U7 and H Bars
12
12
12
12
12
S5
S6
S5
S6
12
12
U8
U7
S7
S8
DETAIL OF LIFTING EYE
PLAN
U6
U5
"d"
C
C C
C
C
C
C
Diaphragm (Typ.)
C
C
C
PLAN
C
ELEVATION - 0 SKEW ELEVATION - 30 SKEW
C
OPERATING
RATING
DEAD LOAD
DEFLECTION
DEAD LOAD DEFLECTION
DIAGRAM
End of U6 Bars
L2 BARS #13 x 1320
End of U8 Bars
CL Brng.
NOTE:
C
CL Brng.
(See End View and L Section)C(See End View and L Section)C
"d" @ L Span
(See Table)
Draped strands, U5, U7, and H bars shall extend 65mm beyond ends
of beam. Straight strands shall be cut flush with ends of beam.
U6 and U8 bars shall be set 50 clear from ends of beam.
S8
S7
C
at L BeamC
Dimensions along L BeamC
End of
Beam
CENTERLINE SECTION
(18 - 13 Dia. Strands)
END VIEW
WITH REINFORCING
50 Dia. open hole
for diaphragm rod.
TYPICAL DIAPHRAGM
SPACING - 30 SKEW
CENTERLINE SECTION
(22 - 13 Dia. Strands)
END VIEW
WITH REINFORCING
END VIEW
WITH REINFORCING
END VIEW
WITH REINFORCING
CENTERLINE SECTION
(24 - 13 Dia. Strands)
GENERAL NOTES
C
100 Dia.
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
279
165
50 50
50 5
0
50
50
50
50 5
0
50
50
50
50
50
Angle to Suit Lifting Beam
SECTION THRU BEAM
S7 BARS #13 x 1016
S8 BARS #13 x 1422
U7 BARS #13 x 5150
U8 BARS #13 x 4915
U5 BARS #13 x 5130
U6 BARS #13 x 4900
UL2 Bars #13
2 H Bars #13
L2 Bars in pairs
25 cl.
25 cl.
8 S5 or S7
8 S6 or S8
279
14
0
UL2 Bars #13
2 H Bars #13
2 U Bars #13
L2 Bars in pairs
25 cl.
25 cl.
25 cl.
UL2 Bars #13
2 H Bars #13
L2 Bars in pairs
25 cl.
8 S6 or S8
8 S5 or S7
8 S5 or S7
8 S6 or S8
UL2 Bars #13
2 H Bars #13
2 U Bars #13
L2 Bars in pairs
25 cl.
25 cl.
54 54
5454
8 S6 or S8
8 S5 or S7
165
280
Twisted Cable
8 S7 #13
4 U8 #13
8 S8 #13
160
End of beam at L Beam
2 H #13 Bars Roughened Surface
5 spcs. @ 50 c/c=250
2 H #13 Bars
Span Length
190
114
114
190 190
114
8 S6 #13
4 U6 #13
8 S5 #13
50
End of beam
5 spcs. @ 50 c/c=250 (L2 #13
2 H #13 Bars
140
50
10
0
13
0
104 104104 104
104 104 104 104
130
130
350
10
0
@ 127 c/c@ 102 c/c
13
0
130
130
8 S6 #13 @ 150 c/c (Bottom of Beam)8 S8 #13 @ 150 c/c (Bottom of Beam)
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 152 c/c
@ 152 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
154154 154
178
178
178
180
330
320
c/c=350 c/c=350
c/c=350 c/c=350
356
Bars @
12
7
c/c
=381
Bars @
127
c/c
=3
81
Bars @
127
c/c
=3
81
Bars @
127
c/c
=3
81
115
406
406
c/c=450 c/c=450
483
508
558
584
713
713
763
2400 2400
65 2 H #13 Bars
65
1143
41
9
154
41
9
419
41
9
14
0
S6 BARS #13 x 1346
UL2 BARS #13 x 820
1040
65
50
60
635
13 Dia. Pretensioned Strands
470
13 Dia. Pretensioned Strands
470
SPAN
(m)
DESIGN DATA
CENTERLINE SECTION
(28 - 13 Dia. Strands)
End of Draped Strands, U5 and H Bars
End of beam2 U5 #13 Bars
4 U6 #13 Bars
8 S5 #13 @ 150 c/c (Top of Beam)
Symm. about L
L Beam
bars in pairs & UL2 Bars #13)
L2 #13 Bars in Pairs & UL2 Bars # 13 @ 300 c/c
2 U5 #13 Bars
End of beamHold Down Point
Roughened Surface Symm. about L
End of Beam @ L Beam
Symm. about L
L Beam
End of Draped Strands,
Symm. about L
Hold Down Point
2 U7 #13 Bars 4 U8 #13 Bars
8 S7 #13 @ 150 c/c (Top of Beam)
(L2 #13 bars in pairs & UL2 Bars #13)
L2 #13 Bars in Pairs & UL2 Bars #13 @ 300 c/c
2 U7 #13 Bars
CONCRETE: f’c =41 MPa
f’ci =31 MPa
60
HS 46
HS 46
HS 49
HS 46 24 27
22 19
7
2 U Bars #13
13
01
30
4 U
#13
76
3
S5 BARS #13 x 966
4 U
#13
2 U Bars #13
4 U
#1
3
4 U
#1
3
L Span
1270
PRESTRESSED CONCRETE BEAMS:
CHAMFER REQUIREMENT: Chamfer all exposed edges of P.C. Beams 19mm unless otherwise
noted.
FORMS & PALLETS: All beams shall be cast in concrete floored pallets and metal forms.
FINISH: Top of beams to be rough floated. At approximately the time of initial set, entire
top of beam shall be scrubbed transversely with coarse wire brush to remove all laitance
and to produce a roughened surface for bonding slab.
CEMENT: Type I or III Portland Cement may be used for the Prestressed Concrete Beams.
L Bridge
Intermediate
1999 SPECIFICATIONS
ALL DIMENSIONS ON THIS SHEET IN MILLIMETERS UNLESS OTHERWISE NOTED.
OKLAHOMA DEPT. OF TRANSPORTATION
DATE
COUNTY BRIDGE STANDARD ( METRIC )
APPROVED BY BRIDGE ENGINEER
8875 (18 m Span), 9875 (20 m Span)
10 875 (22 m Span), 11 875 (24 m Span)
Beam Length = 21 750 (22 m Span), 23 750 (24 m Span)
Beam Length = 17 750 (18 m Span), 19 750 (20 m Span)
1800 (18 m Span)
2000 (20 m Span)
2200 (22 m Span)
2400 (24 m Span)
1800 (18 m Span)
2000 (20 m Span)
2200 (22 m Span)
2400 (24 m Span)
Beam Length = 17 710 (18 m Span), 19 710 (20 m Span)
Beam Length = 21 710 (22 m Span), 23 710 (24 m Span)
18 8
20 13
18 m SPAN20 m SPAN
22 m SPAN 24 m SPAN
1010
CB-34M
00M
7 sp. @50 7 sp. @50
9 sp. @509 sp. @507 sp. @507 sp. @50
8855 (18 m Span), 9855 (20 m Span)
10 855 (22 m Span), 11 855 (24 m Span)
L End Diaphragm
L End Diaphragm
P.C. BEAM ELEVATIONS AND SECTIONS
TYPE III - 7.8 m RDY.
FABRICATOR SHALL PROVIDE
REQUIRED DESIGN STRENGTH
The Prestressed Concrete Beams may be redesigned to use "Debonded" and or
15 mm strands rather than the "Draped" strands shown. The New Design and
Structural Calculations for "Debonded" and or 15 mm strands must be prepared
by and sealed by a Professional Engineer registered in the State of Oklahoma
and submitted to the Bridge Engineer for approval.
If "Debonded" Strands are used the "U" bars shall extend an additional
1200 mm, toward the middle of the span, just past the point of debonding.
HANDLING: In the handling of the beams, they must be maintained in an upright position at
all times and must be picked up from the lifting eye provided at the beam ends. Disregard
of this requirement may lead to collapse of the member.
SPECIFICATIONS FOR STEEL STRANDS: Grade 270, 7-wire, uncoated, low relaxation steel
strand shall conform to the requirements of AASHTO M203 (ASTM A-416) and Supplement I.
STRAND: All strands shall be the size and type as shown on the Plans. Initial load per strand
shall be 75% of the breaking strength of the strand for low relaxation strand.
TREATMENT OF CUT STRANDS: All cut off strands that will be exposed are to be coated with
two coats of an approved zinc rich paint (minimum 80 m). Painting to be done by
fabricator.
SHOP DRAWINGS: The Contractor shall have his Prestressed Concrete Beam Fabricator furnish
the Bridge Engineer, for his approval, two sets of checked shop drawings. Shop drawings shall
show the casting length center to center of bearings, and the calculated prestress shortening.
One copy shall be returned to the fabricator with any desired corrections indicated. The
fabricator shall then furnish the Bridge Engineer with as many, generally seven, corrected copies
of the shop drawings as may be required for approval and distribution. The approval of the
shop drawings in no way relieves the Contractor or his fabricator of the responsibility for
mistakes on the shop drawings.
m
NOTE: 30 Rt. Fwd. Skew shown.
30 Lt. Fwd. Skew by opposite hand.
.
Wearing Surface
1
LOADING: MS 18+1 kPa Future
50 Dia. open hole
as required for
diaphragm rod.
L Brng. L Brng.
PCB5-1