CASE STUDY Integrated Services One Stop Shop: Service Integration Facilitates Multiple Discoveries Schlumberger delivers an integrated service package that leads the way to new discoveries in the North Sea With certified personnel and technology being sourced from land locations all around the North sea, the Integrated Services Project Manager (ISPM) ensured resource availability at all times— every time. The operator, PA Resources, intended to explore the Broder Tuck and Lille John prospects, located in the North Sea (250 km west of Esbjerg, Denmark), in cooperation with their partners and the Danish Energy Agency. Requiring equipment, technologies, and services critical to such an operation, and being newcomers to North Sea exploration, the operator chose to request the assistance of Schlumberger Integrated Services (IS). Schlumberger IS drafted to assist operator’s first North Sea operation The North Sea is a complex and challenging exploration environment for even the most experienced operator. The outcome of this project would determine the future for PA Resources in this area. However, being first-timers in the region was only the operator’s first challenge; the second being the generally held belief (by the Danish oilfield industry) that the targets had low prospectivity. PA Resource’s mission to drill and evaluate both prospects in the most efficient and safe manner would entail a project of substantial complexity. The operator recognized the need for process simplification, overheads reduction, efficiency enhancement, and comprehensive contingency plans, whilst achieving their objectives with minimal operational personnel. North Sea Skagerrak Kattegat United Kingdom Neth. Denmark Hamburg Kristiansand Esbjerg Alborg S Oxford Dundee Aberdeen Gothenburg Amsterdam London The Hague Copenhagen Broder Tuck CHALLENGE Substantially complex project No previous exploration experience in North Sea area Lack of footprint in a suspected ‘dry’ location SOLUTION Schlumberger integrated package of services supported by an ISPM Project manager: single point of contact to simplify client/ Schlumberger/third-party relationships Greater accountability provided by combining services and management RESULTS Discoveries of oil and gas in a region thought to have little prospectivity PA Resources established a footprint in North Sea Zero delays on service delivery Zero lost time injuries Successful exploration with two new discoveries “The Schlumberger basket of services accelerated our procurement process and simplified operational logistics” Graham Goffey Managing Director PA Resources

One Stop Shop: Service Integration Facilitates Multiple .../media/Files/ipm/case_studies/ip_cs_one_stop_shop.pdf · One Stop Shop: Service Integration Facilitates Multiple Discoveries

  • Upload
    ngocong

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: One Stop Shop: Service Integration Facilitates Multiple .../media/Files/ipm/case_studies/ip_cs_one_stop_shop.pdf · One Stop Shop: Service Integration Facilitates Multiple Discoveries

CASE STUDY

Integrated Services

One Stop Shop: Service Integration Facilitates Multiple DiscoveriesSchlumberger delivers an integrated service package that leads the way to new discoveries in the North Sea

With certified personnel and technology being sourced from land locations all around the North sea, the Integrated Services Project Manager (ISPM) ensured resource availability at all times— every time.

The operator, PA Resources, intended to explore the Broder Tuck and Lille John prospects, located in the North Sea (250 km west of Esbjerg, Denmark), in cooperation with their partners and the Danish Energy Agency. Requiring equipment, technologies, and services critical to such an operation, and being newcomers to North Sea exploration, the operator chose to request the assistance of Schlumberger Integrated Services (IS).

Schlumberger IS drafted to assist operator’s first North Sea operationThe North Sea is a complex and challenging exploration environment for even the most experienced operator. The outcome of this project would determine the future for PA Resources in this area. However, being first-timers in the region was only the operator’s first challenge; the second being the generally held belief (by the Danish oilfield industry) that the targets had low prospectivity.

PA Resource’s mission to drill and evaluate both prospects in the most efficient and safe manner would entail a project of substantial complexity. The operator recognized the need for process simplification, overheads reduction, efficiency enhancement, and comprehensive contingency plans, whilst achieving their objectives with minimal operational personnel.

A t l a n t i cO c e a n

Norwegian Sea

North Sea

Mediterranean Sea

Mediterranean Sea

BalticSea

Bayof

Biscay

Strait of Sicily

Strait of Gilbraltar

IonianSea

G. of Riga

Gulf of Lions

Balearic Sea

G. of Finland

Gulf ofBothnia

Tyrrhenian Sea

English Channel

Celtic Sea

AdriaticSea

Skagerrak

Kattegat

Ukraine

L i b y a

Sweden

Russia

Russia

Romania

Finland

Belarus

A l g e r i a

UnitedKingdom

T u n i s i a

Switzerland

S p a i n

Slovenia

S l o v a k i a

San Marino

Portugal

P o l a n d

N o r w a y

Neth.

M o r o c c o

M o n a c o

M a l t a

Macedonia

Lux.

Lithuania

Liech.

Latvia

I t a l y

Ireland

H u n g a r y

Greece

Gibraltar

Sp.

G e r m a n y

F r a n c e

Estonia

Denmark

Czech Rep.

Croatia

Bosnia& Herz.

Belgium

A u s t r i a

Andorra

Albania

Serbia

Montenegro

Hamburg

Casablanca

Uzhhorod

Luts'k

Umea

Sundsvall

Sodertalje

Gavle

VitoriaPontevedra

OrenseLogrono

Leon

JaenHuelva

Castellon De La PlanaCaceres

Almeria

Albacete

Timisoara

Oradea

Arad

Lublin

Kielce

Bialystok

Stavanger

Kristiansand

Kosice

Panevezys

Marijampole

Ventspils

Jelgava

VercelliVarese

Trapani

Terni

Siracusa

Sassari

Rimini

Pisa

Marsala

Lecce

L'aquilaGrosseto

Gela

Cosenza

Catanzaro

Caserta Andria

Tatabanya

Szeged

Pecs

Debrecen

Rijeka

Osijek

Marseille

Lyon

ZlinPlzen

Pardubice

Olomouc

Liberec

Klagenfurt

Vlore

Pskov

Oran

Lerida

Miskolc

Parnu

Esbjerg

Alborg

Subotica

Pancevo

Nis

San Fernando

Manresa

Linares

El Ferrol

Badalona

Alcoy

Torun

Slupsk

RadomPabianice

Bitola

Vaasa

Pori

LappeenrantaLahti

Kuopio

Narva

Mostar

Novi Sad

Jyvaskyla

Lida

ZenicaTuzla

St. Petersburg

NaplesBarcelona

L'vivOxford

Dundee

Aberdeen

LausanneGeneva

Gothenburg

ZaragozaValladolid

Valencia

Seville

Santander

San Sebastian

Palma De Mallorca

Oviedo

Malaga

La Coruna

Granada

Cordoba

Cadiz

Burgos

Bilbao

Badajoz

Alicante

Porto

Wroclaw

PoznanLodz

CracowKatowice

Gdansk

Bydgoszcz

Trondheim

Bergen

Klaipeda Kaunas

Liepaja Daugavpils

VeronaVenice

Trieste

Turin

Taranto

Reggio di Calabria

Perugia

Parma

Palermo

Milan

Messina

La SpeziaGenoa

Foggia

Ferrara

Catania

Cagliari

Bari

Turku

Ostrava

Brno

Tartu

Brest

GrazSalzburg

Salamanca

Murcia

Salerno

Ravenna

Florence

BolognaAncona

Innsbruck

Linz

Kaliningrad

Vigo

Jerez De La Frontera

Gijon

Elx

Cartagena

Gliwice

Tampere

Pinsk

Baranavichy

Amsterdam

Belgrade

London

Stockholm

Madrid

Ljubljana

Lisbon

Warsaw

Oslo

TheHague

Valletta

Skopje

Bratislava

Vilnius

Riga

Rome

Budapest

Zagreb

Paris

Helsinki

Prague

Tallinn

Dublin

Copenhagen

Sarajevo

Vienna

AndorraTirana

Tunis

Rabat

Tripoli

Algiers

Podgorica

Broder Tuck

W e s t e r n E u r o p eNational CapitalsCities 3,000,000+Cities 900,000-2,999,999Cities 250,000-899,999Cities 75,000-249,999Cities 0-74,999

International BoundariesHighwaysPrimary RoadsMajor RiversIntermediate RiversLakes

0 240 Miles120

0 240 KM120

CHALLENGE ■ Substantially complex project ■ No previous exploration experience

in North Sea area ■ Lack of footprint in a suspected

‘dry’ location

SOLUTION ■ Schlumberger integrated package

of services supported by an ISPM ■ Project manager: single point of

contact to simplify client/Schlumberger/third-party relationships

■ Greater accountability provided by combining services and management

RESULTS ■ Discoveries of oil and gas in a region

thought to have little prospectivity ■ PA Resources established a footprint

in North Sea ■ Zero delays on service delivery ■ Zero lost time injuries ■ Successful exploration with two

new discoveries

“The Schlumberger basket of services accelerated our procurement process and simplified operational logistics”

Graham Goffey Managing Director

PA Resources

Page 2: One Stop Shop: Service Integration Facilitates Multiple .../media/Files/ipm/case_studies/ip_cs_one_stop_shop.pdf · One Stop Shop: Service Integration Facilitates Multiple Discoveries

IS offers process simplification A Schlumberger ISPM was allocated to plan, co-ordinate, and enhance processes by integrating all the services and technology the project would require. These included drilling reservoir evaluation, and well testing services, engineering and operational support, logistics, and third-party management.

The unified Schlumberger drilling portfolio provided seamlessly integrated services from Smith Bits, Smith Services, M-I SWACO drilling fluids, Geoservices mud logging, and Schlumberger direc-tional and measurement-while-drilling segments. This provided a 360-degree-vision over the drilling operation, allowing a real-time exchange of information and ideas that enabled optimal adjustment of drilling parameters, delivering more productive drilling.

Consequently, a comprehensively integrated operation with a single interface for all services, people, products, and administrative procedures simplified work processes while maintaining and exceeding quality and safety requirements. Schlumberger also exceeded PA Resources’ expectations by delivering high downhole tool reliability.

Flawless execution of project objectives brings about new discoveriesSchlumberger planning, provision, and integration of multiple services, and providers was executed flawlessly.

The ISPM’s concerted efforts to reduce NPT (non prod- uctive time) over the life of the project resulted in only 21 hours of NPT encountered during 186 operational days by Schlumberger IS.

Lessons learned were quickly implemented; testimony to this is the fact that, of those 21 NPT hours, 20 occurred during the first well’s operation, and only one during the second well’s operation. Schlumberger demonstrated an excellent performance with operational efficiency above 99.4%, with zero lost time injuries (LTIs) recorded for the entire life of the project.

The Schlumberger Drilling & Measurement (D&M) group enjoyed particular success; making 20 bottomhole assemblies (BHAs) in various hole sizes from 24-in to 6-in, with zero downhole tool failure. All planned sections were drilled in one single run. PA Resources described the performance as “outstanding”.

Having drilled 6992.5 m, Smith Bits achieved the required dogleg and ROP (rate of penetration) on-schedule, as planned.

The M-I SWACO drilling fluids segment built and transferred 22,227 bbl PHB, 12,094 bbl Versavert drilling fluids, and 1,788 bbl wash chemicals. Both the M-I SWACO drilling fluids, and drilling waste management segments upheld zero environmental or unplanned discharge. 

The first exploration well was drilled on the Broder Tuck prospect and discovered hydrocarbon in the primary Middle Jurassic target. The discovered hydrocarbon is high-quality gas with condensate of approximately 44° API gravity at a ratio of approximately 80–90 barrels of condensate per million standard cubic feet gas. The second well was drilled on the Lille John prospect. The Lille John well also encountered hydrocarbon pay in an overall Miocene sand-stone, at the extraordinarily shallow depth of 930 m below mean sea level. This discovery is confirmed as a light oil of 34–35° API gravity.  

The Danish Energy Agency is very pleased with these results, and PA Resources’ Danish partners expressed their satisfaction at the outcome of the program. Having established itself as a success-ful and viable operator in North Sea operations, PA Resources is consequently satisfied with Schlumberger performance and will not hesitate to use Schlumberger IS provision in future projects.

www.slb.com

*Mark of SchlumbergerCopyright © 2012 Schlumberger. All rights reserved. 12-IP-0008

CASE STUDY: Schlumberger delivers an integrated service package that leads the way