigned
fromthis Claim
0
o
Reserve: Work to be Claimed at
a Future Date
ITHZ
I?(12.Total Assigned Total Reserve
From
1CDCOoT3
CD CO
SQ.
toO
75CD-o
o3 to
73 .. S?815^,0o2
IBCD CD
So*"" W
Q) *~*.-S \"c-^
I!*— CD m OT
"O CD OQ.
-zisico y.S3 O3*5
t) c®.eCO CD
r CD
If
If 0)—.c .e
"S * 73 o2 **CO CO
gloj3CO 0
pg-
to•ot.CO
1Cs.Q.O)^
osto 5T3
2
E"to oCD
"sO)
CO to
1S3
3 OCD
S3
2
2 COOJ
TO
2O
Dr-
jio"o
I2CO'•S
c•oCDC
2iCO
'5 o73
i75O" CD
oCO
oCD
S3O
CD COW
1O
DC\j
xTOcCDQ. CL co
1
173CD
c o•oCD
.0Q.
ioCD
2ISIO
DCO
T3 2
CDECD 0.ECD S3
SCD
OC
Q. O
O
O."oCD O'o
0
3 O
ot specified y
i3
SLTo^-SCD
CD.C*^
^
8o.(Ov
oCD
S oCD2 coCO
•o
S oCD
S9
92o* a
O)
o.
1CDm2 "a.
w ea
"2 o8
5
CO *
liSo,
SiSE 14m O *- 111 ** 5Z
CD
JO•o o
lo 0wCd
O
CM
l
N
g) co
1 c2 75 a.
CO co E
35d) ***
S3 5 5
Ontario'
Ministry ofNorthern Developmentand Mines
Jtere du oppement du Nord
et des mines
Statement of Costs for Assessment Credit
Etat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No./N 0 de transaction
Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignements personnels contenus dans la presents formule sont recueillis en vertu de la Loi sur les mines et serviront a tenir a Jour un registre des concessions minieres. Adresser toute queslton sur la collece de ces renseignements au chef provincial des terrains minlers, minlstere du D6veloppement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/Couts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Drolts de ('entrepreneur et de ('expert- consell
Supplies Used Fournltures utillsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
Type
Typef i ,i A 1 - i 1 L- it a i n jj( ( v \j , | i | i
sF f - ' 7 /
MvCvpMj*^
pj/c,;^ r;uType
J
f̂ \^\^\
Amount Montant
15600
t7 ^- \\s?{.{q(!
t ™)
yj^^n
lioo
2 w C'
tio -Total Direct Costs
Total des couts directs
Totals Total global
IMW
WWU
T-Ofi, *1()
f
'^{0
IW C1 v
/
f
f
x'
2. Indirect Costs/CoQts indirects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportation Transport
Food and Lodging Nourrlture et hlbergementMobilization and Demobilization Mobilisation et demobilisation
Description
Type 645
t*}
f civ.'
5h'(''n'-f\a
Amount Montant
•27-5.05
jn.cx"'lo. oo '
T, to -
f 6.'?^
Sub Total of Indirect Costs Total partiel des coQts Indirects
Amount Allowable (not greater than 20W of Direct Costs) Montant admissible (n'excedant pas 20 Vo des couts directs)Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable d'evaluation Indirect costs) (Total des coflts directs
Totals Total globalt
J
36T./5,
W
H^Hfl
i'l-ll'let Indirects admissible*
Note: The recorded holder will be required to verify expenditures claimed In this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demande a eel effet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux d'evaluation presentes.
Filing Discounts
1. Work filed within two years of completion is claimed at 100 07o of the above Total Value of Assessment Credit.
Remises pour depdt
1. Les travaux deposes dans les. deux ans suivant leur achievement sont rembourses a 100 "/o de la valeur totale susmentionnee du credit d'evaluation.
2. Work filed three, four or five years after completion is claimed at 5007o of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimed
x 0.50
2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 "/o de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit devaluation
x 0,50Evaluation totale demanded
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
//Jthat as .———-.—————--———(Recorded Holder, Agent, Position in Company)
to make this certification
Attestation de l'6tat des coOts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont 616 engagers pour effectuer les travaux devaluation sur les terrains indiquSs dans ia formule de rapport de travail ci-joint.
l am authorized Et qu'a litre de je suis autorise*(titulaire enregistre, representant, poste occupe dans la compagnle)
a faire cette attestation.
Signature Date
0212 (04/91) Nota : Dans cette formule, lorsqu'il deslgne des personnes, le masculin est utilisd au sens neutre.