12-508-97 Production and Operations Management
MRP-ERP-OM
7/30/2019 OM_MRP-ERP
2/41
22-508-97 Production and Operations Management
INVENTORY
Idle stock reqd for Production
Carefully manged to reduce the cost
EOQ MODEL
BOM
FAST/SLOW MOVING ITEM
OBSOLETE ITEMS
USE OF I T
7/30/2019 OM_MRP-ERP
3/41
32-508-97 Production and Operations Management
From Aggregate to Master Planning
Aggregate Production Plan
Capacity ?
Master Production Schedule
Feasibility approved?
Material Requirement Planning
Yes
Yes
No
No
Can we produce 10,000
equivalent units (total for
products A, B and C) per month
for the next year?
Can we produce 500
units of A, 600 of B and400 of C per week for the
next month ?
7/30/2019 OM_MRP-ERP
4/41
42-508-97 Production and Operations Management
Production Plan VS
Master Production Schedule
Mid term production planning
Order promising
SKU level(stock keeping unit)
About 3 months
1 week
Long term capacity
decisions
Product families
(Equiv. Units)
12 to 15 months
1 month
ProductionPlan
Objective
Product
Horizon
Timebuckets
Master ProductionSchedule
7/30/2019 OM_MRP-ERP
5/41
52-508-97 Production and Operations Management
The Aggregate Plan and the Master
Production Schedule
7/30/2019 OM_MRP-ERP
6/41
62-508-97 Production and Operations Management
When to Order ?Three approaches
Reorder Point (continuous review system)Constant amount ordered when inventory declines to
predetermined level
Periodic Review System(fixed time review period)Order placed for variable amount after fixed passage of time
Time Phased Order PointMaster Production Schedule
Material Requirements Planning
Distribution Requirements Planning
RE
ACTIVE
SYSTEMS
PROACTIVE
SYSTEMS
7/30/2019 OM_MRP-ERP
7/4172-508-97 Production and Operations Management
Objectives of the Master Production Schedule
Establish and meet delivery dates
Determine launch dates for orders
Optimize the use of available capacity
Meet the objectives of the aggregate plan
Make trade-off decisions between production and
marketing
Sales
Purch.
Operations
Operations
Systemic
Approach
7/30/2019 OM_MRP-ERP
8/4182-508-97 Production and Operations Management
Master Production Plan : Inputs
Inputs to the MPS are :
Beginning Inventory
Forecasts for each week of the schedule
Customer orders (quantities already committed to
customers)
Total available capacity for each week of the schedule
7/30/2019 OM_MRP-ERP
9/4192-508-97 Production and Operations Management
Developing a MPS
Identification of individual products.
Development of an MPS grid for each product in
real units according to the available data (forecast,
committed orders, inventory levels, lot sizes, lead
times) and the specified constraints.
Rough cut capacity planning in equivalent units (for
all products).
Does the plans meet all constraints? (capacitylimits, stock levels, etc.)
7/30/2019 OM_MRP-ERP
10/41102-508-97 Production and Operations Management
Developing a MPS
Forecast of the demand for the products with independent demand
Firm orders received from the customers for period i.
Projected on-hand Inventory (i)= Projected on-hand inv. (i - 1)
+ Planned production (i)
- Max (Forecast (i) ,
Customer orders (i) )
Lot size 100 unitsLead time: 1 period
Periods 1 2 3
75 85 80
80 60 55
Proj. on-hand Inv. 200 120 35 55
100
100MPS - Order Release
ForecastCustomer Orders
MPS - Order Receipt
7/30/2019 OM_MRP-ERP
11/41112-508-97 Production and Operations Management
Period 1 2 3 4
Forecast250 250 250 250
Customer
Orders 230 280 180 150
Projectedinventory 160 80 30 180
Planned
receipts 0 200 200 400
Plannedreleases 200 200 400
Product Lot Size LeadTime BeginningInventory
X12DE 200 1 410
1) Forecast for products with an independant
demand2) Committed customer orders
2a) Identify the Max between forecast and
customer orders
3) Planned order receipts for each period:
4) Projected on-hand inventory (i) = beginning inventory (i - 1)
+ planned order receipts (i) - Max (forecast (i) , customer
orders (i) )
5) Planned order releases
shifted back the
length of the lead
time
Developing a MPS
7/30/2019 OM_MRP-ERP
12/41122-508-97 Production and Operations Management
Periods 1 2 3 4 5 6 7 8 9 10
50 45 45 50 50 50 40 40 40 50
25 60 15 55 25 35
Projected on-hand inv 100
Forecast
Customer Orders
Planned Order Receipts
Planned Order Releases
Product A
Preliminary Plan :
Complete the following MPS
Product A
Beginning Inventory = 100 Lot Size: 100 units
Lead Time: 1 week
1 equivalent unit
7/30/2019 OM_MRP-ERP
13/41132-508-97 Production and Operations Management
Periods 1 2 3 4 5 6 7 8 9 10
60 120 80 40 30 50 20 20 20 30
35 150 60 30 25 35
Proj. on-hand inv. 300
Forecast
Customer Orders
Planned Order Receipts
Planned Order Releases
Product B
Product B
Beginning Inv. = 300 Lot Size : 100 units
Lead Time: 1 week
2 equivalent units
Preliminary Plan :
Complete the following MPS
7/30/2019 OM_MRP-ERP
14/41142-508-97 Production and Operations Management
Rough Cut Capacity Planning
Approximate calculation of the capacity required at critical
work centers to meet the demand in order to check the
feasibility of a Master Production Schedule.
When the capacity required exceeds the capacity
available the MPS must be adjusted before proceeding to
the MRP.
Fi l MPS
7/30/2019 OM_MRP-ERP
15/41152-508-97 Production and Operations Management
100 0 100 0 100 0 0 100 0 0
0 0 200 0 200 0 0 0 0 0
100 0 300 0 300 0 0 100 0 0
Prod A - Planned Order Releases
Prod B - Planned Order Releases
Total
Products A and B
Total capacity is 200 equivalent units per period. Establish
the final MPS for each product.
Because the total planned order releases of products A and Bis superior to 200 units in periods 3 and 5, we must move the
release ofone of the two articles to periods 2 and 4.
We decide, for example, to move the release of product A toperiods 2 and 4.
We must then complete the final plan for both products.
Final MPS :
Rough Cut Capacity Planning
Fi l MPS
7/30/2019 OM_MRP-ERP
16/41162-508-97 Production and Operations Management
Periods 1 2 3 4 5 6 7 8 9 10
50 45 45 50 50 50 40 40 40 50
25 60 15 55 25 35
Proj. on-hand inv. 100 0 100 0 0 100 0
100 0 0 100 0 0
Forecast
Customer Orders
Planned Order Receipts
Planned Order Releases
Product A
Planned Order Release is moved from period 3 to period 2.
Consequently, Planned Order Receipts are moved from period4 to period 3.
Projected on-hand inventories must be recalculated to accountfor the changes.
50 90 145 90 140 90 50 10 70 20
1000
10001000
1000
Final MPS :
Modifications to the Preliminary Plan
Final MPS
7/30/2019 OM_MRP-ERP
17/41172-508-97 Production and Operations Management
Periods 1 2 3 4 5 6 7 8 9 10
60 120 80 40 30 50 20 20 20 30
35 150 60 30 25 35
Proj. on-hand inv. 300 240 90 10 70 40 90 70 50 30 00 0 0 100 0 0 100 0 0 0
0 0 100 0 0 100 0 0 0 0
Forecast
Customer Orders
Planned Order Receipts
Planned Order Releases
Product B
Since weve made no changes to the planned order releases ofprodcut B, le preliminary and final plans are identical.
Final MPS :
Modifications to the Preliminary Plan
7/30/2019 OM_MRP-ERP
18/41
7/30/2019 OM_MRP-ERP
19/41192-508-97 Production and Operations Management
On-hand
inventory
Inventory of tables
Time
Quantity
Demand for the tables
Time
Reorder Point System VS MRP
7/30/2019 OM_MRP-ERP
20/41202-508-97 Production and Operations Management
Reorder Point System VS MRP
Quantity
Inventory of the table legs
Quantity
Demand for the table legs
7/30/2019 OM_MRP-ERP
21/41212-508-97 Production and Operations Management
Objectives of MRP
Calculate with precision the quantities of components,
parts and raw material that must be produced or
purchased in order to realize the MPS
HOW MANY ?
To determine when to release production or to place
the orders in order to receive the required units at the
right moment WHEN ?
M t i l R i t Pl i
7/30/2019 OM_MRP-ERP
22/41222-508-97 Production and Operations Management
Material Requirements Planning :
Information Structure
- Stocks on hand- Safety stocks
- Lot sizes
- Economic Order Quantities
- Lead time
Item Master
File
ForecastsCustomer
Orders
Bill of
MaterialMRP
MPS
Aggregate
Planning
7/30/2019 OM_MRP-ERP
23/41232-508-97 Production and Operations Management
Bill of Materials (BOM)
X
Y (3) Z (2)
Y (1)W (2)
Level 0
Level 1
Level 2
For each product X we need 3 Y and 2 ZFor each product Z we need 2 W and 1 Y
Product Structure Tree
Parent
ParentComponent
Component
7/30/2019 OM_MRP-ERP
24/41242-508-97 Production and Operations Management
ProblemsS&H (2007) p.515 #3 - S&H (2004) p.628 #3
Item Lead Time Amount on
Hand
Direct
Components
End 1 0 L(2), C(1), K(3)
L 2 10 B(2), J(3)
C 3 15 G(2), B(2)
K 3 20 H(4), B(2)
B 2 30
J 3 30
G 3 5
H 2 0
7/30/2019 OM_MRP-ERP
25/41252-508-97 Production and Operations Management
MRP Matrix
Note: The book from Stevenson shows the projected inventory at the
beginning of the period, this is not the usual way to do it, so we will
always show the projected inventory at the END of the period
7/30/2019 OM_MRP-ERP
26/41262-508-97 Production and Operations Management
MRP calculation process
Always process the items in the order of their low level
code: level 0 level 1 level 2
When an item appears at different levels of the product
structure(s), the lowest level (highest number) is the level
that we must use.
Gross requirements for an item are calculated by:
Multiplying the quantity of the planned order
release(s) of the parent(s) of the item by thequantity required as per the BOM for the
specific parent-component relationship(s).
7/30/2019 OM_MRP-ERP
27/41
272-508-97 Production and Operations Management
Lot Sizing in MRP Systems
Lot-for-lot (L4L) ordering policy
Minimum order quantity (Ex: Min 250)
Multiple order quantity (Ex: X100)
Economic order quantity (Ex: 350; annual demand: 4 200)
Periodic order quantity (Ex: 2 months)
7/30/2019 OM_MRP-ERP
28/41
282-508-97 Production and Operations Management
Example
A company is manufacturing several office supply items
among which we have:Clipboard
Lapdesk
etc.
7/30/2019 OM_MRP-ERP
29/41
292-508-97 Production and Operations Management
Product Structure
Top clip (1) Bottom clip (1)
Pivot (1) Spring (1)
Rivets (2)
Finished clipboard Pressboard (1)
Clipboard
7/30/2019 OM_MRP-ERP
30/41
302-508-97 Production and Operations Management
Product Structure Tree
Clipboard Level 0
Level 1
Level 2Spring
(1)Bottom Clip
(1)Top Clip
(1)Pivot
(1)
Rivets(2)
Clip Assy(1)
Pressboard(1)
7/30/2019 OM_MRP-ERP
31/41
312-508-97 Production and Operations Management
MRP: Example (cont.)
Product Structure Record
Clipboard
Lapdesk
Pressboard(2)
Trim(3)
Beanbag(1)
Glue(4 oz)
Level 0
Level 0
Pressboard(1)
Clip Assy(1)
Rivets(2) Level 1
Level 1
7/30/2019 OM_MRP-ERP
32/41
322-508-97 Production and Operations Management
ITEM: PRESSBOARD LLC: 1 PERIOD
LOT SIZE: MIN 100 LT: 1 1 2 3 4 5
Gross Requirements
Scheduled Receipts
Projected on Hand 150
Net Requirements
Planned Order Receipts
Planned Order Releases
ITEM: CLIPBOARD LLC: 0 PERIOD
LOT SIZE: L4L LT: 1 1 2 3 4 5
Planned Order Releases 100 100 100
ITEM: LAPDESK LLC: 0 PERIOD
LOT SIZE: MULT 50 LT: 1 1 2 3 4 5
Planned Order Releases 50 50
MRP: Example (cont.)
M.P.S.
M.R
.P.
7/30/2019 OM_MRP-ERP
33/41
332-508-97 Production and Operations Management
M.P.S.
M.R
.P.
ITEM: PRESSBOARD LLC: 1 PERIOD
LOT SIZE: MIN 100 LT: 1 1 2 3 4 5
Gross Requirements 100 100 200 100 0
Scheduled Receipts
Projected on Hand 150
Net Requirements
Planned Order Receipts
Planned Order Releases
ITEM: CLIPBOARD LLC: 0 PERIOD
LOT SIZE: L4L LT: 1 1 2 3 4 5
Planned Order Releases 100 100 100
ITEM: LAPDESK LLC: 0 PERIOD
LOT SIZE: MULT 50 LT: 1 1 2 3 4 5
Planned Order Releases 50 50
x2 x2
x1 x1x1
MRP: Example (cont.)
7/30/2019 OM_MRP-ERP
34/41
342-508-97 Production and Operations Management
M.P.S.
M.R
.P.
ITEM: PRESSBOARD LLC: 1 PERIOD
LOT SIZE: MIN 100 LT: 1 1 2 3 4 5
Gross Requirements 100 100 200 100 0
Scheduled Receipts
Projected on Hand 150 50 50 0 0 0Net Requirements 50 150 100
Planned Order Receipts 100 150 100
Planned Order Releases 100 150 100
ITEM: CLIPBOARD LLC: 0 PERIOD
LOT SIZE: L4L LT: 1 1 2 3 4 5
Planned Order Releases 100 100 100
ITEM: LAPDESK LLC: 0 PERIOD
LOT SIZE: MULT 50 LT: 1 1 2 3 4 5
Planned Order Releases 50 50
MRP: Example (cont.)
MRP E l ( t )
7/30/2019 OM_MRP-ERP
35/41
352-508-97 Production and Operations Management
Planned Order Report
PERIOD
ITEM 1 2 3 4 5
Clipboard 100 100 100
Lapdesk 50 50
Pressboard 100 150 100
MRP: Example (cont.)
Item Lot size LT
Prod ct A 200 1
Product A
7/30/2019 OM_MRP-ERP
36/41
Product A 200 1
MPS 1 2 3 4 5 6
25 25 25 25 25 25
30 20 15 10 5
Projected inventory 135 105 80 55 30 5 180
200
Order releases 200
Item Lot size LT
Product Z 500 2
MPS 1 2 3 4 5 630 30 30 30 30 30
35 20 15 20 10 5
Projected inventory 135 100 70 40 10 480 450
500
Order releases 500
Item Lot size LT
Sub-ass. B 1 500 2
MRP 1 2 3 4 5 6
Gross Requirements Prod. A 0 0 0 0 400 0
Gross Requirements Prod. Z 0 0 1 500 0 0 0
0 0 1 500 0 400 0
Projected inventory 200 200 200 200 200 1 300 1 300
1 300 200
1 500 1 500
Planned Order Releases 1 500 1 500
Item Lot size LT
Component C 4 500 1
MRP 1 2 3 4 5 6
Gross Requirements Prod. A 0 0 0 0 200 0
Gross Requirements Sub-ass. B 4 500 0 4 500 0 0 0
4 500 0 4 500 0 200 0
Projected inventory 4 600 100 100 100 100 4 400 4 400
4 400 100
4 500 4 500
Planned Order Releases 4 500 4 500
Item Lot size LT
Component D 10 000 1
MRP 1 2 3 4 5 6
Gross Requirements Prod. Z 0 0 1 000 0 0 0
Gross Requirements Sub-ass. B 6 000 0 6 000 0 0 0
6 000 0 7 000 0 0 0
Projected inventory 6500 500 500 3 500 3 500 3 500 3 500
6 500
10 000
Planned Order Releases 10 000
Sales Forecast
Customer Orders
Gross Req. Tot.
Planned Order Receipts
Net Requirements
Net Requirements
Gross Req. Tot.
Order Receipts
Planned Order Receipts
Gross Req. Tot.
Net Requirements
Planned Order Receipts
Sales Forecast
Customer Orders
Order Receipts
Component C
(1)
Sub.-Ass. B
(2)
Component C(3)
Component D(4)
Product A
Component D
(2)
Sub.-Ass. B
(3)
Component C
(3)Component D
(4)
Product Z
Month
7/30/2019 OM_MRP-ERP
37/41
0 1 2 3 4 5
Gross Requirements 75 350 200 750 1000
Lot-for-lot (L4L) ordering policy
Net Requirements 75 350 200 750 1000
Planned order receipts 75 350 200 750 1000
Projected on-hand inventory 0 0 0 0 0 0
Fixed-size lot ordering policy (Ex: 500)
Net Requirements 75 125 375 875
Planned order receipts 500 500 500 1000
Projected on-hand inventory 0 425 75 375 125 125
Minimum order quantity (Ex: Min 250)
Net Requirements 75 175 125 625 1000Planned order receipts 250 250 250 625 1000
Projected on-hand inventory 0 175 75 125 0 0
Multiple order quantity (Ex: X100)
Net Requirements 75 325 125 675 975
Planned order receipts 100 400 200 700 1000
Projected on-hand inventory 0 25 75 75 25 25
Economic order quantity (ex: 700; Ann. Dem: 4200)
Net Requirements 75 675 975
Planned order receipts 700 700 1400
Projected on-hand inventory 0 625 275 75 25 425
Periodic order quantity (2 months)
Net Requirements 75 200 1000
Planned order receipts 425 950 1000
Projected on-hand inventory 0 350 0 750 0 0
Month
7/30/2019 OM_MRP-ERP
38/41
382-508-97 Production and Operations Management
Establishing the Minimum Planning Horizon
9 periods
4 periods
7 periods
A
B C
D(2) E
Lead Time = 2 periods
Lead Time = 3 periods
Lead Time = 2 periods Lead Time = 4 periods
Lead Time = 2 periods
7/30/2019 OM_MRP-ERP
39/41
392-508-97 Production and Operations Management
Establishing the Minimum Planning Horizon
A
B
C
D(2)
E
LT = 2 periods
LT = 3 periods
LT = 2 periods
LT = 4 periods
LT = 2 periods
LT 2 3 4 5 6 7 8 9 10
A Assembly 2 100 100
B Purchase 2 100 100
C Assembly 3 100 100
D Purchase 2 200 200
E Purchase 4 100 100
Periods
MPS / MRP PROCESS
7/30/2019 OM_MRP-ERP
40/41
402-508-97 Production and Operations Management
Billofmaterials
MPS / MRP PROCESSPlanned Order Receipt
Planned Order Release
Ref.: adapted from D. A. Turbide, MRP+, Industrial Press, 1993.
Level 0
Planned Order Release
Supplier
Gross Requirements
Net Requirements
Planned Order Receipt
Level 2
Planned Order Release
Gross Requirements
Net Requirements
Planned Order Receipt
Level 1 On-hand Inv.
Lot Sizing
Lead time
MPS
Mate
rialsRequirementPlanning
Minimum
Planning
Horizon
ERP
7/30/2019 OM_MRP-ERP
41/41
ERP
EXTN OF MRP
ENTIRE ORGANIZATION IS USED
IT MUST
WASTEFUL WORK IS ELIMINATED
INFORMATION AT FINGER TIP