2010 ITS-3McDonough 4 & 5 Network Improvement
McDonough 4 & 5 Network Improvement
Construct the Jack McDonough – Smyrna 230 kV line via Cumberland (convert from 115 kV) and Galleria (new) substations. Add a 5 element, 230 kV ring bus at Smyrna and replace the 300 MVA 230 / 115 kV transformer with two 400 MVA transformers.
The loss of the Jack McDonough – Peachtree 230 kV T.L. will cause overloading of the facilities surrounding McDonough.
2010 ITS-7Klondike 230 Reactor Project
Fig. 1 One-line diagram of the Klondike 500 / 230 kV Substation.
Install a 0.5% series reactor on the low side of the 500 / 230 kV transformer.
2011 ITS-8Factory Shoals
Gro
over
Lake Fa
ctor
ySh
oals
Fact
Shls
Jc
t
Douglasville
East Point
Gor
don
Rd. G
ord
Rd.
Jct Hig
htow
er. J
ct
to Mableton,Jack Mac-West
Mar.115
to Jack Mac.-West Mar. 115
Greenbriar
Plt. Jack McDonough
Buzzard RoostBo
at
Roc
k
Bake
rsFe
rry
ThorntonRoad
230kV
115kV
230kVPostRoad
Problem:Loss of the Groover Lake segment of the Douglasville – Greenbriar 115kV line overloads the East Point – Gordon Rd. Jct. as early as 2011.
Solution:•Breaker up Buzzard Roost 230kV•Add 230kV line Thornton Rd. to Factory Shoals.•Add 230/115 autobank and 115 breakers at Factory Shoals.
Adamsville
2017 ITS-19Middle Fork 500 / 230 kV ProjectMiddle Fork – Thomson 500 kV T.L.
2017 ITS-20
ITS-19Install a 500 / 230 kV transformer at Middle Fork and loop in the South Hall – Oconee 500 kV T.L. Replace the existing 300 MVA 230 / 115 kV transformer with a 400 MVA transformer.
ITS-20Build a new 500 kV Middle Fork – Thomson 500 kV T.L. (approximately 110 miles long)