19
On-line Performance Monitoring of a Chemical Process BP Chemicals/CPACT/MDC

On-line Performance Monitoring of a Chemical Process

  • Upload
    cybil

  • View
    25

  • Download
    1

Embed Size (px)

DESCRIPTION

On-line Performance Monitoring of a Chemical Process. BP Chemicals /CPACT/MDC. Summary. Will talk about application of multivariate SPC. A data visualisation system for overview of plant operation. Tried on Hull site plant. Will aid operators’ control of plant. Introduction. - PowerPoint PPT Presentation

Citation preview

Page 1: On-line Performance  Monitoring of a  Chemical Process

On-line Performance Monitoring of a

Chemical Process

BP Chemicals/CPACT/MDC

Page 2: On-line Performance  Monitoring of a  Chemical Process

2

•Will talk about application of multivariate SPC.

•A data visualisation system for overview of plant operation.

•Tried on Hull site plant.

•Will aid operators’ control of plant.

Summary

Page 3: On-line Performance  Monitoring of a  Chemical Process

3

• Plants have data overload.

• MSPC gives overview of plant operation on just a few graphs.

• PCA is used to compress correlated plant variables to just a few [PC’s].

• Technique was applied to the BP Hull A4 CO plant.

• Plant manufactures CO by steam reforming of nat. gas. CO is feedstock for acetic acid production.

Introduction

Page 4: On-line Performance  Monitoring of a  Chemical Process

4

Plant Schematic

Natural Gas (desulphurised)

Reformer

HeatCO2 Removal

Water Removal

Cold Box Separation

H2 (NH3 plant)

CO (acetic acid plant)

Steam MEA

Page 5: On-line Performance  Monitoring of a  Chemical Process

5

MSPC

• Data points due to plant problem appear outside a confidence ellipse.

• Problem points also show up using statistical measures (e.g. SPE and T2 statistic) - distances from model.

• Problem points interrogated using contribution plots for causal variables.

•Data point on PC scores plots represent plant status at that time.

Page 6: On-line Performance  Monitoring of a  Chemical Process

6

First Model

• An MSPC model was built of “normal” operation for the A4 CO plant.

• The model used 27 main plant variables, including temperatures, pressures, flows and analyser results.

• Model training data was collected at 4 minute snapshots over a 1 week period of stable operation.

• 6 PC’s explains ~70% of variance.

• This is effectively then used as a basis to compare future operation.

Page 7: On-line Performance  Monitoring of a  Chemical Process

7

Off-line Analysis

Off-line Analysis of Operator Error

•Using CPACT MultiDAT and PreScreen2 Software

Page 8: On-line Performance  Monitoring of a  Chemical Process

8

On-line with MDC

On-line Model, Feedstock Upset (N2)

•PC scores plots, statistics vs time, etc

•Zoom in

•Click on point to select contribution plot

•Plus off-line tools for model building

•Plus PLS and adaptive models

Page 9: On-line Performance  Monitoring of a  Chemical Process

9

On-line with MDC

Process Variable Contribution Plots

•Normalised

•Greatest first

•Scrollable

•Click for time trend

Time Trend of a Process Variable

Page 10: On-line Performance  Monitoring of a  Chemical Process

10

Problems

• But plant operates at different rates.

• What data to use for model?

• What variables to use?

• Dynamic data – influenced by the past.

• Serially correlated (invalid control limits).

• Result – hard to find balance between alerts and false alarms.

• So concentrated on smaller section of plant & tried new techniques.

Page 11: On-line Performance  Monitoring of a  Chemical Process

11

Plant Section - MEA

•Model for MEA (10 tags)•Has oscillation upset at high rates

Upset in Column Level

1

32

Score & Statistics Plots

The Oscillation

• Clusters 1, 2 and 3 represent different ‘modes’ of operation

Page 12: On-line Performance  Monitoring of a  Chemical Process

12

Live Demo

• Live demo of MDC MSPC+ with the previous data for MEA.

Page 13: On-line Performance  Monitoring of a  Chemical Process

13

Multi Rate Model

• Work by Ewan Mercer et al (CPACT Newcastle University).• Model for MEA.• Need models for different plant rates.• Modes of operation seen as clusters.• But better to collapse clusters together…

PC1 vs PC2 Scores Plot

Page 14: On-line Performance  Monitoring of a  Chemical Process

14

New Technique

• Also by Ewan Mercer et al.

• Based on plant model mismatch (PMM).

• Build state space model for MEA (1m data, I/P’s and O/P’s).

• Build PCA model on differences between predicted and actual plant data (residuals).

• Will effectively collapse clusters.

• Use standard MSPC graphs to monitor plant.

Page 15: On-line Performance  Monitoring of a  Chemical Process

15

Plant/Model Mismatch

Schematic of Technique

Page 16: On-line Performance  Monitoring of a  Chemical Process

16

PCA on Residuals

• Model for multiple plant rates.

• Near normal distribution with low serial correlation.

• Picks up upset with fewer false alarms.

Page 17: On-line Performance  Monitoring of a  Chemical Process

17

Parallel Coords

•Another potential technique

•Light ‘cluster’ is normal MEA operation

•Other [darker] data is upset

•Can also use to visualise many PC’s

•Each y-axis is a plant variable•Each path is state of plant at one point in time

Page 18: On-line Performance  Monitoring of a  Chemical Process

18

Conclusion/Next Steps

• Model built for overview of the A4 CO plant.

• Tested on-line using MDC’s MSPC+ software.

• Overview of plant operation with drill down.

• Picks up process problems and helps diagnose cause.

• Will improve running of plants.

• Gain site acceptance for deployment.

• Initially to see plant changes.

• Use alerting later with the new techniques (i.e. PMM).

Page 19: On-line Performance  Monitoring of a  Chemical Process

19

Acknowledgements

• BP Hull Site:

• Steve Batty, Zaid Rawi et al.

• CPACT/Newcastle University:

• Ewan Mercer, Julian Morris, Elaine Martin et al.

• MDC:

• Chris Hawkins, Paul Booth et al.