    A LEED Overview LEED with Lighting

    The following tables summarize the lighting related prerequisites and credits in the various versions of LEED.These are brief, introductory notes. To see the complete requirements and other associated details, consult theappropriate USGBC/LEED documentation at www.usgbc.org. Some additional details may also be found athttp://www.acuitybrandslighting.com/sustainability/.

    Category Prerequisite orCredit NC v2.2

    New ConstructionEB v2

    Existing BuildingsCI v2

    Commercial Interiors

    SiteSelection

    Light PollutionReduction

    ( to 1 Credit)

    For Interior Lighting:The angle of max candela fromeach interior luminaire shall notexit out through the windows. ORAll non-emergency interior lightingshall be automatically controlled toturn off during non-business hours.

    For Exterior Lighting: Do not exceed 80% of the LPDs

    for exterior areas and 50% forbuilding facades and landscapefeatures as specified inASHRAE/IESNA Standard 90.1-2004, without amendments.

    Limits have been set (by IESNA

    Lighting Zone) for illuminance atsite boundaries, fall off ofilluminance outside of siteboundaries and total uplight.

    Have no luminaire, of 50watts or greater, withuplight or show that lessthan 5% of light emittedby all exterior luminairesreaches the night sky onan annual basis.

    The direction of maxintensity for all interiorluminaires must fallwithin the building (notstriking a window).

    The direction of maxintensity for all exteriorluminaires must fallwithin the property.

    Shield all luminaires thatare within 2.5MH of theproperty line.

    Meet or be lower than lightlevels in IESNA RP-33-99.

    Shield all exterior luminaireswith initial lamp lumens over1000 lumens.

    All exterior luminaires withinitial lamp lumens over3,500 must be IESNA FullCutoff.

    The direction of maxintensity for all interiorluminaires must fall withinthe building (not striking awindow).

    All exterior lighting within 2.5mounting heights of the

    property boundary cannotemit light off of the property.

    FundamentalCommissioning(Prerequisite)

    Lighting controls (including fordaylighting) must be commissioned.

    Lighting system must becommissioned.

    Lighting controls (including fordaylighting) must be commissioned.

    MinimumEnergy

    Performance(Prerequisite)

    Meet ASHRAE/IESNA 90.1-2004 orlocal energy code (whichever is morestringent)

    Achieve an EPA EnergyPerformance Rating of at least 60using the Portfolio Manager

    Meet ASHRAE/IESNA 90.1-2004 withamendments or local energy code(whichever is more stringent)

    Ene

    rgy&Atmosphere

    OptimizeEnergy

    Performance(1 -10 Credits)

    Reductions in energy costs below thatset in ASHRAE/IESNA 90.1-2004without amendments:

    10.5% = 1 point

    14.0% = 2

    17.5% = 3

    21.0% = 4

    24.5% = 5 28.0% = 6

    31.5% = 7

    35.0% = 8

    38.5% = 9

    42.0% = 10

    Achieve an EPA EnergyPerformance Rating of at least

    63 = 1 point

    67 = 2

    71 = 3

    75 = 4

    79 = 5

    83 = 6 87 = 7

    91 = 8

    95 = 9

    99 = 10

    Reductions in lighting power densitybelow that set in ASHRAE/IESNA 90.1-2004 by:

    15% = 1 point

    25% = 2

    35% = 3

    And install daylight responsive controlsin regularly occupied spaces within 15of windows and under skylights = 1 point

    MercuryContent in

    Lamps(Prerequisite)

    Below 100 picograms per lumen-hour on weighted average

    MercuryContent inLamps (1

    Credit)

    Below 80 picograms per lumen-houron weighted average

    RecycledContent

    Lighting equipment is specificallyexcluded from this credit.

    Lighting equipment is specificallyexcluded from this credit.

    Materials&

    Resources

    RegionalMaterials

    Lighting equipment is specificallyexcluded from this credit.

    Use a minimum of 20% of materialsmanufactured within 500 miles.

    Indoor

    Environmental

    Quality

    Controllabilityof LightingSystems

    (1-2 Credits)

    Provide individual lighting controlsfor 90% (minimum) of the buildingoccupants to enable adjustmentsto suit individual task needs andpreferences. AND-

    Provide lighting systemcontrollability for all shared multi-occupant spaces to enable lightingadjustment that meets groupneeds and preferences.

    Provide lighting controls for:

    At least 50% of alloccupants allowing forindividual adjustments,and

    All shared areas

    Provide lighting controls for:

    At least 90% of all occupantsallowing for individualadjustments, and

    All shared areas

    -OVER-

    Note:All projectsregistered after

    6/26/07 arerequired to get atleast 2 of theoptional energypoints.

  • 7/25/2019 One Sheet LEED Lighting Overview2

    2/2

    Category Prerequisite orCredit

    CS v2Core and Shell

    H (Pilot Study)Homes

    SiteSelection

    Light PollutionReduction(1 Credit)

    For Interior Lighting:Wherever interior lights can see out anopening, either:

    Automatically shut of the lightsfrom 11p-5a, orAutomatically shield the openingfrom 11p-5a.

    For Exterior Lighting: Do not exceed 80% of the LPDs

    for exterior areas and 50% forbuilding facades and landscapefeatures as specified inASHRAE/IESNA Standard 90.1-2004, without amendments.

    Limits have been set (by IESNALighting Zone) for illuminance atsite boundaries, fall off ofilluminance outside of siteboundaries and total uplight.

    FundamentalCommissioning

    (Prerequisite)

    Lighting controls (including fordaylighting) must be commissioned.

    MinimumEnergy

    Performance(Prerequisite)

    Meet ASHRAE/IESNA 90.1-2004 or localenergy code (whichever is morestringent)

    Energy&Atmosphere

    OptimizeEnergy

    Performance(1 -8 Credits)

    Option 1: Reductions in energy costsbelow that set in ASHRAE/IESNA 90.1-2004 without amendments:

    10.5% = 1 point

    14.0% = 2

    17.5% = 3

    21.0% = 4

    24.5% = 5

    28.0% = 6

    31.5% = 7

    35.0% = 8Option 2: Small offices may comply withASHRAE Advanced Energy Design

    Guide for Small Office Buildings for up to3 points.Option 3: Comply with NBI AdvancedBuildings Benchmark v1.1 for 1 point.

    Option 1:Select and install any one of thefollowing measures:

    Install motion sensorcontrols on all outdoorlight fixturesANDat leastfour wireless photovoltaicexterior light fixtures, ifexterior fixtures areinstalled (1 Point)

    Install at least fourENERGY STAR labeledlight fixtures (1 Point)

    OR

    Option 2:Install ENERGY STAR AdvancedLighting Package (ALP) (3 Points)

    MercuryContent in

    Lamps(Prerequisite)

    MercuryContent inLamps (1

    Credit)

    RecycledContent

    Lighting equipment is specificallyexcluded from this credit.M

    aterials&

    Resources

    RegionalMaterials

    Lighting equipment is specificallyexcluded from this credit.

    Go to www.acuitybrandslighting.com/sustainability for ideason how ABL can assist you in meeting LEED requirements, including: Search for full cutoff and shielded fixtures Specification of lighting requirements for outdoor situations Spreadsheets to assist with LEED compliance documentation Product suggestions

    Note:All projectsregistered after6/26/07 arerequired to get atleast 2 of theoptional energypoints.