On TUESDY, JNURY 7, 2020, the CONSTRUCTION COMMITTEE f the Greater Orland Aviatin .Authrity met in Cnference Rm. Apll/Gemini/Taurus, 5655 Carg Rad, Orland Internatinal Airprt, Orland, Flrida. Chair Thrntn called the meeting t rder at 6:30 a.m. The meeting was psted in accrdance with Flrida Statutes and a qurum was present. Cmmittee Members present: Stanley J. Thrntn, Chair Kathleen Sharman, Chief Financial Officer Mike Pattersn, Directr f Cnstructin Gary Hunt, Directr f Maintenance Denise Schneider, Assistant Directr f Purchasing and Material Cntrl Als present: Tm Draper, GOA.A Senir Directr f Airprt Operatins Rbert A.lfert, Jr., Legal Cunsel (Nelsn Mullins Brad 5 Cassel) Karen Ryan, Legal Cunsel (Nelsn Mullins Brad 6 Cassel) David Willis, Legal Cunsel (Rumberger, Kirk & Caldwell) Brad Friel, GOAA Planning Marie Dennis, GOAA Finance Mark Birkebak, GOAA Engineering Pam L'Heureux, GOAA Finance Debbie McKewn, GOAA Prject Cntrls Dan Carringtn, GOAA Envirnmental Davi Nichlsn, GOAA Finance Edelis Mlina, GOAA Small Business Ian Brks, GOAA IT Jackie Chin, GOAA Airline Affairs Jhn Carlsn, GOAA Cnstructin Kathy Andersn, GOAA Cntracts and Grants Larry Ell, GOAA Public Affairs Tara Ciaglia, GOAA Prject Cntrls Vendla Davermann, GOAA Finance Venus Hinds, GOAA Cnstructin Finance Alex Srnd, HNTB Crpratin Az Thmas, PSA Management, Inc. Ben Brwn, A2 Grup, Inc. Bill Brks, HNTB Crpratin Blake Herld, WSP USA Brandn Rutterfrd, Hensel Phelps Cnstructin Brent Hawrth, Getech Cnsultants Internatinal, Inc. dba GCI, Inc. Carls Rche, Schenkel & Shultz, Inc. Charles Sukanek, Page One Cnsultants, Inc. Chris Kieffer, A2 Grup, Inc. Dan Willems, AECOM Technical Services, Inc. Duy Da, Da Cnsultants Ejaz Ahmad, CMTS/Hansn JV Errick Yung, PSA Management, Inc. Ishne Hbbs, CMTS Cnstructin Management Services, LLC Jamies Pancast, Getech Cnsultants Internatinal, Inc. dba GCI, Inc. Jamie McGnagill, Getech Cnsultants Internatinal, Inc. dba GCI, Inc. Jhn Guirges, Getech Cnsultants Internatinal, Inc. dba GCI, Inc. Krista Stcked, R.W. Blck Cnsulting, Inc. Lance Quick, R.W. Blck Cnsulting, Inc. Lisa Rainey, R.W. Blck Cnsulting, Inc. Michael Kurek, R. W. Blck Cnsulting Paul Gula, Getech Cnsultants Internatinal, Inc. dba GCI, Inc. Rita Watsn, Schenkel & Shultz, Inc. Rb Jarvis, Artistic Identity, Ryan Allen, R.W. Blck Cnsulting, Inc. Teresa Andrecheck, AECOM Technical Services, Inc. LLC

On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

On TUESD Y, J NU RY 7, 2020, the CONSTRUCTION COMMITTEE f the Greater Orland Aviati n .Auth rity met in C nference R m. Ap ll /Gemini/Taurus, 5655 Carg R ad,Orland Internati nal Airp rt, Orland , Fl rida. Chair Th rnt n called the meetingt rder at 6:30 a.m. The meeting was p sted in acc rdance with Fl rida Statutes anda qu rum was present.

C mmittee Members present:Stanley J. Th rnt n, ChairKathleen Sharman, Chief Financial OfficerMike Patters n, Direct r f C nstructi nGary Hunt, Direct r f MaintenanceDenise Schneider, Assistant Direct r f Purchasing and Material C ntr l

Als present:T m Draper, GOA.A Seni r Direct r f Airp rt Operati nsR bert A.lfert, Jr., Legal C unsel (Nels n Mullins Br ad 5 Cassel)Karen Ryan, Legal C unsel (Nels n Mullins Br ad 6 Cassel)David Willis, Legal C unsel (Rumberger, Kirk & Caldwell)Brad Friel, GOAA PlanningMarie Dennis, GOAA FinanceMark Birkebak, GOAA EngineeringPam L'Heureux, GOAA FinanceDebbie McKe wn, GOAA Pr ject C ntr lsDan Carringt n, GOAA Envir nmentalDavi Nich ls n, GOAA FinanceEdelis M lina, GOAA Small BusinessIan Br ks, GOAA ITJackie Chin, GOAA Airline AffairsJ hn Carls n, GOAA C nstructi nKathy Anders n, GOAA C ntracts and GrantsLarry Ell, GOAA Public AffairsTara Ciaglia, GOAA Pr ject C ntr lsVendla Davermann, GOAA FinanceVenus Hinds, GOAA C nstructi n FinanceAlex S r nd , HNTB C rp rati nAz Th mas, PSA Management, Inc.Ben Br wn, A2 Gr up, Inc.Bill Br ks, HNTB C rp rati nBlake Her ld, WSP USABrand n Rutterf rd, Hensel Phelps C nstructi nBrent Haw rth, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.Carl s R che, Schenkel & Shultz, Inc.Charles Sukanek, Page One C nsultants, Inc.Chris Kieffer, A2 Gr up, Inc.Dan Willems, AECOM Technical Services, Inc.Duy Da , Da C nsultantsEjaz Ahmad, CMTS/Hans n JVErrick Y ung, PSA Management, Inc.Ishne H bbs, CMTS C nstructi n Management Services, LLCJamies Panc ast, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.Jamie McG nagill, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.J hn Guirges, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.Krista St cked, R.W. Bl ck C nsulting, Inc.Lance Quick, R.W. Bl ck C nsulting, Inc.Lisa Rainey, R.W. Bl ck C nsulting, Inc.Michael Kurek, R. W. Bl ck C nsultingPaul Gula, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.Rita Wats n, Schenkel & Shultz, Inc.R b Jarvis, Artistic Identity,Ryan Allen, R.W. Bl ck C nsulting, Inc.Teresa Andrecheck, AECOM Technical Services, Inc.

LLC

Page 2: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 2 of 30

Win Beltran, Ge tech C nsultants Internati nal, Inc. dba GCI, Inc.Nadege Cadet, Rec rding Secretary

LOBBYIST DISCLOSUREParties present were reminded that f r individuals wh c nduct l bbying activitieswith Aviati n Auth rity empl yees r B ard members, registrati n with the Aviati nAuth rity is required each year pri r t c nducting any l bbying activities,statement f expenditures incurred in c nnecti n with th se l bbying instances sh uldals be filed pri r t April 1st f each year f r the preceding year. As f JanuaryIS,

A

2013, l bbying any Aviati n Auth rity Staff wh are members f any c mmitteeresp nsible f r ranking Pr p sals, Letters f Interest, Statements f Qualificati ns r Bids and thereafter f rwarding th se rec mmendati ns t the B ard and/ r B ardMembers is pr hibited fr m the time that a Request f r Pr p sals, Request f r Letters f Interests, Request f r Qualificati ns r Request f r Bids is released t the timethat the B ard makes an award. As ad pted by the B ard n September 19, 2012,l bbyists are n w required t sign-in at the Aviati n Auth rity ffices pri r t anymeetings with Staff r B ard members. In the event a l bbyist meets with r therwisec mmunicates v;ith Staff r a B ard member at a l cati n ther than the Aviati nAuth rity ffices, the l bbyist shall file a N tice f L bbying (F rm 4) detailingeach instance f l bbying t the Aviati n Auth rity within 7 calendar days f suchl bbying.Aviati n Auth rity when meeting with the May r f the City f Orland r the May r f Orange C unty at their ffices. The p licy, f rms, and instructi ns are availablein the Aviati n Auth rity's ffices and the website, f B ard Services with questi ns at (407) 825-2032.

As f January 16, 2013, l bbyists will als pr vide a n tice t the

Please c ntact the Direct r

NNOUNCEMENTAny appeals f decisi ns made by the C nstructi n C mmittee must be filed with theChief Executive Officer -within five business days (n later than 4:00 p.m. n thefifth business day) f the rendering f that decisi n.

CH NGE ORDER GEND 1 . The f ll wing Change Orders were presented f r c nsiderati n:

A. Change Order BP-00482-01 V RIOUS REVISIONS. [A han out was presente ,inclu ing a revise Coversheet.J This change rder t the c ntract with Carr& C llier Inc. f r Gate E-50 and Checkp int Charlie Devel pment is t : 1.Pr vide all lab r, materials, and equipment t install a 4-inch c ncrete capwith tracer wire ver the existing fiber duct and repair damaged fiber c nduitwith split duct. This change rder replaces Field Change Order N . 1. ADD:$19,909.54; 2. Pr vide all lab r, materials, and equipment t cut and capexisting reclaimed water lines at five l cati ns and rem ve the p rti n f thereclaimed lines within the pr ject limits. Included are additi n c sts f rlab r, equipment and material required t l cate undergr und utilities n tsh wn n the c ntract drawings and t carefully excavate and rem ve tree r tss as n t t damage these utilities. This change rder replaces Field ChangeOrder N . 2. ADD: $38, 669.37; and, 3. Pr vide all lab r, material and equipmentt install r adway striping and signage f r the east r adway, and t reducethe east r adway width fr m 30 feet t 24 feet. DEDUCT: ($4,084.05).

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veChange Order BP-00482-01, f r a t tal am unt f $54,494.86 and n timeextensi n, -with funding fr m previ usly-appr ved Capital Expenditure Funds.

b. Change Order BP-00486-01 DRB CONTR CT REVISION. This change rder t thec ntract with Hubbard C nstructi n C mpany f r Run-way 18L-36R Rehabilitati nand Related W rk is t delete Secti n 00 73 83.13 Dispute Review B ard, fr m

Page 3: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 3 of 30

the C ntract D cuments in its entirety, and replace with Secti n 00 .'3 8J.13Dispute Review B ard (Revised), pr vided as Attachment 'A'. N C st Change.

Legal C unsel stated that this item was presented t the Capital ManagementC mmittee which has c nsensed t the c ntract change.required t inc rp rate the new DRB terms int the c ntract d cuments.

This change rder is

Up n m ti n f Ms. Schneider, sec nd by Mr. Hunt, v te carried t appr veChange Order BP-00486-01, f r a t tal am unt f $0.00 and n time extensi n;there is n fiscal impact.

C. Change Order L-00047-01 NO COST CH NGE TO R TE SHEET. [A han out was presente ,which inclu es a revise Coversheet an Supporting Documentation.] This change rder t the c ntract with Orland Business Teleph ne Systems, Inc. f r On-Call L w V ltage Services (FY20-OBTS) is a M C st Change t inc rp rate therevised rate sheet f r L-0004"?, pr vided as Attachment 'A'. ADD: $0.00.

Ms. Sharman asked if the intent wasc ntract was executed.

t include this rate sheet when theMr. Ian Br ks replied yes, that the sheet 'was

inadvertently missed and is c nsistent with rate sheets n similar l w v ltage n-call service c ntracts.

Chair Th rnt n asked if the 15* mark-up is als c nsistent,yes .Br ks replied yes, th ugh he 'w uld have t c nfirm the am unt f the percentageincrease.

Mr. Br ks repliedChair Th rnt n c ntinued and asked if the rates had increased. Mr.

Ms. Sharman asked if this mark-up was part f any IT pr jects under $50,000.Mr. Patters n replied yes.Mr. Br ks stated that rates and percentages will be neg tiated n any ITpr ject ver $50,000.

Chair Th rnt n requested that this be m nit red.

Agenda Item N s. 1-C, 1-D, and 1-E were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried appr ve ChangeOrder L-0004t-01, f r a t tal am unt f $0.00 and n time extensi n; there isn fiscal impact.

D. Change Order L-00048-01 NO COST CH NGE TO R TE SHEET. This change rder t the c ntract with Orland Business Teleph ne Systems, Inc. f r WAC t MainTerminal C mmunicati ns R m Fiber Installati n is a N C st Change t inc rp rate the revised rate sheet f r L-00048, pr vided as Attachment 'A'.ADD: $0.00.

Ms. Sharman asked if the intent v/as t include this rate sheet when theMr. Ian Br ks replied yes, that the sheet 'was

inadvertently missed and is c nsistent with rate sheets n similar l w v ltage n-call service c ntracts.

c ntract 'was executed.

Chair Th rnt n asked if the 15* mark-up is als c nsistent. Mr. Br ks repliedyes. Chair Th rnt n c ntinued and asked if the rates had increased. Mr.Br ks replied yes, th ugh he w uld have t c nfirm the am unt f the percentageincrease.

Ms. Sharman asked if this mark-up was part f any IT pr jects under $50,000.Mr. Patters n replied yes.Mr. Br ks seated that rates and percentages will be neg tiated n any ITpr ject ver $50,000.

Chair Th rnt n requested that this be m nit red.

-

Page 4: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes f the C nstructi n C mmittee Meeting, January 7, 2020Page 4 f 30

Agenda Item N s. 1-C, 1-D, and 1-E were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried appr ve ChangeOrder L-00048-01, f r a t tal am unt f $0.00 and n time extensi n; there isn fiscal impact.

E. Change Order L-S0004-01 NO COST CHANGE TO RATE SHEET. This change rder t the c ntract with Orland Business Teleph ne Systems, Inc. f r On-Call L wV ltage Services (FY20-OBTS) f r SAPM/ITF is a N C st Change t inc rp ratethe revised rate sheet f r L-S00004, pr vided as Attachment 'A'. ADD: $0.00.

Ms. Sharman asked if the intent was t include this rate sheet when thec ntract was executed,inadvertently missed and is c nsistent with rate sheets n similar l w v ltage n-call service c ntracts.

Mr. Ian Br ks replied yes, that the sheet was

Chair Th rnt n asked if the 15% mark-up is als c nsistent,yes.Br ks replied yes, th ugh he w uld have t c nfirm the am unt f the percentageincrease.

Mr. Br ks repliedChair Th rnt n c ntinued and asked if the rates had increased. Mr.

Ms. Sharman asked if this mark-up was part f any IT pr jects under $50,000.Mr. Patters n replied yes. Chair Th rnt n requested that this be m nit red.Mr. Br ks stated that rates and percentages will be neg tiated n any ITpr ject ver $50,000.

Agenda Item N s. 1-C, 1-D, and 1-E were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried appr ve ChangeOrder L-S00004-01, f r a t tal am unt f $0.00 and n time extensi n; thereis n fiscal impact.

CONSTRUCTION MANAGEMENT AT RISK (CM@R) GUARANTEED MAXIMUM PRICE (GMP) BUDGET, BUYOUT,AND CONTINGENCY (BBC) MANAGEMENT REQUESTS AGENDA2. The f ll wing GMP Budget, Buy ut, and C ntingency Management requests (relatedt the S uth Terminal C, Phase One Pr ject) were presented f r c nsiderati n:

A. Subc ntract r M dificati n f r BP-S00141 (GMP N . 5-S.4) with SchindlerElevat r C rp rati n f r CR0347-LST-RFIs 1402 and 1402.1-Apply SimulatedSandblast Silkscreen at Glass Elevat r Entrance D rs. Mr. Guirges presentedthe mem randum, requesting appr val f r Turner-Kiewit J int Venture (TKJV) t issue a Subc ntract r M dificati n n BP-S00141, S uth Terminal C, Phase 1 -Elevat rs & Escalat rs J int Pr curement (GMP N . 5-S.4), at the Orland Internati nal Airp rt, in the t tal am unt f $8,140.00 t Schindler Elevat rC rp rati n f r CR0347-LST-RFIs 1402 and 1402.1-Apply Simulated SandblastSilkscreen at Glass Elevat r Entrance D rs. Bid Package 14.0.0 "C nveyingSystems" was previ usly awarded within GMP N . 5-S.4 t Schindler Elevat rC rp rati n, CC N . 20181004.007.

TKJV is pr p sing a subc ntract m dificati n t Schindler Elevat r C rp rati nin the t tal lump sum am unt f $8,140.00 f r CR0347-LST-RFIs 1402 and 1402.1-Apply Simulated Sandblast Silkscreen at Glass Elevat r Entrance D rs. Them dified sc pe f w rk c nsists f adding, as a safety measure t preventp tential user impacts, applied dec rative film (i.e., simulated sandblastsilkscreen) n the thirty-tw (32) glass entrance d rs f Elevat rs 5.1, 5.2,5.3, 5.4, 6.1, 6.2, 6.3, and 6.4 as captured in resp nses t RFIs 1402 and1402.1.

Page 5: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 5 of 30

The appr val f this subc ntract m dificati n t Schindler Elevat r C rp rati nres lves all requests f r c sts and time resulting fr m RFIs 1402 and 1402.1.

TKJV has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

TKJV t issue subc ntract m dificati n t SchindlerElevat r C rp rati n in the lump sum am unt f:Deduct fr m Owner C ntingency:

$ 8,140.00(8,140.00)$

Turner-Kiewit J int Venture is c mmitted t 20* MWBE and 4* LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00141 (GMP N . 5-S.4} f r this subc ntract m dificati n isSchindler Elevat r C rp rati n (N n-MWBE/LDB/VBE). There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Legal C unsel, Ms. Ryan, stated that six f the BBC agenda items were n tsigned because f time c nstraints during the review pr cess f the agendaitems, but that they have n w been reviewed and are acceptable.

Mr. Patters n asked if the tw BBC agenda items n t signed by the FinanceDepartment had been reviewed. Ms. Sharman stated that they were n t signedbecause they were received after the submissi n deadline, but that they haven w been reviewed and are acceptable.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue a Subc ntract r M dificati n n BP-S00141,S uth Terminal C, Phase 1 Airside Terminal, Structure and Encl sure (GMP N .5-S.4), f r the t tal lump sum am unt f $6,140.00, with funding fr m PassengerFacility Charges .

B. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with RandallMechanical, Inc, for CR0413-6S1-RFI 1558 Return Duct Connection to CR UnitsLi-4 and Ll-7. Mr. Guirges presented the mem randum, requesting appr val f rHensel Phelps C nstructi n (HPC) t issue a Subc ntract r M dificati n n BP-300143, S uth Terminal C, Phase 1 Airside Terminal, Structure and Encl sure(GMP N . 6-S.l}, at the Orland Internati nal Airp rt, in the t tal am unt f$7,856.00 t Randall Mechanical, Inc. f r CR0413-6S1-RFI 1558 Return DuctC nnecti n t A.CR Units Li-4 and Ll-7. Bid Package f r BP-5143 23.01 "HVAC"has been previ usly awarded within GMP N . 6-5.1 t Randall Mechanical, Inc.,CC N . 20180410.008.

HPC is requesting t issue a Subc ntract r M dificati n t Randall Mechanical,Inc. in the t tal Lump Sum am unt f $7,856.00 f r CR0413-6S1-RFI 1556 ReturnDuct C nnecti n t ACR Units Ll-4 and Ll-7. RFI 1556 c nfirmed the returnduct requirement f r Air C nditi ning Unit with Refrigerant Back-UpUnits Ll-4 and Ll-7.lab r, material and equipment c sts f r tw 24-inches high fl r stands andduct w rk skirts, and final c nnecti n t return duct f r Units ST-A.C-A.S-L1-4and ST-AC-AS-L1-7, per RFI 1558 resp nse.

(ACR)The m dified sc pe f w rk c nsists f the additi nal

-

-

Page 6: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 6 of 30

The appr val f this Subc ntract r M dificati n t Randall Mechanical, Inc.,res lves ail requests f r c st and time resulting fr m RFI 1558 Return DuctC nnecti n t ACR Units Ll-4 and Ll-7.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt this request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t RandallMechanical, Inc. in the lump sum am unt f:Deduct fr m Owner C ntingency:

S 7,856.00$ (7,856.00)

Hensel Phelps C nstructi n is c mmitted t 20* MWBE and 48 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 {GMP N . 6-S.l) f r this subc ntract m dificati n isRandall Mechanical, Inc. (N n-MWBE/LDB/VBE). There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t RandallMechanical, Inc. n BP-S00143, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 6-S.l), f r the t tal lump sum am unt f$7,856.00, with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

Airside Terminal,

C. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with RandallMechanical, Inc, for CR0408-6S1-RFI 1702 C Ll-13 Location Clarification. Mr.Guirges presented the mem randum, requesting appr val f r Hensel PhelpsC nstructi n (HPC) t issue a Subc ntract r M dificati n n BP-S00143, S uthTerminal C, Phase 1S.l), at the Orland Internati nal Airp rt, in the t tal deductive am unt f($9,058.00) t Randall Mechanical, Inc. f r CRQ40S-6S1-RFI 1702 AC Ll-13L cati n Clarificati n,previ usly awarded within GMP M . 6-S.l t Randall Mechanical, Inc., CC M .20180410,008.

Airside Terminal, Structure and Encl sure (GMP N . 6

Bid Package f r BP-S0014O 23.01 "HVAC" has been

HPC is requesting t issue a Subc ntract r M dificati n t Randall Mechanical,Inc. in the t tal deductive Lump Sum am unt f ($9,056.00) f r CR0406-6S1-RFI17Q2 AC Ll-13 L cati n Clarificati n. The m dified sc pe f 'w rk c nsists fa credit f r the deleted AC Ll-13 unit that will n l nger serve R m 01-0239,per RFI 1702.

The appr val f this Subc ntract r M dificati n t Randall Mechanical, Inc.,res lves all request f r c sts and time resulting fr m RFI 1702 sc pe f w rk.Credit f r RFI 1/02 L w V ltage sc pe in GMP N . 6-S.4 will be submitted in afuture CR. There are n c st impacts t GMP N s. 6-S, 6-S.2, 6-S.3, 6-S.5,and 11-S.

HPC has submitted d cumentati n including the subc ntract r's pr p sal sh wingmaterials, equipment, and lab r pricing t supp rt their request. Anindependent c st estimate is included. By appr ving this request, the Ownerd es n t waive its right t enf rce the c ntract requirements f r therrequests f r c sts r time.

Page 7: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 7 of 30

The effect f this Subc ntract r M dificati n t r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t RandallMechanical, Inc. in the lump sum am unt f:Add t Owner C ntingency:

$ (9,058.00}9, 058.00$

Hensel Phelps C nstructi n is c mmitted t 20’ MWBE and 48 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 (GMP NO. 6-S.l) f r this subc ntract m dificati n isRandall Mechanical, Inc. (N n-MWBE/LDB/VBE}. There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t RandallMechanical, Inc. n BP-S00143, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 6-S.l), f r the t tal deductive lump sumam unt f ($9,058.00), with funding credited t Passenger Facility Charges andGeneral Airp rt Revenue B nds.

Airside Terminal,

D. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with Banker SteelCo., LLC for CR0407 6S1 RFI 1527 Elevators 16.1, 16.2 and 16.3 Stiffeners.Mr. Guirges presented the mem randum, requesting appr val f r Hensel PhelpsC nstructi n (HPC} t issue a Subc ntract M dificati n n BP-S00143, S uthTerminal C, Phase 1S.l), at the Orland Internati nal Airp rt, in the t tal am unt f $8,193.00t Banker Steel C ., LLC, f r CR0407 6S1 RFI 1527 Elevat rs 16.1, 16.2 and16.3 Stiffeners.Miscellane us Metals" has been previ usly awarded within GMP N . 6-S.l t Banker Steel C ., LLC, CC N . 20180410.008.

Airside Terminal, Structure and Encl sure (GMP N . 6-

Bid Package f r BP-S00143 05.01 "Structural Steel and

HPC is requesting t issue a Subc ntract r M dificati n t Banker Steel C .,LLC, in the t tal Lump Sum am unt f $8,193.00 f r CR0407-6S1-RFI 1527Elevat rs 16.1, 16.2 and 16 3 Stiffeners. The additi nal sc pe f 'w rk c nsists f added 10 EA Stiffeners beneath the slab n metal deck at the centralelevat r bank, per RFI 1527.

The appr val f this Subc ntract r M dificati n t Banker Steel C r ., LLC,res lves all requests f r c st and time resulting fr m RFI 1527 sc pe f w rkin GMP N . 6-S.l. C sts f r Patching f Firepr fing and Insulati n,Testing and Inspecti n, if any, will be submitted in a future CR.

and

HPC has submitted d cumentati n including the subc ntract r's pr p sal andnecessary back-up t supp rt their request. An independent c st estimate isincluded. By appr ving this request, the Owner d es n t waive its right t enf rce the c ntract requirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t BankerSteel C ., LLC, in the lump sum. am. unt f:Deduct fr m Owner C ntingency:

$ 8,193.00(8,193.00)$

Hensel Phelps C nstructi n is c mmitted t 208 MWBE and 48 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 (GMP N . 6-S.l) f r this subc ntract m dificati n is

— —

— —

'

Page 8: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 8 of 30

Banker Steel C ., LLC (N n-MWBE/LDB/VBE). There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

O 2-J, 2-K, 2-L,-I,

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t BankerSteel C ., LLC n BP-S00143, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 6-S.l), f r the t tal lump sum am unt f$8,153.00, with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

A.irside Terminal,

E. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with Banker SteelCo., LLC for CR0416.1-6S1- SC RFI 1496 Edge of Slab (EOS) Dimension in SC

Mr. Guirges presented the mem randum, requesting appr valf r Hensel Phelps C nstructi n (HPC) t issue a Subc ntract M dificati n nBP-S00143, S uth Terminal C, Phase 1Encl sure (GMP N . 6-S.l), at the Orland Internati nal Airp rt, in the t talam unt f $144,331.00 t Banker Steel C ., LLC f r CR0416.1-6S1-ASC RFI 1496Edge f Slab (EOS) Dimensi n in ASC Area 14 Level 6.BP-S00143 05.01 "Structural Steel and Miscellane us Metals" has been previ uslyawarded within GMP N . 6-S.l t Banker Steel C ., LLC, CC N . 201800410.008.

rea 14 Level 6.

Airside Terminal, Structure and

Bid Package f r

HPC is requesting t issue a Subc ntract r M dificati n t Banker Steel C .,LLC in the t tal Lump Sum am unt f $144,331.00. The additi nal sc pe f w rkc nsists f the detailing, material, fabricati n and erecti n c sts ass ciatedwith the structural steel revisi ns at the Slab- n-Metal-Deck (SOMD) in A.rea14 Level 6, based n the resp nse t RFI 1496. RFI 1496 resp nse c nfirmed thedimensi ns t the EOS and the Radial Dimensi n at the EOS in Area 14 Level 6.

The appr val f this Subc ntract r M dificati n t Banker Steel C ., LLCres lves all requests f r c st resulting fr m RFI 1496-Edge f Slab (EOS)Dimensi n in ASC Area 14 Level 6 sc pe f w rk in GMP N . 6-S.l. C st impactsf r RFI 1496 t GMP N . 6-S.3 will be submitted via CR0416.2-0062 at a futureCCM.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt this request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t BankerSteel C ., LLC in the lump sum am unt f:Deduct fr m PIX Owner C ntingency:

$ 144,331.00(144,331.00)$

Hensel Phelps C nstructi n is c mmitted t 2 0* MWBE and 41 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 (GMP N . 6-S.l) f r this subc ntract m dificati n isBanker Steel C ., LLC (N n-MWBE/LDB/VBE). There isparticipati n ass ciated with this m dificati n.

small businessn

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t Banker

Page 9: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 9 of 30

Steel C ., LLC n BP-S00143, S uth Terminal C, Fhase 1Structure and Encl sure (GMP N . 6-S.l),$144,331.00, with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

Airside Terminal,f r the t tal lump sum am unt f

F. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with RandallMechanical, Inc, for CR0405-6S1-RFI 1459 Liebert C Unit Control and SchematicConfirmation. Mr. Guirges presented the mem randum, requesting appr val f rHensel Phelps C nstructi n (HPC) t issue a Subc ntract M dificati n n BP-

Airside Terminal, Structure and Encl sureS00143, S uth Terminal C, Phase 1(GMP M . 6-S.l), at the Orland Internati nal Airp rt, in the t tal am unt f$14,510.00 t Randall Mechanical, Inc. f r CR0405-6S1-RFI 1459 Liebert AC UnitC ntr l and Schematic C nfirmati n. Bid Package f r BP-S00143 23.01 "HVAC"has been previ usly awarded within GMP N . 6-S.l t Randall Mechanical, Inc.,CC N . 20180410.003.

HPC is requesting t issue a Subc ntract r M dificati n t Randall Mechanical,Inc. in the t tal Lump Sum am unt f $14,510.00 f r CR0405-6S1-RFI 1459 LiebertAC Unit C ntr l and Schematic C nfirmati n. The m dified sc pe f w rk c nsists f c sts ass ciated with revising the c ntr ls sequence f r 24 Liebert airc nditi ning units. The design required t many c mmands fr m the Liebertunits and Building Management System (BMS), s the c ntr ls sequence wasm dified f ll wing directi n fr m Leibert and Syska Hennessey f r pump c ntr l f backup water c led perati n, per RFI 1459.

The appr val f this Subc ntract r M dificati n t Randall Mechanical, Inc.res lves all request f r c sts and time resulting fr m RFI 1459 sc pe f 'w rk.There are n c st impacts t GMP N s. 6-S, 6-S.2, 6-S.3, 6-S.4, 6-S.5, andU-S.

HPC has submitted d cumentati n including the subc ntract r's pr p sal sh wingmaterials, equipment, and lab r pricing t supp rt their request. Anindependent c st estimate is included. By appr ving this request, the Ownerd es n t waive its right t enf rce the c ntract requirements f r therrequests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t RandallMechanical, Inc. in the lump sum am unt f:Deduct fr m t Owner C ntingency:

$ 14,510.00(14,510.00)$

Hensel Phelps C nstructi n is c mmitted t 201 MWBE and 41 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 (GMP N . 6-S.l) f r this subc ntract m dificati n isRandall Mechanical, Inc. (N n-MWBE/LDB/VBE). There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F,2-M, 2-N, 2-0, 2-P, 2-Q,

2-H, 2-1, 2-J, 2-K, 2-L,and 2-R 'were c nsidered in ne m ti n.

2-G,

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t RandallMechanical, Inc. n BP-S00143, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 6-S.l), f r the t tal lump sum am unt f$14,510.00, with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

A.irside Terminal,

Page 10: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 10 of 30

G. Subcontractor Modification for BP-S00143 (GMP No. 6-S.l) with RandallMechanical, Inc, for CR0417.1-6S1-RFI 1426.2 Deletion of Unitary Water SourceHeat Pump. Mr. Guirges presented the mem randum, requesting appr val f rHensel Phelps C nstructi n (HPC) t issue a Subc ntract M dificati n n BP-300143, S uth Terminal C, Phase 1 Airside Terminal, Structure and Encl sure(GMP N . 6-S.l), at the Orland Internati nal Airp rt, in the t tal deductiveam unt f ($40,663.00) t Randall Mechanical, Inc. f r CR0417.1-6S1-RFI 1426.2Deleti n f Unitary Water S urce Heat Pump. Bid Package f r BP-S00143 23.01"HVAC" has been previ usly awarded within GMP N . 6-S.l t Randall Mechanical,Inc., CC N . 20130410.006.

HPC is requesting t issue a Subc ntract r M dificati n t Randall Mechanical,Inc. in the t tal deductive Lump Sum am unt f ($40,663.00) f r CR0417.1-6S1RFI 1426.2 Deleti n f Unitary Water S urce Heat Pump. The m dified sc pe fw rk c nsists f a credit f r the deleted unitary heat pump PMP-HP01, per RFI1426.2.

The appr val f this Subc ntract r M dificati n t Randall Mechanical, Inc.res lves all request f r c sts and time resulting fr m RFI 1426, 1426.1 and1426.2 sc pes f w rk. Credit f r the L w V ltage sc pe 'within GMP M . 6-S.4are captured in CR0417.2. There are n c st impacts t GMP N s. 6-S, 6-S.2,6-S.3, 6-S.5, and 11-S.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t RandallMechanical, Inc. in the lump sum am unt f:Add t Owner C ntingency:

$ (40,663.00)40,663.00$

Hensel Phelps C nstructi n is c mmitted t 20* MWBE and 4r: LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00143 (GMP N . 6-S.l) f r this subc ntract m dificati n isRandall Mechanical, Inc. (N n-MWBE/LDBNBE). There is n small businessparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R v/ere c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t RandallMechanical, Inc. n BP-S00143, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 6-S.l),

($40,663.00), with funding fr m Passenger Facility Charges andGeneral Airp rt Revenue B nds.

Airside Terminal,f r the t tal deductive lump sum

fam unt

H. Subcontractor Modification for BP-S00144 (GMP No. 6-S.2) with InlandConstruction and Engineering, Inc, for CR0372 6S.2 RFI 1613.4 Stainless SteelExpansion Joint Flashing.appr val f r Hensel Phelps C nstructi n (HPC)M dificati n n BP-S00144, S uth Terminal C, Phase 1Exteri r Finishes (GMP N .the t tal am unt f $17,300.00 t Inland C nstructi n and Engineering,f r CRQ372-6S.2 RFI 1613.4 Stainless Steel Expansi n J int Flashing.

Mr. Guirges presented the mem randum, requestingt issue a Subc ntract

.Airside Encl sure and6-S.2), at the Orland Internati nal Airp rt, in

Inc.Bid

-

-

— —

Page 11: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 11 of 30

Package f r 3P-S00144 07.C4 "R fing" has been previ usly awarded within GMPN . 6-S.2 t Inland C nstructi n and Engineering, Inc., CC N . 20160605.006.

HPC is requesting t issue a Subc ntract r M dificati n t Inland C nstructi nand Engineering, Inc. in the t tal Lump Sum am unt f $17,300.00 f r CR03726S.2 RFI 1613.4 Stainless Steel Expansi n J int Flashing. The m dified sc pe f w rk c nsists f necessary lab r, material and equipment t add 22-gaugestainless steel flashing n appr ximately 1,400 feet f r f-t -r f expansi nj ints, as a backing material, per RFI 1613.4.

The appr val f this Subc ntract r M dificati n t Inland C nstructi n andEngineering, Inc. res lves all requests f r c sts and time resulting fr m RFIs1613, 1613.1, 1613.2, 1613.3,There are n c st impacts t GMP N s.

and 1613.4 sc pes f w rk in GMP N . 6-S.2.6-S, 6-S.l 6-3.3, 6-S.4 and 11-S.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t InlandC nstructi n and Engineering, Inc., in the lump sumam unt f:Deduct fr m Owner C ntingency:

$ 17,300.00(1^,300.00)$

Hensel Phelps C nstructi n is c mmitted t 20* MWBE and 4* LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00144 (GMP N . 6-S. 2) f r this subc ntract m dificati n isInland C nstructi n $ Engineering, Inc. (N n-MWBE/LDB/VBE). There is n smallbusiness participati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t InlandC nstructi n and Engineering, Inc. n BP-S00144, S uth Terminal C, Phase 1Airside Encl sure and Exteri r Finishes (GMP N . 6-S. 2), f r the t tal lumpsum am unt f $17,300.00, with funding fr m Passenger Facility Charges andGeneral Airp rt Revenue B nds.

I. Subcontractor Modification for BP-S00144 (GMP No. 6-S.2) with InlandConstruction and Engineering, Inc, for CR0429-6S.2 Phase 1 Expansion Roofing.Mr. Guirges presented the mem randum, requesting appr val f r Hensel PhelpsC nstructi n (HPC) t issue a Subc ntract M dificati n n BP-S00144, S uthTerminal C, Phase 1 Airside Encl sure and Exteri r Finishes (GMP N . 6-S.2at the Orland Internati nal Airp rt, in the t tal am unt f $2,850,000.00 t Inland C nstructi n and Engineering, Inc. f r CR0425-6S.2 Phase 1 Expansi n(P1X) R fing. Bid Package f r BP-S00144 07.04 "R fing" has been previ uslyawarded within GMP N . 6-S.2 t Inland C nstructi n and Engineering, Inc., CCN . 20180605.006.

) /

HPC is requesting t issue a Subc ntract r M dificati n t Inland C nstructi nand Engineering, Inc. in the t tal Lump Sum am unt f $2,650,000.00 f r CR0429-6S.2 Phase 1 Expansi n (P1X) R fing. The m dified sc pe f 'w rk c nsists fthe lab r, material and equipment c sts ass ciated with the inc rp rati n fthe P1X R fing Sc pe f W rk.

-—

-

-

Page 12: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 12 of 30

The appr val f this Subc ntract r M dificati n t Inland C nstructi n andEngineering, Inc. res lves all requests f r c sts and time resulting fr mCR0429-6S.2 Phase 1 Expansi n (P1X) R fing.

HPC has submitted d cumentati n necessary back-up t supp rt their request.An independent c st estimate is included. By appr ving this request, the Ownerd es n t waive its right t enf rce the c ntract requirements f r therrequests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

Current GMP Line Item 'R fing' value:HPC t issue a subc ntract m dificati n t InlandC nstructi n and Engineering, Inc., in the lump sunam unt f:Deduct fr m GMP Line Item 'R fing':Deduct fr m P1X Owner C ntingency:Remaining GMP Line Item 'R fing' value:

$ 2,750,000.00

2,650,000.00$ (2,750,000.00}

(100,000.00)0.00

$

$$

Hensel Phelps C nstructi n is c mmitted t 201 MWBE and 11 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00144 (GMP N . 6-S.2) f r this subc ntract m dificati n isInland C nstructi n & Engineering, Inc. (N n-MWBE/LD3/VBE). There is n smallbusiness participati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t InlandC nstructi n and Engineering, Inc. n BP-S00144, S uth Terminal C, Phase 1Airside Encl sure and Exteri r Finishes (GMP N . 6-3.2), f r the t tal lumpsum am unt f $2,850,000.00, with funding fr m Passenger Facility Charges andGeneral Airp rt Revenue B nds.

J. Subcontractor Modification for BP-S00144 (GMP No. 6-S.2) with BergElectricCorp. dba Bergelectric Corp. Contractors and Engineers for CR0238.2-6S.2- SC

Mr. Guirges presented themem randum, requesting appr val f r Hensel Phelps C nstructi n (HPC) t issuea Subc ntract M dificati n n BP-S00144, S uth Terminal C, Phase 1

Bulletin 024 Remainder of Electrical Scope.

AirsideEncl sure and Exteri r Finishes (GMP N . 6-S.2), at the Orland Internati nalAirp rt, in the t tal am unt f $380,000.00 t BergElectric C rp. dbaBergelectric C rp. C ntract rs and Engineers f r CR0238.2-6S.2-ASC Bulletin024 Remainder f Electrical Sc pe. Bid Package f r BP-S00144 26.01 "AirsideC nc urse Electrical Systems" has been previ usly awarded within GMP N . 6-S.2 t Bergelectric C rp., CC N . 20180605.006.

HPC is requesting t issue a Subc ntract r M dificati n t Bergelectric C rp.in the t tal Lump Sum am unt f $380,000.00 f r CR023S.2-6S.2-ASC Bulletin 024Remainder f Electrical Sc pe. The additi nal sc pe f w rk c nsists f thenecessary lab r, material and equipment c sts ass ciated with n n-r ugh-msc pe, such as breaker st rage cabinets, wall utlets, light fixtures,receptacles, am ng thers, as per ASC Bulletin 024. HPC will submit Time ImpactAnalysis (TIA-059) requesting additi nal time ass ciated with this sc pe fw rk f r ASC Bulletin 024.

ASC Bulletin 024 affected the sc pe f w rk in GMP M . 6-S.2 nly,t tal neg tiated value f $1,160,000.00 f r the changes t p wer,

'with alight

-

Page 13: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 13 of 30

fixtures and c ntr ls thr ugh ut all levels f the building, changes t p werf r signage, updated light fixture schedule, and rel cated panels thr ugh utthe building. The neg tiated value f ASC Bulletin 021 als includes all RFIslisted in the Bulletin with the excepti n f RFI 0965. Part f RFI 0969 willbe priced in ASC Bulletin 026 electrical sc pe. C sts f r RFIs 1010, 1097,1093, 1099, 1101, 1129 and 1333.1 are included.

The appr val f this Subc ntract r M dificati n t Bergelectric C rp. res lvesall requests f r c sts resulting fr m CR0238.2-6S.2-ASC Bulletin 024-Remainder f Electrical Sc pe. C st f r In-Wall R ugh-ins and Electrical Gear wassubmitted in CR0238.1 with a value f $800,000.00. C st f r Patching fFirepr fing and Insulati n, if any, and c sts f r Testing and Inspecti n areexcluded, and will be submitted in future CRs. There are n c sts t GMP N .6-S, 6-S.l, 6-S.3, 6-S.4, and 6-S.5. The OA.R 'will evaluate TIA.-059 and anyadditi nal time rec mmended t be granted will be submitted at a future CCM.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n t r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t Bergelectric C rp. in the lump sum am unt f:Deduct fr m Owner C ntingency:

$ 380,000.00$ (380,000.00)

Hensel Phelps C nstructi n is c mmitted t 201 MWBE and 4c LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S0Q144 (GMP N . 6-S.2) f r this subc ntract m dificati n isBergElectric C rp. dba Bergelectric C rp. C ntract rs and Engineers (N n-MWBE/LDB/VBE). There is n small business participati n ass ciated with thism dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t BergElectric C rp. dba Bergelectric C rp. C ntract rs and Engineers n BP-S00144, S uth Terminal C, Phase 1 Airside Encl sure & Exteri r Finishes {GMPN . 6-S.2), f r the t tal lump sum am unt f $380,000.00, with funding fr mPassenger Facility Charges and General Airp rt Revenue B nds.

K. Subcontractor Modification for BP-SQQ145 (GMP No. 6-S.3) with dvancedMillwork, Inc, for CR0395 6S.3 RFI 1700 Wood Veneer Soffit Panels. Mr. Guirgespresented the mem randum, requesting appr val f r Hensel Phelps C nstructi n(HPC) t issue a Subc ntract M dificati n n BP-S00145, S uth Terminal C,Phase 1 Airside Early Interi rs (GMP N . 6-S.3), at the Orland Internati nalAirp rt, in the t tal am unt f $25,339.00 t A.dvanced Millw rk, Inc. f rCR0395 6S.3-RFI 17Q0 W d Veneer S ffit Panels.06.02 "Millw rk" has been previ usly awarded within GMP M . 6-S.3 t AdvancedMillw rk, Inc., CC M . 2018080"?. 010 .

Bid Package f r BP-S0014O

HPC is requesting t issue a Subc ntract r M dificati n t Advanced Millw rk,Inc. in the t tal Lump Sum am unt f $25,339.00 f r CR0355-6S.3-RFI 1700 W dVeneer S ffit Panels. The additi nal sc pe f w rk c nsists f c sts f rfurnish and installati n f the w d s ffits and ass ciated bl cking,RFI 1700.

per

-

— —

-

Page 14: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 14 of 30

The appr val f this Subc ntract r M dificati n t Advanced Millw rk, Inc.,res lves all requests f r c sts and time resulting fr m P.FI 1700 sc pe fw rk. There are n c st impacts t GMP N s. 6-S, 6-S.l, 6-S.2, 6-S.4, 6-S.5and 11-5.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t AdvancedMillw rk, Inc., in the lump sum am unt f:Deduct fr m Owner C ntingency:

$ 25,339.00S (25,339.00)

Hensel Phelps C nstructi n is c mmitted t 203 MWBE and 43 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-SQQ145 (GMP N . 6-S.3) f r this subc ntract m dificati n isAdvanced Millw rk,participati n ass ciated with this m dificati n.

(M n-MWBE/LDB). There n small businessInc. is

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E,2-M, 2-N, 2-0, 2-P, 2-Q,

2-H, 2-1, 2-J,and 2-R were c nsidered in ne m ti n.

2-K, 2-L,2-E, 2-G,

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t AdvancedMillw rk, Inc. n BP-S00145, S uth Terminal C, Phase 1Interi rs (GMP N . 6-S.3),Aviati n Auth rity Funds and General Airp rt Revenue B nds.

Airside Earlyf r the am unt f $25,339.00, with funding fr m

L. Subcontractor Modification for BP-S00146 (GMP No. 7-S) with Banker Steel Co.,LLC for CR0597.1-LST Bulletin 28-Base Building Revisions to Delineate Tenant

Mr. Guirges presented the mem randum, requesting appr val f rTurner-Kiewit J int Venture (TKJV) t issue a Subc ntract M dificati n n BP-300146,(GMP N . 7 s),$1,293.00 t Banker Steel C ., LLC f r CR0597.1-LST Bulletin 26-Base BuildingRevisi ns t Delineate Tenant Fit-Out Areas.Steel" was previ usly awarded within GMP N . 7-s t Banker Steel C ., LLC, CCM . 20180313.010.

Fit-Out reas.

S uth Terminal C, Phase 1, Landside Terminal, Structure and Encl sureat the Orland Internati nal Airp rt, in the t tal am unt f

Bid Package 5.0.0 "Structural

TKJV is pr p sing a subc ntract m dificati n t Banker Steel C ., LLC in thet tal lump sum am unt f $1,293.00 f r CR0597.1-LST-Bulletin 26-StructuralSteel-CMU Clips. The m dified sc pe f w rk c nsists f furnishing,fabricating, and installing an additi nal twelve (12) 1/4-inch x 3-inches x12-inches, 6-inch-wide mas nry clips and additi nal sh p drawings f r theadded wall, per LST Bulletin 28 revisi ns t delineate tenant fit- ut areas.

The appr val f this subc ntract m dificati n t Banker Steel C ., LLC es lvesall requests f r c sts and time ass ciated with LST Bulletin 26 f r structuralsteel in GMP M . ^-S. CR 059”7 v/as submitted f r GMP N . 7-S.l Drywall.

There will be n c st f r GMPCR

is f rthc ming f r GMP N . "'-S.l L w V ltage.N s. ^-S.2 r 7-s . 3.

TKJV has submitted d cumentati n including the subc ntract r's pr p sal withsupp rting back-up t substantiate this request. A.n independent c st estimate

Page 15: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 15 of 30

is included. By appr ving this request, the Owner d es n t waive its right t enf rce the c ntract requirements f r ther requests f r c sts r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

TKJV t issue a subc ntract m dificati n t BankerSteel C ., LLC in the lump sum am unt f:Deduct fr m PI Owner C ntingency:

$ 1,293.00(1,293.00)$

Turner-Kiewit J int Venture is c mmitted t 208 MWBE and 4k LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00146 (GMP N . 7-S) f r this subc ntract m dificati n isBanker Steel C ., LLC (N n-MWBE/LDB/VBE). There is 961 MWBE participati nass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R viere c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue a Subc ntract r M dificati n t BankerSteel C ., LLC n BF-S00146, S uth Terminal C, Phase 1Structure and Encl sure (GMP N . 7-S), f r the t tal lump sum am unt f$1,293.00, with funding fr m General Airp rt Revenue B nds.

Landside Terminal,

M. Subcontractor Modifications for BP-S00147 (GMP No. 7-S.l) with MSE2, Inc, dbaMader Southeast for CR0583-7S.1-LST RFI 1048.2-Bracing Requirements for Motor ccess Hatches at the Ticket Counters. Mr. Guirges presented the mem randum,requesting appr val f r Turner-Kiewit J int Venture (TKJV) t issue Subc ntractM dificati ns n BP-S0Q147, S uth Terminal C, Phase 1Remaining Structure and Systems (GMP N . 7-S.l), at the Orland Internati nalAirp rt, in the t tal am unt f $119,818.00 t MSE2, Inc. dba Mader S utheastf r CR0583-7S.1-LST RFI 1048.2-Bracing Requirements f r M t r Access Hatchesat the Ticket C unters. Bid Package 9.1.0 "Drywall and Framing" was previ uslyawarded within GMP N . 7-s.l t MSE2, Inc. dba Mader S utheast, CCM . 20181002.09.

Landside Terminal

TKJV is pr p sing a subc ntract m dificati n t MSE2, Inc. dba Mader S utheastin the t tal lump sum am unt f $119,818.00 f r CR0583-7S.1-LST RFI 1048.2

TheBracing Requirements f r M t r Access Hatches at the Ticket C unters,m dified sc pe f w rk c nsists f adding light-gage metal framing, plyw dand angles t c nstruct hatches t access the baggage c nvey r m t rs per thedetails pr vided in the resp nse t RFI 1048.2. This change was required nceclarificati n was pr vided f r the resp nsibility f this sc pe, which wasestablished via RFI 1048.1, t be under TKJV.

The appr val f this subc ntract m dificati n t MSE2, Inc. dba Mader S utheastres lves all requests f r c st and time ass ciated with RFI 1046.2.

TKJV has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t 'waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

TKJV t issue a subc ntract m dificati n t MSE2, Inc.dba Mader S utheast., Inc. in the lump sum am unt f:Deduct fr m Owner C ntingency:

$ 119,818.00$ (119,818.00)

Page 16: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 16 of 30

Turner-Kiewit J int Venture is c mmitted t 20* MW3E and 41 LD3 participati nf r C nstructi n Services,participate n BP-S00147 (GMP N . 7-s.l) f r this subc ntract m dificati n isMSE2, Inc., dba Mader S utheast (N n-MWBE/LDB/VBE). There is 101 MWBEparticipati n ass ciated with this m dificati n.

The subc ntract r identified and c rrmitted t

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue Subc ntract r M dificati n t MSE2, Inc.dba Mader S utheast n BP-S00147, S uth Terminal C, Phase 1Remaining Structure and Systems {GMP N . 7-S.l), f r the t tal lump sum am unt f $119,816.00, with funding fr m Passenger Facility Charges.

Landside Terminal

N. Subcontractor Modification for BP-S00147 {GMP No. 7-S.l) with lpha Insulation8 Waterproofing, Inc, for CR0403.2-LST Bulletin 24-Level 2 Structural SlabInfill for GO Office/Leased Spaces. Mr. Guirges presented the mem randum,requesting appr val f r Turner-Kiewit J int Venture (TKJV) t issue aSubc ntract M dificati n n BP-S00147, S uth Terminal C, Phase 1Terminal Remaining Structure and Systems (GMP N . 7-S.l}, at the Orland Internati nal Airp rt, in the t tal am unt f $8,039.00 t Alpha Insulati n &Waterpr fing, Inc. f r CR0403.2-LST Bulletin 24-Level 2 Structural Slab Infillf r GOAA Office/Leased spaces. Bid Package 7.0.2 "Waterpr fing & Caulking"was previ usly awarded within GMP N . 7-S.l t Alpha Insulati n &Waterpr fing, Inc., CC N . 20181002.009.

Landside

is pr p sing a subc ntract m dificati n t Alpha Insulati n &Inc. in the t tal lump sum am unt f S3,039.00 f r CR0403.2-

nsists

TKJVWaterpr fing,LST-Bulletin 24-Spray n Fire Pr fing. The m dified sc pe f 'w rk f adding 2,433 square feet f spray n firepr fing due t the additi n fstructural steel framing members, per LST Bulletin 24 updates.

The appr val f this subc ntract m dificati n t Alpha Insulati n &Waterpr fing, Inc. res lves all requests f r c st and time ass ciated withLST Bulletin 24 f r GMP M . 7-S.l. The f ll wing is the list f all theass ciated CRs that have been r will be submitted.

• GMP N . 7-S CR0403-Structural Steel Framing Revisi ns (Appr ved; CC N .20190813.02N}

• GMP N . 7-s(Appr ved; CC N . 20190702.02E)

• There are n m re CRs f rthc ming f r LST Bulletin 24.

CR0403.1-Early Release Detailing and Engineering Only

TKJV has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

TKJV t issue a subc ntract m dificati n t AlphaInsulati n & Waterpr fing, Inc. in the lump sumam unt f:Deduct fr m PI Owner C ntingency:

$ 8,039.00(8,039.00;$

Turner-Kiewit J int Venture is c mmitted t 20* MWBE and 41 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S00147 (GMP N . 7-s.l) f r this subc ntract m dificati n is

-

Page 17: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 17 of 30

Alpha Insulati n and Waterpr fing, Inc. (N n-MWBE/LDa/VBE) . There is 21e MWBEparticipati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-F. were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue a Subc ntract r M dificati n t AlphaInsulati n & Waterpr fing, Inc. n BP-S00147, S uth Terminal C, Phase 1

f r theLandside Terminal Remaining Structure and Systems (GMP N .am unt f $8,039.00, with funding fr m General Airp rt Revenue B nds.

7 S . 1) ,

0. Subcontractor Modification for BP-S00147 (GMP No, 7-S.l) with M.C. Dean, Inc.for CR0650-CEP-RFI 2700- ccess Control for Electrical Room 01-1042. Mr.Guirges presented the mem randum, requesting appr val f r Turner-Kiewit J intVenture (TKJV) t issue a Subc ntract M dificati n n BP-S00147, S uth TerminalC, Phase 1 Landside Terminal Remaining Structure and Systems (GMP N . 7-

at the Orland Internati nal Airp rt, in the t tal am unt f $4,101.00Dean, Inc. f r CR0650-CEP-REI 2700-Access C ntr l f r Electrical R mBid Package 28.0.0 "L w V ltage" was previ usly awarded within GMP

Me. 7 5.1 t MC Dean, Inc., CC N . 20181002.009.

t M.C.01-1042 .

TKJV is pr p sing a subc ntract m dificati n t M. C. Dean, Inc. in the t tallump sum am unt f $4,101.00 f r CR0650-CEP-REI 2700-Access C ntr l f rElectrical R m 01-1042. The m dified sc pe f w rk c nsists f additi nalw rk t pr vide and install PACS system in D r 01-1041, including allass ciated c nduits, fittings, hangers and juncti n b xes due t CEP Bulletin3 revisi n repurp sing R m 01-1042 fr m "St rage R m" t an "ElectricalR m", and the RFI 27Q0 resp nse c nfirming that GOAA Physical Access C ntr lSystem (PACS) was required f r D r 01-1041.

The appr val f this subc ntract m dificati n t M. C. Dean, Inc. res lves allrequests f r c st and time ass ciated with RFI 2700.

TKJV has submitted d cumentati n including the subc ntract r's pr p sal withsubstantiating back-up t supp rt this request. An independent c st estimateis included. By appr ving this request, the Owner d es n t waive its right t enf rce the c ntract requirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

TKJV t issue a subc ntract m dificati n t MC Dean,Inc., in the lump sum am unt f:Deduct fr m Owner C ntingency:

$ 4,101.00(4, 101.00)$

Turner-Kiewit J int Venture is c mmitted t 20t MWBE and 4 8 LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-S0014^ (GMP N . 7-s.i) f r this subc ntract m dificati n isM. C. Dean, Inc. (N n-MWBE/LDB/VBE). There is 511 LDB participati n ass ciatedwith this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue a Subc ntract r M dificati n t M.C.Dean, Inc. n BP-S00147, S uth Terminal C, Phase 1Remaining Structure and Systems (GMP N . 7-S.l), f r the t tal lump sum am unt

Landside 'Terminal

--

Page 18: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 18 of 30

f $4,101.00, with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

P. Subcontractor Modification for BP-S00168 (GMP No. 6-S.4) with M.C. Dean, Inc,for CR0417.2-6S4 RFI 1426 Series; Elimination of Unitary Water Source HeatPump from Glycol System Low Voltage. Mr. Guirges presented the mem randum,requesting appr val f r Hensel Phelps C nstructi n (HPC) t issue a Subc ntractM dificati n n BP-S00168, S uth Terminal C, Phase 1Specialties (GMP N . 6-S.4), at the Orland Internati nal Airp rt, in thet tal deductive am unt f ($4,104.00) t M.C. Dean, Inc. f r CR0417.2-6S4 RFI1426 Series; Eliminati n f Unitary Water S urce Heat Pump fr m Glyc l System

L w V ltage. Bid Package f r BP-S00168 27.01 "Airside C nc urse L w V ltageSystems" was previ usly awarded within the GMP N . 6-S.4 t M.C. Dean, Inc.,CC Reference N . 20181002.010.

Interi r Finishes and

HPC is requesting t issue a Subc ntract r M dificati n t M. C. Dean, Inc.in the t tal deductive Lump Sum am unt f ($4,104.00) f r CR04l1.2-6S4 RFI1426 Series, Eliminati n f Unitary Water S urce Heat Pump fr m Glyc l System.The resp nse t RFI 1426.2 c nfirmed the deleti n f the Unitary Heat pump(Tag N . PCP-HP01) fr m the ASC Building Glyc l Water System as the sequencest perate the c ndenser water pumps were revised t circulate water if thel p temperature dr ps bel w 45°F. The m dified sc pe f w rk c nsists f thematerial and lab r credits ass ciated with the c ntr l interface and m nit ringf r the deleted Unitary Heat Pump, per RFI 1426.2 resp nse.

The appr val f this Subc ntract r M dificati n t M. C. Dean, Inc. res lvesall requests f r c st and time resulting fr m RFIs 1426, 1426.1 and 1426.2 inGMP N . 6-S.4. C st impact t GMP N . 6-S.l will be submitted via CR0417.1-6S4 RFI 1426 Series; Eliminati n f Unitary Water S urce Heat Pump fr m Glyc lSystem HVAC, at a later date.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt this request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ether requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t M.C.Dean, Inc. in the lump sum am unt f:Add t Owner C ntingency:

$ (4,104.00)4,104.00$

Hensel Phelps C nstructi n is c mmitted t 20s MWBE and 4i LDB participati nf r C nstructi n Services. The subc ntract r identified and c mmitted t participate n BP-SI 68 (GMP M . 6-S.4) f r this subc ntract m dificati n isM. C. Dean, Inc. (N n-MWBE/LDB/VBE). There is n small business participati nass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-i, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t M.C. Dean,Inc. BP-S00168, S uth Terminal C, Phase 1Specialties (GMP N . 6-S.4), f r the t tal deductive lump sum am unt f($4,104.00), with funding fr m. Passenger Facility Charges and General Airp rtRevenue B nds.

Interi r Finishes and n

-

Page 19: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 19 of 30

Q. Subcontractor Modification for BP-S00168 (GMP No. 6-S.4) with M.C. Dean, Inc,for CR0391-6S4 SC RFI 1765 mbient Sensor and Speaker Pathways (VE) .Guirges presented the mem randum, requesting appr val f r Hensel PhelpsC nstructi n (HPC) t issue a Subc ntract M dificati n n BP-S00168, S uthTerminal C, Phase 1the Orland Internati nal Airp rt,

Mr.

Interi r Finishes and Specialties (GMP M . 6-S.4), atin the t tal deductive am unt

($59,027.00) t M.C. Dean, Inc. f r CR0391-6S4 ASC RFI 1765 Ambient Sens r andSpeaker Pathways (VE). Bid Package f r BP-S00168 27.01 "Airside C nc urse L wV ltage Systems" was previ usly awarded within the GMP M . 6-S.4 t M C. Dean,Inc., CC Reference N . 20181002.010.

f

HPC is requesting t issue a Subc ntract r M dificati n t M.C. Dean, Inc. inthe t tal deductive Lump Sum am unt f ($59,027.00) f r CR0391-6S4 ASC RFI1765 Ambient Sens r and Speaker Pathways. The resp nse t RFI 1^65 c nfirmedthat it is acceptable t c mbine speaker and ambient sens r wires in a sharedpathway t IDF r m. The m dified sc pe f w rk c nsists f the material andlab r credits ass ciated 'with the eliminati n f the ambient sens r c nduits,per RFI 1^65 resp nse.

The appr val f this Subc ntract r M dificati n t M C. Dean, Inc., res lvesall request f r c st and time resulting fr m RFI 1765 Ambient Sens r andSpeaker Pathways.

HPC has submitted d cumentati n including the subc ntract r's pr p sal t supp rt this request. An independent c st estimate is included. By appr vingthis request, the Owner d es n t waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n f r this pr ject is as f ll ws:

HPC t issue a subc ntract m dificati n t M.C.Dean, Inc., in the lump sum am unt f:Add t Owner C ntingency:

S (59,027.00)59,027.00$

is c mmitted t 2 0 MWBE and 41 LDBThe subc ntract r identified and

6-S.4) f r this subc ntract(N n-MWBE/LDB/VBE). There is 1001 reducti n

Hensel Phelps C nstructi n C .participati n f r C nstructi n Services,c mmitted t participate n BP-S00168 (GMP N .m dificati n is M.C. Dean, Inc.in MWBE participati n ass ciated with this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R were c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veHensel Phelps C nstructi n t issue a Subc ntract r M dificati n t M.C. Dean,Inc. n BP-S00166, S uth Terminal C, Phase 1Specialties (GMP N . 6-S.4), f r the t tal deductive lump sum am unt f($59,027.00), with funding fr m Passenger Facility Charges and General Airp rtRevenue B nds.

Interi r Finishes and

R. Subcontractor Modification for BP-S00173 (GMP No. 7-S.3) with Kirlin Florida,LLC for CR0618-LST-RFI 2353-4 Inch DCW Riser at L18/N1 on Second Floor. Mr.Guirges presented the mem randum, requesting appr val f r Turner-Kiewit J intVenture (TKJV) t issue a Subc ntract M dificati n n BP-S00173, S uth Terminal

FDOT (GMP N . 7-S.3), at thein the t tal am unt f $9,255.00 t Kirlin

Inch DCW Riser at L18/M1 n Sec ndBid Package BP 23.0.0 "Plumbing and HVAC" -was previ usly awarded via

CR02 3 9 t Kirlin Fl rida, LLC, CC N . 201902 05.02HI.

C, Phase 1, Landside Terminal, MEP SystemsOrland Internati nal Airp rt,Fl rida, LLC f r CR0618-LST-RFI 2353-4Fl r.

Page 20: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 20 of 30

TKJV is pr p sing a subc ntract m dificati n t Kirlin Fl rida, LLC. in thet tal Lum.p Sum am unt f $9,255.00 f r CR0618-LST-RFI 2353-4 Inch DCW Riserat L18./N1 n Sec nd Fl r. The m dified sc pe f w rk c nsists f additi nal4-inches D mestic C ld Water (DCW) piping revisi ns as captured in PFI 2353.

The appr val f this subc ntract m dificati n t Kirlin Fl rida, LLC, res lvesall requests f r c st and time ass ciated with RFI 2353.

TKJV has submitted d cumentati n including the subc ntract r's pr p sal t supp rt their request. An independent c st estimate is included. By appr vingthis request, the Ov/ner d es n t 'waive its right t enf rce the c ntractrequirements f r ther requests f r c st r time.

The effect f this Subc ntract r M dificati n t r this pr ject is as f ll ws:

TKJV t issue a subc ntract m dificati n t KirlinFl rida, LLC in the lump sum am unt f:Deduct fr m Ov/ner C ntingency:

$ 9,255.00(9,255.00)$

Due t the funding s urce f this GMP 7-S.3, Turner-Kiewit J int Venturepr p sed a 10? DBE participati n g al f r C nstructi n Services, in lieu fMWBE and LDB participati n g als. As such, Turner-Kiewit J int Venture'sc mmitted MWBE and LDB C nstructi n Services g als are n t affected by thism dificati n. The subc ntract r identified and c mmitted t participate nBP-S001J3 (GMP N . 7-S.3) f r this subc ntract m dificati n is Kirlin Fl rida,LLC (M n-MWBE/LDB/VBE). There is n small business participati n ass ciatedwith this m dificati n.

Agenda Item N s. 2-A, 2-B, 2-C, 2-D, 2-E, 2-F, 2-G, 2-H, 2-1, 2-J, 2-K, 2-L,2-M, 2-N, 2-0, 2-P, 2-Q, and 2-R v/ere c nsidered in ne m ti n.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr veTurner-Kiewit J int Venture t issue a Subc ntract r M dificati n t Kirlin

LLC n BP-S00173, S uth Terminal C, Phase 1, Landside Terminal, ME?FDOT (GMP N . 7-S.3), f r the t tal lump sum am unt f $9,255.00,

Fl rida,Systemswith funding fr m General Airp rt Revenue B nds.

GENER L

REQUEST FOR PPROV L OF N DDENDUM TO THE PROFESSION L SERVICES GREEMENT FORCENTR L PL NT IMPROVEMENTS WITH M TERN PROFESSION L ENGINEERING, INC. FORCONSTRUCTION DMINISTR TION SERVICES FOR BP-00484 CENTR L PL NT EQUIPMENTREPL CEMENT ND UPGR DE, T THE ORL NDO INTERN TION L IRPORT.

Mr. S r nd presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m Matern Pr fessi nal Engineering, Inc., dated December 24, 2019, f rC nstructi n Administrati n Services f r BP-00484, Central Plant EquipmentReplacement and Upgrade, at the Orland Internati nal Airp rt.

3 .

The Office f Small Business Devel pment has reviewed the qualificati ns f thesubject c ntract's MWBE/LD8/VBE specificati ns and determined that MaternPr fessi nal Engineering, Inc. pr p ses 46.41 MWBE participati n n this Addendum.

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve anAddendum t the Pr fessi nal Services Agreement f r Central Plant Impr vements withMatern Pr fessi nal Engineering, Inc., f r C nstructi n Administrati n Services f rBP-00484, Central Plant Equipment Replacement and Upgrade, f r the t tal am unt f$96,712.00, which includes the n t-t -exceed fee am unt f $98,028.00, and the n t-

Page 21: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 21 of 30

t -exceed reimbursable expense am unt f $684.00,appr ved Capital Expenditure Funds.

with funding fr m previcusly-

REQUEST FOR PPROV L OF N MENDMENT TO DDENDUM NO. 2 6 TO THE CONTINUING PROGR M ND PROJECT M N GEMENT SERVICES (O R PRIME ENTITY) GREEMENT WITH 2 GROUP, INC. FORNO COST ROLE DJUSTMENTS FOR CONSTRUCTION PH SE O R SERVICES FOR BP-00486 RUNW Y18L-36R REH BILIT TION ND REL TED WORK, T THE ORL NDO INTERN TION L IRPORT.

[A han out was presente , which inclu es revise Supporting Documentation. ]Mr. Br wn presented the mem randum, dated January 7, 2019, al ng with a pr p salfr m A2 Gr up, Inc., f r N C st R le Adjustments f r C nstructi n Phase OAR Servicesf r BP-00486, Runway 18L-36R Rehabilitati n and Related W rk, at the Orland Internati nal Airp rt. On July 23, 2019, the C nstructi n C mmittee rec mmendedappr val f Addendum N . 26 in the am unt f $1,392,166.14 t the ab ve-referencedagreement, which the Aviati n Auth rity B ard appr ved n Oct ber 16, 2019. Sincethat time, s me f the pr p sed p siti ns and firms have been revised and specificpers nnel have been identified t participate n this pr ject. Theref re, a n c stamendment is requested t revise the r les and firms previ usly appr ved in AddendumN . 26 as n ted bel w:

4 .

• The pr p sed Pr ject Manager r le changed firms fr m an A2 Gr up, Inc. empl yeet a W5P USA Inc. empl yee.

• An additi nal Pr ject Manager r le was added.• A Seni r Inspect r r le was rem ved.• A2 Gr up, Inc.'s pr p sed Pr ject C rdinat r r le was changed t a D cument

C ntr l r le.• The pr p sed Inspect r Aide r le changed firms fr m a WSP USA Inc. empl yee

t a yet t be determined A2 Gr up, Inc. empl yee as an Inspect r r le.

While the billing rates will change t match the changes in r les and applicablefirms, these changes will n t affect the previ usly appr ved Addendum am unt f$1,392, 166.14 .

Up n m ti n f Mr. Hunt, sec nd by Mr. Patters n, v te carried t appr ve an Amendmentt Addendum M . 26 t the C ntinuing Pr gram and Pr ject Management Services (OARPrime Entity) Agreement with A2 Gr up, Inc. f r N C st R le Adjustments f rC nstructi n Phase OAR Services f r BP-00486, Runway 18L-36R Rehabilitati n andRelated W rk, f r the n -c st am unt f $0.00; there is n fiscal impact.

REQUEST FOR PPROV L OF JOB ORDER CONSTRUCTION SERVICES DDENDUM TO THE CONTINUINGELECTRIC L CONSTRUCTION SERVICES GREEMENT WITH ELECTRIC SERVICES, INC. FOR E-00263,UPGR DE IRSIDE 4 RECHECK/TR NSFER SYSTEM CONTROLS (DESIGN/BUILD), T THE ORL NDOINTERN TION L IRPORT.

Mr. Willems presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m Electric Services, Inc., dated December 10, 2019, f r E-00263 UpgradeAirside 4 Recheck/Transfer System C ntr ls (Design/Build), at the Orland Internati nal Airp rt. The sc pe f this pr ject is t replace the existing Airside4 baggage recheck and transfer system c ntr ls that have reached the end f itsuseful life, and replace existing MCP-5 and MCP-6 with a single new MCP which willpr vide p wer and c ntr l t all related subsystems (i.e., ILRC, RC2, RC3, RC4 andMU1). A new PLC pr gram will be devel ped and installed with a new pr cess r. Thedurati n f the pr ject is 210 calendar days f r Substantial C mpleti n and 90calendar days f r Final C mpleti n with a c ntemplated N tice t Pr ceed (NTP) date f January 18, 2020.

5 .

The Office f Small Business Devel pment has determined that due t the limitedsc pe f the services t be pr vided, Electric Services, Inc. d es n t pr p se anysmall business participati n n this Addendum.

Page 22: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes f the C nstructi n C mmittee Meeting, January 7, 2020Page 22 f 30

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve a J bOrder C nstructi n Services Addendum t the C ntinuing Electrical C nstructi nServices Agreement with Electric Services, Inc. f r E-00263 Upgrade Airside 4Recheck/Transfer System C ntr ls (Design/Build), f r the t tal direct-neg tiatedam unt f $165,664.40 and waive the requirement f Perf rmance and Payment b nds,with funding fr m previ usly-appr ved General Airp rt Revenue B nds.

REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING MEP ENGINEERING SERVICESAGREEMENT WITH C&S ENGINEERS, INC. FOR CONSTRUCTION ADMINISTRATION SERVICES FORV-00948, LEVEL 1, B-SIDE, EAST END SEWER LINE REPLACEMENT, AT THE ORLANDOINTERNATIONAL AIRPORT.

Mr. Kieffer presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m C&S Engineers, Inc., dated December 18, 2019, f r V-00948, Level 1,B-Side, East End Sewer Line Replacement, at the Orland Internati nal Airp rt. Thesc pe f services will pr vide C nstructi n Administrati n Services, f r thereplacement f a secti n f undergr und legacy sewer line that d es n t have adequatesl pe f r pr per drainage, l cated at B-Side Level 1, in the Landside Terminal.

6.

If appr ved, these services w uld be effective January 7, 2020.

The Office f Small Business Devel pment has determined that due t the specializedsc pe f the services t be pr vided, C&S Engineers, Inc. d es n t pr p se any smallbusiness participati n n this Addendum.

Mr. Patters n asked if this pr ject is starting next week,that the N tice t Pr ceed is pr p sed f r January 6, 2020.

Mr. Kieffer resp nded

Chair Th rnt n asked if the sc pe is well defined. Mr. Patters n resp nded yes.

Up n m ti n f Ms. Schneider, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing MEP Engineering Services Agreement with C&S Engineers, Inc. f rC nstructi n Administrati n Services f r V-00948, Level 1, B-Side, East End SewerLine Replacement, f r the t tal n t-t -exceed fee am unt f $5,572.00, with fundingfr m previ usly-appr ved Discreti nary Funds and previ usly-appr ved CapitalExpenditure Funds.

REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING CIVIL ENGINEERING CONSULTANTSERVICES AGREEMENT WITH AVCON, INC. FOR DESIGN, BID, AND AWARD SERVICES FOR W-00371,ALCMS CONVERSION TO SINGLE-MODE FIBER OPTIC CABLE CONDITION ASSESSMENT AND SCOPEDEVELOPMENT, AT THE ORLANDO INTERNATIONAL AIRPORT.

Mr. S r nd presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m Avc n, Inc., dated December 23, 2019, f r design, bid and awardservices f r W-00371, ALCMS C nversi n t Single-M de Fiber Optic Cable C nditi nAssessment and Sc pe Devel pment, at the Orland Internati nal Airp rt. The sc pe f services will pr vide design, bid and award services f r the c nversi n f theAirfield Lighting C ntr l and M nit ring System (ALCMS) fr m a multi-m de fiber ptic cable t a single-m de fiber ptic cable.

7 .

If appr ved, these services w uld be effective January 7, 2020.

The Office f Small Business Devel pment has determined that due t the limited andspecialized sc pe f the required services, Avc n, Inc. d es n t pr p se any smallbusiness participati n n this Addendum.

Ms. Sharman asked ab ut the status f the startup package. Mr. Birkebak resp ndedthat he signed it yesterday, January 6, 2020.still being pr cessed.

Mr. S r nd c nfirmed that it is

Page 23: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes f the C nstructi n C mmittee Meeting, January 7, 2020Page 23 f 30

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Civil Engineering C nsultant Services Agreement with Avc n, Inc.f r Design, Bid, and Award Services f r W-00371, ALCMS C nversi n t Single-M deFiber Optic Cable C nditi n Assessment and Sc pe Devel pment, f r the t tal am unt f $61,598.00, which includes the lump-sum fee am unt f $61,398 and the n t-t -exceed reimbursable expense am unt f $200.00, with funding fr m previ usly-appr vedCapital Expenditure Funds.

REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING CIVIL ENGINEERING CONSULTANTSERVICES AGREEMENT WITH AVCON, INC. TO PROVIDE PRELIMINARY INVESTIGATIONS ANDANALYSIS FOR W-00416, DEEP EMBANKMENT VOID ANALYSIS, TAXIWAYS E, F, AND J BRIDGES,AT THE ORLANDO INTERNATIONAL AIRPORT.8. Mr. S r nd presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m Avc n, Inc., dated December 23, 2019, f r W-00416, Deep EmbankmentV id Analysis, Taxiways E, F, and J Bridges, at the Orland Internati nal Airp rt.The sc pe f services will pr vide a preliminary investigati n and analysis f r thedeep embankments f r the Taxiway E, F, and J bridges.

If appr ved, these services w uld be effective January 7, 2020.

The Office f Small Business Devel pment has determined that due t the limited andspecialized sc pe f the required services, Avc n, Inc. d es n t pr p se any smallbusiness participati n n this Addendum.

Ms. Sharman asked if the sc pe is well defined. Mr. S r nd resp nded yes.

Up n m ti n f Ms. Schneider, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Civil Engineering C nsultant Services Agreement with Avc n, Inc.t pr vide Preliminary Investigati ns and Analysis f r W-00416, Deep Embankment V idAnalysis, Taxiways E, F, and J Bridges, f r the t tal am unt f $28,466.00, whichincludes the lump-sum fee am unt f $28,166.00 and the n t-t -exceed reimbursableexpense am unt f $300.00, with funding fr m previ usly-appr ved Operati n andMaintenance Funds.

REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING CIVIL ENGINEERING CONSULTANTSERVICES AGREEMENT WITH AECOM TECHNICAL SERVICES, INC. FOR ENGINEERING SERVICES FORW-00417, PLUMBING SURVEY AND ANALYSIS AIRSIDE 1, AT THE ORLANDO INTERNATIONALAIRPORT.9. Mr. S r nd presented the mem randum, dated January 7,pr p sal fr m AECOM Technical Services,Engineering Services f r W-00417 Plumbing Survey and AnalysisOrland Internati nal Airp rt.

2020, al ng with aInc., dated December 19, 2019, f r

Airside 1, at theThe sc pe f services will pr vide sc ping f

existing sanitary and st rm lines, thr ugh ut Airside 1, with the intent fdetermining current c nditi ns f the lines and their p tential f r lining versusreplacement. Additi nally, the services will include verifying existing drawingsand devel ping appr ximate "as-builts" f r use in c ntract drawings indicating liningand/ r replacement.

If appr ved, these services w uld be effective January 7, 2020.

The Office f Small Business Devel pment has determined that due t the specializedsc pe f the required services, AECOM Technical Services, Inc. d es n t pr p se anyMWBE/LDB/VBE participati n n this Addendum.

Legal C unsel stated that this c uld be a tw -step pr cess based n what isdisc vered.but the evaluati ns will be given immediately.

Mr. S r nd c nfirmed that it c uld p tentially be a tw -step pr cess,

Mr. Patters n asked if Airside 3 will be next. Mr. S r nd resp nded yes.

Page 24: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 24 of 30

Ms. Sharman asked ab ut the status f the start-up package. Mr. Hunt resp nded thatthere was s me specific language that needed t be c rrected, and that it sh uld besigned s n. Mr. S r nd c nfirmed that it is in pr cess.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Civil Engineering C nsultant Services Agreement with AECOMTechnical Services, Inc. f r Engineering Services f r W-00417, Plumbing Survey andAnalysis Airside 1, f r the t tal am unt f $237, 110.00, 'which includes the n t-t -exceed fee am unt f $163,190.00 and the n t-t -exceed reimbursable expense am unt f $73,920.00, with funding fr m previ usly-appr ved Capital Expenditure Funds.

REQUEST FOR PPROV L OF N DDENDUM TO THE CONTINUING ENVIRONMENT L ENGINEERINGSERVICES GREEMENT WITH ECOM TECHNIC L SERVICES, INC. TO PERFORM IRSIDE 1 SITECLOSURE SERVICES B SED ON THE COMPLETED SITE REH BILIT TION COMPLETION REPORT, TTHE ORL NDO INTERN TION L IRPORT.10 .pr p sal fr m AECOM Technical Services, Inc., dated December 19, 2019, t perf rmAirside 1 Site Cl sure Services based n the C mpleted Site Rehabilitati n C mpleti nRep rt, at the Orland Internati nal Airp rt. The sc pe f services will facilitatethe preparati n f legal d cumentati n as it relates t restrictive c venant packageass ciated with Airside 1 site cl sure and subsequent appr val f g verning agencies.

Mr. Carringt n presented the mem randum, dated January 7, 2020, al ng with a

If appr ved,appr val.

these services 'w uld be effective the date f C nstructi n C mmittee

The Office f Small Business Devel pment has reviewed the qualificati ns f thesubject c ntract's MW3E/LDB/VBE specificati ns and determined that AECOM TechnicalServices, Inc. pr p ses 2.4* MWBE participati n n this Addendum.

Chair Th rnt n asked ab ut the specific l cati n f the pr ject at .Airside 1. Mr.Carringt n resp nded that it is l cated near the tram where the carts are kept. Mr.Patters n c nfirmed that it is cl se t where the ld bus st p used t be.

Chair Th rnt n asked if the s urce has been addressed and res lved,resp nded yes.

Mr. Carringt n

Ms. Sharman stated that funding sh uld be changed t Capital Expenditure Funds.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Envir nmental Engineering Services Agreement with AECOM TechnicalServices, Inc. t perf rm Airside 1 Site Cl sure Services based n the C mpletedSite Rehabilitati n C mpleti n Rep rt, f r the t tal am unt f $16,646.00, whichincludes the n t-t -exceed fee am unt f $18,196.00 and the n t-t -exceedreimbursable am unt f $450.00, with funding fr m previ usly-appr ved CapitalExpenditure Funds.

REQUEST FOR PPROV L OF N MENDMENT TO PURCH SING CONTR CT 01-20, PERSONNELSCREENING SERVICES WITH COVEN NT VI TION SECURITY, LLC, T THE ORL NDO INTERN TION L IRPORT.

Ms. McKe wn presented the mem randum, dated January 7, 2020, al ng with aqu te fr m C venant Aviati n Security, LLC, f r Pers nnel Screening Services, at theOrland Internati nal Airp rt. The Aviati n Auth rity currently is c ntracted with

LLC, with the initial term f the C ntract f r (36)m nths, effective N vember 1, 2019, with the Aviati n Auth rity having ne pti nt renew the C ntract f r ne (11 additi nal peri d f three (3) years.

11.

Coven nt .Avi tion Security,

-

r

Page 25: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 25 of 30

The Planning, Engineering, and C nstructi n Department had f recasted that Pers nnelScreening Services w uld be required f r specific pr jects. As time has pr gressed,it has bec me necessary adjust the budgeted services bey nd the riginal f recasts.

The f ll wing is the current f recast f Pers nnel Screening Services:

Project Project Name Forecasted Need Time FrameBP-00491 West Security Screening Check

P int Expansi n Package 2$2,000.00 C nstructi n thr ugh

pr ject c mpleti n

This C ntract includes MWBE and LDB participati n requirements.Business Devel pment certifies that the C ntract is in g d standing as it relatest MWBE and LDB participati n.

The Oftice f Small

Chair Th rnt n asked if this is f r screening f c nstructi n pers nnel nt thej bsite. Ms. McKe wn resp nded yes.

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve anAmendment t Purchasing C ntract 01-20, Pers nnel Screening Services with C venantAviati n Security, LLC, f r the t tal n t-t -exceed fee am unt f $2,000.00, withfunding fr m previ usly-appr ved Capital Expenditure Funds and General Airp rtRevenue B nds.

REQUEST FOR PPROV L OF N DDENDUM TO THE CONTINUING ENVIRONMENT L CONSULTINGSERVICES GREEMENT WITH DRMP, INC. TO PERFORM T SKS CONCERNING THE ENVIRONMENT LPERMIT TR CKING D T B SE (EPTD) ND H Z RD M TERI L D T B SE (HMD) , T THE ORL NDOINTERN TION L IRPORT.12 . Mr. Carringt n presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m DRMP, Inc., dated December 6, 2019, t perf rm tasks c ncerning theEnvir nmental Permit Tracking Database (EPTD) and Hazard Material Database (HMD),at the Orland Internati nal Airp rt. The sc pe f services will include multipletasks t supp rt the Envir nmental Permit Tracking Database (EPTD) and the Hazard usMaterial Database (HMD). The ETPD system will track critical permit inf rmati nsuch as issuance and expirati n dates, permit c nditi ns and ther pertinentinf rmati n fr m multiple agencies.

If appr ved,appr val.

these services 'w uld be effective the date f C nstructi n C mmittee

The Office f Small Business Devel pment has determined that due t the limitedsc pe f the required services, DRMP, Inc. d es n t pr p se any MWBE/LDB/VBEparticipati n n this Addendum.

Ms. Sharman stated that funding sh uld be changed tc Operati n and Maintenance Funds.

Up n m ti n f Ms. Sharman, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Envir nmental C nsulting Services Agreement v/ith DRMP, Inc. t perf rm Tasks c ncerning the Envir nmental Permit Tracking Database ;EPTD; and HazardMaterial Database (HMD), f r the t tal n t-t -exceed fee am unt f $53,523.00, withfunding fr m previ usly-appr ved Operati n and Maintenance Funds.

REQUEST FOR PPROV L OF N MENDMENT TO DDENDUM NO. 1 TO THE CONTINUING ENVIRONMENT LENGINEERING CONSULT NT SERVICES GREEMENT WITH MSE GROUP, LLC FOR DDITION L ON-C LLEMERGENCY SPILL RESPONSE FOR PETROLEUM, CHEMIC L ND/OR SEWER DISCH RGE, T THEORL NDO INTERN TION L IRPORT.13.pr p sal fr m MSE Gr up, LLC, dated DecemberEmergency Spill Resp nse f r Petr leum, Chemical and/ r Sewer Discharge, at theOrland Internati nal Airp rt. On June 19, 2018, the C nstructi n C mmittee appr ved

Mr. Carringt n presented the mem randum, dated January 7, 2020, al ng with a1G, 2019, f r Additi nal On-Call

-

Page 26: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 26 of 30

Addendum N . 1 in the am unt f $40,000.00 t the ab ve-referenced agreement..Additi nally, the C nstructi n C mmittee has appr ved Amendment N s. 1-5, resultingin a t tal awarded am unt f $160,000.00 f r Addendum N . 1. Since that time, ithas been disc vered that additi nal n-call emergency spill resp nse services f rpetr leum, chemical and/ r sewer discharge are required at Orland Internati nal.Airp rt. These services are required t stay in c mpliance with GASB49. The feesand expenses will be adjusted depending n the situati n.

If appr ved,appr val.

these services w uld be effective the date f C nstructi n C mmittee

The Office f Small Business Devel pment have reviewed the qualificati ns f thesubject c ntract's MWBE/LDB/VBE specificati ns and determined that MSE Gr up, LLCpr p ses ln: MWBE and 61 VBE participati n n this Amendment.

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve anAmendment t Addendum N . 1 t the C ntinuing Envir nmental Engineering C nsultantServices Agreement with MSE Gr up, LLC f r Additi nal On-Call Emergency SpillResp nse f r Petr leum, Chemical and/ r Sewer Discharge, f r the t tal am unt f$40,000.00, which includes the n t-t -exceed fee am unt f $25,000.00 and the n t-t -exceed reimbursable expense am unt f $15,000.00, 'with funding fr m previ usly-appr ved Operati n and Maintenance Funds.

REQUEST FOR PPROV L OF N DDENDUM TO THE CONTINUING ENVIRONMENT L ENGINEERINGCONSULT NT SERVICES GREEMENT WITH MSE GROUP, LLC TO PROVIDE FISC L YE R (FY) 2020

(BEII), T THE ORL NDOON-C LL B SELINE ENVIRONMENT L IMP CT INVESTIG TIONSINTERN TION L IRPORT.14 .a pr p sal fr m MSE Gr up, LLC, dated December 9, 2019, t pr vide FY 2020 On-CallBaseline Envir nmental Impact Investigati ns (BEII), at the Orland Internati nalAirp rt. The sc pe f services will include c nducting Baseline Envir nmental ImpactInvestigati ns (BEII) n an as-needed basis at the Orland Internati nal Airp rt.

Mr. Carringt n presented the mem randum, dated December 31, 2019, al ng with

If appr ved,appr val.

these services w uld be effective the date f C nstructi n C mmittee

The Office f Small Business Devel pment has reviewed the qualificati ns f thesubject c ntract's MWBE/LDB/VBE specificati ns and determined that MSE Gr up, LLCpr p ses 21.61 MWBE and 2.41 LDB participati n n this Addendum.

Ms. Sharman stated that funding sh uld be changed t Capital Expenditure Funds.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Envir nmental Engineering C nsultant Services Agreement with MSEGr up, LLC t pr vide FY 2020 On-Call Baseline Envir nmental Impact Investigati ns(BEII), f r the t tal am unt f $50,000.00, which includes the n t-t -exceed feeam unt f $30,000.00 and the n t-t -exceed reimbursable expense am unt f $20,000.00,with funding fr m, previ usly-appr ved Capital Expenditure Funds.

REQUEST FOR PPROV L OF N MENDMENT TO DDENDUM NO. 84 TO THE GENER L CONSULTINGSERVICES GREEMENT WITH SCHENKEL & SHULTZ, INC. FOR ST FF DJUSTMENTS OF FISCL YE R(FY) 2020 ENGINEERING ND CONSTRUCTION SUPPORT SERVICES, T THE ORL NDO INTERN TION L IRPORT.15 .pr p sal fr m Schenkel & Shultz, Inc., dated December 10, 2019, f r Staff Adjustments f FY 2020 Engineering and C nstructi n Supp rt Services, at the Orland Internati nal .Airp rt. On August 13, 2019, the C nstructi n C mmittee rec mmendedappr val f Addendum: M . 84 in the am unt f $903,960.00 t the ab ve-referencedagreement, 'which the Aviati n Auth rity B ard appr ved n September 18, 2019. On

2020, al ng with aMs. Wats n presented the mem randum, dated January 7,

--

Page 27: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 27 of 30

N vember 6, 2019, staff adjustments c nsisted f the reducti n f a Pr ject Managerand the additi n f a CADD Technician. Since the departure f the Pr ject Manager,the sc pe has been acc mplished via the new CA.DD Technician as well as existingstaff. These changes have resulted in a reducti n f services f r this addendum.

The Office f Small Business Devel pment has determined that the pr p sed deductiveAmendment t Addendum N . 8 4 d es n t have any impact n the small businessparticipati n.

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve anAmendment t .Addendum M . 84 t the General C nsulting Services .Agreement withSchenkel & Shultz, Inc. f r Staff Adjustments f FY 2020 Engineering and C nstructi nSupp rt Services, f r the t tal deductive n t-t -exceed fee am unt f ($244,560.00),with funding credited t previ usly-appr ved Operati n and Maintenance Funds.

REQUEST FOR PPROV L OF N MENDMENT TO DDENDUM NO. 13 TO THE CONTINUINGENVIRONMENT L ENGINEERING SERVICES GREEMENT WITH TERR CON CONSULT NTS, INC. FOR NO COST RE LLOC TION TO CONDUCT REMEDI L SYSTEM DECOMMISSIONING, T THE ORL NDOINTERN TION L IRPORT.16. Mr. Carringt n presented the mem randum, dated January 7, 2020, al ng with apr p sal fr m Terrac n C nsultants, Inc., dated Oct ber 18, 2019, f r a N C stReall cati n t c nduct Remedial System Dec mmissi ning, at the Orland Internati nalAirp rt. On August 6, 2019, the C nstructi n C mmittee appr ved Addendum M . 13 inthe am unt f $9,469.00 t the ab ve-referenced agreement,additi nal expenses were needed t c mplete field w rk f r dec mmissi ning the systemat Orland Internati nal Airp rt. Reall cati n fr m n t-t -exceed Fees t n t-t -exceed Reimbursable Expenses are required as detailed bel w and as further describedin C nsultant's pr p sal:

Since that time,

ddendum No. 13 ProposedReallocation

Revised Total

$ $ (900.00) $N t t Exceed Fees 2,819.00 1,919.00$ $ 0.00 $ 0.00Lump Sum Fees 0.00

$ $N t t Exceed Expenses $ 6,650.00 900.00 7,550.00$ $ $ 9,469.00Total 9,469.00 0.00

The Office f Small Business Devel pment has determined that the pr p sed n c streall cati n d es n t have any impact n the small business participati n.

Up n m ti n f Ms. Sharman, sec nd by Mr. Patters n, v te carried t appr ve anAmendment t Addendum N . 13 t the C ntinuing Envir nmental Engineering ServicesAgreement with Terrac n C nsultants, Inc. f r a N C st Reall cati n t c nductRemedial System Dec mmissi ning, f r the n -c st am unt f $0.00, which includes thedeductive n t-t -exceed fee am unt f ($900.00) and the n t-t -exceed reimbursableexpense am unt f $900.00, with funding fr m previ usly-appr ved Capital ExpenditureFunds.

REQUEST FOR PPROV L OF N DDENDUM TO THE CONTINUING ENVIRONMENT L ENGINEERINGSERVICES GREEMENT WITH TERR CON CONSULT NTS, INC. TO CONDUCT N SBESTOS OPER TION ND M INTEN NCE PROGR M UPD TE, T THE ORL NDO INTERN TION L IRPORT.17 .presented the mem randum, dated January 7, 2020 (Revised December 10, 2019), al ngwith a pr p sal fr m Terrac n C nsultants, Inc., dated Oct ber 16, 2019, t c nductan Asbest s Operati n and Maintenance Pr gram. Update, at the Orland Internati nalAirp rt. The sc pe f services will update the Asbest s Operati n and MaintenancePr gram c nsisting f supplemental sampling, peri dic walk thr ugh f areaspertaining t Asbest s C ntaining Materials (ACM), awareness training, and Operati nand Maintenance (O&M).

[A han out was presente , which inclu es a revise Memoran um.] Mr. Carringt n

Page 28: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 28 of 30

If appr ved, these services w uld be effective n the date f C nstructi n C mmitteeappr val.

The Office f Small Business Devel pment reviewed the qualificati ns f the subjectc ntract's MWBE/LDB/VBE specificati ns and determined that Terrac n C nsultants,Inc. pr p ses 83-1 MwBE participati n n this Addendum.

Ms. Sharman stated that funding sh uld be changed t Operati n and Maintenance Funds.

Up n m ti n f Mr. Patters n, sec nd by Mr. Hunt, v te carried t appr ve an Addendumt the C ntinuing Envir nmental Engineering Services Agreement with Terrac nC nsultants, Inc. t C nduct an Asbest s Operati n and Maintenance Pr gram Update,f r the t tal am unt f 312,333.50, which includes the n t-t -exceed fee am unt f311,861.00 and the n t-t -exceed reimbursable expense am unt f $472.50, with fundingfr m previ usly-appr ved Operati n and Maintenance Funds.

REQUEST FOR PPROV L OF CONTR CTOR7 S FIN L P YMENT TO HENSEL PHELPS CONSTRUCTION FORBP-S00152 (GMP NO. 10-S) PRON/ IRFIELD, T THE ORL NDO INTERN TION L IRPORT.18 . Mr. Patters n presented the mem randum, dated December 31, 2019, requestingthe C ntract r's Final Payment t Hensel Phelps C nstructi n f r BP-S00152 {GMP N .10-S) Apr n/Airfield, at the Orland Internati nal Airp rt. The Guaranteed MaximumPrice C nstructi n C ntract f r the referenced pr ject has been c mpleted and allissues inv lving the C ntract r have been addressed and res lved.

Up n m ti n f Ms. Sharman, sec nd by Ms. Schneider, v te carried t appr ve theC ntract r's Final Payment Auth rizati n t Hensel Phelps C nstructi n f r BP-S00152(GMP N . 10-S) Apr n/Airfield, at the Orland Internati nal Airp rt.

REQUEST FOR PPROV L OF CONTR CTOR'S FIN L P YMENT TO HENSEL PHELPS CONSTRUCTION,FOR BP-S00159 (GMP NO. 16-S) CM R ST FF ND GENER L CONDITIONS OCTOBER 1, 2017,THROUGH SEPTEMBER 30, 2018, T THE ORL NDO INTERN TION L IRPORT.19.the C ntract r's Final Payment t Hensel Phelps C nstructi n f r BP-S00159 (GMP M .16-S) CMAR Staff and General C nditi ns Oct ber 1, 2017, thr ugh September 30, 2018,at the Orland Internati nal Airp rt. The Guaranteed Maximum Price C nstructi nC ntract f r the referenced pr ject has been c mpleted and all issues inv lving theC ntract r have been addressed and res lved.

Mr. Patters n presented the mem randum, dated December 31, 2019, requesting

Up n m ti n f Mr. Hunt, sec nd by Ms. Schneider, v te carried t appr ve theC ntract r's Final Payment Auth rizati n t Hensel Phelps C nstructi n f r BP-S00159(GMP N . 16-S) CMAR Staff and General C nditi ns Oct ber 1, 2017, thr ugh September30, 2018, at the Orland Internati nal Airp rt.

REQUEST FOR PPROV L OF CONTR CTOR'S FIN L P YMENT TO HENSEL PHELPS CONSTRUCTION FORBP-S00162 (GMP NO, 16-S.3) CM R ST FF ND GENER L CONDITIONS OCTOBER 1, 2018, THROUGHSEPTEMBER 30, 2019, T THE ORL NDO INTERN TION L IRPORT.20 .presented the mem randum, dated January 7, 2C2C,Payment t Hensel Phelps C nstructi n f r BP-S00162 (GMP N . 16-S.3) CMAR Staff andGeneral C nditi ns Oct ber 1, 2018, thr ugh September 30, 2019, at the Orland Internati nal Airp rt. The Guaranteed Maximum Price C nstructi n C ntract f r thereferenced pr ject has been c mpleted and all issues inv lving the C ntract r havebeen addressed and res lved.

[A han out was presente , which inclu es a revise Memoran um.]requesting the C ntract r's Final

Mr. Patters n

Up n m ti n f Mr. Hunt, sec nd by Ms. Schneider, v te carried t appr ve theC ntract r's Final Payment Auth rizati n t Hensel Phelps C nstructi n f r BP-S00162(GMP N . 16-S. 3) CMAR Staff and General C nditi ns Oct ber 1, 2018, thr ugh September30, 2019, at the Orland Internati nal Airp rt

Page 29: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes of the Construction Committee Meeting, January 7, 2020Page 29 of 30

REQUEST FOR PPROV L OF CONTR CTOR'S FIN L P YMENT TO V LENCI CONSTRUCTION GROUP,INC. FOR H-00309, L KE GILLOOLY DEBRIS CLE NUP, T THE ORL NDO INTERN TION L IRPORT.21 . Mr. Patters n presented the mem randum, dated January 7, 2019, requesting theC ntract r's Final Payment t Valencia C nstructi n Gr up, Inc. f r H-00309, LakeGill ly Debris Cleanup, at the Orland Internati nal Airp rt. The C nstructi nC ntract f r the referenced pr ject has been c mpleted and all issues inv lving theC ntract r have been addressed and res lved.

Up n m ti n f Ms. Schneider, sec nd by Mr. Hunt, v te carried t appr ve theC ntract r's Final Payment Auth rizati n t Valencia C nstructi n Gr up, Inc. f rH-00309, Lake Gill ly Debris Cleanup, at the Orland Internati nal Airp rt.

INFORM TION ITEMS

22 . The f ll wing items 'were presented f r inf rmati n nly:

Field Change Order (FCO) L gA.

Revised Mem randum and Supp rting D cumentati n f r the Request f rAppr val f an .Addendum t the Techn l gy and Multi-Media SystemsSpecialty Engineer f r S uth Terminal C, Phase 1 Agreement with BurnsEngineering, Inc. f r Landside EME Design Adaptati n f r W-S00113, S uthTerminal C, Phase 1 Techn l gy & Multi-Media Services, at the Orland Internati nal A.irp rt. [Fr m C nstructi n C mmittee n January 25, 2019,I tern M . 3] .

B.

Revised Mem randum f r the Request f r Appr val f an A.ddendum t theTechn l gy and Multi Media Specialty Engineer f r the S uth Terminal C,Phase 1 Agreement with Burns Engineering, Inc. t Devel p and Execute theExperiential Media Envir nment (EME) Pr ducti n C ntracts with C ntentPr ducti n C mpanies (CPC) f r WS00113, S uth Terminal C, Phase 1Techn l gy & Multi-Media Services, at the Orland Internati nal A.irp rt.[Fr m C nstructi n C mmittee n May 28, 2019, Item N . 12].

C.

Revised Mem randum and Supp rting D cumentati n f r the Rec mmendati nf r Appr val f an Addendum t the Techn l gy and Multi- Media SpecialtyEngineer f r the S uth Terminal C, Phase 1 Agreement with BurnsEngineering, Inc. t Pr duce and Direct C ntent Pr ducti n, Pr gramming

Techn l gy andServices, at the Orland Internati nal Airp rt. [Fr m

C nstructi n C mmittee n September 10, 2019, Item N . 12-K] .

D.

and Integrati n t r W-S00113, S uth Terminal C, Phase 1Multi-Media

Revised C versheet f r Change Order f r BP-00159-07, Secured Area AccessP int CCTV Impr vements with SimplexGrinnell LP, at The Orland Internati nal Airp rt. [Fr m C nstructi n C mmittee n December l7, 2019,Item N . 2 A] .

E.

Revised Backup D cumentati n f r the Request f r Appr val f an Amendmentt Addendum M . 107 t the C ntinuing Pr gram and Pr ject ManagementServices (OAR Prime Entity) Agreement with GCI Inc. f r Additi nalC nstructi n Phase OAR Services f r BP-00482, Gate E-50 & Checkp intCharlie Devel pment, at the Orland Internati nal Airp rt. [Fr mC nstructi n C mmittee n December l7, 2019, Item N . 16].

F.

Revised Backup D cumentati n f r the Request f r Appr val f an A.ddendumt the C ntinuing MEP Engineering C nsultant Services .Agreement 'withMatern Pr fessi nal Engineering, Inc. (MPE) t pr vide Design and Bid SAward Services f r E-00235 N rth C mplex PA System Upgrade, at the Orland

G.

-

-

Page 30: On TUESDAY, JANUARY 7, 2020, the …...On TUESDAY, JANUARY 7, 2020, the CONSTRUCTION COMMITTEE of the Greater Orlando Aviation .Authority met in Conference Room. Apollo/Gemini/Taurus,

Minutes f the C nstructi n C mmittee Meeting, January 7, 2020Page 30 f 30

Internati nal Airp rt. [Fr m C nstructi n C mmittee n December 17, 2019,Item N . 17 ] .

Revised Backup D cumentati n f r the Request f r Appr val f a J b OrderC nstructi n Services Addendum t the C ntinuing Electrical C nstructi nServices Agreement with Electric Services, Inc. f r E-00260, Airside 2and 4 APM Generat r Refurbishment (Design/Build), at the Orland Internati nal Airp rt. [Fr m C nstructi n C mmittee n December 17, 2019,Item N . 19].

H.

Revised C versheet f r the Request f r Final Payment t R L Burns, Inc.f r V-00823, Hyatt Regency Ballr m Lighting M dificati ns, at the Orland Internati nal Airp rt. [Fr m C nstructi n C mmittee n December 17, 2019,Item N . 30].

I.

ADJOURNMENT

23. There being n further business f r discussi n, the meeting was adj urned at 8:58 a.m.

Stanley J. Tlrs^nt n, ChairC nstructi n C mmitteeChief Operating Officer