16
Factory Address OMKAR ELECTRICALS 56, Ambica Industrial Park, Ambica Tube Compund, Nr, Vatva GIDC Overbirdge, Vatva, Ahmedabad 382445 (Gujarat.) INDIA. Cell +91 9374195235 Email: [email protected]

OMKAR ELECTRICALS PROFILE

Embed Size (px)

Citation preview

Page 1: OMKAR ELECTRICALS PROFILE

Factory Address

OMKAR ELECTRICALS

56, Ambica Industrial Park, Ambica Tube Compund, Nr, Vatva GIDC Overbirdge, Vatva, Ahmedabad – 382445 (Gujarat.) INDIA. Cell +91 9374195235

Email: [email protected]

Page 2: OMKAR ELECTRICALS PROFILE

INDEX

1. Preamble

2. Scope of Work

A. Manufacturing of L.T. Distribution Panel Boards

3. Quality Assurance / Control Producer

4. Our Valued Client List

5. Project Organization and Management Team

6. Distribution Boards Manufactured Till Today

7. List Of Tools

Page 3: OMKAR ELECTRICALS PROFILE

1. Preamble

1.1. THE COMPANY

We OMKAR ELECTRICALS a fast growing firm in electrical field, for manufacturing Power and Control Distribution Boards. We specialized in range of Power and Control Panels with for all kind of industries. We have full facility for testing various types of Distribution Boards. We have professionally managed team to meet most stringent quality standard to cater to our client’s requirements.

OMKAR ELECTRICALS, also executing all types of projects works. On Turn-Key basis as per the tender specifications. We have team of qualified and experience Engineers and in taking care of the title things to keep costs low and performance level high. Our Mission is to meet our customer’s expectations. To achieve this we strive to provide innovative electrical solutions and applications through quality materials and superior craftsmanship. Our focus is to provide services to both the customer and the company by working together as a team. We are working in the field of Electrical Control Panels since last more than 35 years and got lots of progress. B. APPROCH

OMKAR ELECTRICALS. Our approach is total service orientation. We are dedicated to Quality and commitments. We believe that each client/project has special need and therefore we provide special attention from beginning to end, and make economical design to meet the needs of client. Also product innovation is a continuous at OE. We are fully upgrade to the latest technology to provide best services of client’s requirements. We design the projects in best economical manner. The approach of SEF is to render highly personalized service at each stage and to attend to the need of the project.

Page 4: OMKAR ELECTRICALS PROFILE

2. Scope of Work

OMKAR ELECTRICALS. Provides wide range of services to cater to the project needs of a cross section of clients / Architects. We are listing down the major services which are regularly offered by SEF but we understand that each client has different needs so the emphasis is always on tailored solutions.

A. Our Specialization in L.T Distribution Panel Board

LT Control Panels

Power Control Center Panel

Motor Control Center Panel

APFCR PANEL

Auto mains Failure Control Panel

Bus duct up to 6300A

Synchronizing Panel

Auto Battery Charger Panel

Lighting Distribution Panel

Power Distribution Panel

DOL, ATS & Star - Delta Starter Control Panel

PLC Panel

Page 5: OMKAR ELECTRICALS PROFILE

3.Quality Assurance / Control Producer

OVERVIEW

OE’s fundamental to all works to be understood is to provide quality service by satisfying client’s requirements.

The aim of quality management is to achieve satisfaction of the client requirements in overall progress of each works and the services provided in selection of suitable rating.

The quality monitoring system will be fully integrated into the administration,

Project Management and Account Department.

A. QUALITY CONTROL PROCEDURE

Utmost care is taken to check the quality of deliverables before they are being

issued for execution. The quality assurance programmed shall be to achieve following objectives.

Correctness of Documents.

Reliability of Documents.

To avoid unnecessary delay in the project schedule.

B. QUALITY ASSURANCE AND TESTING OF PANEL

LIST OF TEST CARRIED OUT AT OUR WORKSHOP

100 % checking of all Branded components before use.

Inspection of Fabrication structure for dimensions as per approved G.A. Drawing.

Inspection of painting / Powder Coating.

Page 6: OMKAR ELECTRICALS PROFILE

List of Machineries

1.Power Shearing Machine Cutting-2.0MM Thick Max Lenth 2500MM

2.Hydrolic Bending Machine. Bending Capacity-2MM Thick, Lenth Size-2500MM, Stroke/Min.8Storks

3.Drill Machine Capacity-25MM

4. Drill Machine Capacity-20MM

5.Drill Machine Capacity-16MM

6.Drill Machine Capacity-12MM

7.Electric Welding Machine Capacity 400Amp

8. Electric Welding Machine Capacity 300Amp

9.Electric Welding Machine Capacity 250Amp

10.Spot Welding Machine 20Kva

11.Hand Press Machine 6Nos.Size

12.Hand Press Machine 10Nos.Size

13.Bending Machine 3Feet,5Feet,7Feet

14.Handing Shearing Machine 12”Lenth-2Nos.

15.Handing Shearing Machine 3Nos

16.Air Compressor Machine. 2Nos

17.Hydrolic Bending Machine For Pipe, cu,al. Patta

18.Mechanical Hackshaw Machine 1No

Routine Tests are conducted on each panel Like

H.V Tester, Continuity Tester, Venire-Caliber, Micro Meter, Clip-on Meter, Megger, Primary Injection Kit, Insulation Resistance Tester

Page 7: OMKAR ELECTRICALS PROFILE

4. Our Valued Client List

List of our Clients

1 Airports Authority Of India – Ahmedabad

2 Airtel – Ahmadabad

3 Ajanta Manufacture Ltd.

4 Apex Automation Pvt.Ltd

5 Arvind Mills

6 Asarwa Mills

7 Asarwa Ovreseas

8 Autonic Systems (India) Pvt.Ltd

9 Bank Of India

10 Deepkiran Foods Pvt.Ltd.

11 Hutch – Ahmedabad

12 Iffco – Kandla

13 Indian Institute Of Management (IIM)

14 Mother Darity

15 National Institute Of Design (NID)

16 National institute of Fashion Design (NIFT)

17 ONGC

18 Plasma Research Laboratory

19 Reliance Engg.Asso.Pvt.Ltd.

20 Reliance Industries Ltd

21 Parsons Electricals, Surat

22 Om Electricals, Ahmedabad

23 Soma Textiles & Indutries

24 Space Application Centre

25 Maize Products, Ahmedabad

26 G Sons Power, Ahmedabad

Page 8: OMKAR ELECTRICALS PROFILE

5. Project Organization and Management Team OMKAR ELECTRICALS, Believes that a key element to get success in development project depends in Project Management. In order to accomplish this, OMKAR ELECTRICALS, set up a special team for all New Projects.

The team head, manage to keep record of telephonic discussion or Personal meeting with the client. Same is made available to all members of team and the client. The customer has the responsibility to approve these notes, OMKAR ELECTRICALS maintains a comprehensive Project-Schedule for every job besides generation of written and overall co-coordinators of the Project execution and regularly discussing for meeting target date of completion. During project execution factory and site acceptance test are taken project progress status is continuously monitored so that problem and deviation can resolved.

Throughout the life of a project from start to end, There are important / special actions that need to be taken by the client. As and when the need for such action arises they are recorded and assigned to specific engineer with the time to complete the action. The project coordinators on weekly basis review the list and issue alerts and warnings when the dead line for the action approaches. This ensures timely completion of the project

OMKAR ELECTRICALS maintains comprehensive Project schedule for every job. The schedule is decided after first meeting with the client. Normally if is kept with project team. The schedule shows all critical activities and include key completion dates for project completion and for the client actions.

Besides, generation of written documentations and the overall co-ordination of project execution it is the responsibility of the project co-ordinates to meet dead line of project completion period.

In order to maintain quality communication, resolve issues and related questions and review project progress. It is necessary for client and SEF to meet periodic basis. SEF usually recommends that meetings should be held monthly basis. The frequency of meeting can be increased or decreased depending upon the state of the project. Normally SEF request the meetings are held at SEF’s office because of the availability of the projects team. But these also arrange at client site.

As a part of the commencement of the Project, OMKAR ELECTRICALS entrusts the Work to Project Co-coordinator. Project Progress is continuously Monitored so that problems and deviations can be addressed at the earliest. Along with the client, SEF generates periodic progress reports to documents all pertinent period issues

Page 9: OMKAR ELECTRICALS PROFILE

6. Distribution Boards Manufactured Till Today

Weatherford _L.T Panel, Vadodara Birla Collage_3200A FP Busducts

L&T Toll Palza, Rajathan Mcnally Sayaj Engg Ltd (L.T Panel)

Page 10: OMKAR ELECTRICALS PROFILE

Dudh Sager Dairy LT Panel 400kvar RTPFC Panel, Baroda

JCT Syncronizing Panel, Baroda Maize Products, (MCC Panel Ahmedabad)

Page 11: OMKAR ELECTRICALS PROFILE

Torrent D.G.N (Dahej) H.D.C.F BANK BARODA

Synchronizing 500KVAR X 2 with APFCR 400KVAR APFCR Panel (Baroda)

Page 12: OMKAR ELECTRICALS PROFILE

2 X 1000KVA & 1 X 1500KVA DG Set Synchronizing Panel

Page 13: OMKAR ELECTRICALS PROFILE

7. LIST OF TOOLS

Sr. No. Name of Tools Make Capacity/Range Qty.

1 H.V. Tester APEX 2.5 Kv 1

2 Megger Meco 1000V/200MΏ 1

3 Busbar Cutter Hitachi 3500 RPM 1

4 Multimeter Rishabh 2

5 Clamp On Meter Mastech 1

6 Hot Air Gun Hitachi 2

7 Blower Hitachi / Power 1

8 Hylem Cutter B & D 1

9 Drill Machine Hitachi 3

10 Busbar Bender Deepak 1

11 Pedestal Drill M/C Hitachi 1

12 Insulation Tester (Analogue) Meco 1000V-500M

OHMS 1

13 Hole Saw Cutter Taparia 22.5MM 2

14 Flat File Taparia 2

15 H/R File Taparia 2

16 Hacksaw Frame 1

17 Hammer Taparia 1

18 Box Spanner Set Taparia 2

19 Ring Spanner Set Taparia 2

20 Long Nose Pliers Taparia 3

21 Pliers Taparia 3

22 Screw Driver Set Taparia 3

23 Allen Key Taparia 4

24 Crimping Tools 1.5 to 50Sq.mm 2

25 End Sealing Crimping Tools 2

26 Drill Bit Set All Range 2

27 Fix Spanner Set 1

28 Welding Machine 2

29 Earth Resistance Tester 1

30 Laser Printer HP 2

31 Ferrule Machine L-MARK 2

32 FAX HP 1

33 Desktop Computer L.G 2

34 Laptop Dell / Samsung 1

Page 14: OMKAR ELECTRICALS PROFILE

8.RESUMES OF KEY PERSONNALS

Mr. Jignesh Talati

Proposed Position for this Assignment.: Management Name of Person.: Jignesh Talati Designation: Patner Key Qualifications: Electrical Engineer Education: Diploma In Electrical Total No. of Years Experience 8 years

Mr. Haresh Patel

Proposed Position for this Assignment: Management. Name of Person.: Haresh Patel Designation: Partner Key Qualifications: Electrical Engineer Total No. of Years Experience 35 years

Mr. Dhaval Patel

Proposed Position for this Assignment.: Coordinator & Designer Name of Person.: Dhaval Patel Designation: Manager Key Qualifications: Electrical Engineer Education: B.E Total No. of Years Experience 2 years

Mr. Rohit Ramani

Proposed Position for this Assignment. Production Supervisor Name of Person.: Rohit Ramani Designation: Supervisor Key Qualifications: Electrician Education: B.E Total No. of Years Experience 1 years

Page 15: OMKAR ELECTRICALS PROFILE

Mr. Pravin Panchal

Proposed Position for this Assignment. Production Name of Person.: Pravin Panchal Designation: Wireman Key Qualifications: Wireman Education: I.T.I. Total No. of Years Experience 15 years

Mr. Sanjay Vagela

Proposed Position for this Assignment. Production Name of Person.: Sanjay Vagela Designation: Fitter Key Qualifications: Fitter Education: I.T.I. Total No. of Years Experience 7 years

Mr. Vijay Prajapati

Proposed Position for this Assignment. Production Name of Person.: Vijay Prajapati Designation: Wireman Key Qualifications: Wireman Education: I.T.I. Total No. of Years Experience 3 years

Mr. Naresh Pandor

Proposed Position for this Assignment. Production Name of Person.: Naresh Pandor Designation: Helper Key Qualifications: - Education: SCC Pass Total No. of Years Experience 4 years

Page 16: OMKAR ELECTRICALS PROFILE

Nos. OF EMPLOYEES DATE

1 Administrative 2

2 Diploma Engineers 2

3 Supervisor / Foreman 2

4 Skilled Workers 4

5 Unskilled Workers 2

7 Draftsman 1

Design Organization

1 USE OF CAD Yes.

No. of Machine 2