2
Exploration and Appraisal Drilling Update – January 2016 (ASX:OSH | ADR: OISHY | POMSoX: OSH) 4 February 2016 * All depths quoted are MDRT (measured depth from rotary table) Well Name Well Type Location Objective/ Targets Status Operator Participants 1 Antelope 5 Gas appraisal PRL 15, Gulf Province, PNG 1.7km west of Antelope 2 Delineate the size and structural extent of the Elk-Antelope gas field. The second extended well test on Antelope 5 commenced on 19 January 2016. The well was flowed at ~57mmscf/d for approximately two weeks, with downhole pressure gauges set in Antelope 1 to observe pressure movements. Following completion of the flow test, Antelope 5 will be shut-in for approximately 12 days to record subsequent pressure build-up. Total E&P PNG Limited Oil Search 22.8% Total 40.1% InterOil 36.5% Minorities 0.5% Total 100% 1 Gross interests, pre-Government and landowner back-in rounded to 1 decimal place Antelope 5 PPL 475 PPL 476 PRL 15 Elk / Antelope Oil Search Limited Incorporated in Papua New Guinea ARBN 055 079 868 Head office Port Moresby Papua New Guinea Sydney office 1 Bligh Street Sydney NSW 2000 Australia Mailing address GPO Box 2442 Sydney NSW 2001 Australia Tel: +61 2 8207 8400 Fax: +61 2 8207 8500 www.oilsearch.com

OIl Search - Drilling Report for January 2016

Embed Size (px)

DESCRIPTION

Oil Search Corp - Drilling Report for January 2016

Citation preview

Page 1: OIl Search - Drilling Report for January 2016

Exploration and Appraisal Drilling Update – January 2016 (ASX:OSH | ADR: OISHY | POMSoX: OSH) 4 February 2016

* All depths quoted are MDRT (measured depth from rotary table)

Well Name

Well Type

Location

Objective/ Targets

Status

Operator

Participants1

Antelope 5

Gas appraisal

PRL 15, Gulf Province, PNG 1.7km west of Antelope 2

Delineate the size and structural extent of the Elk-Antelope gas field. The second extended well test on Antelope 5 commenced on 19 January 2016. The well was flowed at ~57mmscf/d for approximately two weeks, with downhole pressure gauges set in Antelope 1 to observe pressure movements. Following completion of the flow test, Antelope 5 will be shut-in for approximately 12 days to record subsequent pressure build-up. Total E&P PNG Limited

Oil Search 22.8% Total 40.1% InterOil 36.5% Minorities 0.5% Total 100%

1 Gross interests, pre-Government and landowner back-in rounded to 1 decimal place

Antelope 5

PPL 475 PPL 476

PRL 15 Elk /

Antelope

Oil Search Limited Incorporated in Papua New Guinea ARBN 055 079 868

Head office Port Moresby Papua New Guinea

Sydney office 1 Bligh Street Sydney NSW 2000 Australia

Mailing address GPO Box 2442 Sydney NSW 2001 Australia

Tel: +61 2 8207 8400 Fax: +61 2 8207 8500 www.oilsearch.com

Page 2: OIl Search - Drilling Report for January 2016

Well Name

Well Type

Location

Spud Date

Rig

Objective/ Targets

Status

Operator

Participants1

Antelope 6

Gas appraisal

PRL 15, Gulf Province, PNG 2km east-southeast of Antelope 3

23 December 2015

HA 115 To provide structural control and reservoir definition on the eastern flank of the field. As at 31 January 2016, the Antelope 6 well was at a depth of 2,266 metres in a 12-1/4” hole. During the month, the well encountered top reservoir within expectations at approximately 2,264 metres MD. The forward plan is run 9-5/8” liner prior to drilling ahead through the reservoir and conducting a planned programme of coring, logging and testing. The well has a planned total depth of approximately 2,650 metres. Total E&P PNG Limited

Oil Search 22.8% Total 40.1% InterOil 36.5% Minorities 0.5% Total 100%

1 Gross interests, pre-Government and landowner back-in rounded to 1 decimal place

PETER BOTTEN, CBE Managing Director For further information please contact: Stephanie Chu Senior Investor Relations Advisor Tel: +61 2 8207 8542 Mob: +61 481 038 179

Antelope 6

PPL 475 PPL 476

PRL 15 Elk /

Antelope

Oil Search – January Drilling Report – 4 February 2016 www.oilsearch.com 2