Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
OIL INDIA LIMITED (A Government of India Enterprise)
P.O. Duliajan – 786602, Assam, India Website: www.oil-india.com
Corrigendum No. 4 to IFB No. CPI9724P19
Engineering, Fabrication and Supply of Modular Electrical Packages for
OCS at Nadua and GGS at East Khagorijan in Dibrugarh district, Assam 1. This Corrigendum is issued to notify the following:
a) In view of queries received from bidders in matter corresponding to technical SOW, the final OIL’s responses to the queries are generated.
All the bidders are requested to refer to Annexure- I attached herewith.
b) Hazardous Area Classification Drawing sheet for OCS, Nadua & GGS,
East Khagorijan are attached herewith as Attachment – 1 & 2 respectively.
c) Site conditions and Available Utilities for for OCS, Nadua & GGS, East Khagorijan are attached herewith as Attachment – 3 & 4 respectively.
2. Extension of the Bid Closing/Technical Bid Opening date as under:- i) Bid Closing Date & Time : 18.01.2019, 11:00 hrs. IST.
ii) Technical Bid Opening Date & Time : 18.01.2019, 14:00 hrs. IST.
3. All other terms and conditions of the tender remain unaltered.
4. All the prospective bidders are requested to regularly visit OIL’s
website: www.oil-india.com and e-procurement portal https://etender.srm.oilindia.in/irj/portal for further announcements/latest
information related to this tender. 5. Bidder to submit this Corrigendum No. 04 along with Annexure – I and
Attachments 1-4 duly signed & stamped in all pages as token of acceptance and shall upload this document in the un-priced folder of the e- bid.
Annexure – I
SUMMARY OF CONSULTANT/OIL’s RESPONSE TO PRE-BID QUERIES
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks
1
CPI9724P19 &
Tech part-I
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site.
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site
Page 8 to 22 of 193 Clause No 2.1
Table 1 contains Electrical scope of supply.
However, we understand scope of supply of
Quantity shall as per Electrical SOR document
only. Kindly confirm
Already captured in corrigendum 1
2
CPI9724P19 &
Tech part-I
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site.
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site Page 8 to 22 of 193 Clause No 2.1
Bidder scope of supply shall be based on
Electrical SOR document quantity only. Any
additional requirement shall be extra based on
Unit rates.
Will be approved based on case to case
basis
3 CPI9724P19
TABLE-1: Electrical Scope of supply for Nadua site
Page 59 of 161 item No.19 &
TABLE-2: Electrical Scope of supply for East Khagorijan
site. Page 66 of 161 item No.19
As per the Table 1 Electrical Scope of supply for
Nadua / East Khagorijan site, item No 19
specify the Local control station requirement,
but the quantity is not mentioned & the same is
not reflecting in SOR document. Kindly
mention the quantity, if required.
Already captured in corrigendum 1
4 CPI9724P19 Spares and Special tools
Page 69 of 161 Clause No.21
Kindly provide the list for mandatory, Start-up
and commissioning, Maintenance tools and
tackles & 2-year operational spares to be quoted
Already captured in corrigendum 1
5
CPI9724P19
Spares and Special tools
Page 69 of 161 Clause No.21
As OEM, we don't envisage extension rails &
portable lift devices. Kindly confirm the
requirement to bidder.
Already captured in corrigendum 1
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks 6 CPI9724P19 19.0 Bidder shall submit the vendors list for supply of
following major items for this project.
Page 79 of 161 Clause No.19
Kindly share the approved Vendor list. Already captured in corrigendum 1
7 Tech part-I
TABLE-1: Electrical Scope of supply for Nadua site
Page 13 of 193 item No.19 &
TABLE-2: Electrical Scope of supply for East Khagorijan
site. Page 20 of 193 item No.19
As per the Table 1 Electrical Scope of supply for
Nadua/East Khagorijan site, item No 19 specify
the Local control station requirement, but the
quantity is not mentioned & the same is not
reflecting in SOR document. Kindly mention the
quantity, if required.
Already captured in corrigendum 1
8
Tech part-I,
II, III, IV, V &
VI
1. Tech part-I:-ANNEXURE – 1:- Piping &
Instrumentation Diagram Page 176 to 193 of 193.
2. Tech part-II :- Piping & Instrumentation Diagram
Page 1 to 32 of 32 sheets
3. Tech part-III:- Piping & Instrumentation Diagram
Page 1 to 15 of 111 sheets
4. Tech part IV:- ANNEXURE – 1:- Piping
&Instrumentation Diagram Page 179 to 193 of 193
5. Tech part-V:- Piping & Instrumentation Diagram
Page 1 to 31 of 31 sheets
6. Tech part-VI :- Piping & Instrumentation Diagram
Page 1 to 31 of 31 sheets
This document is not applicable to Electrical
supply. Kindly specify requirement, if any. Already captured in corrigendum 1
9
Tech part-III & Tech part-VII
ELECTRICAL LOAD LIST for NADUA & EAST
KHAGORIJAN Page No. 40 to 49 of 111 &
ELECTRICAL LOAD LIST for NADUA & EAST
KHAGORIJAN Page No. 34 to 44 of 105
We have considered the feeder quantity as
mentioned in the electrical SOR line item No. 2
only.
Kindly confirm if any spare feeders to be
considered /electrical load list to be followed.
Already captured in corrigendum 1
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks 10 Tech part-III
ELECTRICAL SOR FOR NADUA Page No. 51 of
111 , item No. 2
As per the Electrical SOR for Nadua (line item
No. 2) 850kVAR APFC system is mentioned,
kindly mention the quantity. If required, kindly
Share the specification & datasheet for the same.
Already captured in corrigendum 1
11 Tech part-III & Tech part-VII
ELECTRICAL SOR FOR NADUA Page No. 55 of 111,
item No. 7 & ELECTRICAL SOR FOR EAST
KHAGORIJAN Page No. 49 of 105 , item No. 7
Kindly confirm the scope of heat tracing system.
As per our Understanding bidder to provide only
EHT type distribution board & Transformer only.
Already captured in corrigendum 1
12 Tech part-III &
Tech part-VII
ELECTRICAL SOR FOR NADUA
Page No. 57 of 111 , item No. 18 &
ELECTRICAL SOR FOR EAST KHAGORIJAN Page No.
51 of 105 , item No. 18
Kindly confirm the scope of cable trenching if any
to the bidder Already captured in corrigendum 1
13
Tech part-III & Tech part-VII
ELECTRICAL SOR FOR NADUA
Page NO. 58 of 111 , item No. 19 &
ELECTRICAL SOR FOR EAST KHAGORIJAN Page No.
52 of 105 , item No. 19
Bidder understanding is that civil & structural /
works like structural supports for cable trays at
field is not in Bidders scope.
Already captured in corrigendum 1
14
Tech part-III & Tech part-VII
ELECTRICAL SOR FOR NADUA
Page NO. 59 of 111 , item No. 20 & ELECTRICAL SOR
FOR EAST KHAGORIJAN Page No. 53 of 105 , item No.
20
Bidder understanding is that only hume pipe
supply is in scope. civil works for road cross over
/ culverts is not in Bidder scope
Already captured in corrigendum 1
15 Tech part-III &
Tech part-VII
ELECTRICAL SOR FOR NADUA
Page NO. 59 of 111 , item No. 20.2 & 20.3
ELECTRICAL SOR FOR EAST KHAGORIJAN Page No. 53
of 105 , item No. 20.2 & 20.3
Kindly specify the scope of RCC foundation to
bidder. Already captured in corrigendum 1
16 Tech part-III
Datasheet for clarified water disposal pump motor local
control station Page NO. 100 to 104 of 111 sheet &
Datasheet for clarified water disposal pump motor local
control station Page NO. 105 to 111 of 111 sheets.
Kindly specify the scope of Motors. If
required, please share the specification &
datasheet of each rating.
Already captured in corrigendum 1
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks 17 General Specification for Distribution Board Please share the specification for Distribution
board. Already captured in corrigendum 1
18 General Datasheet for 10KVA UPS Please share the Datasheet for 10 KVA UPS. Already captured in corrigendum 1
19
General Specification & Datasheet for Lighting transformer
Please share the Specification &
Datasheet for Lighting transformer. Already captured in corrigendum 1
20
LV Switchgear
Electrical Design basis Cl No 7.13 & specification Cl
No 6.15
Bidder understands residual current
monitoring system (RCMS) is nothing but earth
leakage relay. Kindly confirm the Bidder’s
understanding is correct.
Bidder understanding is correct
21 LV Switchgear specification Cl No 8.1.8
Specs (Clause 8.1.8) say that ACB without
releases with numerical relay but in Electrical
SOR for Nadua & east Khagorijan mentioned as
ACB with LSING releases. Please re-confirm the
ACB requirement.
Comply as per SOR
22
LV Switchgear
specification Cl No 9.4
Specs (Clause 9.4) says that MCCB 125A &
above are with E/F releases but in Electrical
SOR for Nadua & east Khagorijan mentioned as
all power feeder MCCB's are thermal magnetic
type. Please reconfirm the MCCB requirement.
a) Motor Feeders up to 40HP shall be
provided with MCCB having adjustable Thermal Magnetic protection. b) Motor Feeders above 40 HP shall be
provided with MCCB having μp based protection and Numerical Motor Protection Relay having protective functions as per OISD RP149.
c) Power Feeders shall be provided with MCCB having adjustable Thermal Magnetic Protection.
23
MCT
Electrical SOR
As per the description MCT shall be mild steel,
but in frame size description stainless steel is
required. Kindly confirm.
MCT shall be stainless steel
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks
24
Cables
Electrical SOR
As per the electrical SOR description steel wire
armour is required, whereas electrical design
basis requirement is for steel strip armour.
Kindly clarify the requirement.
Both are same, comply as per SOR
25
Electrical design basis
Cl No 6
As per Electrical design basis For Site
Conditions and available utilities details
“17039-ND-P-GD-1002”, to be referred.
Document not available.
Attached
26 Electrical SOR Cable trays
As per the actual calculation 2 No’s of slipe
plate required for each cable tray length of 3
Meter, (i.e, FRP flat splice plate for 750mm
width ladder type cable , 150mm height is 600
No’s, where in the electrical SOR 321 is
mentioned )
please check the quantity & revert back
It may be a spare value shall be
accounted; bidder shall round up the
value.
27 General Scope of civil works BIDDER understands that no civil work at site
is in Bidders scope, structure below the E-
House is not in BIDDER scope.
Bidder understanding is correct
28
General
Scope of civil works
BIDDER understands structure work\Cable
cellar below the E-House is not in Bidder scope. Bidder understanding is correct
29
CPI9724P19
Integrity Pact-Annexure B
OIL sign & Stamped Integrity pact is not
available. Kindly provide the same
Kindly refer page no.115 of 161 of NIT
CPI9724P19
30
Electrical SOR
Electrical Heat Tracing system
Kindly confirm the offered cable quantity
mentioned in the SOR
includes power & control cable required for heat
tracing system
No
31
Electrical SOR
Electrical Heat Tracing system
Bidder understands thermal insulation on
pipeline for heat tracing system is not is Bidder’s
Scope. Kindly confirm
Bidder understanding is correct
32
Electrical SOR
UPS
As per electrical SOR for 30KVA output voltage
is 3 Phase, but as per datasheet & electrical
design basis (Cl No 10.6.1)1 phase is required.
Kindly confirm which has to be considered.
Comply as per SOR
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks 33 Electrical SOR Cable tray Kindly confirm the scope of Structural supports
(channel / box for above pipe rack for cable tray
angle installation)
Not in bidder scope
34 Electrical SOR Kindly specify the scope of stair case from
ground level to E-House. Not in bidder scope
35 Electrical
design basis
Cl No 10.5
Kindly specify the supply of VFD’s. If required,
please share the specification & datasheet of
each rating.
Not in bidder scope
36 Electrical SOR Interposing relay Please specify the contact voltage, ampere rating
& No. of contact required for interposing relay
Will be confirmed during detail
engineering.
37 Electrical design basis
Cl No 9.4.1
Kindly specify the scope of supply for container for gas engine generator & emergency switchboard &EDG control panel.
Not in bidder scope
38
CPI9724P19 &
Tech part-I
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site.
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site Page 8 to 22 of 193 Clause No 2.1
Table 1 contains Electrical scope of supply.
However, we understand scope of supply of
Quantity shall as per Electrical SOR document
only. Kindly confirm
Scope of supply is table is guide line for
the bidder and the tender is lump sum
contract.
39
CPI9724P19 &
Tech part-I
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site.
TABLE-1: Electrical Scope of supply for Nadua site &
TABLE-2: Electrical Scope of supply for East
Khagorijan site
Page 8 to 22 of 193 Clause No 2.1
Bidder scope of supply shall be based on
Electrical SOR document quantity only. Any
additional requirement shall be extra based on
Unit rates.
Bidder shall note that the tender is lump
sum contract.
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks
40 CPI9724P19
TABLE-1: Electrical Scope of supply for Nadua site
Page 59 of 161 item No.19 &
TABLE-2: Electrical Scope of supply for East Khagorijan
site.
Page 66 of 161 item No.19
As per the Table 1 Electrical Scope of supply for
Nadua/East Khagorijan site, item No 19 specify
the Local control station requirement, but the
quantity is not mentioned & the same is not
reflecting in SOR document. Kindly mention the
quantity, if required.
Bidder shall provide unit rate for LCS for
addition if required later.
41
CPI9724P19
Spares and Special tools
Page 69 of 161 Clause No.21
Kindly provide the list for mandatory, Start-up
and commissioning, Maintenance tools and
tackles & 2-year operational spares to be quoted
Vendor shall list out and provide offer
based on the spares required for quoted
system
42
CPI9724P19
Spares and Special tools
Page 69 of 161 Clause No.21
As OEM, we don't envisage extension rails &
portable lift devices. Kindly confirm the
requirement to bidder.
Noted. Bidder shall supply required
special tools applicable for the quoted
model of the equipment.
43
General
3D lay out for electrical and instrumentation
control , power and signal cable and tray
3D model is part of detail engineering
and it is not available as of now.
44
General Cable routing diagram
All cables are to be routed overhead. At
road crossing cable has to pass through
hume pipes. Cables shall be routed in
the topmost layer of the pipe rack shown
in the plot plan. Wherever pipe rack is
not available, separate cable tray
supports shall be considered.
45
General
Equipment/Instrumentation installation
location
Equipment location shall be referred in
the plot plan. Instruments shall be
identified in the respective P&ID of the
module package as referred in
Instrument Index.
SL
No
RFQ
Section
Ref. Clause Existing Clause / BIDDER Scope of
Supply Clarification.
OIL / Consultant’s Response
Remarks
46
General HAZOP/SIL study report:
Based on the HAZOP and SIL study
report, field instrument SIL rating is
specified in datasheet
47
General Soil resistivity report
Soil resistivity Report will be shared to
the successful bidder after award of
contract
48
General
Zone classification details
Bidder shall refer to Hazardous Area
classification drawing attached
49
General
Bidder shall follow IEC standard
Revised Electrical Load list/feeder List
50
General
Quantity will be derived basis on the engineering
documents provided during pre-bid stage and it
shall become part of the contract. Any Change with
respect to the base documents will have time &
cost implications.
Bidder understanding is not correct. SOR
quantities are only the guideline values
and the bidder to use their best
judgement and provide offer on lump
sum basis.
51
General Specifications of FRP Cable tray, CCTV Server,
NVR, Ethernet switches, MCT
FRP cable tray ,MCT - Bidder shall follow
the specification mentioned in the latest
SOR
52
General Kindly confirm if the tender is LSTK or BOQ based. Tender is LSTK
&&&&&&&&&&&&&&&&&&&&
Attachment -1
Attachment -2
Rev.
PAGE 2 of 2
1
2 Site Location: Elevation above MSL: m Barometer: kg/cm²
3
4 Air Temperature: Design:oC Maximum:
oC Normal:oC Minimum:
oC
5 Atmosphere: Noncorrosive Corrosive Dust Fumes
6 Wind Speed: Avg: m/s Max: m/s Max. Speed: m/s ∆7 Prevailing Direction: (@ 10 m height) ∆8 Relative Humidity: Mean: % High: % Low: %
9 Precipitation: Annual Max: mm Monthly Max: mm mm 24 Hour Max: mm
10 (Rain fall) Ice/Snow Burden: mm
11 Installation: Offshore Coastal Inland Enclosure by Supplier
12 Indoor Outdoor Winterization Tropicalization
13 Seismic Loads: None Seismic Zone: Load:
14 Water Properties: Fresh Salt Temp: Max Surface: N/AoC Max Seabed: N/A
oC
15 Min Surface: N/AoC Min Seabed: N/A
oC
16
17 Case 1: Dynamic Accelerations Case 2 : Static Inclinations
18
19 Normal ( On Spec) Operating NA NA NA
20 Utility ( Off Spec) Operating NA NA NA
21 Extreme Condition22
23
24 Area Classification: Zone: T Class: Group: Nonclassified
25 Available Power: 415V AC, 3 Ph, 50 Hz 120 V, 1 Ph, 50 Hz 120 V, 1 Ph, 60 Hz
17039-ND-P-GD-1002 BKIP-17039
SITE CONDITIONS &
AVAILABLE UTILITIESPROJECT:
CREATION OF SURFACE PRODUCTION FACILITIES (OCS) AT NADUA
RE
VIS
ION
NA NA
NA NA
UTILITIES
NOTE-3
1600*
V *
Ax (Pitch): Ay (Roll): Az (Heave): Heel Angle: Trim Angle:
North East* 98 3619450 * Monthly Min: *
80 41 * 2
14.4 * 50
SITE CONDITIONSNadua 116 1.0335
LOCATION: ONSHORE NADUA
CLIENT: OIL INDIA LIMITED
2 of 2
SERVICE: B 6-Mar-18 Issued for BID MG PSN/TKV MSB/MSR 2 of 2
APPROVED PAGE
A 17-Nov-17 Issued for TBP/RFP MG PSN/TKV MSB/MSR
TAG NO REV DATE ISSUED FOR BY CHECKED
Project No. Kavin Doc No
25 Available Power: 415V AC, 3 Ph, 50 Hz 120 V, 1 Ph, 50 Hz 120 V, 1 Ph, 60 Hz
26 110V AC, 1Ph, 50Hz 11 kV, 3 Ph, 50 Hz 6.6 KV AC, 3 Ph, 50 Hz
27 240V AC, 1 Ph, 50 Hz 24V DC 110V DC
28
29 NITROGEN Design Press: Temp:oC ∆
30 Operating Press: Temp:oC ∆
31 INSTRUMENT AIR Design Press: Temp:oC ∆
32 Operating Press: Temp:oC ∆
33 HP FUEL GAS None Design Press: Temp:oC
34 Operating Press: Temp:oC
35 FUEL GAS: Design Press: Temp:oC
36 Operating Press: Temp:oC ∆
37 COOLING MEDIUM None Design Press: Temp:oC
38 Operating Press: Temp:oC
39
40 HEATING MEDIUM (NOTE-1) Design Press: Temp:oC
41 Operating Press: Supply Temp:oC
42 Return Temp:oC
43 UTILITY AIR Design Press: Temp:oC ∆
44 Operating Press: Temp:oC ∆
45 SEA WATER None Design Press: Temp:oC
46 Operating Press: Temp:oC
47
48 FIRE WATER Design Press: Temp:oC ∆
49 Operating Press: Temp:oC
50 SERVICE WATER Design Press: Temp:oC
51 Operating Press: Temp:oC
52
53 FOAM Design Press: Temp:oC
54 Operating Press: Temp:oC
57 POTABLE WATER Design Press: Temp:oC
58 Operating Press: Temp:oC
59 GROUND FLARE Design Press: Temp:oC
60 Operating Press: Temp:oC
63
64 CLOSED DRAIN Design Press: Temp:oC
65 Operating Press: Temp:oC
66
67
68 Skid Type
697071 Other Beams
72 Skid Level Screws
73 Equipment Mounting
747576 NOTE:
TBA
Main Beams TBATBATBA
0.7 kg/cm²g AMB
SKID CONSTRUCTION
Onshore-GroutedLifting Devices Lugs
3.5/FV kg/cm²g 80.0
3.5/FV kg/cm²g 200.0
0.2-0.7 kg/cm²g AMB
5.0 kg/cm²g 80.0
ATM kg/cm²g AMB
15.0 kg/cm²g 80.0
12.0 kg/cm²g AMB
5.0 kg/cm²g 80.0
ATM kg/cm²g AMB
15.0 kg/cm²g 80.0
10.00 kg/cm²g AMB
- kg/cm²g -
- kg/cm²g -
100.0
12.5 kg/cm²g 85.0
6.8-8.8 kg/cm²g 51.0
12.0 kg/cm²g 250.0
5.0 kg/cm²g 200.0
- kg/cm²g -
- kg/cm²g -
11.0 kg/cm²g 100.0
6.0 kg/cm²g 66-67
- kg/cm²g -
- kg/cm²g -
12.5 kg/cm²g 85.0
6.5-8.5 kg/cm²g 51.0
12.5 kg/cm²g 85.0
6.3-8.3 kg/cm²g 51.0
76 NOTE:77 1. Hot oil (Therminol-55) is used as a heating medium.78 2. FOW - Full of water798081 * OIL to provide information.
3. Area Classification as per OMR Guidelines.
-1
Attachment -3
Rev.
PAGE 2 of 2
1
2 Site Location: Elevation above MSL: m Barometer: kg/cm²
3
4 Air Temperature: Design:oC Maximum:
oC Normal:oC Minimum:
oC
5 Atmosphere: Noncorrosive Corrosive Dust Fumes
6 Wind Speed: Avg: m/s Max: m/s Max. Speed: m/s ∆7 Prevailing Direction: (@ 10 m height) ∆8 Relative Humidity: Mean: % High: % Low: %
9 Precipitation: Annual Max: mm Monthly Max: mm mm 24 Hour Max: mm
10 (Rain fall) Ice/Snow Burden: mm
11 Installation: Offshore Coastal Inland Enclosure by Supplier
12 Indoor Outdoor Winterization Tropicalization
13 Seismic Loads: None Seismic Zone: Load:
14 Water Properties: Fresh Salt Temp: Max Surface: N/AoC Max Seabed: N/A
oC
15 Min Surface: N/AoC Min Seabed: N/A
oC
16
17 Case 1: Dynamic Accelerations Case 2 : Static Inclinations
18
19 Normal ( On Spec) Operating NA NA NA
20 Utility ( Off Spec) Operating NA NA NA
21 Extreme Condition22
23
SITE CONDITIONS &
AVAILABLE UTILITIES
PROJECT:
CREATION OF SURFACE PRODUCTION FACILITIES (GGS) AT EAST KHAGORIJAN
KIP-17039 B17039-EK-P-GD-1002
RE
VIS
ION
LOCATION:ONSHORE - EAST
KHAGORIJAN
NA NA
NA NA
UTILITIES
V *
Ax (Pitch): Ay (Roll): Az (Heave): Heel Angle: Trim Angle:
19450 * Monthly Min: * 1600*
14.4 * 50North East
* 98 36
SITE CONDITIONSEast Khagorijan 121 1.0335
80 41 * 2
CLIENT: OIL INDIA LIMITED
2 of 2
SERVICE: B 6-Mar-18 Issued for BID MG PSN/TKV MSB/MSR 2 of 2
APPROVED PAGE
A 17-Nov-17 Issued for TBP/RFP MG PSN/TKV MSB/MSR
TAG NO REV DATE ISSUED FOR BY CHECKED
Project No. Kavin Doc No
23
24 Area Classification: Zone: T Class: Group: Nonclassified
25 Available Power: 415V AC, 3 Ph, 50 Hz 120 V, 1 Ph, 50 Hz 120 V, 1 Ph, 60 Hz
26 110V AC, 1Ph, 50Hz 11 kV, 3 Ph, 50 Hz 6.6 KV AC, 3 Ph, 50 Hz
27 240V AC, 1 Ph, 50 Hz 24V DC 110V DC
28
29 NITROGEN Design Press: Temp:oC ∆
30 Operating Press: Temp:oC ∆
31 INSTRUMENT AIR Design Press: Temp:oC ∆
32 Operating Press: Temp:oC ∆
33 HP FUEL GAS None Design Press: Temp:oC
34 Operating Press: Temp:oC
35 FUEL GAS: Design Press: Temp:oC ∆
36 Operating Press: Temp:oC ∆
37 COOLING MEDIUM None Design Press: Temp:oC
38 Operating Press: Temp:oC
39
40 HEATING MEDIUM (NOTE-1) Design Press: Temp:oC
41 Operating Press: Supply Temp:oC
42 Return Temp:oC
43 UTILITY AIR Design Press: Temp:oC ∆
44 Operating Press: Temp:oC ∆
45 SEA WATER None Design Press: Temp:oC
46 Operating Press: Temp:oC
47
48 FIRE WATER Design Press: Temp:oC ∆
49 Operating Press: Temp:oC
50 SERVICE WATER Design Press: Temp:oC
51 Operating Press: Temp:oC
52
53 FOAM Design Press: Temp:oC
54 Operating Press: Temp:oC
57 POTABLE WATER Design Press: Temp:oC
58 Operating Press: Temp:oC
59 Design Press: Temp:oC
60 Operating Press: Temp:oC
61
64 CLOSED DRAIN Design Press: Temp:oC
65 Operating Press: Temp:oC
66
67
68 Skid Type
697071 Other Beams
72 Skid Level Screws
73 Equipment Mounting
TBATBATBA
SKID CONSTRUCTION
Onshore-GroutedLifting Devices LugsMain Beams TBA
3.5/FV kg/cm²g 80.0
0.7 kg/cm²g AMB
GROUND FLARE 3.5/FV kg/cm²g 200.0
0.2-0.7 kg/cm²g AMB
5.0 kg/cm²g 80.0
ATM kg/cm²g AMB
15.0 kg/cm²g 80.0
12.0 kg/cm²g AMB
5.0 kg/cm²g 80.0
ATM kg/cm²g AMB
15.0 kg/cm²g 80.0
10.0 kg/cm²g AMB
- kg/cm²g -
- kg/cm²g -
100.0
12.5 kg/cm²g 85.0
6.8-8.8 kg/cm²g 51.0
12.0 kg/cm²g 250.0
5.0 kg/cm²g 200.0
- kg/cm²g -
- kg/cm²g -
11.0 kg/cm²g 85.0
6.0 kg/cm²g 46-52
- kg/cm²g -
- kg/cm²g -
12.5 kg/cm²g 85.0
6.5-8.5 kg/cm²g 51.0
12.5 kg/cm²g 85.0
6.3-8.3 kg/cm²g 51.0
UTILITIES
NOTE-3
73 Equipment Mounting
747576 NOTE:77 1. Hot oil (Therminol-55) is used as a heating medium.78 2. FOW - Full of water798081 * OIL to provide information.
3. Area Classification as per OMR Guidelines.
TBA
Attachment -4